CN207228617U - A kind of concrete-pouring template float Structure for basement barricade single side formwork - Google Patents

A kind of concrete-pouring template float Structure for basement barricade single side formwork Download PDF

Info

Publication number
CN207228617U
CN207228617U CN201721111287.0U CN201721111287U CN207228617U CN 207228617 U CN207228617 U CN 207228617U CN 201721111287 U CN201721111287 U CN 201721111287U CN 207228617 U CN207228617 U CN 207228617U
Authority
CN
China
Prior art keywords
girder
barricade
pull rod
template
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721111287.0U
Other languages
Chinese (zh)
Inventor
刘帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Co of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Construction Co of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Co of China Railway No 8 Engineering Group Co Ltd filed Critical Construction Co of China Railway No 8 Engineering Group Co Ltd
Priority to CN201721111287.0U priority Critical patent/CN207228617U/en
Application granted granted Critical
Publication of CN207228617U publication Critical patent/CN207228617U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of concrete-pouring template float Structure for basement barricade single side formwork, belong to housing construction technical field, including template, secondary beam and girder, barricade is equipped with template, secondary beam and girder successively towards indoor side, some secondary beams are set up in parallel vertically, and some groups of girder horizontal Tiles are set, close most to descend row's girder, anti-floating pull rod is embedded with floor face, anti-floating pull rod is by linking up with most descending row's girder drawknot to fix.Form floating when the utility model can avoid the concrete from pouring into a mould.

