CN208803740U - A kind of support system of dome structure - Google Patents
A kind of support system of dome structure Download PDFInfo
- Publication number
- CN208803740U CN208803740U CN201821292944.0U CN201821292944U CN208803740U CN 208803740 U CN208803740 U CN 208803740U CN 201821292944 U CN201821292944 U CN 201821292944U CN 208803740 U CN208803740 U CN 208803740U
- Authority
- CN
- China
- Prior art keywords
- support
- truss
- support stand
- dome
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to dome structure technical fields, more particularly to a kind of support system of dome structure, truss including dome bottom end is arranged in, it is vertical at truss end and extends to the support stand in dome, it is evenly arranged on the overhanging rest of support stand end, the suspension apparatus for being symmetrical arranged installation dead man on the support frame and being cooperatively connected with overhanging rest, the truss sets there are three and is in angularly to be arranged, the support stand is fixedly connected with truss cooperation, the equal base setting in the free end of the truss, traction rope is additionally provided on the overhanging rest, the installation dead man bottom end is additionally provided with column foot, the structure design of the utility model is reasonable, live civil engineering structure can be utilized, the center ring beam of dome structure is installed by support stand, and then radial direction and circumferential direction are installed using installation dead man cooperation suspension apparatus, by described Installation support system is easy for installation, and reasonable stress, working security is good, and work efficiency is high, can be widely applied in the installation of dome structure.
Description
Technical field
The utility model relates to dome structure technical field more particularly to a kind of support systems of dome structure.
Background technique
Dome structure is the hemispherical space dangled in building top, worker when carrying out construction operation to dome structure,
Generally can be using steel construction as the convenient construction operation to dome of support system, but steel construction in the prior art generally can
Installation is in roofing, and height is high and structure lower section is hanging, and worker can not carry out construction operation, while scene using existing structure face
Condition is limited, cannot be carried out substantially using the device and method of scaffold class, still remain under such working environment safety it is poor,
The big problem of installation difficulty.
Summary of the invention
The utility model is high for the support system height of dome structure in the prior art and lower section is hanging, construction operation is tired
Difficult, safety difference disadvantage provides a kind of construction of base, easy for construction, stability and highly-safe support system.
In order to solve the above-mentioned technical problem, the utility model is addressed by following technical proposals:
A kind of support system of dome structure, including the truss of dome bottom end is arranged in, is vertical at truss end and prolongs
Extend to the support stand in dome, the overhanging rest for being evenly arranged on support stand end, installation on the support frame arranged symmetrically are pulled out
Bar and the suspension apparatus being cooperatively connected with overhanging rest, the truss are set there are three and in be angularly arranged, and the support is vertical
Frame is fixedly connected with truss cooperation, the equal base setting in the free end of the truss, is additionally provided with traction rope on the overhanging rest, institute
It states installation dead man bottom end and is additionally provided with column foot.
As preferred: the overhanging rest includes being fixedly connected with the vertically disposed tray of support stand, with tray cooperation
Fixed block and the rope support of choosing that is arranged on fixed block, the tray is fixedly connected with support stand cooperation, it is the tray, solid
Determine block and choose rope support to be integrally formed setting, it is described to choose rope support and traction rope mating connection.
As preferred: the peace for choosing rope support and including the upright bar being cooperatively connected with fixed block, being fixedly connected with upright bar cooperation
Dress platform, the card column being fixedly connected with erecting bed cooperation and the limited block being fixed on card column outer wall, the upright bar, installation
Platform, card column and limited block are integrally formed setting, and also there are the installations being cooperatively connected with traction rope between the limited block and card column
Slot.
As preferred: the installation dead man includes that the first dagger being obliquely installed with support stand and the first dagger cooperate
The second dagger for being fixedly connected and be fixed at abaculus of second dagger far from the first dagger end, first dagger with
Support stand cooperation is fixedly connected, and the abaculus and column foot are cooperatively connected, and second dagger is arranged in parallel with support stand.
As preferred: the suspension apparatus includes the slider disc being cooperatively connected with tray, the motor being arranged in slider disc
Frame, with motor rack be cooperatively connected motor, with slider disc be cooperatively connected hanging wheel, with hanging wheel be cooperatively connected lifting rope and
The hanging basket being cooperatively connected with lifting rope bottom end, the motor rack and tray are cooperatively connected.
The utility model can pass through branch using live civil engineering structure the utility model has the advantages that the structure design of the utility model is reasonable
The center ring beam of stand installation dome structure is supportted, and then radial direction and circumferential direction are pacified using installation dead man cooperation suspension apparatus
Dress, easy for installation by the installation support system, reasonable stress, working security is good, and work efficiency is high, can be widely applied to
In the installation of dome structure.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the partial enlarged view in Fig. 1 at P.
Appended drawing reference: 1, truss;2, stand is supported;3, overhang rest;4, dead man is installed;5, suspension apparatus;6, traction rope;
7, column foot;8, tray;9, fixed block;10, rope support is chosen;11, upright bar;12, erecting bed;13, card column;14, limited block;15, first
Dagger;16, the second dagger;17, abaculus;18, slider disc;19, motor rack;20, motor;21, hanging wheel;22, lifting rope;23,
Hanging basket.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
As shown in Figure 1 to Figure 2, a kind of support system of dome structure, the truss 1, vertical including dome bottom end is arranged in
Set on 1 end of truss and extend in dome support stand 2, be evenly arranged on support 2 end of stand overhanging rest 3, symmetrically set
Set on the support frame installation dead man 4 and with overhanging rest 3 be cooperatively connected suspension apparatus 5, the truss 1 set there are three and
In being angularly arranged, the support stand 2 is fixedly connected with the cooperation of truss 1, the equal base setting in the free end of the truss 1, institute
It states and is additionally provided with traction rope 6 on overhanging rest 3,4 bottom end of installation dead man is additionally provided with column foot 7, can by system supported above
Using live civil engineering structure, the center ring beam of dome structure is installed by support stand 2, and then outstanding using the installation cooperation of dead man 4
5 pairs of radial directions of device for hoisting and circumferential direction are installed, easy for installation by the installation support system, reasonable stress, working security
Good, work efficiency is high, can be widely applied in the installation of dome structure.
In the present embodiment, the overhanging rest 3 includes cooperating admittedly with the support vertically disposed tray 8 of stand 2, with tray 8
Surely the fixed block 9 that connects and be arranged on fixed block 9 and choose rope support 10, the tray 8 with the support cooperation of stand 2 is fixed connects
It connects, the tray 8, fixed block 9 and chooses rope support 10 and be integrally formed setting, rope support 10 and the traction rope 6 chosen is cooperatively connected, institute
It states tray 8, fixed block 9 and chooses rope support 10 and be integrally formed setting, improve the structural strength of overhanging rest 3;The tray 8 and branch
Support stand 2 is vertically arranged the installation connection for conveniently choosing rope support 10 and suspension apparatus 5, improves the stability of support system, improves outstanding
The installation capability of beam rest.
In the present embodiment, the rope support 10 of choosing includes the upright bar 11 being cooperatively connected with fixed block 9, cooperates with upright bar 11 and fix
The erecting bed 12 of connection cooperates the card column 13 being fixedly connected and the limit being fixed on 13 outer wall of card column with erecting bed 12
Block 14, the upright bar 11, erecting bed 12, card column 13 and limited block 14 are integrally formed setting, the limited block 14 and card column 13
Between also there are the mounting groove being cooperatively connected with traction rope 6, at least two card columns 13 are set on the erecting bed 12, while by institute
It states upright bar 11 to be vertically arranged with fixed block 9, facilitates the fixation of mounting groove Yu traction rope 6, it is convenient that traction rope 6 is oriented to, together
The installation strength of Shi Tigao traction rope 6.
