CN208280564U - A kind of translatable formula operating platform - Google Patents

A kind of translatable formula operating platform Download PDF

Info

Publication number
CN208280564U
CN208280564U CN201820494695.7U CN201820494695U CN208280564U CN 208280564 U CN208280564 U CN 208280564U CN 201820494695 U CN201820494695 U CN 201820494695U CN 208280564 U CN208280564 U CN 208280564U
Authority
CN
China
Prior art keywords
platform
hanging
outrigger
hanging type
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820494695.7U
Other languages
Chinese (zh)
Inventor
胡怡
闵溯洋
郁政华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201820494695.7U priority Critical patent/CN208280564U/en
Application granted granted Critical
Publication of CN208280564U publication Critical patent/CN208280564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model proposes a kind of translatable formula operating platforms, it include: hanging type platform system under modularization, including operating platform and suspension, suspension is made of hanging column, guide rail, oriented module, brake apparatus and power blocks, operating platform is assembled via hanging column, oriented module and is suspended on guide rail, operating platform as a source of power, is moved forward and backward with power blocks along guide rail direction;Upper hanging type outrigger platform system, including outrigger platform ontology, oriented module, guide rail, reinforcing bar hanging ring, fixedly connected part, wherein outrigger platform ontology assembles integral with oriented module, and it is buckled in guide rail inner edge two sides, the tail end of outrigger platform ontology is fixed in overhanging main structure using reinforcing bar hanging ring, and the bottom end of outrigger platform ontology is fixed in the hanging column connecting node of lower hanging type platform using fixedly connected part.The utility model makes up the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and precision reach design requirement.

