CN207878789U - A kind of assembled architecture reinforcing steel bar connecting device - Google Patents

A kind of assembled architecture reinforcing steel bar connecting device Download PDF

Info

Publication number
CN207878789U
CN207878789U CN201820250948.6U CN201820250948U CN207878789U CN 207878789 U CN207878789 U CN 207878789U CN 201820250948 U CN201820250948 U CN 201820250948U CN 207878789 U CN207878789 U CN 207878789U
Authority
CN
China
Prior art keywords
steel
steel bar
connection device
connecting sleeve
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820250948.6U
Other languages
Chinese (zh)
Inventor
何明春
曾凡贵
王悦
王清江
李月霞
段云峰
李津纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qijiang District Building Engineering Testing Center
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Original Assignee
Chongqing Qijiang District Building Engineering Testing Center
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Qijiang District Building Engineering Testing Center, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd, Chongqing Technology and Business Institute filed Critical Chongqing Qijiang District Building Engineering Testing Center
Priority to CN201820250948.6U priority Critical patent/CN207878789U/en
Application granted granted Critical
Publication of CN207878789U publication Critical patent/CN207878789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种装配式建筑钢筋连接装置,包括双面叠合墙板,所述双面叠合墙板之间通过连接套筒组件、钢筋骨架组件和分布钢筋组件连接形成一个网状结构;还包括设置在混凝土基座内的预埋钢筋组件,所述连接套筒组件与预埋钢筋组件通过套接方式形成一个一体式结构;所述连接套筒组件包括若干根连接套筒构成,每根连接套筒均为上、下端为开口的连接钢管,连接钢管的管壁上分布有若干个进料孔洞;本实用新型与现有技术相比,提高了整体钢筋骨架的稳定性能,使得浇筑形成的混凝土抗压能力强,提高了墙体的安全性能;且避免浇注形成的混凝土内出现空心和空包的现象。

The utility model discloses a prefabricated building steel bar connection device, which comprises a double-sided laminated wall panel, and the double-sided laminated wall panels are connected to form a network through a connecting sleeve component, a steel bar skeleton component and a distributed steel bar component. structure; it also includes a pre-embedded steel bar assembly arranged in the concrete base, and the connecting sleeve assembly and the pre-embedded steel bar assembly form an integrated structure through socketing; the connecting sleeve assembly consists of several connecting sleeves , each connecting sleeve is a connecting steel pipe with openings at the upper and lower ends, and several feeding holes are distributed on the pipe wall of the connecting steel pipe; compared with the prior art, the utility model improves the stability of the overall steel skeleton, The concrete formed by pouring has strong compressive resistance, and the safety performance of the wall is improved; and the phenomenon of hollowness and empty bag in the concrete formed by pouring is avoided.

Description

一种装配式建筑钢筋连接装置A prefabricated building steel bar connection device

技术领域technical field

本实用新型涉及装配式建筑装置领域,具体涉及一种装配式建筑钢筋连接装置。The utility model relates to the field of assembled building devices, in particular to an assembled building steel bar connection device.

背景技术Background technique

混凝土装配式建筑作为建筑工业化的标志,代表了绿色、环保和低碳,现已广泛的被应用。混凝土装配式建筑墙板形式有实体板和双面叠合墙板两种形式,现有的双面叠合板接点连接方式,多是将基座预埋钢筋穿套在墙板夹芯内,之后直接浇筑混凝土,形成刚性连接点。上述作业时,基座预埋连接钢筋伸入叠合板夹芯内,仅锚固在夹芯混凝土内,预埋连接钢筋未与墙体钢筋骨架连接固定,形成整体钢筋骨架,从而使得形成的整体钢筋骨架稳定性差,浇筑形成的混凝土抗压能力差。因此,需研制开发一种装配式双面叠合墙板钢筋连接装置及构造已显得非常必要而紧迫。As a symbol of construction industrialization, concrete prefabricated buildings represent green, environmental protection and low carbon, and have been widely used. There are two forms of concrete prefabricated building wall panels: solid panels and double-sided laminated wall panels. The existing joint connection methods of double-sided laminated panels are mostly to insert pre-embedded steel bars at the base into the wall panel sandwich, and then Concrete is poured directly to form a rigid connection point. During the above operations, the pre-embedded connecting steel bars of the base extend into the laminated slab sandwich, and are only anchored in the sandwich concrete. The pre-embedded connecting steel bars are not connected and fixed with the steel bar skeleton of the wall to form an integral steel bar skeleton, so that the formed integral steel bar The skeleton stability is poor, and the concrete formed by pouring has poor compressive capacity. Therefore, it is very necessary and urgent to develop a kind of prefabricated double-sided laminated wall panel reinforcement connection device and structure.

实用新型内容Utility model content

针对现有技术中所存在的不足,本实用新型的目的在于提供一种装配式建筑钢筋连接装置,以解决现有技术中,整体钢筋骨架稳定性差,浇筑形成的混凝土抗压能力差的问题。Aiming at the deficiencies in the prior art, the purpose of this utility model is to provide a prefabricated construction steel bar connection device to solve the problems in the prior art of poor stability of the overall steel bar skeleton and poor compressive resistance of the poured concrete.

为实现上述目的,本实用新型采用了如下的技术方案:一种装配式建筑钢筋连接装置,包括双面叠合墙板,所述双面叠合墙板之间通过连接套筒组件、钢筋骨架组件和分布钢筋组件连接形成一个网状结构;还包括设置在混凝土基座内的预埋钢筋组件,所述连接套筒组件与预埋钢筋组件通过套接方式形成一个一体式结构;In order to achieve the above purpose, the utility model adopts the following technical scheme: an assembly-type building steel bar connection device, including double-sided laminated wall panels, and the double-sided laminated wall panels are connected by connecting sleeve components and steel bar skeletons. The component and the distribution reinforcement component are connected to form a network structure; it also includes a pre-embedded reinforcement component arranged in the concrete base, and the connecting sleeve component and the pre-embedded reinforcement component form an integrated structure through socketing;

所述连接套筒组件包括若干根连接套筒构成,每根连接套筒均为上、下端为开口的连接钢管,连接钢管的管壁上分布有若干个进料孔洞。The connecting sleeve assembly is composed of several connecting sleeves, each connecting sleeve is a connecting steel pipe with open upper and lower ends, and several feeding holes are distributed on the pipe wall of the connecting steel pipe.

相比于现有技术,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、在双面叠合墙板之间通过连接套筒组件、钢筋骨架组件和分布钢筋组件形成一个网状结构,从而提高了整体钢筋骨架的稳定性能,使得浇筑形成的混凝土抗压能力强,提高了墙体的安全性能;1. Between the double-sided laminated wall panels, a network structure is formed by connecting sleeve components, steel frame components and distributed steel components, thereby improving the stability of the overall steel frame and making the concrete formed by pouring strong in compression. Improve the safety performance of the wall;

2、连接套筒组件与预埋钢筋组件通过套接方式快速连接形成一个一体式结构,提高了本装置的安装速度,且精确的进行了安装定位,提高了本装置在安装过程中的精确度;浇注混泥土之后形成了一个整体结构,进一步提高了整体钢筋骨架的稳定性能;2. The connecting sleeve assembly and the pre-embedded steel bar assembly are quickly connected to form an integrated structure through socketing, which improves the installation speed of the device, and accurately performs installation positioning, which improves the accuracy of the device during installation ; After pouring concrete, an integral structure is formed, which further improves the stability of the overall steel skeleton;

3、通过若干根连接钢管形成连接套筒组件提高了整体钢筋骨架的稳定性能,同时每根连接钢管的结构设置是为了在进行浇注混泥土的过程中,混泥土从进料孔洞中进入连接钢管内,避免浇注形成的混泥土出现空心的情况,提高了混泥土的抗压能力;且进料孔洞和连接钢管的端部为开口还有利于混泥土在浇注的过程中进行排气工作,避免浇注形成的混泥土内形成空包,进一步提高了混泥土的抗压能力。3. The connecting sleeve assembly is formed by several connecting steel pipes to improve the stability of the overall steel skeleton. At the same time, the structural setting of each connecting steel pipe is to allow concrete to enter the connecting steel pipe from the feeding hole during the process of pouring concrete. In order to avoid the hollowness of the concrete formed by pouring, the compressive capacity of the concrete is improved; and the opening of the feeding hole and the end of the connecting steel pipe is also conducive to the exhausting of the concrete during the pouring process, avoiding An empty bag is formed in the concrete formed by pouring, which further improves the compressive capacity of the concrete.

附图说明Description of drawings

图1为本实用新型一种装配式建筑钢筋连接装置的水平断面示意图;Fig. 1 is the horizontal section schematic diagram of a kind of prefabricated building reinforcement connection device of the present utility model;

图2为图1中连接钢管的结构示意图;Fig. 2 is the structural representation of connecting steel pipe in Fig. 1;

图3为图1中预埋钢筋与混凝土基座连接后的俯视图。Fig. 3 is a top view after the pre-embedded steel bar in Fig. 1 is connected to the concrete base.

具体实施方式Detailed ways

下面通过具体实施方式对本实用新型作进一步详细的说明:The utility model is described in further detail below by means of specific embodiments:

说明书附图中的附图标记包括:双面叠合墙板1、混凝土基座2、连接钢管3、进料孔洞4、预埋钢筋5、第一钢筋6、第二钢筋7。The reference signs in the drawings of the description include: double-sided laminated wallboard 1, concrete base 2, connecting steel pipe 3, feeding hole 4, pre-embedded steel bar 5, first steel bar 6, and second steel bar 7.

实施例Example

参考图1~图3所示:一种装配式建筑钢筋连接装置,包括双面叠合墙板1和设置在混凝土基座2内的预埋钢筋组件,双面叠合墙板1之间通过连接套筒组件、钢筋骨架组件和分布钢筋组件连接形成一个网状结构;连接套筒组件与预埋钢筋组件通过套接方式形成一个一体式结构。Referring to Figures 1 to 3, a prefabricated building reinforcement connection device includes a double-sided laminated wall panel 1 and a pre-embedded steel bar assembly arranged in a concrete base 2, and the double-sided laminated wall panels 1 pass through The connection sleeve assembly, the reinforcement skeleton assembly and the distributed reinforcement assembly are connected to form a network structure; the connection sleeve assembly and the embedded reinforcement assembly form an integrated structure through socketing.

所述连接套筒组件包括若干根连接套筒构成,每根连接套筒均为上、下端为开口的连接钢管3,连接钢管3在双面叠合墙板1之间呈阵列布置,每根连接钢管3的管壁上均分布有若干个进料孔洞4,进料孔洞4沿连接钢管3周向呈多列布置,相邻两列进料孔洞4沿连接钢管3轴向方向呈交错布置;进料孔洞4的布置方式,为了在进行混泥土浇注的过程中,混泥土能够快速的从不同的方向进入连接钢管3内,且混泥土浇注到不同高度的时候都能够有混泥土进入连接钢管3内,同时也有利于混泥土在浇注的过程中从不同的方向进行排气,提高了浇注之后形成的混泥土的品质;预埋钢筋组件包括多根预埋钢筋5构成,预埋钢筋5按照连接钢管3的方式进行布置,连接套筒组件与预埋钢筋组件进行套接时,通过预埋钢筋5一一对应的插入连接钢管3内。The connecting sleeve assembly includes several connecting sleeves, each connecting sleeve is a connecting steel pipe 3 with openings at the upper and lower ends, and the connecting steel pipes 3 are arranged in an array between the double-sided laminated wall panels 1, each Several feeding holes 4 are evenly distributed on the pipe wall of the connecting steel pipe 3, and the feeding holes 4 are arranged in multiple rows along the circumferential direction of the connecting steel pipe 3, and two adjacent rows of feeding holes 4 are arranged in a staggered manner along the axial direction of the connecting steel pipe 3 ; The layout of the feed hole 4 is to allow the concrete to quickly enter the connecting steel pipe 3 from different directions during the pouring of the concrete, and to allow the concrete to enter the connecting pipe 3 when the concrete is poured to different heights. In the steel pipe 3, it is also conducive to the exhaust of the concrete from different directions during the pouring process, which improves the quality of the concrete formed after pouring; the embedded steel bar assembly includes a plurality of embedded steel bars 5, and the embedded steel bars 5 Arrange according to the way of connecting the steel pipe 3, when the connecting sleeve assembly and the pre-embedded steel bar assembly are socketed, the embedded steel bars 5 are inserted into the connecting steel pipe 3 in one-to-one correspondence.

所述钢筋骨架组件包括连接在双面叠合墙板1之间的多组钢筋骨架构成,多组钢筋骨架沿竖直方向进行布置,每组钢筋骨架包括通过若干根第一钢筋6首尾相接形成一个波浪折线结构,第一钢筋6与每列连接钢管3呈交错的形式进行布置,每组钢筋骨架中相邻两根第一钢筋6之间的夹角为ɑ;通过第一钢筋6与连接钢管3的布置方式是为了加强所形成的网状结构的网状复杂度,从而增强网状结构的稳定性能;进一步,ɑ可以为60度,通过相邻的两根第一钢筋6与双面叠合墙板1中的其中一面墙板形成一个等边三角形结构,等边三角形结构的稳定性高,从而进一步提高了网状结构的稳定性能。分布钢筋组件包括若干根将连接钢管3与第一钢筋6相连的第二钢筋7,通过第二钢筋7将连接钢管3与第一钢筋6相连,形成网状结构的一部分。The steel frame assembly is composed of multiple groups of steel frame connected between the double-sided laminated wallboards 1, and the multiple groups of steel frame are arranged along the vertical direction, and each group of steel frame includes a plurality of first steel bars 6 connected end to end. Forming a wavy line structure, the first steel bars 6 and each row of connecting steel pipes 3 are arranged in a staggered form, and the angle between two adjacent first steel bars 6 in each group of steel bar skeletons is ɑ; through the first steel bars 6 and The arrangement of connecting steel pipes 3 is to strengthen the network complexity of the formed network structure, thereby enhancing the stability of the network structure; further, ɑ can be 60 degrees, through the two adjacent first steel bars 6 and the double One of the wallboards in the surface-laminated wallboards 1 forms an equilateral triangle structure, and the stability of the equilateral triangle structure is high, thereby further improving the stability of the network structure. The distributed reinforcing bar assembly includes several second reinforcing bars 7 connecting the connecting steel pipe 3 with the first reinforcing bar 6, and connecting the connecting steel pipe 3 with the first reinforcing bar 6 through the second reinforcing bar 7 to form a part of the network structure.

施工时,在混凝土基座2进行浇注的过程中通过模板对预埋钢筋5进行固定和定位,然后将第一钢筋6、第二钢筋7和连接钢管3按照上述的布置方式采用焊接的方式进行连接,且固定连接在双面叠合墙板1之间,然后将预埋钢筋5插入与其配合的连接钢管3上,之后浇注混泥土,形成一个抗压性能好的混凝土装配式建筑墙体。During construction, during the pouring process of the concrete base 2, the pre-embedded steel bar 5 is fixed and positioned through the formwork, and then the first steel bar 6, the second steel bar 7 and the connecting steel pipe 3 are welded according to the above arrangement. Connected, and fixedly connected between the double-sided laminated wall panels 1, then insert the embedded steel bar 5 into the connecting steel pipe 3 matched with it, and then pour concrete to form a concrete prefabricated building wall with good compression resistance.

本方案中的“第一”和“第二”仅用于命名上的区别。"First" and "second" in this scheme are only used for the difference in naming.

最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the utility model can be Modifications or equivalent replacements of the technical solutions without departing from the spirit and scope of the technical solutions of the utility model shall be covered by the claims of the utility model.

Claims (6)

1.一种装配式建筑钢筋连接装置,其特征在于,包括双面叠合墙板,所述双面叠合墙板之间通过连接套筒组件、钢筋骨架组件和分布钢筋组件连接形成一个网状结构;还包括设置在混凝土基座内的预埋钢筋组件,所述连接套筒组件与预埋钢筋组件通过套接方式形成一个一体式结构;1. A prefabricated building reinforcement connection device, characterized in that it comprises double-sided laminated wall panels, and the double-sided laminated wall panels are connected to form a network by connecting sleeve components, steel bar skeleton components and distributed steel bar components. shaped structure; also includes a pre-embedded steel bar assembly arranged in the concrete base, and the connecting sleeve assembly and the pre-embedded steel bar assembly form an integrated structure through socketing; 所述连接套筒组件包括若干根连接套筒构成,每根连接套筒均为上、下端为开口的连接钢管,每根连接钢管的管壁上均分布有若干个进料孔洞。The connecting sleeve assembly consists of several connecting sleeves, each connecting sleeve is a connecting steel pipe with open upper and lower ends, and several feeding holes are distributed on the pipe wall of each connecting steel pipe. 2.根据权利要求1所述的一种装配式建筑钢筋连接装置,其特征在于:所述钢筋骨架组件包括连接在双面叠合墙板之间的多组钢筋骨架构成,多组钢筋骨架沿竖直方向进行布置,每组钢筋骨架包括通过若干根第一钢筋首尾相接形成一个波浪折线结构。2. A prefabricated building steel bar connection device according to claim 1, characterized in that: the steel bar skeleton assembly is composed of multiple sets of steel bar frames connected between double-sided laminated wall panels, and the multiple sets of steel bar frames are along the Arranged in the vertical direction, each group of steel reinforcement skeletons includes a wavy broken-line structure formed by connecting several first steel reinforcements end-to-end. 3.根据权利要求1或2所述的一种装配式建筑钢筋连接装置,其特征在于:所述进料孔洞沿连接钢管周向呈多列布置,相邻两列进料孔洞沿连接钢管轴向方向呈交错布置。3. A prefabricated building reinforcement connection device according to claim 1 or 2, characterized in that: the feeding holes are arranged in multiple rows along the circumference of the connecting steel pipe, and two adjacent rows of feeding holes are arranged along the axis of the connecting steel pipe. Arranged in a staggered direction. 4.根据权利要求2所述的一种装配式建筑钢筋连接装置,其特征在于:所述每组钢筋骨架中相邻两根第一钢筋之间的夹角为60度。4. A prefabricated construction steel bar connection device according to claim 2, characterized in that: the angle between two adjacent first steel bars in each set of steel bar skeletons is 60 degrees. 5.根据权利要求2所述的一种装配式建筑钢筋连接装置,其特征在于:所述连接钢管呈阵列布置,且每列连接钢管与第一钢筋呈交错的形式进行布置。5 . The prefabricated building reinforcement connection device according to claim 2 , wherein the connection steel pipes are arranged in an array, and each column of connection steel pipes is arranged in a staggered manner with the first steel bars. 5 . 6.根据权利要求2所述的一种装配式建筑钢筋连接装置,其特征在于:所述分布钢筋组件包括若干根将连接钢管与第一钢筋相连的第二钢筋。6 . The prefabricated building steel bar connection device according to claim 2 , wherein the distribution steel bar assembly includes several second steel bars connecting the connecting steel pipes with the first steel bars. 7 .
CN201820250948.6U 2018-02-11 2018-02-11 A kind of assembled architecture reinforcing steel bar connecting device Expired - Fee Related CN207878789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820250948.6U CN207878789U (en) 2018-02-11 2018-02-11 A kind of assembled architecture reinforcing steel bar connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820250948.6U CN207878789U (en) 2018-02-11 2018-02-11 A kind of assembled architecture reinforcing steel bar connecting device

Publications (1)

Publication Number Publication Date
CN207878789U true CN207878789U (en) 2018-09-18

Family

ID=63498486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820250948.6U Expired - Fee Related CN207878789U (en) 2018-02-11 2018-02-11 A kind of assembled architecture reinforcing steel bar connecting device

Country Status (1)

Country Link
CN (1) CN207878789U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020103449A1 (en) * 2018-11-19 2020-05-28 上海建工五建集团有限公司 Protective support for double-sided superimposed wall and manufacturing method therefor
CN113417465A (en) * 2021-07-30 2021-09-21 中国建筑第二工程局有限公司 Assembled building grout sleeve grout system
CN114934436A (en) * 2022-05-16 2022-08-23 江西省水利科学院 Assembly type aqueduct wet joint reinforcing steel bar anchoring structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020103449A1 (en) * 2018-11-19 2020-05-28 上海建工五建集团有限公司 Protective support for double-sided superimposed wall and manufacturing method therefor
CN113417465A (en) * 2021-07-30 2021-09-21 中国建筑第二工程局有限公司 Assembled building grout sleeve grout system
CN114934436A (en) * 2022-05-16 2022-08-23 江西省水利科学院 Assembly type aqueduct wet joint reinforcing steel bar anchoring structure
CN114934436B (en) * 2022-05-16 2023-10-20 江西省水利科学院 Assembled aqueduct wet joint reinforcing steel bar anchoring structure

Similar Documents

Publication Publication Date Title
CN107227822A (en) Building post and its construction technology that a kind of steel pipe is combined with batten plate
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN107401217B (en) A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN205502577U (en) A thimble assembly for buried sleeve one shot forming construction in piping shaft
CN108179842A (en) A kind of assembled steel tube confined concrete models and its production technology
CN205954965U (en) Novel node of steel skeleton light floor
CN105239668B (en) A kind of internal partition formula concrete filled steel tube switching node structure and its construction method
CN207647033U (en) A kind of precast reinforced basket structure
CN202492795U (en) Bridge pier structure with square steel tube provided with stiffening ribs with openings and light steel fiber reinforced concrete
CN110805141B (en) A connection device and method for a steel pipe column and a seismic isolation support after a building is jacked up
CN207863185U (en) A kind of Novel steel pipe concrete pole splicing apparatus of band edge sleeve-board cylinder
CN106065676A (en) Novel external wallboard joint and construction method
CN105178445A (en) Connection joint between endplate type concrete-filled steel tube column and steel beam with internal reinforcement ring
CN206245480U (en) A prefabricated assembly flat column steel frame-support structure system
CN209703281U (en) A pre-buried channel with high structural strength
CN208183950U (en) A kind of prefabricated foundation raft board concrete leads wall
CN210263950U (en) Thin-wall multi-opening pouring string barrel
CN208815672U (en) Connection node structure of circular CFST column and reinforced concrete beam
CN207727805U (en) A kind of reinforced perps unit of fabricated shear wall anchor pole
CN210459181U (en) New and old ground is wall T joint design node even
CN222045075U (en) Beam column core area concrete interception structure
CN214941284U (en) A joint structure for connecting prefabricated concrete shear walls and SP slabs
CN110005207B (en) Concrete-filled steel tube pouring exhaust device and construction method thereof
CN208167766U (en) A kind of simple and fast connection precast concrete plate fetal membrane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180918

Termination date: 20210211

CF01 Termination of patent right due to non-payment of annual fee