CN108277971A - A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing - Google Patents

A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing Download PDF

Info

Publication number
CN108277971A
CN108277971A CN201810312011.1A CN201810312011A CN108277971A CN 108277971 A CN108277971 A CN 108277971A CN 201810312011 A CN201810312011 A CN 201810312011A CN 108277971 A CN108277971 A CN 108277971A
Authority
CN
China
Prior art keywords
platform
hanging
outrigger
operating platform
hanging type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810312011.1A
Other languages
Chinese (zh)
Inventor
胡怡
闵溯洋
郁政华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201810312011.1A priority Critical patent/CN108277971A/en
Publication of CN108277971A publication Critical patent/CN108277971A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The present invention proposes a kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing, including:Hanging type platform system under modularization, including operating platform and suspension, suspension is made of hanging column, guide rail, oriented module, brake apparatus and power blocks, operating platform is assembled via hanging column, oriented module and is suspended on guide rail, operating platform as a source of power, is moved forward and backward with power blocks along guide rail direction;Upper hanging type outrigger platform system, including outrigger platform ontology, oriented module, guide rail, reinforcing bar hanging ring, fixedly connected part, wherein outrigger platform ontology assembles integral with oriented module, and it is buckled in guide rail inner edge both sides, the tail end of outrigger platform ontology is fixed on using reinforcing bar hanging ring in overhanging main structure, and the bottom end of outrigger platform ontology is fixed on using fixedly connected part in the hanging column connecting node of lower hanging type platform.The present invention makes up the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and precision reach design requirement.

Description

A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing
Technical field
The invention belongs to technical field of building construction, relate generally to a kind of operating platform of translatable formula, especially Translatable formula operating platform suitable for the curtain wall construction that cornices.
Background technology
In executive information systems field, the installation for the curtain wall that cornices is always the problem of construction field.The curtain wall that cornices It is generally on the outside of agent structure, depends on around overhanging main structure, big, construction precision requires high, construction risk with the scale of construction The features such as property is big.When engineering construction, according to Normal practice, need to set up full hall superelevation scaffold either builder's jack, Not only it is dangerous it is larger, quality control on construction is difficult, but also installation and dismounting for the scaffold system being related to itself have high risk; Common hanging basket is installed according to high-rise vertical alien invasion curtain wall to construct, the anchor point of hanging basket then with cornice curtain wall sealing plate that This has overlapping phenomenon, is unfavorable for curtain wall installation, and hanging basket input amount is big, of high cost.It is a kind of suitable for choosing it is therefore desirable to invent The translatable formula operating platform of eaves curtain wall construction, meets the requirement of construction.
Invention content
In order to make up the deficiency of conventional hanging basket and the construction of foot hand, present invention proposition is a kind of to meet executive information systems In cornice the translatable formula operating platform of curtain wall construction, it is ensured that construction safety is controllable, quality and precision reach design and want It asks.
In order to achieve the above object, the present invention proposes a kind of translatable formula operating platform dress for the curtain wall construction that is suitable for cornicing It sets, including:
Hanging type platform system under modularization comprising operating platform and suspension, the suspension is by hanging column, lower extension Formula platform rail, lower hanging type platform oriented module, brake apparatus and power blocks composition, the operating platform via hanging column, Lower hanging type platform oriented module is assembled and is suspended on lower hanging type platform guide rail, and the operating platform is using power blocks as power Source is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system comprising outrigger platform ontology, upper hanging type outrigger platform oriented module, upper hanging type are outstanding Platform rail, reinforcing bar hanging ring, fixedly connected part are chosen, wherein the outrigger platform ontology and upper hanging type outrigger platform oriented module group Entirety is dressed up, and is buckled in upper hanging type outrigger platform guide rail inner edge both sides, to prevent platform from toppling, the tail of the outrigger platform ontology End is fixed on using reinforcing bar hanging ring in overhanging main structure, and the bottom end of the outrigger platform ontology is fixed on down using fixedly connected part In the hanging column connecting node of hanging type platform.
Further, the operating platform is according to platform loads and size, using the structure shape of solid web girder or truss Formula.
Further, the length and width dimensions of the operating platform are controlled in 3x11m.
Further, the quantity of hanging type platform system is set according to the overhanging distance of overhanging main structure under the modularization It sets, forms laterally arrangement.
Further, hanging type platform system carries out suspension connection with 6 points under the modularization, and ready-made 2 sections continuous, and 1 section outstanding The structure type chosen.
Further, the fixedly connected part is using bearing type screw design, the rest height for adjusting position, Outrigger platform is converted into the freely-supported platform of both ends support, effectively reduces working load.
Further, the power blocks control dynamical system motor by master control box and frequency conversion tank computer program and turn Speed realizes platform movement synchronism operation.
It is flat that the present invention proposes a kind of translatable formula operation meeting the curtain wall construction that cornices in executive information systems Table apparatus compensates for the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and precision reach design It is required that.After this kind of device, the construction for the curtain wall that cornices becomes more economical, reasonable, safe and efficient.The device can be in master Reusability between each area of cantilevered structure, significantly reduces working measure cost;The device disclosure satisfy that superaltitude is corniced curtain The construction requirement of wall meets the loading characteristic of curtain wall installation, construction is made to become more reasonable;The device can be that construction personnel creates The operating environment of one safety greatly improves the safety of superaltitude construction;The device avoids cornice curtain wall construction when Interfering between interim measure structure, greatly improves construction efficiency.
Description of the drawings
Fig. 1 and Fig. 2 show the translatable formula operating platform of the curtain wall construction that is suitable for cornicing of present pre-ferred embodiments Apparatus structure schematic diagram.
Fig. 3 show hanging type platform system structure diagram under the modularization of present pre-ferred embodiments.
Fig. 4~Fig. 6 show the schematic diagram of translatable formula operating platform different angle.
Specific implementation mode
The specific implementation mode of the present invention is provided below in conjunction with attached drawing, but the present invention is not limited to the following embodiments and the accompanying drawings.Root According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing be all made of it is very simple The form of change and use non-accurate ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
Please refer to Fig.1~Fig. 3, what Fig. 1 and Fig. 2 showed the curtain wall construction that is suitable for cornicing of present pre-ferred embodiments can Parallel-moving type operating platform structural schematic diagram.Fig. 3 show hanging type platform system under the modularization of present pre-ferred embodiments Structural schematic diagram.The present invention proposes a kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing, including:
Hanging type platform system 1 under modularization comprising operating platform and suspension, the suspension by hanging column 1a, Lower hanging type platform guide rail 8, lower hanging type platform oriented module 7, brake apparatus 9 and power blocks 10 form, the operating platform It assembles and is suspended on lower hanging type platform guide rail 8 via hanging column 1a, lower hanging type platform oriented module 7, the operating platform is with dynamic Power coaster 10 as a source of power, is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system 2 comprising outrigger platform ontology 2, upper hanging type outrigger platform oriented module 3, upper extension Formula outrigger platform guide rail 4, reinforcing bar hanging ring 5, fixedly connected part 6, wherein the outrigger platform ontology 2 is led with upper hanging type outrigger platform It is assembled to module 3 integral, and is buckled in 4 inner edge both sides of upper hanging type outrigger platform guide rail, to prevent platform from toppling, the overhanging is flat The tail end of playscript with stage directions body 2 is fixed on using reinforcing bar hanging ring 5 in overhanging main structure, and the bottom end of the outrigger platform ontology 2 is using fixation Connector 6 is fixed in the hanging column 1a connecting nodes of lower hanging type platform.
According to present pre-ferred embodiments, the operating platform according to platform loads and size, using solid web girder or The structure type of truss.The length and width dimensions of the operating platform are controlled in 3x11m or so.
The quantity of hanging type platform system is configured according to the overhanging distance of overhanging main structure under the modularization, is formed horizontal To arrangement.Hanging type platform system carries out suspension connection with 6 points under the modularization, and ready-made 2 sections continuous, the structure shape of 1 section of overhanging Formula is convenient for the construction of follow-up curtain wall cover board.
Not when upper people's operation, which can be moved via artificial push-and-pull along 4 direction of upper hanging type outrigger platform guide rail.On When people operates, platform tail end need to be fixed on reinforcing bar hanging ring 5 in overhanging main structure, and platform overhanging section bottom end need to use fixedly connected part 6 are fixed in the hanging column 1a connecting nodes of lower hanging type platform, and the fixedly connected part 6 uses bearing type screw design, for adjusting Outrigger platform is converted into the freely-supported platform of both ends support, effectively reduces working load by the rest height for saving position.
The power blocks 10 control dynamical system motor speed by master control box and frequency conversion tank computer program, realize flat Platform moves synchronism operation.
It is flat that the present invention proposes a kind of translatable formula operation meeting the curtain wall construction that cornices in executive information systems Table apparatus mainly has following several functions:
1, meet normal operating condition
Hanging type platform 1 and upper hanging type outrigger platform 2 detach in advance under normal operating condition, modularization, respectively start to Then hanging type platform under modularization 1 and upper hanging type outrigger platform 2 are interconnected to form by precalculated position by fixedly connected part 6 It is whole.Dynamical system is in shutdown status simultaneously, and opens brake apparatus 9, it is ensured that platform stable is secured.Construction personnel can be It completes to cornice on hanging type platform 1 and upper hanging type outrigger platform 2 under modularization installation, welding and the application operation of each component of curtain wall.
2, horizontally moveable operating function
When operating platform change area's construction, by upper hanging type outrigger platform guide rail 4 and lower hanging type platform guide rail 8 Turnover and displacement, form towards next construction area and start channel.Construction personnel all withdraws platform at this time, unclamps the ownership Dynamic device 9 and fixedly connected part 6, upper hanging type outrigger platform 2 are pushed by artificial, and lower hanging type platform turns on the power coaster 10 along rail Road direction running, in conjunction with the measure for " meeting normal operating condition " before this, and so on, it follows and cornices curtain wall construction sequence by cross Complete installation operation.
3, console module function
The platform is processed with modularized design, and material turnover is high, is repeated and is recycled, the bigger economy of construction area Efficiency is more prominent.Especially suitable for cornicing on big high-rise building, it is flat can several modularizations to be set according to length of cornicing Platform is formed into lateral arrangement, and the whole section of installation requirements corniced are met.
Please refer to Fig.4 the schematic diagram that~6, Fig. 4~Fig. 6 show translatable formula operating platform different angle.In east Western both sides are corniced after the completion of curtain wall construction, and whole device, which is moved to southern side, cornices, because overhanging distance is corniced more than thing in southern side Both sides, therefore 3 rows are increased to by platform is hung under original 2 row, all standing for construction of being corniced with guarantee.It, can be according to by the above method Secondary completion cornice structure each region curtain wall construction.
In conclusion the present invention proposes and a kind of meeting the translatable of the curtain wall construction that cornices in executive information systems Formula operating platform compensates for the deficiency of conventional hanging basket and scaffold construction, it is ensured that construction safety is controllable, quality and precision Reach design requirement.After this kind of device, the construction for the curtain wall that cornices becomes more economical, reasonable, safe and efficient.The device Can between each area of main cantilevered structure Reusability, significantly reduce working measure cost;The device disclosure satisfy that superelevation Sky cornices the construction requirement of curtain wall, meets the loading characteristic of curtain wall installation, construction is made to become more reasonable;The device can be construction Personnel create the operating environment of a safety, greatly improve the safety of superaltitude construction;The device avoids the curtains that cornices Interfering between interim measure structure, greatly improves construction efficiency when wall is constructed.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause This, the scope of protection of the present invention is defined by those of the claims.

Claims (7)

1. a kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing, which is characterized in that including:
Hanging type platform system under modularization comprising operating platform and suspension, the suspension by hanging column, under it is hanging flat Platform guide rail, lower hanging type platform oriented module, brake apparatus and power blocks composition, the operating platform is via hanging column, lower extension Formula platform oriented module is assembled and is suspended on lower hanging type platform guide rail, and the operating platform is using power blocks as power Source is moved forward and backward along lower hanging type platform guide rail direction;
Upper hanging type outrigger platform system comprising outrigger platform ontology, upper hanging type outrigger platform oriented module, upper hanging type overhanging are flat Platform guide rail, reinforcing bar hanging ring, fixedly connected part, wherein the outrigger platform ontology is assembled into upper hanging type outrigger platform oriented module It is whole, and upper hanging type outrigger platform guide rail inner edge both sides are buckled in, to prevent platform from toppling, the tail end of the outrigger platform ontology is adopted It is fixed in overhanging main structure with reinforcing bar hanging ring, the bottom end of the outrigger platform ontology is fixed on down hanging using fixedly connected part In the hanging column connecting node of platform.
2. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that The operating platform is according to platform loads and size, using the structure type of solid web girder or truss.
3. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that The length and width dimensions of the operating platform are controlled in 3x11m.
4. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that The quantity of hanging type platform system is configured according to the overhanging distance of overhanging main structure under the modularization, forms laterally arrangement.
5. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that Hanging type platform system carries out suspension connection with 6 points under the modularization, and ready-made 2 sections continuous, the structure type of 1 section of overhanging.
6. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that The fixedly connected part uses bearing type screw design, the rest height for adjusting position to be converted into outrigger platform The freely-supported platform of both ends support, effectively reduces working load.
7. the translatable formula operating platform of the curtain wall construction according to claim 1 that is suitable for cornicing, which is characterized in that The power blocks control dynamical system motor speed by master control box and frequency conversion tank computer program, realize that platform movement synchronizes Property operation.
CN201810312011.1A 2018-04-09 2018-04-09 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing Pending CN108277971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810312011.1A CN108277971A (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810312011.1A CN108277971A (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing

Publications (1)

Publication Number Publication Date
CN108277971A true CN108277971A (en) 2018-07-13

Family

ID=62811481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810312011.1A Pending CN108277971A (en) 2018-04-09 2018-04-09 A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing

Country Status (1)

Country Link
CN (1) CN108277971A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236616A (en) * 2019-07-11 2020-06-05 宝业湖北建工集团有限公司 Horizontal guide rail walking hanging basket for high-rise construction
CN111593894A (en) * 2019-02-21 2020-08-28 武汉凌云建筑装饰工程有限公司 High altitude platform suspended ceiling system
CN113137049A (en) * 2021-04-14 2021-07-20 方远建设集团股份有限公司 Large-span steel limb cornice construction platform
CN114197847A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Construction method of assembled roof cornice modeling curtain wall
CN114809583A (en) * 2022-06-06 2022-07-29 上海建工集团股份有限公司 Transversely-sliding hanging basket for building construction and mounting method
CN114892933A (en) * 2022-04-26 2022-08-12 中冶天工集团有限公司 Adjustable platform for pipeline construction under platform beam and using method
CN116480119A (en) * 2023-06-06 2023-07-25 中国十七冶集团有限公司 An operating platform for the construction of cantilevered steel beam curtain walls
CN116733176A (en) * 2023-06-14 2023-09-12 中国十七冶集团有限公司 Intelligent spraying device for cornices of inclined roofs and application method of intelligent spraying device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203769322U (en) * 2013-12-18 2014-08-13 中铁建工集团北方工程有限公司 Overhanging type feeding and discharging device
CN204001658U (en) * 2014-06-03 2014-12-10 上海宝冶集团有限公司 A kind of movable hanging frame of installing for cornice decorative ceiling
CN104989094A (en) * 2015-07-06 2015-10-21 上海中建八局装饰有限责任公司 Walking hanging basket and installing method of walking hanging basket
CN206128603U (en) * 2016-09-29 2017-04-26 上海江河幕墙系统工程有限公司 Curtain mounting structure that leads a wandering life cornices
CN208280564U (en) * 2018-04-09 2018-12-25 上海市机械施工集团有限公司 A kind of translatable formula operating platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203769322U (en) * 2013-12-18 2014-08-13 中铁建工集团北方工程有限公司 Overhanging type feeding and discharging device
CN204001658U (en) * 2014-06-03 2014-12-10 上海宝冶集团有限公司 A kind of movable hanging frame of installing for cornice decorative ceiling
CN104989094A (en) * 2015-07-06 2015-10-21 上海中建八局装饰有限责任公司 Walking hanging basket and installing method of walking hanging basket
CN206128603U (en) * 2016-09-29 2017-04-26 上海江河幕墙系统工程有限公司 Curtain mounting structure that leads a wandering life cornices
CN208280564U (en) * 2018-04-09 2018-12-25 上海市机械施工集团有限公司 A kind of translatable formula operating platform

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593894A (en) * 2019-02-21 2020-08-28 武汉凌云建筑装饰工程有限公司 High altitude platform suspended ceiling system
CN111236616A (en) * 2019-07-11 2020-06-05 宝业湖北建工集团有限公司 Horizontal guide rail walking hanging basket for high-rise construction
CN113137049A (en) * 2021-04-14 2021-07-20 方远建设集团股份有限公司 Large-span steel limb cornice construction platform
CN114197847A (en) * 2021-11-25 2022-03-18 中建八局第二建设有限公司 Construction method of assembled roof cornice modeling curtain wall
CN114892933A (en) * 2022-04-26 2022-08-12 中冶天工集团有限公司 Adjustable platform for pipeline construction under platform beam and using method
CN114809583A (en) * 2022-06-06 2022-07-29 上海建工集团股份有限公司 Transversely-sliding hanging basket for building construction and mounting method
CN116480119A (en) * 2023-06-06 2023-07-25 中国十七冶集团有限公司 An operating platform for the construction of cantilevered steel beam curtain walls
CN116733176A (en) * 2023-06-14 2023-09-12 中国十七冶集团有限公司 Intelligent spraying device for cornices of inclined roofs and application method of intelligent spraying device

Similar Documents

Publication Publication Date Title
CN108277971A (en) A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing
CN102373670B (en) Mobile platform carrying and erecting integrated machine and bridge erecting method
CN103669832A (en) Standard Bailey truss assembling type jacking formwork system
CN208280564U (en) A kind of translatable formula operating platform
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN107447973A (en) A kind of unilateral suspension type aerial movement steel platform
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
DE10335499B3 (en) Steam generator erection method has pre-assembled pipe wall modules attached to steam vessel frame before fitting frame cover
CN202953748U (en) Wall-attached structure of overhanging external hanging type self-climbing tower crane
ZA202403115B (en) Space truss support platform, system and method for super-deep slurry wall
CN106193567A (en) Variable-section integrated lifting operation platform adduction construction method for ultrahigh building
CN106368457B (en) Workshop is moved in sandblasting dust suppression
CN106013453A (en) Construction method for large-span overhung ultra-limit structure
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN112523520B (en) Construction method of lifting protection platform for prefabricated building
CN109160421A (en) A kind of integral hoisting system of mobile shelter
CN205874987U (en) Simply put up bridge crane
CN201671393U (en) Inner-outer tubular self-supporting steel chimney
CN103882882B (en) Integral jacking formula tower crane platform structure
CN204531215U (en) For the mobile truss of Standard Factory Room under tile construction
CN206082172U (en) Denitration high -temperature flue draws rod fixing structure
CN102817467A (en) Operating platform for high-altitude installation of steel structure
CN106121213A (en) Super High all steel climbs outrigger repeatedly variable cross-section lifting device and construction method
CN215631490U (en) Elevator shaft operating platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713