Description

A kind of concrete-pouring template float Structure for basement barricade single side formwork
Technical field
The utility model belongs to housing construction technical field, more particularly to single side formwork construction basement barricade.
Background technology
Applicant's engineering is because adjacent with subway line, and foundation pit west side supporting construction form is in lagging pile+armored concrete Support, the deep about 20m of foundation pit, is being only 350mm by subway position basement barricade and lagging pile distance, can not meet conventional Wall form is installed, therefore can only use single side formwork construction basement barricade.
There are respective defect for existing construction technology:
1st, shaping tool formula support system (tripod).Tripod apperance is produced into factory's sizing and reinforces frame body, to now Field is assembled.It is higher using the method cost, it need to be shaped and produced according to story height, the cycle is longer, and turnover utilization rate is low.Work People's professional operation Capability Requirement is high, and the installation and movement of tripod cannot be realized freely in floor, install and dismantle inconvenience. Support system conflicts with full hall rack position, and wall and beam slab must be separated and poured, and influence floor one-pass molding.
2nd, I-steel (channel steel) bearing diagonal.Using the processing welding of I-steel (channel steel) scene.Using the method specificity it is strong, Single Meteorological is higher, turnover rate is relatively low, and processing capacity is big, scene occupation of land is wider, and support system conflicts with full hall rack position, and It is poor with full framing connectivity, it is impossible to form an entirety of stabilization and reinforcement, wall and beam slab, which must separate, to be poured, and influences floor One-pass molding.
Utility model content
The purpose of this utility model is that:It is proposed that a kind of concrete-pouring template for basement barricade single side formwork resists Floating structure, Form floating when avoiding the concrete from pouring into a mould.
The utility model aim is realized by following technical proposals:
A kind of concrete-pouring template float Structure for basement barricade single side formwork, including template, secondary beam and master Beam, barricade are equipped with template, secondary beam and girder successively towards indoor side, and some secondary beams are set up in parallel vertically, some groups of girder water It is flat to be arranged side by side, close to row's girder is most descended, anti-floating pull rod is embedded with floor face, anti-floating pull rod is by hook with most descending row's girder Drawknot is fixed.
In the utility model, compared with the prior art, anti-floating pull rod is innovatively buried using floor face, avoids Form floating.
The utility model passes through the reliable drawknot in template bottom, it is ensured that formwork reinforcement is stablized, it is ensured that concrete of basement is kept off Cob wall Forming Quality.
The utility model can carry out various reinforcings using steel pipe, and easy to operate, circulation material utilization rate is high, avoid material unrestrained Take.
Alternatively, anti-floating pull rod is L-shaped pull rod, and L-shaped pull rod one end is bending end, and the other end is straight end, L-shaped pull rod Bending end is embedded in floor face, its straight end is fixed with hook connection, hooks girder.In the program, to avoid concrete Form floating when pouring to template, it is necessary to carry out anti-floating connection, by the L-shaped pull rod buried in advance with hanging on the girder of bottom Welding hook is firm, and template tightening is fixed on floor face.
Alternatively, every group of girder is made of and by the screw card through girder, secondary beam and template side by side two girders Button is fixed with barricade bar connecting.
As further selection, screw buckle includes L-shaped screw, curved baffle and fastener, and L-shaped screw one end is bending End, the other end is straight end, and the bending end of L-shaped screw hooks barricade reinforcing bar, and the straight end of L-shaped screw is pierced by between two girders, And be pierced by from shrouding on the curved baffle for compressing two girders, finally it is fastened on by fastener on curved baffle.In the program, lead to The bending end for crossing L-shaped screw hooks barricade reinforcing bar, and two girders are strained and fixed on secondary beam by straight end by curved baffle.
The foregoing main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes, The scheme that can be used and be claimed for the utility model;And the utility model, (each non conflicting selection) selection between and and It can also be freely combined between other selections.Those skilled in the art after the utility model is understood according to the prior art and Common knowledge, which can understand, multiple combinations, is the claimed technical solution of the utility model, does not do exhaustion herein.
The beneficial effects of the utility model:
1st, material is versatile, turnover rate is high, cost is relatively low.
2nd, it is easy to operate, set up flexibly.
3rd, the reliable drawknot in template bottom is passed through, it is ensured that formwork reinforcement is stablized, it is ensured that concrete of basement retaining wall is molded Quality.
Brief description of the drawings
Fig. 1 is the facade arrangement schematic diagram of the utility model embodiment;
Fig. 2 is the plane arrangement structure schematic diagram of the utility model embodiment;
Fig. 3 is the structure diagram of row's anchor structure of the utility model embodiment;
Fig. 4 is the structure diagram of the float Structure of the utility model embodiment;
Fig. 5 is the fixed structure schematic diagram of the girder of the utility model embodiment;
Wherein 1 it is template, 2 be secondary beam, 3 be girder, 4 be skewed horizontal load, 5 be anti-floating pull rod, 6 be full hall frame, 7 is horizontal Bar, 8 be horizontal support bar, 9 be vertical bridging, 10 be barricade, 11 be barricade reinforcing bar, 12 be L-shaped screw, 13 be arc gear Plate, 14 be fastener, 15 be waterproof screw, 16 be foundation pit lagging pile, 17 be bar planting, 18 be waterproofing unction, 19 be guide pile, 20 For floor face, 21 be connecting rod, 22 be hook, 23 be foundation pit retaining wall, 24 be brick fetal membrane, 25 be waterproof matrix, 26 be waterproof layer, 27 it is protective layer, 28 is horizontal cross brace.
Embodiment
Following non-limiting examples are used to illustrate the utility model.
With reference to shown in figure 1,2,4,5, a kind of concrete-pouring template float Structure for basement barricade single side formwork, Including template 1, secondary beam 2 and girder 3, barricade 10 is equipped with template 1, secondary beam 2 and girder 3, some secondary beams 2 successively towards indoor side It is set up in parallel vertically, some groups of 3 horizontal Tiles of girder are set, refering to what is shown in Fig. 5, every group of girder 3 is made of side by side two girders 3 And fixation is connected with barricade reinforcing bar 11 by being buckled through the screw of girder 3, secondary beam 2 and template 1;Screw buckle includes L-shaped silk Bar 12, curved baffle 13 and fastener 14,12 one end of L-shaped screw are bending end, and the other end is straight end, the bending of L-shaped screw 12 End hook lives barricade reinforcing bar 11, and the straight end of L-shaped screw 12 is pierced by between two girders 3, and from shroud compress two girders 3 arc It is pierced by shape baffle 13, is finally fastened on by fastener 14 on curved baffle 13.Close to row's girder 3 is most descended, buried in floor face 20 Equipped with anti-floating pull rod 5, anti-floating pull rod 5 is by hook 22 with most descending 3 drawknot of row's girder to fix.Anti-floating pull rod 5 is L-shaped pull rod, L-shaped Pull rod one end is bending end, and the other end is straight end, and the bending end of L-shaped pull rod is embedded in floor face 20, its straight end and hook 22 Connection is fixed, and hook 22 hooks girder 3.
Further, added using the basement barricade single side formwork of the concrete-pouring template float Structure of the utility model Fixing structure, with reference to shown in figure 1-5, including template 1, secondary beam 2, girder 3, horizontal support, skewed horizontal load 4, anti-floating pull rod 5, row's anchor Structure and full hall frame 6, full hall frame 6 is arranged in floor and its horizon bar 7 is used as horizontal support, and horizontal support is further included arranged on full hall Some horizontal support bars 8 between 6 horizon bar 7 of frame, 2 row of horizontal supporting rods 8 are shown with reference to figure 1;Full hall frame 6, which is equipped with, vertically to be cut Knife support 9 and horizontal cross brace 28, vertical bridging 9 are arranged vertically within 10 direction of barricade.Barricade 10 is equipped with successively towards indoor side Template 1, secondary beam 2 and girder 3, some secondary beams 2 are set up in parallel vertically, and some groups of 3 horizontal Tiles of girder are set, with reference to the institute of figure 5 Show, every group of girder 3 is made of and by the screw buckle and barricade steel through girder 3, secondary beam 2 and template 1 side by side two girders 3 The connection of muscle 11 is fixed;Screw buckle includes L-shaped screw 12, curved baffle 13 and fastener 14, and 12 one end of L-shaped screw is bending End, the other end are straight end, and the bending end of L-shaped screw 12 hooks barricade reinforcing bar 11, the straight end of L-shaped screw 12 from two girders 3 it Between be pierced by, and from shroud compress two girders 3 curved baffle 13 on be pierced by, curved baffle 13 is finally fastened on by fastener 14 On.Refering to what is shown in Fig. 3, every group of girder 3 is also protected by some waterproof screws 15 through girder 3, secondary beam 2 and template 1 and foundation pit The fixed row's of the being formed anchor structure of the connection of bar planting 17 in wall stake 16, waterproof screw 15 and 17 single-selded lap joint of bar planting, and bar planting 17 with The joint location of foundation pit lagging pile 16 is blocked with waterproofing unction 18, and row's anchor structure often arranges 2 and takes root in muscle 17.With reference to figure 1,2,4 Shown, some row's guide piles 19 are embedded in floor face 20, and guide pile 19 is connected in a row by connecting rod 21, corresponding with guide pile 19 Some row's skewed horizontal loads 4 connection guide pile 19 and girder 3;It is preferred that 4 angle of skewed horizontal load is 30 ° to 45 °.19 number of rows of guide pile Corresponded to skewed horizontal load 4, and typically, floor floor height is higher, and required number of rows is more, and 3 row's guide piles 19 are shown with reference to figure 1 With skewed horizontal load 4.Close to row's girder 3 is most descended, anti-floating pull rod 5 is embedded with floor face 20, anti-floating pull rod 5 is by hook 22 and most Lower 3 drawknot of row's girder is fixed.Anti-floating pull rod 5 is L-shaped pull rod, and L-shaped pull rod one end is bending end, and the other end is straight end, L-shaped pull rod Bending end be embedded in floor face 20, its straight end be connected fixation with hook 22, links up with 22 and hooks girder 3.
A kind of reinforcement means using foregoing basement barricade single side formwork bracing means, comprises the following steps successively:
1) lagging pile and retaining wall side reinforcing steel implant:Foundation pit lagging pile 16 and 23 side of foundation pit retaining wall are planted by the drilling of spacing rule Enter reinforcing bar, the waterproof screw 15 of the leakage of bar planting 17 part and carpenter carry out effectively welding and in a row regular arrangement forms row's anchor knot Structure;
2) brick mold is constructed:By the construction brick of foundation pit retaining wall 23 fetal membrane 24;
3) waterproof and protective layer construction:By brick fetal membrane 24 successively construction waterproof basic unit 25, waterproof layer 26 and protective layer 27;
4) barricade reinforcing bar 11 is bound;
5) full hall frame 6 is set up and is connected with earth anchor;
6) barricade template 1 is installed;
7) horizontal support, skewed horizontal load construction;
8) bridging is constructed;
9) anti-floating connects:Drawknot fixes anti-floating pull rod 5 and girder 3;
10) earth anchor of lower floor and anti-floating pull rod 5 is pre-buried;
11) inspect for acceptance;
12) concreting:Pour into a mould barricade concrete;
13) form removal conserves.
The application example of the utility model basement barricade single side formwork bracing means and reinforcement means:
Certain engineering is to integrate business, office, the large scale business synthesis of house.Overall floorage is 141889.09 ㎡, high building totally 3, highest 123.6m.4 layers of the engineering underground, floor height are respectively -4 layers to -2 layers each 3.6m, -1 layer of 6m.The work Cheng Yin is adjacent with subway line, and foundation pit west side supporting construction form is lagging pile+reinforced concrete inner support, the deep about 20m of foundation pit, By subway position basement barricade 10 and lagging pile 16 apart from only 350mm, it can not meet conventional wall form installation, therefore Single side formwork construction basement barricade can only be used.
Main Construction Technique scheme:
A, single side formwork parameter and main points:
Major parameter table is as follows:
B, construction technique:
Construction technology process:
Lagging pile and retaining wall side reinforcing steel implant → brick mold construction (barricade outboard template) → waterproof and protective layer construction → Barricade reinforcing bar bind → expire hall frame set up and be connected with earth anchor → barricade model sheetinstallat → horizontal support, skewed horizontal load are constructed → cuts Knife, which supports construction → anti-floating connection, → earth anchor of lower floor and anti-floating pull rod pre-buried → inspects for acceptance → and concreting → form removal supports Shield.
Construction method and main points:
1st, 12 reinforcing bars of φ are implanted into by the drilling of spacing rule using deep basal pit lagging pile 16 and retaining wall 23,17 depth of bar planting is big In 15d, 30 centimeters of leakage length and the waterproof screw 15 of carpenter are effectively welded, and water-stopping pull rod regular arrangement in a row, which is formed, arranges Anchor structure.After the completion of bar planting 17, blocked with 18 butt joint position of waterproofing unction.
2nd, by mouth line setting-out in brick mold 24 it is accurate after, using 240 thickness MU10 solid bricks, M5 masonry of cement mortar, and right Gap between brick mold 24 and retaining wall 23 carries out tamping processing, and the lagging pile 16 of prominent brick mold 24 is carried out picking chisel.Using 20 thickness 1:2.5 cement mortar are plastered, as waterproof matrix 25.
3rd, waterproof layer 26 is using II type waterproof rolls (polyester blank) of 4mm thickness SBS-.
4th, barricade reinforcing bar 11 has bound rear, cement lining block and must have been moulded according to 600*600 quincuncial arrangements, cover to reinforcement Backing strap block also must be provided with place.
5th, full hall frame 6 is set up is set up with reference to socket joint type disk button steel-tube die support construction method, and will be pre-buried before Good earth anchor steel pipe connecting is in a row, is effectively connected with full hall frame 6, increases full 6 Lateral resisting ability of hall frame.
6th, 10 template 1 of barricade uses 18mm thickness clad can wood plywoods, and outside sets vertical steel pipe secondary beam 2, spacing 200mm. Girder 3 merges two layers, spacing 700mm for two steel pipes, is fixed using leading screw buckle, connection full-page proof is as schemed ....
7th, the horizon bar of full hall frame also serves as the horizontal support of mounted split pattern, and the step pitch of full hall frame is 1400, can not meet to lead The reinforcing of beam@700, therefore one of horizon bar of increase among every step is needed, as shown in Figure 1.
Bearing diagonal is arranged with reference to Fig. 1,2, and angle is 30 ° to 45 °, and girder and earth anchor connecting rod are connected to using fastener On.3.6m floor heights use 3 row's diagonal braces, and 6m floor heights use 4 row's diagonal braces.
8th, it is the stability of increase rectification frame body, bridging should be set on request.Bridging is divided into vertical bridging and water Flat two kinds of bridging.Vertical bridging, across setting together, is arranged vertically within barricade direction every 4.3.6 meters of floors are in centre position One of bridging is set;6m floors set twice bridging in middle and tip position.
Form floating when the 9th, to avoid concreting resists, it is necessary to template progress anti-floating connection by what is buried in advance The welding hook of floating reinforcing bar φ 20 and bottom girder are firm (as shown in Figure 4).Anti-floating reinforcing steel bar sets a row away from wall side 200mm, Carried out away from 1m pre-buried.
10th, after steel corrosion quantity qualification, whether the jacking of inspection AQL support holds out against, whether bridging by above-mentioned requirements cloth Put, earth anchor be connected with full hall frame whether reliably, whether firm supporting, measure of anti float perfect etc. for bearing diagonal.After passed examination, Can casting concrete.
11st, before concreting, it is necessary to tell somebody what one's real intentions are to worker.Concrete is first since the direction away from single formwork barricade Pour, column beam slab concreting it is complete after, finally pour barricade concrete.This is also for the beam slab coagulation using new building Soil applies a downward load to full hall frame, increases the Lateral resisting ability of full hall frame.
12nd, concreting is completed, form removal condition form removal to be achieved, checks barricade Forming Quality, and strengthen coagulation Soil maintenance.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (4)

