CN215564320U - A construction platform for installation of cantilevered structure curtain wall - Google Patents

A construction platform for installation of cantilevered structure curtain wall Download PDF

Info

Publication number
CN215564320U
CN215564320U CN202121710290.0U CN202121710290U CN215564320U CN 215564320 U CN215564320 U CN 215564320U CN 202121710290 U CN202121710290 U CN 202121710290U CN 215564320 U CN215564320 U CN 215564320U
Authority
CN
China
Prior art keywords
platform
construction
curtain wall
installation
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121710290.0U
Other languages
Chinese (zh)
Inventor
祝胜
庄陆挺
冯宗义
程雪辰
龚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Reclaim Construction Group Co ltd
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Zhejiang Reclaim Construction Group Co ltd
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Reclaim Construction Group Co ltd, Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Zhejiang Reclaim Construction Group Co ltd
Priority to CN202121710290.0U priority Critical patent/CN215564320U/en
Application granted granted Critical
Publication of CN215564320U publication Critical patent/CN215564320U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a construction platform for mounting a curtain wall of an overhanging structure, which comprises a hanging platform, a connecting structure and a scaffold structure, wherein the hanging platform is suitable for being arranged below the overhanging structure; the platform that suspends in midair is located structure width direction's both ends of encorbelmenting are equipped with the extension, scaffold puts up the structure and is suitable for the setting and is in extension department, just scaffold puts up the structure width direction of encorbelmenting go up with the structure interval of encorbelmenting sets up. According to the utility model, the suspension platform is arranged below the cantilever structure, so that the convenience of mounting and dismounting the construction platform is improved, the construction time for mounting the curtain wall for the cantilever structure is saved, the structure of the construction platform is simplified, and the cost of the construction platform is saved; moreover, the suspension platform is connected with the cantilever structure through the connecting structure and is provided with the scaffold structure, so that the stability of the construction platform for mounting the curtain wall of the cantilever structure and the construction safety of construction workers are improved.

Description

A construction platform for encorbelmenting structure curtain installation
Technical Field
The utility model relates to the technical field of building construction, in particular to a construction platform for mounting a curtain wall of an overhanging structure.
Background
With the development of the water conservancy building industry in China, the appearance of buildings and related requirements matched with surrounding natural landscapes begin to be considered in the design stage of a plurality of water conservancy buildings, and curtain wall structures are adopted outside the water conservancy buildings in a plurality of cities at present, particularly on high-altitude overhanging parts such as corridors of the water conservancy buildings. For example, curtain wall installation at the high-altitude overhanging part of the corridor is generally carried out by erecting a construction platform, but the existing construction platform is generally erected and supported on the ground or hung in the air by a hanging basket, and the construction platform erected and supported on the ground increases the cost and the installation difficulty of the construction platform and is not suitable for curtain wall installation at the high-altitude overhanging part; for example, the construction platform of the hanging basket is difficult to keep stable, is not beneficial to the safety of construction workers, and is difficult to realize the standardized construction of the curtain wall.
SUMMERY OF THE UTILITY MODEL
The utility model solves the problems that: how to reduce the cost and the installation degree of difficulty of construction platform, promote construction platform's stability.
In order to solve the above problems, the present invention provides a construction platform for mounting a curtain wall of an overhanging structure, which includes a hanging platform suitable for being disposed below the overhanging structure, a connecting structure suitable for connecting the hanging platform and the overhanging structure, and a scaffold structure; the platform that suspends in midair is located structure width direction's both ends of encorbelmenting are equipped with the extension, scaffold puts up the structure and is suitable for the setting and is in extension department, just scaffold puts up the structure width direction of encorbelmenting go up with the structure interval of encorbelmenting sets up.
Optionally, the suspension platform comprises a plurality of main beams and a plurality of secondary beams, the plurality of main beams are suitable for being arranged at intervals along the length direction of the cantilever structure, the plurality of secondary beams are suitable for being arranged at intervals along the width direction of the cantilever structure, and each secondary beam is suitable for connecting at least two main beams; the upper end of the connecting structure is suitable for being connected with the overhanging structure, and the lower end of the connecting structure is suitable for being connected with the main beam and/or the secondary beam.
Optionally, the suspended platform further comprises a formwork adapted to lay on the primary and secondary beams.
Optionally, the scaffold structure includes a scaffold body arranged in the width direction of the overhanging structure at an interval with the overhanging structure, and the scaffold body is a double-row scaffold.
Optionally, the scaffold bodies are provided in two sets, the two sets of scaffold bodies being adapted to be respectively provided at the two extensions of the suspended platform.
Optionally, the scaffolding structure further comprises a wall connecting member adapted to connect the double row scaffolding and the cantilever structure.
Optionally, scaffold structure still includes the safety net, the safety net is suitable for hanging to establish double scaffold frame is kept away from one side of structure of encorbelmenting.
Optionally, the connecting structure comprises a boom adapted to be vertically disposed between the suspended platform and the overhanging structure and connecting the lower end of the overhanging structure with the suspended platform.
Optionally, the connection structure further includes a diagonal draw bar, and the diagonal draw bar is adapted to connect the lower end of the cantilever structure and the extension portion.
Optionally, the connecting structure further comprises a connecting cable adapted to connect the upper end of the cantilever structure with the extension portion.
Compared with the prior art, the utility model has the following beneficial effects: by arranging the suspension platform below the overhanging structure, on one hand, a standing construction space is provided for construction workers, and the arrangement of the scaffold structure on the suspension platform is facilitated; on the other hand, the suspension platform is convenient to hoist through machinery such as a crane, so that the mounting and dismounting convenience of the construction platform for mounting the curtain wall of the cantilever structure is improved, and the construction time for mounting the curtain wall of the cantilever structure is saved; on the other hand, the structure of the construction platform for installing the overhanging structure curtain wall is simplified, and the cost of the construction platform for installing the overhanging structure curtain wall is saved. Through set up connection structure in order to connect between hanging in midair the platform and the structure of encorbelmenting and hang the platform and encorbelment the structure, promoted and hung in midair the stability of being connected between platform and the structure of encorbelmenting and construction worker's construction safety nature, be convenient for realize the standardized construction of curtain. Moreover, the scaffold structure with a certain distance from the overhanging structure is arranged at the extending part of the overhanging platform, so that a construction worker can stably stand on the scaffold structure to install the curtain wall for the side wall of the overhanging structure, a sufficient space is provided for installing the curtain wall of the side wall of the overhanging structure, the safety of the construction worker is guaranteed, and the standardized construction of the curtain wall is convenient to realize.
Drawings
FIG. 1 is a schematic structural diagram of a construction platform for installing a curtain wall of an overhanging structure, which is arranged on the overhanging structure in the embodiment of the utility model;
fig. 2 is a schematic structural diagram of another view angle when the construction platform for installing the curtain wall of the cantilever structure is arranged on the cantilever structure in the embodiment of the utility model.
Description of reference numerals:
1-suspended platform, 11-extension, 12-main beam; 2-connecting structure, 21-hanging rod, 22-diagonal draw bar, 23-connecting cable; 3-overhanging structure.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below.
In the coordinate system XYZ provided herein, the X axis represents forward, the X axis represents backward, the Y axis represents forward, the Y axis represents leftward, the Z axis represents forward, and the Z axis represents backward.
With reference to fig. 1 and 2, an embodiment of the present invention provides a construction platform for installing a curtain wall of an overhanging structure, including a suspension platform 1 adapted to be disposed below an overhanging structure 3, a connecting structure 2 adapted to connect the suspension platform 1 and the overhanging structure 3, and a scaffold structure; hang in midair platform 1 and be located the ascending both ends of 3 width direction of structure of encorbelmenting and be equipped with extension 11, scaffold puts up the structure and is suitable for the setting in extension 11 department, and scaffold puts up the structure 3 width direction of encorbelmenting and set up with the structure 3 interval of encorbelmenting.
In this embodiment, a construction platform for encorbelmenting structure curtain installation is applicable to the structure 3 of encorbelmenting of vestibule (shelter bridge), for example, the vestibule adopts the steel construction that is frame construction usually as the main part to install the curtain above that, a construction platform for encorbelmenting structure curtain installation then is used for providing the station for the constructor of encorbelmenting structure 3 installation curtain (for example glass curtain etc.) to promote the convenience and the security of encorbelmenting the installation of structure 3 curtain. The construction platform for installing the overhanging structure curtain wall comprises a hanging platform 1, wherein the hanging platform 1 is suitable for being arranged below an overhanging structure 3 (namely, the Z axis is reverse in figure 1) and has a certain distance with the lower end of the overhanging structure 3 (namely, the overhanging structure 3 is arranged at one end of the Z axis in figure 1) in the arrangement direction, so that a space for standing construction is provided for construction workers, and the hanging platform 1 is convenient to hoist the hanging platform 1 through machinery such as a crane. Suspend platform 1 in midair and be connected through connection structure 2 with structure 3 of encorbelmenting, specifically, connection structure 2 sets up and suspends platform 1 in midair and encorbelment between the structure 3 and its both ends respectively with suspend platform 1 and structure 3 of encorbelmenting and be connected to promote and suspend platform 1 in midair and the steadiness of being connected of structure 3 of encorbelmenting, guarantee the safety when construction worker constructs. On the width direction of structure 3 encorbelmenting (Y axle direction in fig. 1 promptly), the size of suspending platform 1 in midair is greater than the width of structure 3 encorbelmenting, and scaffold structure is then vertical setting (along Z axle direction setting in fig. 1 promptly) in the extension 11 department that suspends platform 1 and be located the structure 3 width direction of encorbelmenting both ends in midair to in order that construction workman stands steadily for the structural 3 lateral walls installation curtain of encorbelmenting of scaffold, guaranteed construction workman's safety and be convenient for realize the standardized construction of curtain. Moreover, scaffold structure and the 3 intervals of structure of encorbelmenting set up in the 3 width direction of structure of encorbelmenting, scaffold structure has the certain interval with the structure 3 of encorbelmenting on the 3 width direction of structure of encorbelmenting promptly, for the curtain installation of the 3 lateral walls of structure of encorbelmenting provides sufficient space.
In the prior art, curtain wall installation at a high-altitude overhanging part of a corridor is generally carried out by erecting a construction platform, but the existing construction platform is generally erected and supported on the ground or hung in the air by a hanging basket, and the construction platform erected and supported on the ground increases the cost and the installation difficulty of the construction platform and is not suitable for curtain wall installation at a higher high-altitude overhanging part; for example, the construction platform of the hanging basket is difficult to keep stable, is not beneficial to the safety of construction workers, and is difficult to realize the standardized construction of the curtain wall. In the embodiment, the suspension platform 1 is arranged below the overhanging structure 3, so that on one hand, a standing construction space is provided for construction workers, and the arrangement of the scaffold structure on the suspension platform 1 is facilitated; on the other hand, the suspension platform 1 is convenient to hoist the suspension platform 1 through a crane, so that the mounting and dismounting convenience of a construction platform for mounting the curtain wall of the cantilever structure is improved, and the construction time for mounting the curtain wall for the cantilever structure 3 is saved; on the other hand, the structure of the construction platform for installing the overhanging structure curtain wall is simplified, and the cost of the construction platform for installing the overhanging structure curtain wall is saved. Through set up connection structure 2 in order to connect between platform 1 and the structure 3 of encorbelmenting in midair between platform 1 and the structure 3 of encorbelmenting, promoted and suspended in midair the steadiness of being connected between platform 1 and the structure 3 of encorbelmenting and construction workman's construction safety nature, be convenient for realize the standardized construction of curtain. Moreover, the scaffold structure with a certain distance from the overhanging structure 3 (in the width direction of the overhanging structure 3) is arranged at the extending part 11 of the hanging platform 1, so that a construction worker can stably stand on the scaffold structure to install the curtain wall for the side wall of the overhanging structure 3, and a sufficient space is provided for the installation of the curtain wall of the side wall of the overhanging structure 3, thereby ensuring the safety of the construction worker and facilitating the standardized construction of the curtain wall.
Optionally, as shown in fig. 1 and 2, the suspension platform 1 includes a plurality of main beams 12 and secondary beams, the plurality of main beams 12 are suitable for being arranged at intervals along the length direction of the cantilever structure 3, the plurality of secondary beams are suitable for being arranged at intervals along the width direction of the cantilever structure 3, and each secondary beam is connected with at least two main beams 12; the upper end of the connecting structure 2 is adapted to be connected to the cantilever structure 3, and the lower end of the connecting structure 2 is adapted to be connected to the main beam 12 and/or the secondary beam.
In this embodiment, the main beams 12 of the suspended platform 1 are spaced along the length direction of the cantilever structure 3 (i.e. the X-axis direction in fig. 2), the secondary beams of the suspended platform 1 are spaced along the width direction of the cantilever structure 3 (for example, the secondary beams are perpendicular to the main beams 12), and the secondary beams are adapted to connect (for example, by welding) at least two main beams 12, so that the stability of the suspended platform 1 as a whole is improved by the connection between the main beams 12 and the secondary beams. The upper end (the positive one end of Z axle in connecting structure 2 is located figure 1 promptly) of connecting structure 2 is connected on overhanging structure 3, and the lower extreme (the reverse one end of Z axle in connecting structure 2 is located figure 1 promptly) of connecting structure 2 then is connected on girder 12 and/or secondary beam to promote the steadiness of being connected between overhanging platform 1 and the overhanging structure 3, guarantee the stability and the security of construction workman's construction.
In some embodiments, the main beams 12 are made of i-steel, and the secondary beams are made of light steel keels, so that the mass, cost and installation difficulty of the suspended platform 1 are reduced while the structural strength of the suspended platform 1 is ensured.
Optionally, the suspended platform 1 further comprises formworks adapted to be laid on the primary beams 12 and the secondary beams.
In this embodiment, templates (not shown) are laid on the main beams 12 and the secondary beams of the suspension platform 1, and a plurality of templates are fully laid on the suspension platform 1 to increase the bearing area of the suspension platform 1, on one hand, the safety of construction workers moving on the suspension platform 1 is improved; on the other hand, accidents (such as smashing people or buildings under the suspension platform 1) caused by falling of objects (such as construction materials and the like) on the suspension platform 1 are avoided.
Optionally, the scaffold structure includes a scaffold body that is arranged at an interval with the overhanging structure 3 in the width direction of the overhanging structure 3, and the scaffold body is a double-row scaffold.
In this embodiment, scaffold structure's scaffold frame body (not shown in the figure) is double scaffold to when guaranteeing to provide stable station for constructor, reduce the space that scaffold frame body occupy and alleviate scaffold frame body's weight, thereby alleviate the load that suspends platform 1 in midair, guarantee constructor construction safety on the construction platform that is used for encorbelmenting the installation of structure curtain. And the double-row-foot scaffold is arranged at intervals with the cantilever structure 3 in the width direction of the cantilever structure 3 so as to provide enough space for installing the curtain wall on the side wall of the cantilever structure 3.
In some embodiments, the distance between the scaffolding structure and the cantilever structure 3 in the width direction of the cantilever structure 3 is 30cm, the vertical rod longitudinal distance of the double-row scaffolding of the scaffolding structure is 0.6m, and the vertical rod transverse distance (row distance) is 1.5 m.
Optionally, there are two sets of scaffold bodies adapted to be arranged at two extensions 11 of the suspended platform 1, respectively.
In this embodiment, two sets of vertical settings of scaffold body are hanging in midair that platform 1 is located two extensions 11 departments at the structure 3 width direction of encorbelmenting upward both ends to in the installation of the structure 3 two lateral walls department curtain of encorbelmenting. And two sets of scaffold frame bodies and platform 1 formation one relatively confined environment suspends in midair to guarantee the security of construction workman when being used for encorbelmenting the construction platform of structure curtain installation.
Optionally, the scaffolding structure further comprises wall connectors adapted to connect double row scaffolding with the cantilever structure 3.
In this embodiment, scaffold structure's wall connecting piece (not shown in the figure) is used for connecting double scaffold and structure 3 of encorbelmenting to set up at double scaffold and on the basis of suspending platform 1 in midair, keep away from the stability of suspending the part of platform 1 in order to guarantee double scaffold upper end part through connecting structure 3 of encorbelmenting and double scaffold, thereby promote the holistic stability of double scaffold, guarantee constructor's construction safety on the construction platform that is used for encorbelmenting the structure curtain installation.
Optionally, the scaffolding structure further comprises a safety net adapted to be hung on a side of the double row scaffolding remote from the overhanging structure 3.
In this embodiment, keep away from the one side of encorbelmenting structure 3 at double scaffold and fill to hang and have the safety net (not shown in the figure) for the building engineering scene of curtain installation provides safety protection, plays the cushioning effect for falling of the people or the thing of building scene, avoids the occurence of failure.
In some embodiments, the security mesh employs a closed mesh security mesh.
Alternatively, as shown in fig. 1 and 2, the connecting structure 2 comprises a boom 21, the boom 21 being adapted to be vertically disposed between the suspended platform 1 and the cantilever structure 3 and to connect the lower end of the cantilever structure 3 with the suspended platform 1.
The jib 21 (for example, flat steel jib 21) of connection structure 2 is suitable for vertical setting, and the structure of encorbelmenting 3 is connected to the upper end of jib 21, and the main beam 12 and/or the secondary beam of platform 1 are suspended in midair in the lower extreme connection of jib 21, so to hang platform 1 in midair below the structure of encorbelmenting 3 steadily, guarantee the stability and the security of construction workman's construction.
In some embodiments, the hanger bar 21 is detachably connected to the overhanging structure 3 to further enhance the ease of installation and removal of the construction platform for mounting of the overhanging structure curtain wall. For example, the upper ends of the two booms 21 are clamped to steel structural beams at the lower end of the cantilever structure 3 and connected by fasteners, and the lower ends of the two booms 21 are clamped to main beams 12 of the suspended platform 1 and connected by fasteners, so as to suspend the suspended platform 1 below the cantilever structure 3. Further, the joint of the suspension rod 21 and the overhanging structure 3 and the suspended platform 1 connected by the fastener is further provided with a reinforcing plate (or reinforcing steel bar) to improve the stability of the connection of the suspension rod 21 and the overhanging structure 3 and the suspended platform 1.
Optionally, as shown in fig. 1 and 2, the connecting structure 2 further includes a diagonal draw bar 22, and the diagonal draw bar 22 is adapted to connect the lower end of the cantilever structure 3 and the extending portion 11.
The diagonal draw bar 22 is used for connecting the lower end of the overhanging structure 3 and the extending part 11, so as to further improve the stability of the connection between the suspended platform 1 and the overhanging structure 3 on the basis that the suspended platform 1 and the overhanging structure 3 are connected through the suspension rod 21. And because scaffold structure sets up in extension 11 department, the bearing capacity of extension 11 has been promoted to diagonal draw 22 with being connected of extension 11, has further guaranteed the stable setting of scaffold structure in extension 11 department, has guaranteed constructor's the safety of being under construction on scaffold structure. Moreover, the diagonal draw bar 22 simultaneously supports the extending portion 11 of the suspended platform 1, so as to prevent the extending portion 11 at the other end of the suspended platform 1 from tilting (wherein, the connecting portion of the guide rod and the suspended platform 1 is used as a fulcrum) when the load of the extending portion 11 at one end of the suspended platform 1 is large, thereby ensuring the stability of the suspended platform 1.
In some embodiments, the diagonal draw bars 22 are made of i-steel, and the diagonal draw bars 22 are connected with the cantilever structure 3 and the suspension platform 1 by welding.
Optionally, as shown in fig. 1 and 2, the connecting structure 2 further includes a connecting cable 23, and the connecting cable 23 is adapted to connect the upper end of the cantilever structure 3 with the extension 11.
The connecting cable 23 (for example, a steel wire rope) is used for connecting the upper end of the overhanging structure 3 (that is, the overhanging structure 3 is located at the forward end of the Z axis in fig. 1) and the extension portion 11, so that on the basis that the overhanging platform 1 and the overhanging structure 3 are connected through the suspension rod 21 and the diagonal draw bar 22, the stability of connection between the overhanging platform 1 and the overhanging structure 3 and the bearing capacity of the extension portion 11 are further improved, the stable arrangement of the scaffold structure at the extension portion 11 is ensured, and the construction safety of constructors on the scaffold structure is ensured.
Although the present disclosure has been described above, the scope of the present disclosure is not limited thereto. Various changes and modifications may be effected therein by one of ordinary skill in the pertinent art without departing from the spirit and scope of the present disclosure, and these changes and modifications are intended to be within the scope of the present disclosure.

Claims (10)

1.一种用于悬挑结构幕墙安装的施工平台,其特征在于,包括适于设置在悬挑结构(3)下方的悬吊平台(1)、适于连接所述悬吊平台(1)与所述悬挑结构(3)的连接结构(2)以及脚手架结构;所述悬吊平台(1)位于所述悬挑结构(3)宽度方向上的两端设有延伸部(11),所述脚手架结构适于设置在所述延伸部(11)处,且所述脚手架结构在所述悬挑结构(3)宽度方向上与所述悬挑结构(3)间隔设置。1. A construction platform for the installation of a cantilevered structure curtain wall, characterized in that it comprises a suspended platform (1) suitable for being arranged below the cantilevered structure (3), suitable for connecting the suspended platform (1) The connection structure (2) with the cantilever structure (3) and the scaffolding structure; the two ends of the suspended platform (1) located in the width direction of the cantilever structure (3) are provided with extension parts (11), The scaffolding structure is suitable for being disposed at the extending portion (11), and the scaffolding structure is spaced apart from the overhanging structure (3) in the width direction of the overhanging structure (3). 2.如权利要求1所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述悬吊平台(1)包括主梁(12)和次梁,多个所述主梁(12)适于沿所述悬挑结构(3)的长度方向间隔设置,多个所述次梁适于沿所述悬挑结构(3)的宽度方向间隔设置,且每个所述次梁适于连接至少两个所述主梁(12);所述连接结构(2)的上端适于连接所述悬挑结构(3),所述连接结构(2)的下端适于连接所述主梁(12)和/或所述次梁。2. The construction platform for installation of a cantilevered structure curtain wall according to claim 1, wherein the suspended platform (1) comprises a main beam (12) and a secondary beam, and a plurality of the main beams (12) ) is adapted to be arranged at intervals along the length direction of the cantilever structure (3), a plurality of the secondary beams are adapted to be arranged at intervals along the width direction of the cantilever structure (3), and each of the secondary beams is adapted to At least two main beams (12) are connected; the upper end of the connection structure (2) is suitable for connecting the cantilever structure (3), and the lower end of the connection structure (2) is suitable for connecting the main beam ( 12) and/or the secondary beam. 3.如权利要求2所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述悬吊平台(1)还包括模板,所述模板适于铺设在所述主梁(12)和所述次梁上。3. The construction platform for installation of a cantilevered structure curtain wall according to claim 2, wherein the suspended platform (1) further comprises a template, and the template is suitable for laying on the main beam (12) and on the secondary beam. 4.如权利要求1-3中任一项所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述脚手架结构包括在所述悬挑结构(3)宽度方向上与所述悬挑结构(3)间隔设置的脚手架本体,所述脚手架本体为双排脚手架。4. The construction platform for installation of a curtain wall of a cantilevered structure according to any one of claims 1-3, wherein the scaffolding structure comprises a The cantilever structure (3) is a scaffold body arranged at intervals, and the scaffold body is a double-row scaffold. 5.如权利要求4所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述脚手架本体设有两组,两组所述脚手架本体适于分别设置在所述悬吊平台(1)的两个所述延伸部(11)处。5. The construction platform for cantilevered structure curtain wall installation according to claim 4, wherein the scaffold body is provided with two groups, and the scaffold bodies of the two groups are suitable for being respectively arranged on the suspension platform ( 1) at the two extension parts (11). 6.如权利要求4所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述脚手架结构还包括连墙件,所述连墙件适于连接所述双排脚手架和所述悬挑结构(3)。6 . The construction platform for the installation of a cantilevered structure curtain wall according to claim 4 , wherein the scaffolding structure further comprises a wall connecting piece, and the wall connecting piece is suitable for connecting the double-row scaffolding and the Cantilever structure (3). 7.如权利要求4所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述脚手架结构还包括安全网,所述安全网适于挂设在所述双排脚手架远离所述悬挑结构(3)的一侧。7. The construction platform for installation of a cantilevered structure curtain wall according to claim 4, wherein the scaffolding structure further comprises a safety net, and the safety net is suitable for hanging on the double-row scaffolding away from the One side of the cantilevered structure (3). 8.如权利要求1-3中任一项所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述连接结构(2)包括吊杆(21),所述吊杆(21)适于竖直设置在所述悬吊平台(1)与所述悬挑结构(3)之间,并连接所述悬挑结构(3)下端与所述悬吊平台(1)。8. The construction platform for installation of a cantilevered structure curtain wall according to any one of claims 1-3, wherein the connecting structure (2) comprises a boom (21), and the boom (21) ) is suitable for being vertically arranged between the suspension platform (1) and the suspension structure (3), and connecting the lower end of the suspension structure (3) and the suspension platform (1). 9.如权利要求8所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述连接结构(2)还包括斜拉杆(22),所述斜拉杆(22)适于连接所述悬挑结构(3)下端与所述延伸部(11)。9. The construction platform for the installation of a cantilevered structure curtain wall according to claim 8, wherein the connecting structure (2) further comprises an oblique stay rod (22), and the oblique stay rod (22) is suitable for connecting all the The lower end of the cantilever structure (3) and the extension portion (11). 10.如权利要求8所述的用于悬挑结构幕墙安装的施工平台,其特征在于,所述连接结构(2)还包括连接索(23),所述连接索(23)适于连接所述悬挑结构(3)上端与所述延伸部(11)。10. The construction platform for installation of a cantilevered structure curtain wall according to claim 8, wherein the connecting structure (2) further comprises a connecting cable (23), and the connecting cable (23) is suitable for connecting all The upper end of the cantilever structure (3) and the extension part (11).
CN202121710290.0U 2021-07-26 2021-07-26 A construction platform for installation of cantilevered structure curtain wall Active CN215564320U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121710290.0U CN215564320U (en) 2021-07-26 2021-07-26 A construction platform for installation of cantilevered structure curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121710290.0U CN215564320U (en) 2021-07-26 2021-07-26 A construction platform for installation of cantilevered structure curtain wall

Publications (1)

Publication Number Publication Date
CN215564320U true CN215564320U (en) 2022-01-18

Family

ID=79828840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121710290.0U Active CN215564320U (en) 2021-07-26 2021-07-26 A construction platform for installation of cantilevered structure curtain wall

Country Status (1)

Country Link
CN (1) CN215564320U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445723A (en) * 2021-07-26 2021-09-28 浙江省围海建设集团股份有限公司 Construction platform for mounting overhanging structure curtain wall and mounting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445723A (en) * 2021-07-26 2021-09-28 浙江省围海建设集团股份有限公司 Construction platform for mounting overhanging structure curtain wall and mounting method

Similar Documents

Publication Publication Date Title
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN201598820U (en) Single-point suspension external hanging rack
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN215564320U (en) A construction platform for installation of cantilevered structure curtain wall
CN207727953U (en) A kind of suspended operating platform of slip
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN205330140U (en) Tall support rack of structure encorbelments greatly in high altitude
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN208168317U (en) A kind of lower extension platform of high-altitude construction
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN105776092A (en) Stretching type basket device and construction method thereof
CN114876176A (en) Adjustable long cantilever combined hanging basket and application thereof
CN211597658U (en) Movable overhanging scaffold
CN203334643U (en) Tower crane standard knot and structural steel combination high-altitude large-span operation frame device
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN205955156U (en) Elevartor shaft steel platform
CN117027352A (en) Large-span high altitude vestibule curtain wall construction operation platform
CN106149568A (en) A kind of device for the outside construction of box beam chamber and construction method
CN211714543U (en) Sliding construction platform for aerial work
CN206090309U (en) A device that is used for outdoor portion of case roof beam case to be under construction
CN209554695U (en) Anticollision wall template hoisting device
CN216339062U (en) Auxiliary assembly for mounting bridge diaphragm beam template

Legal Events

Date Code Title Description
GR01 Patent grant