In the present embodiment, the installation dead man 4 includes the first dagger 15 being obliquely installed with support stand 2 and the first support
Column 15 cooperates the second dagger 16 being fixedly connected and is fixed at the second abaculus of the dagger 16 far from 15 end of the first dagger
17, first dagger 15 is fixedly connected with the support cooperation of stand 2, and the abaculus 17 is cooperatively connected with column foot 7, second support
Column 16 is arranged in parallel with support stand 2, and first dagger 15 and the range of tilt angles of support stand 2 are spent 30 to 60, excellent
The inclination for being arranged in 45 degree of choosing improves construction efficiency to the circumferential construction offer standard of dome structure;Second dagger 16
The abaculus 17 and column foot 7 of end setting are cooperatively connected, and improve the structural stability of installation dead man 4, facilitate the construction of worker.
In the present embodiment, the suspension apparatus 5 includes the slider disc 18 being cooperatively connected with tray 8, is arranged in slider disc 18
On motor rack 19, be cooperatively connected with motor rack 19 motor 20, with the hanging wheel 21 of the mating connection of slider disc 18, match with hanging wheel 21
The hanging basket 23 for closing the lifting rope 22 of connection and being cooperatively connected with 22 bottom end of lifting rope, the motor rack 19 are matched with tray 8
Connection is closed, the motor 20 controls slider disc 18 and rotates, and the cooperation of hanging wheel 21 synchronizes rotation, while motor 20 in slider disc 18
Control hanging wheel 21 carry out rotation can lifting rope 22 carry out oscilaltion, improve the construction efficiency of worker.
The utility model can install the center ring beam of dome structure by support stand 2 using live civil engineering structure, into
And cooperate 5 pairs of radial directions of suspension apparatus and circumferential direction to install using installation dead man 4, pass through the installation support system installation side
Just, reasonable stress, working security is good, and work efficiency is high, can be widely applied in the installation of dome structure, is needing to construction
When position is controlled, electric control starting motor 20, motor 20 controls slider disc 18 and rotates, and the cooperation of hanging wheel 21 is carried out in slider disc 18
Rotate synchronously, at the same motor 20 control hanging wheel 21 carry out rotation can lifting rope 22 carry out oscilaltion, improve dome knot
The installation effectiveness of structure.
The above content is only the preferred embodiment of the utility model, for those of ordinary skill in the art, according to this reality
With novel thought, there will be changes in the specific implementation manner and application range, and the content of the present specification should not be construed as
Limitations of the present invention.
Claims (5)
1. a kind of support system of dome structure, it is characterised in that: including the truss of dome bottom end is arranged in, is vertical at truss
End and the support stand extended in dome, are symmetrical arranged on the support frame the overhanging rest for being evenly arranged on support stand end
Installation dead man and the suspension apparatus that is cooperatively connected with overhanging rest, the truss set there are three and in being angularly arranged, institute
It states support stand to be fixedly connected with truss cooperation, the equal base setting in the free end of the truss, be additionally provided on the overhanging rest
Traction rope, the installation dead man bottom end are additionally provided with column foot.
2. a kind of support system of dome structure according to claim 1, it is characterised in that: the overhanging rest include with
The vertically disposed tray of support stand cooperates the fixed block being fixedly connected with tray and is arranged on fixed block and chooses rope support,
The tray with support stand cooperation is fixedly connected, the tray, fixed block and choose rope support be integrally formed setting, it is described to choose rope
Frame and traction rope are cooperatively connected.
3. a kind of support system of dome structure according to claim 2, it is characterised in that: the rope support of choosing includes and consolidates
The upright bar for determining block mating connection, the erecting bed being fixedly connected with upright bar cooperation, cooperate with erecting bed the card column that is fixedly connected and
The limited block being fixed on card column outer wall, the upright bar, erecting bed, card column and limited block are integrally formed setting, described
Also there are the mounting grooves being cooperatively connected with traction rope between limited block and card column.
4. a kind of support system of dome structure according to claim 1, it is characterised in that: the installation dead man include with
The first dagger that support stand is obliquely installed cooperates the second dagger for being fixedly connected with the first dagger and is fixed at second
Abaculus of the dagger far from the first dagger end, first dagger are fixedly connected with support stand cooperation, the abaculus and column foot
It is cooperatively connected, second dagger is arranged in parallel with support stand.
5. a kind of support system of dome structure according to claim 2, it is characterised in that: the suspension apparatus include with
The slider disc of tray mating connection, the motor rack being arranged in slider disc are matched with the motor of motor rack mating connection, with slider disc
The hanging wheel for closing connection, the lifting rope being cooperatively connected with hanging wheel and the hanging basket being cooperatively connected with lifting rope bottom end, the electricity
Rack and tray are cooperatively connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821292944.0U CN208803740U (en) | 2018-08-13 | 2018-08-13 | A kind of support system of dome structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821292944.0U CN208803740U (en) | 2018-08-13 | 2018-08-13 | A kind of support system of dome structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208803740U true CN208803740U (en) | 2019-04-30 |
Family
ID=66231439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821292944.0U Active CN208803740U (en) | 2018-08-13 | 2018-08-13 | A kind of support system of dome structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208803740U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331808A (en) * | 2019-07-31 | 2019-10-15 | 浙江百安固金属屋面有限公司 | A kind of metal dome structure and its installation method |
CN111335649A (en) * | 2020-03-31 | 2020-06-26 | 五冶集团上海有限公司 | Hoisting method of building dome structure |
-
2018
- 2018-08-13 CN CN201821292944.0U patent/CN208803740U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331808A (en) * | 2019-07-31 | 2019-10-15 | 浙江百安固金属屋面有限公司 | A kind of metal dome structure and its installation method |
CN111335649A (en) * | 2020-03-31 | 2020-06-26 | 五冶集团上海有限公司 | Hoisting method of building dome structure |
CN111335649B (en) * | 2020-03-31 | 2022-06-24 | 五冶集团上海有限公司 | Hoisting method of building dome structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604334B (en) | A kind of rapid constructing method for large span steel truss integral installation | |
CN208803740U (en) | A kind of support system of dome structure | |
CN106013419B (en) | Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN212926981U (en) | I-steel support of encorbelmenting bears hanging flower basket device | |
CN204899238U (en) | Unitized curtain wall plate hoist device | |
CN104631810A (en) | High-altitude movable hanging basket system and construction method thereof | |
CN105484502A (en) | Combination installation method for steel structure roofing purlins and support bars of industrial factory building | |
CN101723286B (en) | Large gas holder top lifting device and method | |
CN107419907B (en) | A kind of steel-making tower steel structure platform is staggered installation of welding method | |
CN103993744A (en) | Raising system for large-area net frame and installing method thereof | |
CN107476423A (en) | The assembling method of steel building | |
CN104060836A (en) | Lifting and installation method of high curved-surface net racks | |
CN205421988U (en) | Concrete detached column consolidates with PLC intelligence synchronization of jacking up off -load construction equipment | |
CN202359805U (en) | Construction platform for Wiggins dry gas holder | |
CN111305433B (en) | Construction structure and construction method of roof steel structure platform inclined glass curtain wall | |
CN205011283U (en) | Hoist and mount apparatus of large -scale rolling -mill housing | |
CN208684250U (en) | One kind being based on the quick detachable boom hoisting of major structure of construction | |
CN207608234U (en) | A kind of assembly type curtain wall hanging apparatus | |
CN108677749B (en) | PLC frequency conversion control system for bridge swivel construction | |
CN209179519U (en) | Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top | |
CN210369846U (en) | Operating platform capable of being clamped on elevator shaft shear wall surface and lifted layer by layer | |
CN108756437A (en) | A kind of construction technology of high-altitude large size assembling shape steel member | |
CN205500609U (en) | Stage machine installation is put with ring hoist and mount | |
CN213812849U (en) | Integral static load test device of safety belt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |