CN109853973A - For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate - Google Patents
For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate Download PDFInfo
- Publication number
- CN109853973A CN109853973A CN201811415071.2A CN201811415071A CN109853973A CN 109853973 A CN109853973 A CN 109853973A CN 201811415071 A CN201811415071 A CN 201811415071A CN 109853973 A CN109853973 A CN 109853973A
- Authority
- CN
- China
- Prior art keywords
- steel
- screw rod
- supporting
- plate
- cased
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004378 air conditioning Methods 0.000 title claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 95
- 239000010959 steel Substances 0.000 claims abstract description 95
- 239000000725 suspension Substances 0.000 claims abstract description 17
- 239000007787 solid Substances 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 description 8
- 239000004567 concrete Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 230000013011 mating Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005476 soldering Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to technical field of buildings, particularly for the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate, including horizontal steel Cantilever Beams, two supporting steel screw rods, two panels suspension steel plate, a balance steel screw rod, two reserving holes one-to-one correspondence of the position of two supporting steel screw rods and prefabricated air-conditioning plate are successively welded on steel Cantilever Beams;Each supporting steel screw rod top is cased with support steel bushing, and support billet is cased with above support steel bushing, and supporting steel screw tip is cased with fixed billet, and fixed billet is fixed by fixture nut;Balance steel screw rod upper end is cased with jacking sleeve bracket;Two suspension steel plate upper ends are equipped with side opening, further include wearing beam screw rod, wear beam screw rod both ends and be through in side opening respectively, and are fixed on suspension steel plate by steel nut.The present invention reduces the secondary operation at scene, improves efficiency, reduce the manual synchronizing time, improve accuracy, guarantee going on smoothly for engineering.
Description
Technical field
The invention belongs to technical field of buildings, particularly for the field erected overhanging type support positioning dress of prefabricated air-conditioning plate
It sets.
Background technique
Nowadays prefabricated concrete structure building is gradually applied to construction project field, prefabricated concrete structure building
In prefabricated reinforced concrete composite beam, prefabricated reinforced concrete superimposed sheet, prefabricated reinforced concrete air-conditioning plate, precast reinforced mixed
Solidifying soil parapet, prefabricated reinforced concrete column can be first prefabricated in the factory, then are transported to construction site and are installed, and then pour
Reinforced concrete sandwich layer makes pre-constructed unit be linked to be entirety, but due to prefabricated reinforced concrete air-conditioning plate be located at main structure with
Outside, the problem of there is always temporary support positioning when installation at the scene.
When installing at the scene, prefabricated reinforced concrete column beam slab is located within main structure, can sequentially pacify from top to bottom
Dress, is not required to set up external scaffolding from top to bottom.But since prefabricated reinforced concrete air-conditioning plate is located at other than main structure, existing
Installation when there is always temporary support positioning it is highly difficult, it is very time-consuming and laborious if setting up external scaffolding from top to bottom,
It is unfavorable for playing the superiority of assembled architecture.
Summary of the invention
The purpose of the present invention is to provide a kind of field erected overhanging types of air-conditioning plate prefabricated in prefabricated concrete structure
Prefabricated air-conditioning plate can be fixed on stop sleeve for a kind of fixed device of steel Cantilever Beams with steel bushing by supporting and positioning device
On, studdle accurately penetrates in the reserving hole of prefabricated air-conditioning plate.
The specific technical proposal is:
For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate, including horizontal steel Cantilever Beams, the steel
Two supporting steel screw rods, two panels suspension steel plate, a balance steel screw rod, the supporting steel spiral shell are successively welded on Cantilever Beams processed
Bar, suspension steel plate, balance steel screw rod are perpendicular to steel Cantilever Beams upper surface;
Two reserving holes of the position of two supporting steel screw rods and prefabricated air-conditioning plate correspond;
Each supporting steel screw rod top is cased with support steel bushing, is cased with support billet above support steel bushing, supports
Steel screw tip is cased with fixed billet, and the fixation billet is fixed by fixture nut;
The balance steel screw rod upper end is cased with jacking sleeve bracket;Suspension steel plate upper end described in two is equipped with side opening, also wraps
It includes and wears beam screw rod, wear beam screw rod both ends and be through in side opening respectively, and be fixed on suspension steel plate by steel nut.
Further, the supporting steel sleeve lining is equipped with interior screw thread, the interior screw thread and supporting steel screw flight
Connection.
Provided by the present invention for the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate, match with prefabricated air-conditioning plate
It covers, mating prepared screw-bolt hole on prefabricated air-conditioning plate, mating prepared screw-bolt hole on corresponding precast beam is raw after the completion of factory process
It produces the corresponding overhanging type supporting and positioning device of the prefabricated air-conditioning plate of every kind of model to be sent together to construction site, decreases the two of scene
Secondary processing, improve efficiency, reduce the manual synchronizing time, improve accuracy, guarantee going on smoothly for engineering, also complied with dress
Demand for development with formula building.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is that the present invention uses construction schematic diagram.
Specific embodiment
With reference to the accompanying drawing, specific embodiments of the present invention are described in further detail:
As shown in Figure 1, the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate is used for, including horizontal steel Cantilever Beams
1, two supporting steel screw rods 2, two panels suspension 7, balance steel screw rods of steel plate are successively welded on the steel Cantilever Beams 1
10, the supporting steel screw rod 2, suspension steel plate 7, balance steel screw rod 10 are perpendicular to 1 upper surface of steel Cantilever Beams;
Two reserving holes 16 of the position of two supporting steel screw rods 2 and prefabricated air-conditioning plate 20 correspond;
Each 2 top of supporting steel screw rod is cased with support steel bushing 3, supports and is cased with support billet 4 above steel bushing 3,
Fixed billet 5 is cased at the top of supporting steel screw rod 2, the fixation billet 5 is fixed by fixture nut 6;
10 upper end of balance steel screw rod is cased with jacking sleeve bracket 11;7 upper end of suspension steel plate described in two is equipped with side opening,
Further include wearing beam screw rod 8, wear 8 both ends of beam screw rod and be through in side opening respectively, and is fixed on suspension steel plate 7 by steel nut 9.
3 inner wall of support steel bushing is equipped with interior screw thread 12, and the interior screw thread 12 and 2 screw thread of supporting steel screw rod connect
It connects.
Hereinafter, it is used for the field erected overhanging type supporting and positioning device abbreviation positioning device 15 of prefabricated air-conditioning plate.
As shown in Fig. 2, in the prefabricated air-conditioning plate 20 of plant produced, positioning device 15, the positioning device 15 and prefabricated air-conditioning plate
20 is mating, is sent together to construction site, decreases the secondary operation at scene, greatly improves efficiency, reduces manual synchronizing
Time improves accuracy, guarantees going on smoothly for engineering, has also complied with the demand for development of assembled architecture.
It is outstanding that corresponding steel is first gone out according to factory's prefabricated 20 size of air-conditioning plate produced, the size design of reserving hole 16
1 size of outrigger, steel Cantilever Beams 1 carry out soldering according to prefabricated 20 hole of air-conditioning plate;Supporting steel screw rod 2, balance steel screw rod
10, suspension steel plate 7 and steel Cantilever Beams 1 weld, and support steel bushing 3 and support billet 4 are positioned for in-site installation.
Wherein, the size of preformed hole 16 is 2 diameter+2mm of supporting steel screw rod on prefabricated air-conditioning plate 20, to facilitate supporting steel spiral shell
Bar 2 can be passed through smoothly.
Process for using: precast beam 13 and prefabricated panel 18 are first mounted on structure flooring when the prefabricated air-conditioning plate of in-site installation
On, then two suspension steel plates 7 of the positioning device 15 are inserted in from 13 lower part two sides of precast beam, suspension steel plate 7 is adjusted, steel is hung
The reserved side opening of plate 7 and 13 preformed hole of precast beam maintain an equal level, and penetrate beam screw rod 8 from side opening and are fixed with steel nut 9, positioning is filled
It sets 15 and hangs over 13 lower section of precast beam;
Jacking sleeve bracket 11 withstands 18 lower surface of prefabricated panel, stationary positioned device 15;
Prefabricated air-conditioning plate 20 is accurately hung in into scheduled position, the reserving hole 16 of prefabricated air-conditioning plate 20 is located at two supporting steels
On screw rod 2, support steel bushing 3 and support 4 position of billet on 2 top of supporting steel screw rod are adjusted, makes to support 4 support of billet pre-
20 lower surface of air-conditioning plate processed is pierced by prefabricated 20 upper surface of air-conditioning plate at the top of supporting steel screw rod 2, is inserted in fixed billet 5 and with solid
Determine the locking of nut 6, prefabricated air-conditioning plate 20 is accurately positioned, the steel bar stress 17 of prefabricated air-conditioning plate 20 anchors into 18 top of prefabricated panel
Cast-in-place overlapping layers 19 in, pour cast-in-place 19 concrete of overlapping layers, maintenance pours cast-in-place 19 concrete of overlapping layers to design strength,
Prefabricated air-conditioning plate 20 is integrally formed with structure flooring main structure, and positioning device 15 can dismantle reuse.
Claims (2)
1. it is used for the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate, it is special including horizontal steel Cantilever Beams (1)
Sign is, two supporting steel screw rods (2), two panels suspension steel plate (7), one are successively welded on the steel Cantilever Beams (1)
It balances steel screw rod (10), the supporting steel screw rod (2), suspension steel plate (7), balance steel screw rod (10) are perpendicular to steel Cantilever Beams
(1) upper surface;
Two reserving holes 16 of the position of two supporting steel screw rods 2 and prefabricated air-conditioning plate 20 correspond;
Each described supporting steel screw rod (2) top is cased with support steel bushing (3), is cased with supporting steel above support steel bushing (3)
Backing plate (4), supporting steel screw rod (2) top are cased with fixed billet (5), and the fixation billet (5) is solid by fixture nut (6)
It is fixed;
Described balance steel screw rod (10) upper end is cased with jacking sleeve bracket (11);Suspension steel plate (7) upper end described in two is set
There is side opening, further include wearing beam screw rod (8), wear beam screw rod (8) both ends and be through in side opening respectively, and is fixed on by steel nut (9)
It hangs on steel plate (7).
2. according to claim 1 be used for the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate, feature exists
In support steel bushing (3) inner wall is equipped with interior screw thread (12), the interior screw thread (12) and supporting steel screw rod (2) screw thread
Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811415071.2A CN109853973A (en) | 2018-11-26 | 2018-11-26 | For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811415071.2A CN109853973A (en) | 2018-11-26 | 2018-11-26 | For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853973A true CN109853973A (en) | 2019-06-07 |
Family
ID=66890223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811415071.2A Pending CN109853973A (en) | 2018-11-26 | 2018-11-26 | For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853973A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159016A (en) * | 2019-06-26 | 2019-08-23 | 中国铁路设计集团有限公司 | A kind of column check pit that prefabricated assembled adjustable rail top mark is high |
CN111075210A (en) * | 2020-02-26 | 2020-04-28 | 中国二十二冶集团有限公司 | Prefabricated air conditioner plate supporting device and using method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869313A (en) * | 2017-04-16 | 2017-06-20 | 北京天恒建设工程有限公司 | Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method |
CN207453438U (en) * | 2017-10-27 | 2018-06-05 | 北京首钢建设集团有限公司 | A kind of installation branch stake tool for prefabricated air-conditioning plate |
CN207469432U (en) * | 2017-11-06 | 2018-06-08 | 确山县久华住宅工业有限责任公司 | A kind of across wall air-conditioning plate of assembled |
CN207686120U (en) * | 2018-01-03 | 2018-08-03 | 郑州中天建筑节能有限公司 | A kind of prefabricated assembling type reinforced concrete air-conditioning plate |
CN207959933U (en) * | 2017-12-29 | 2018-10-12 | 中民筑友建设有限公司 | A kind of support device |
CN209817462U (en) * | 2018-11-26 | 2019-12-20 | 南京兴华建筑设计研究院股份有限公司 | Overhanging type supporting and positioning device for field installation of prefabricated air conditioner plate |
-
2018
- 2018-11-26 CN CN201811415071.2A patent/CN109853973A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869313A (en) * | 2017-04-16 | 2017-06-20 | 北京天恒建设工程有限公司 | Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method |
CN207453438U (en) * | 2017-10-27 | 2018-06-05 | 北京首钢建设集团有限公司 | A kind of installation branch stake tool for prefabricated air-conditioning plate |
CN207469432U (en) * | 2017-11-06 | 2018-06-08 | 确山县久华住宅工业有限责任公司 | A kind of across wall air-conditioning plate of assembled |
CN207959933U (en) * | 2017-12-29 | 2018-10-12 | 中民筑友建设有限公司 | A kind of support device |
CN207686120U (en) * | 2018-01-03 | 2018-08-03 | 郑州中天建筑节能有限公司 | A kind of prefabricated assembling type reinforced concrete air-conditioning plate |
CN209817462U (en) * | 2018-11-26 | 2019-12-20 | 南京兴华建筑设计研究院股份有限公司 | Overhanging type supporting and positioning device for field installation of prefabricated air conditioner plate |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159016A (en) * | 2019-06-26 | 2019-08-23 | 中国铁路设计集团有限公司 | A kind of column check pit that prefabricated assembled adjustable rail top mark is high |
CN110159016B (en) * | 2019-06-26 | 2023-12-05 | 中国铁路设计集团有限公司 | Column type inspection pit of prefabricated adjustable rail top elevation |
CN111075210A (en) * | 2020-02-26 | 2020-04-28 | 中国二十二冶集团有限公司 | Prefabricated air conditioner plate supporting device and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108049498B (en) | The prefabricated post and Prefabricated beam connection structure and method of assembled architecture frame structure | |
CN103104040B (en) | A kind of assembling frame bean column node and construction method adopting vertical connection | |
CN105649325B (en) | The adjustable tripod support system of assembly concrete shear wall structure and method | |
WO2020118563A1 (en) | Design and rapid construction methods for flush assembly of prefabricated steel beams and floor | |
CN109339229B (en) | Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor | |
CN107355077A (en) | A kind of basement barricade single side formwork reinforcing device and method | |
CN105756369B (en) | A kind of structure built-in heat insulation decorates integrated prefabricated buildings and its construction method | |
CN207228617U (en) | A kind of concrete-pouring template float Structure for basement barricade single side formwork | |
CN105525753A (en) | Method and structure for simultaneously constructing constructional column and main body structure | |
CN109680832A (en) | Precast shear wall unit, spigot-and-socket shear wall and building | |
CN108775084B (en) | Steel-concrete combined precast beam and precast column connecting structure and construction method | |
CN207499427U (en) | Assembly integrated precast superimposed sheet support system | |
CN109853973A (en) | For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate | |
CN111809851A (en) | Steel pipe triangular truss support system and construction method | |
CN106567538B (en) | A kind of positioning mold of toilet concrete flanging | |
CN110644624A (en) | Building connection node and construction method thereof | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN106759943A (en) | A kind of pre-assembled Anchor Bolts in Steel Column Bases structure | |
CN104989149B (en) | A kind of Civil building basement just before a battle converting system and construction method | |
CN207245188U (en) | A kind of basement barricade single side formwork bracing means | |
CN109610707B (en) | Assembly structure with parallel and level prefabricated steel beams and floor slab and rapid construction method | |
CN111101645B (en) | Self-positioning reinforced precast concrete wallboard, connecting structure and construction method | |
JP2005126973A (en) | Joint structure of reinforced concrete column and steel framed beam | |
CN205840052U (en) | Reinforced concrete wall and attachment structure thereof is filled out in a kind of assembled steel framework | |
CN103938755A (en) | Shock insulation structure for under-shaft hanging type transfer girders, and construction method of shock insulation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190607 |
|
WD01 | Invention patent application deemed withdrawn after publication |