Description

A kind of translatable formula operating platform
Technical field
The utility model belongs to technical field of building construction, relates generally to a kind of operating platform of translatable formula, special It is not the translatable formula operating platform suitable for the curtain wall construction that cornices.
Background technique
In executive information systems field, the installation for the curtain wall that cornices is always the problem of construction field.The curtain wall that cornices It is generally on the outside of main structure, depends on around overhanging main structure, big, construction precision requires high, construction risk with the scale of construction The features such as property is big.When engineering construction, according to Normal practice, need to set up full hall superelevation scaffold either builder's jack, Not only risk is larger, quality control on construction is difficult, but also the installation and dismounting of the scaffold system being related to itself have high risk; Common hanging basket is installed according to high-rise vertical alien invasion curtain wall to construct, the anchor point of hanging basket then with cornice curtain wall sealing plate that This has overlapping phenomenon, is unfavorable for curtain wall installation, and hanging basket input amount is big, at high cost.It is therefore desirable to utility model one kind to be applicable in In the translatable formula operating platform for the curtain wall construction that cornices, meet the requirement of construction.
Utility model content
In order to make up the deficiency of conventional hanging basket and the construction of foot hand, the utility model proposes a kind of satisfaction high level and Super Highs Cornice the translatable formula operating platform of curtain wall construction in building, it is ensured that construction safety is controllable, quality and precision reach and set Meter requires.
In order to achieve the above object, the utility model proposes a kind of translatable formula operating platforms, comprising:
Hanging type platform system under modularization comprising operating platform and suspension, the suspension is by hanging column, lower extension Formula platform rail, lower hanging type platform oriented module, brake apparatus and power blocks composition, the operating platform via hanging column, Lower hanging type platform oriented module is assembled and is suspended on lower hanging type platform guide rail, and the operating platform is using power blocks as power Source is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system comprising outrigger platform ontology, upper hanging type outrigger platform oriented module, upper hanging type are outstanding Platform rail, reinforcing bar hanging ring, fixedly connected part are chosen, wherein the outrigger platform ontology and upper hanging type outrigger platform oriented module group Entirety is dressed up, and is buckled in upper hanging type outrigger platform guide rail inner edge two sides, to prevent platform from toppling, the tail of the outrigger platform ontology End is fixed in overhanging main structure using reinforcing bar hanging ring, and the bottom end of the outrigger platform ontology is fixed on down using fixedly connected part In the hanging column connecting node of hanging type platform.
Further, the operating platform is according to platform loads and size, using the structure shape of solid web girder or truss Formula.
Further, the length and width dimensions of the operating platform are controlled in 3x11m.
Further, the quantity of hanging type platform system is set according to the overhanging distance of overhanging main structure under the modularization It sets, forms laterally arrangement.
Further, hanging type platform system with 6 points carries out suspension connection under the modularization, and ready-made 2 sections continuous, and 1 section outstanding The structure type chosen.
Further, the fixedly connected part uses bearing type screw design, for adjusting the rest height of position, Outrigger platform is converted into the freely-supported platform of both ends support, working load is effectively reduced.
Further, the power blocks control dynamical system motor by master control box and frequency conversion tank computer program and turn Speed realizes the mobile synchronism operation of platform.
The utility model proposes a kind of translatable formula behaviour for meeting the curtain wall construction that cornices in executive information systems Make stage apparatus, compensate for the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and precision reach Design requirement.After this kind of device, the construction for the curtain wall that cornices becomes more economical, reasonable, safe and efficient.The device can be with The Reusability between each area of main cantilevered structure, significantly reduces working measure cost;The device can satisfy superaltitude and choose The construction requirement of eaves curtain wall meets the loading characteristic of curtain wall installation, and construction is made to become more reasonable;The device can be construction personnel The operating environment for creating a safety greatly improves the safety of superaltitude construction;The device avoids cornicing, curtain wall is applied Interfering between working hour and interim measure structure, greatly improves construction efficiency.
Detailed description of the invention
Fig. 1 and Fig. 2 show the translatable formula operation of the curtain wall construction that is suitable for cornicing of the utility model preferred embodiment Stage apparatus structural schematic diagram.
Fig. 3 show hanging type platform system structure diagram under the modularization of the utility model preferred embodiment.
Fig. 4~Fig. 6 show the schematic diagram of translatable formula operating platform different angle.
Specific embodiment
Specific embodiment of the present utility model, but the utility model implementation not limited to the following are provided below in conjunction with attached drawing Mode.According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It should be noted that attached drawing It is all made of very simplified form and uses non-accurate ratio, be only used for convenience, lucidly aid in illustrating the utility model The purpose of embodiment.
Please refer to FIG. 1 to FIG. 3, what Fig. 1 and Fig. 2 showed the utility model preferred embodiment is suitable for the curtain wall construction that cornices Translatable formula operating platform structural schematic diagram.Fig. 3 show hanging under the modularization of the utility model preferred embodiment Plateform system structural schematic diagram.The utility model proposes a kind of translatable formula operating platform dresses suitable for the curtain wall construction that cornices It sets, comprising:
Hanging type platform system 1 under modularization comprising operating platform and suspension, the suspension by hanging column 1a, Lower hanging type platform guide rail 8, lower hanging type platform oriented module 7, brake apparatus 9 and power blocks 10 form, the operating platform It assembles and is suspended on lower hanging type platform guide rail 8 via hanging column 1a, lower hanging type platform oriented module 7, the operating platform is with dynamic Power coaster 10 as a source of power, is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system 2 comprising outrigger platform ontology 2, upper hanging type outrigger platform oriented module 3, upper extension Formula outrigger platform guide rail 4, reinforcing bar hanging ring 5, fixedly connected part 6, wherein the outrigger platform ontology 2 is led with upper hanging type outrigger platform It is assembled to module 3 integral, and is buckled in 4 inner edge two sides of upper hanging type outrigger platform guide rail, to prevent platform from toppling, the overhanging is flat The tail end of playscript with stage directions body 2 is fixed in overhanging main structure using reinforcing bar hanging ring 5, and the bottom end of the outrigger platform ontology 2 is using fixation Connector 6 is fixed in the hanging column 1a connecting node of lower hanging type platform.
According to the utility model preferred embodiment, the operating platform is according to platform loads and size, using real abdomen The structure type of beam or truss.The length and width dimensions of the operating platform are controlled in 3x11m or so.
The quantity of hanging type platform system is configured according to the overhanging distance of overhanging main structure under the modularization, is formed horizontal To arrangement.Hanging type platform system carries out suspension connection with 6 points under the modularization, and ready-made 2 sections continuous, the structure shape of 1 section of overhanging Formula, convenient for the construction of subsequent curtain wall cover board.
Not when upper people's operation, which can be moved via artificial push-and-pull along 4 direction of upper hanging type outrigger platform guide rail.On When people operates, platform tail end need to be fixed in overhanging main structure with reinforcing bar hanging ring 5, and platform overhanging section bottom end need to use fixedly connected part 6 are fixed in the hanging column 1a connecting node of lower hanging type platform, and the fixedly connected part 6 uses bearing type screw design, for adjusting Outrigger platform is converted into the freely-supported platform of both ends support, working load is effectively reduced by the rest height for saving position.
The power blocks 10 control dynamical system motor speed by master control box and frequency conversion tank computer program, realize flat The mobile synchronism operation of platform.
The utility model proposes a kind of translatable formula behaviour for meeting the curtain wall construction that cornices in executive information systems Make stage apparatus, mainly there are several types of functions:
1, meet normal operating condition
Hanging type platform 1 and upper hanging type outrigger platform 2 separate in advance under normal operating condition, modularization, respectively start to Then hanging type platform 1 under modularization and upper hanging type outrigger platform 2 are interconnected to form by predetermined position by fixedly connected part 6 It is whole.Dynamical system is in shutdown status simultaneously, and opens brake apparatus 9, it is ensured that platform stable is secured.Construction personnel can be It completes to cornice on hanging type platform 1 and upper hanging type outrigger platform 2 under modularization installation, welding and the coating operation of each component of curtain wall.
2, horizontally moveable operating function
When operating platform change area's construction, by upper hanging type outrigger platform guide rail 4 and lower hanging type platform guide rail 8 Turnover and displacement, form towards next construction area and start channel.Construction personnel all withdraws platform at this time, unclamps the ownership Dynamic device 9 and fixedly connected part 6, upper hanging type outrigger platform 2 are pushed by artificial, and lower hanging type platform turns on the power coaster 10 along rail Road direction running, in conjunction with the measure for " meeting normal operating condition " before this, and so on, it follows and cornices curtain wall construction sequence by cross Complete installation operation.
3, console module function
The platform is processed with modularized design, and material turnover is high, is repeated and is recycled, the bigger economy of construction area Efficiency is more prominent.Especially suitable for cornicing on big super high-rise building, it is flat several modularizations can be set according to length of cornicing Platform is formed into lateral arrangement, and the whole section of installation requirements corniced are met.
Fig. 4~6 is please referred to, Fig. 4~Fig. 6 show the schematic diagram of translatable formula operating platform different angle.In east Western two sides are corniced after the completion of curtain wall construction, and whole device is moved to southern side and is corniced, because overhanging distance is corniced greater than thing in southern side Two sides, therefore 3 rows are increased to by platform is hung under original 2 row, to guarantee all standing of construction of cornicing.It, can be according to by the above method Secondary completion cornice structure each region curtain wall construction.
In conclusion the utility model proposes it is a kind of meet the curtain wall construction that cornices in executive information systems can Parallel-moving type operating platform compensates for the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and Precision reaches design requirement.After this kind of device, the construction for the curtain wall that cornices becomes more economical, reasonable, safe and efficient.It should Device can between each area of main cantilevered structure Reusability, significantly reduce working measure cost;The device can satisfy Superaltitude is corniced the construction requirement of curtain wall, meets the loading characteristic of curtain wall installation, construction is made to become more reasonable;The device can be Construction personnel creates the operating environment of a safety, greatly improves the safety of superaltitude construction;The device avoids choose Interfering between interim measure structure, greatly improves construction efficiency when eaves curtain wall construction.
Although the utility model has been disclosed with preferred embodiment as above, so it is not intended to limit the utility model.This reality It is without departing from the spirit and scope of the utility model, each when that can make with novel those of ordinary skill in the art Kind changes and retouches.Therefore, the protection scope of the utility model is subject to view those as defined in claim.

Claims (6)

1. a kind of translatable formula operating platform characterized by comprising
Hanging type platform system under modularization comprising operating platform and suspension, the suspension by hanging column, under it is hanging flat Platform guide rail, lower hanging type platform oriented module, brake apparatus and power blocks composition, the operating platform is via hanging column, lower extension Formula platform oriented module is assembled and is suspended on lower hanging type platform guide rail, and the operating platform is using power blocks as power Source is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system comprising outrigger platform ontology, upper hanging type outrigger platform oriented module, upper hanging type overhanging are flat Platform guide rail, reinforcing bar hanging ring, fixedly connected part, wherein the outrigger platform ontology is assembled into upper hanging type outrigger platform oriented module It is whole, and upper hanging type outrigger platform guide rail inner edge two sides are buckled in, to prevent platform from toppling, the tail end of the outrigger platform ontology is adopted It is fixed in overhanging main structure with reinforcing bar hanging ring, the bottom end of the outrigger platform ontology is fixed on down hanging using fixedly connected part In the hanging column connecting node of platform.
2. translatable formula operating platform according to claim 1, which is characterized in that the operating platform is according to platform Load and size, using the structure type of solid web girder or truss.
3. translatable formula operating platform according to claim 1, which is characterized in that the length and width ruler of the operating platform Very little control is in 3x11m.
4. translatable formula operating platform according to claim 1, which is characterized in that hanging type platform under the modularization The quantity of system is configured according to the overhanging distance of overhanging main structure, forms laterally arrangement.
5. translatable formula operating platform according to claim 1, which is characterized in that hanging type platform under the modularization System carries out suspension connection with 6 points, and ready-made 2 sections continuous, the structure type of 1 section of overhanging.
6. translatable formula operating platform according to claim 1, which is characterized in that the fixedly connected part is used and held Outrigger platform is converted into the freely-supported platform of both ends support, had by weight formula screw design for adjusting the rest height of position Effect reduces working load.
CN201820494695.7U 2018-04-09 2018-04-09 A kind of translatable formula operating platform Active CN208280564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820494695.7U CN208280564U (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820494695.7U CN208280564U (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform

Publications (1)

Publication Number Publication Date
CN208280564U true CN208280564U (en) 2018-12-25

Family

ID=64750449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820494695.7U Active CN208280564U (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform

Country Status (1)

Country Link
CN (1) CN208280564U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277971A (en) * 2018-04-09 2018-07-13 上海市机械施工集团有限公司 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing
CN110836017A (en) * 2019-10-18 2020-02-25 中建二局第一建筑工程有限公司 Sliding hoisting device and method for large steel truss in narrow space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277971A (en) * 2018-04-09 2018-07-13 上海市机械施工集团有限公司 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing
CN110836017A (en) * 2019-10-18 2020-02-25 中建二局第一建筑工程有限公司 Sliding hoisting device and method for large steel truss in narrow space

Similar Documents

Publication Publication Date Title
CN108277971A (en) A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing
CN101949211B (en) Low-position few-fulcrum modularized integral jacking steel platform formwork system
CN208280564U (en) A kind of translatable formula operating platform
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105016223A (en) Cross beam supporting system used for tower crane
CN203403674U (en) Instrumental adjustable stair steel formwork
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN217175692U (en) Intelligent hydraulic lifting formwork system for super high-rise core tube construction
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN106368457B (en) Workshop is moved in sandblasting dust suppression
CN205314519U (en) High altitude operation platform based on truss
CN106193567A (en) Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN109160421A (en) A kind of integral hoisting system of mobile shelter
CN205874987U (en) Simply put up bridge crane
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN204848050U (en) A crossbeam braced system for tower crane
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN215564320U (en) A construction platform for encorbelmenting structure curtain installation
CN205476588U (en) Encorbelment formwork support system of board of high altitude large -span
CN204940916U (en) A kind of Super High Core Walls Structure emergency escape passage
CN207419984U (en) A kind of scaffold of architectural engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant