CN208724492U - Rock side slope embeds tree planting structure - Google Patents
Rock side slope embeds tree planting structure Download PDFInfo
- Publication number
- CN208724492U CN208724492U CN201821292446.6U CN201821292446U CN208724492U CN 208724492 U CN208724492 U CN 208724492U CN 201821292446 U CN201821292446 U CN 201821292446U CN 208724492 U CN208724492 U CN 208724492U
- Authority
- CN
- China
- Prior art keywords
- rock side
- side slope
- embeds
- tree planting
- planting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Abstract
The utility model discloses a kind of rock side slopes to embed tree planting structure, slope surface is equipped with the slope surface intake chamber in radiation wire shaped, the radiation point of slope surface intake chamber concentrates on the root hole for placing plant growth soil, is distributed several root holes in slope surface, root hole is embedded in rock side slope.The utility model proposes a kind of to plant the structure of green plant on rock side slope, and the utility model is safe and reliable, durable, and combines together naturally, ecosystem stability enhancing.
Description
Technical field
The utility model relates to a kind of structure for being suitble to plant green plant on rock side slope, in particular to a kind of rock side slopes
Embedded tree planting structure.
Background technique
On-site investigation is utilized according to Chinese soil, by October 31st, 1996, the naked rock gravel ground area in the whole nation was
103534.5 thousand hectares (155301.8 ten thousand mu).It is mainly distributed on to naked rock gravel northwest, there are 69779.1 thousand hectares, Zhan Quan
The naked rock gravel of state the gross area 67.4%.The naked rock gravel in Provinces (regions) it is most with Xinjiang, have 48 508.7 thousand hectares, Zhan Quan
The 46.9% of state.Naked rock gravel soil is utilized to be difficult.
Green plant is planted on naked rock or cliff at present to be all made of in slope surface and lay metal, and is fixed with anchoring piece, then
The planting plants on naked rock or cliff, last covered non-woven fabrics etc. are retained.
At present on rock side slope planting plants method there are metal costs high, environment easy to pollute, plant take root it is difficult, at
Low disadvantage living.Therefore, it is necessary to a kind of structure or methods of planting plants, and the ecological ring of rock side slope can preferably be transformed
Border.
Utility model content
The utility model proposes a kind of for the green deficiency for planting implantation methods of existing rock side slope, proposes a kind of new green
Pattern of farming is planted, ecosystem stability is enhanced.
The technical solution adopted in the utility model is: rock side slope embeds tree planting structure, and slope surface is equipped with linear in radiating
The slope surface intake chamber of shape, the radiation point of slope surface intake chamber concentrate on root hole for placing plant growth soil, in slope surface
Several root holes are distributed, root hole is embedded in rock side slope.
Plant growth slot is arranged in the top in the root hole.
The plant is using high-order water tower trickle irrigation.
The wedge shaped body in root hole.
Catch basin is equipped between the root hole.
It is reinforced around the sphenoid using armored concrete or stone material.
The upper bottom surface of the sphenoid is parallel with slope surface.
The plant is drought-enduring low crowntree.
The utility model proposes a kind of to plant the structure of green plant on rock side slope, and the utility model is safe and reliable, resistance to
Long, it and combines together naturally, ecosystem stability enhancing.
Detailed description of the invention
Fig. 1 is the lateral plan of rock side slope planting plants.
Fig. 2 is the front view of rock side slope planting plants.
The lateral plan for the rock side slope planting plants that Fig. 3 is 90 °.
The front view for the rock side slope planting plants that Fig. 4 is 90 °.
Icon note is as follows: 1- rock side slope, 2- slope surface, 3- slope surface intake chamber, the root 4- hole, 41- plant growth slot,
42- catch basin, 5- armored concrete.
Specific embodiment
Tree planting structure is embedded to rock side slope with reference to the accompanying drawing and method is further described.
This rock side slope embeds tree planting structure, and slope surface 2 is equipped with the slope surface intake chamber 3 in radiation wire shaped, slope surface into
It is the through flow velocity that can slow down natural precipitation on rock side slope that certain radian, which is presented, in sink 3, so that rainwater can be maximum
Change enters in plant root hole 4, and the radiation point of slope surface intake chamber 3 concentrates on the heel apertures for placing plant growth soil
Cave 4 is distributed several root holes 4 in slope surface 2, and root hole 4 is embedded in rock side slope 1.
Enough spaces are needed in view of plant grows up, plant growth slot 41 is set in the top in root hole 4.It removes
Above-mentioned slope surface intake chamber 3 can provide other than moisture for plant, and the plant of plantation can also be using high-order water tower trickle irrigation.Often
Catch basin 42 is set between two roots hole 4, natural precipitation can be collected in this way, provide moisture for plant.Significantly
The cost of Late Irrigation is saved.Slope surface intake chamber and catch basin solve the problems, such as the collection of the moisture of natural precipitation, if do not had
There is natural precipitation, plant needs moisture just to keep the skin wet using high-order water tower trickle irrigation.
4 wedgewise body of root hole, the upper bottom surface of sphenoid is parallel with slope surface, is more advantageous to plant in this way and takes root, provides
Its survival rate.
Embodiment one: embedding in rock side slope and plant cypress in tree planting structure,
A. the slope surface 2 for the rock side slope 1 for needing planting plants is carried out smooth;
B. several are dug out for soil needed for placing cypress growth in the slope surface 2 of rock side slope 1 using specific purpose tool
The root hole 4 of the wedge-shaped shape of earth, the dislocation of root hole 4 arrangement provide enough spaces for cypress growth, and described is special
It is the common digging tool in the field with tool, different tools is chosen according to different plants, according to cypress root depth tune
The thickness of whole soil;
C. enough spaces are needed in view of cypress grows up, plant growth slot 41 is dug out above the hole of root;
D. the slope surface intake chamber 3 in radiation wire shaped is built in slope surface 2, certain radian, which is presented, in slope surface intake chamber 3 is
Through flow velocity of the natural precipitation on rock side slope can be slowed down, enter plant root hole 4 so that rainwater can maximize
In, the radiation point of slope surface intake chamber 3 concentrates on the root hole 4 for placing plant growth soil;
E. soil needed for being put into cypress growth in root hole 4, in order to increase the survival rate of cypress, in root hole 4
Soil stabilizer and granule agent is added;
F. kind plants cypress.
Embodiment two: it is embedded in 90 degree of rock side slopes and plants cypress in tree planting structure:
A. the slope surface 2 for the rock side slope 1 for needing planting plants is carried out smooth;
B. several are dug out for soil needed for placing cypress growth in the slope surface 2 of rock side slope 1 using specific purpose tool
The root hole 4 of the wedge-shaped shape of earth, the upper bottom surface of sphenoid is parallel to slope surface 2, perpendicular to the ground, and root hole 4 misplaces
Arrangement provides enough spaces for cypress growth, and the specific purpose tool is the common digging tool in the field, according to different
Plant chooses different tools, and the thickness of soil is adjusted according to cypress root depth;
C. enough spaces are needed in view of cypress grows up, plant growth slot 41 is dug out above the hole of root;
D. the slope surface intake chamber 3 in radiation wire shaped is built in slope surface 2, certain radian, which is presented, in slope surface intake chamber 3 is
Through flow velocity of the natural precipitation on rock side slope can be slowed down, enter plant root hole 4 so that rainwater can maximize
In, the radiation point of slope surface intake chamber 3 concentrates on the root hole 4 for placing plant growth soil;
E. soil needed for being put into cypress growth in root hole 4, in order to increase the survival rate of cypress, in root hole 4
Soil stabilizer and granule agent is added;
F. kind plants cypress;
G. 4 upper surface of root hole is sealed using armored concrete 5, is prevented erosion.
Claims (8)
1. rock side slope embeds tree planting structure, it is characterised in that: slope surface is equipped with the slope surface intake chamber in radiation wire shaped, slope surface
The radiation point of intake chamber concentrates on the root hole for placing plant growth soil, is distributed several root holes in slope surface,
Root hole is embedded in rock side slope.
2. rock side slope according to claim 1 embeds tree planting structure, it is characterised in that: the top in the root hole
Plant growth slot is set.
3. rock side slope according to claim 1 embeds tree planting structure, it is characterised in that: the plant is using high-order water
Tower trickle irrigation.
4. rock side slope according to claim 1 embeds tree planting structure, it is characterised in that: the root hole is wedge shaped
Body.
5. rock side slope according to claim 1 embeds tree planting structure, it is characterised in that: set between the root hole
There is catch basin.
6. rock side slope according to claim 4 embeds tree planting structure, it is characterised in that: used around the sphenoid
Armored concrete or stone material are reinforced.
7. rock side slope according to claim 4 embeds tree planting structure, it is characterised in that: the upper bottom surface of the sphenoid
It is parallel with slope surface.
8. rock side slope according to claim 1 embeds tree planting structure, it is characterised in that: the plant is drought-enduring low
Crowntree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821292446.6U CN208724492U (en) | 2018-08-10 | 2018-08-10 | Rock side slope embeds tree planting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821292446.6U CN208724492U (en) | 2018-08-10 | 2018-08-10 | Rock side slope embeds tree planting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208724492U true CN208724492U (en) | 2019-04-12 |
Family
ID=66029029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821292446.6U Active CN208724492U (en) | 2018-08-10 | 2018-08-10 | Rock side slope embeds tree planting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208724492U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108738892A (en) * | 2018-08-10 | 2018-11-06 | 大连久鼎生态流域治理开发有限公司 | Rock side slope embeds tree planting structure and method |
-
2018
- 2018-08-10 CN CN201821292446.6U patent/CN208724492U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108738892A (en) * | 2018-08-10 | 2018-11-06 | 大连久鼎生态流域治理开发有限公司 | Rock side slope embeds tree planting structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103461068B (en) | The topology layout of large-scale landscape tree method and transplanting plant pit is transplanted in saline land | |
CN105103843A (en) | Vegetation configuration method for preventing water and soil loss of mine dump of dry-hot valley | |
CN102067753B (en) | Long-term governance method for converting saline-alkali soil into fertile farmland | |
CN101112157B (en) | Method for greening high precipitous rock slope | |
CN102138491B (en) | Soil and ecological control method for coastal beaches | |
CN102392454A (en) | Adverse-slope flat-plate treating and ecological restorative measure for refuse dump | |
CN104396494B (en) | A kind of heavy saline original soil greening method | |
CN108738892A (en) | Rock side slope embeds tree planting structure and method | |
CN107155785A (en) | By accumulating the method and device that rainwater is planted trees | |
CN102090255B (en) | Method for artificially inoculating cistanche deserticola | |
CN105706555B (en) | Saline land greening engineering original soil structure-improved and its construction method | |
CN106900197A (en) | A kind of sustainable synthesis improvement method of marine solonchak ecological circulation | |
CN104541641A (en) | Method of thinning, eliminating soil salt and increasing yield by arranging crushed ridge bind drain system | |
CN108142029A (en) | Coastal beach is retired the method for returning to the field | |
CN208724492U (en) | Rock side slope embeds tree planting structure | |
CN105075794A (en) | Plantation method improving desert sapling survival rate | |
CN109673316A (en) | A kind of comprehensive greening system of exposed scar and method | |
CN210580198U (en) | Sloping field water collection and soil conservation structure | |
CN106165567B (en) | A kind of method of stony desertification soil plantation birchleaf pear subtree | |
CN106171730A (en) | A kind of interplanting method of area, south, Anhui Semen Ginkgo arbor | |
CN105493807A (en) | Vegetation plantation method preventing water and soil loss | |
CN114009173B (en) | Marble-based wetland hydro-fluctuation belt vegetation recovery method | |
CN208639114U (en) | The plug-in tree planting structure of rock side slope | |
CN105075793A (en) | Inclined fish-scale pit forestation land preparation technology suitable for earth-rock mountain area in north China | |
CN211037217U (en) | Cover husky arsenic sandstone district top of a slope rainwater and collect and administer structure |