  1. A kind of 1. concrete-pouring template float Structure for basement barricade single side formwork, it is characterised in that:Including template, Secondary beam and girder, barricade are equipped with template, secondary beam and girder successively towards indoor side, and some secondary beams are set up in parallel vertically, some Group girder horizontal Tile is set, and close to row's girder is most descended, is embedded with anti-floating pull rod in floor face, anti-floating pull rod is by hook and most Lower row's girder drawknot is fixed.
  2. 2. it is used for the concrete-pouring template float Structure of basement barricade single side formwork, its feature as claimed in claim 1 It is:Anti-floating pull rod is L-shaped pull rod, and L-shaped pull rod one end is bending end, and the other end is straight end, and the bending end of L-shaped pull rod is embedded in In floor face, its straight end is fixed with hook connection, hooks girder.
  3. 3. it is used for the concrete-pouring template float Structure of basement barricade single side formwork, its feature as claimed in claim 1 It is:Every group of girder is made of and by the screw buckle and barricade reinforcing bar through girder, secondary beam and template side by side two girders Connection is fixed.
  4. 4. it is used for the concrete-pouring template float Structure of basement barricade single side formwork, its feature as claimed in claim 3 It is:Screw buckle includes L-shaped screw, curved baffle and fastener, and L-shaped screw one end is bending end, and the other end is straight end, L The bending end of shape screw hooks barricade reinforcing bar, and the straight end of L-shaped screw is pierced by between two girders, and compresses two masters from shrouding It is pierced by the curved baffle of beam, is finally fastened on by fastener on curved baffle.
CN201721111287.0U 2017-08-31 2017-08-31 A kind of concrete-pouring template float Structure for basement barricade single side formwork Expired - Fee Related CN207228617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721111287.0U CN207228617U (en) 2017-08-31 2017-08-31 A kind of concrete-pouring template float Structure for basement barricade single side formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721111287.0U CN207228617U (en) 2017-08-31 2017-08-31 A kind of concrete-pouring template float Structure for basement barricade single side formwork

Publications (1)

Publication Number Publication Date
CN207228617U true CN207228617U (en) 2018-04-13

Family

ID=61860014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721111287.0U Expired - Fee Related CN207228617U (en) 2017-08-31 2017-08-31 A kind of concrete-pouring template float Structure for basement barricade single side formwork

Country Status (1)

Country Link
CN (1) CN207228617U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700311A (en) * 2019-07-01 2020-01-17 中建五局土木工程有限公司 One-step molding construction method for open-cut large-span double-hole broken line arch tunnel large-volume concrete
CN110761558A (en) * 2019-09-29 2020-02-07 中国二十冶集团有限公司 Basement outer wall unilateral template strutting arrangement
CN113090011A (en) * 2021-03-19 2021-07-09 晟通科技集团有限公司 Anti reinforcing apparatus that floats and template anti reinforcing frame that floats
CN114776002A (en) * 2022-03-31 2022-07-22 中建新疆建工集团第一建筑工程有限公司 Aluminum alloy template anti-floating device for indoor partition water stop table
CN115125996A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Underground house construction technology based on assembled combined die
CN115434372A (en) * 2022-08-09 2022-12-06 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair and block and establish device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700311A (en) * 2019-07-01 2020-01-17 中建五局土木工程有限公司 One-step molding construction method for open-cut large-span double-hole broken line arch tunnel large-volume concrete
CN110761558A (en) * 2019-09-29 2020-02-07 中国二十冶集团有限公司 Basement outer wall unilateral template strutting arrangement
CN113090011A (en) * 2021-03-19 2021-07-09 晟通科技集团有限公司 Anti reinforcing apparatus that floats and template anti reinforcing frame that floats
CN114776002A (en) * 2022-03-31 2022-07-22 中建新疆建工集团第一建筑工程有限公司 Aluminum alloy template anti-floating device for indoor partition water stop table
CN115125996A (en) * 2022-06-30 2022-09-30 陕西帕源路桥建设有限公司 Underground house construction technology based on assembled combined die
CN115434372A (en) * 2022-08-09 2022-12-06 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair and block and establish device
CN115434372B (en) * 2022-08-09 2024-06-04 深圳市建工集团股份有限公司 Be used for basement outer wall post-cast strip assembled template to exempt from to chisel hair to block and establish device

Similar Documents

Publication Publication Date Title
CN207228617U (en) A kind of concrete-pouring template float Structure for basement barricade single side formwork
CN107355077A (en) A kind of basement barricade single side formwork reinforcing device and method
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN205875473U (en) Built -in location prefab reinforced concrete shear wall
CN106245678A (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN207245188U (en) A kind of basement barricade single side formwork bracing means
CN103397658A (en) Single-side support-formwork system backing on brick mixing retaining wall and construction method
CN203383508U (en) One-sided formwork body structure backing onto brick concrete retaining wall
CN105240018A (en) Vertical shaft construction device and method
CN111395745A (en) Basement outer wall single-face formwork supporting system and construction method thereof
CN107905609A (en) Underground people's air defense construction method
CN106988319A (en) A kind of rapid constructing method of large deep foundation pit agent structure side wall
CN207228151U (en) A kind of water-stopping pull rod for basement barricade single side formwork arranges anchor structure
CN212376009U (en) Prefabricated assembled reinforced concrete structure house
CN101761187A (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN204266216U (en) Bamboo beam anchoring and supporting structure of side slope
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN215367367U (en) Pile foundation structure of building engineering on high slope
CN209260748U (en) A kind of stepped tower crane
CN210597742U (en) Shear wall
CN102677679A (en) Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN207392752U (en) For preventing the constructing device of grout leakage of formwork root
CN206769198U (en) Separate combination type armored concrete prefabricated section anchored end supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20210831