CN106193567A - Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform - Google Patents

Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform Download PDF

Info

Publication number
CN106193567A
CN106193567A CN201610560241.0A CN201610560241A CN106193567A CN 106193567 A CN106193567 A CN 106193567A CN 201610560241 A CN201610560241 A CN 201610560241A CN 106193567 A CN106193567 A CN 106193567A
Authority
CN
China
Prior art keywords
integrated form
lifting operation
operation platform
form lifting
variable cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610560241.0A
Other languages
Chinese (zh)
Other versions
CN106193567B (en
Inventor
吕长岩
曾波
高峰
刘洋
陈绍飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201610560241.0A priority Critical patent/CN106193567B/en
Publication of CN106193567A publication Critical patent/CN106193567A/en
Application granted granted Critical
Publication of CN106193567B publication Critical patent/CN106193567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

Construction method is received in the invention discloses a kind of super-high buildings variable cross-section integrated form lifting operation platform, first, cantilever steel girder is fixed on floor, integrated form lifting operation platform is promoted, when integrated form lifting operation platform rises at non-variable cross-section, unclamp the bolt of fixing cantilever steel girder on the floor at non-variable cross-section, it is connected fixing to the front end of cantilever steel girder and integrated form lifting operation platform, the other calabash being connected between floor and integrated form lifting operation platform is used inwardly to be drawn by integrated form lifting operation platform, move integrated form lifting operation platform to position several times, integrated form lifting operation platform is fixedly mounted on after moving position on the floor at non-variable cross-section.

Description

Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
Technical field
Receive construction method in the present invention relates to a kind of integrated form lifting operation platform, particularly relate to a kind of high-rise building Exterior building profile due in integrated form lifting operation platform when moulding needs to carry out variable cross-section receipts process construction method.
Background technology
In high-rise building, often due to architectural image needs by batter post external frame trestle carried out interior receipts, and just Presently, Super High often uses integrated form lifting operation platform, how to carry out elevator belt when this is with regard to giving and constructing this variable cross-section Carry out difficulty.
The mode of the most commonly used replacing climbing frame carries out interior receipts at present, and i.e. interior region climbing frame of receiving is parked in variable cross-section Place, re-assemblies climbing frame in bottom, and period structure construction uses the construction of overhang steel pipe support, and how this alternative asks if having Topic:
(1) the site operation duration is affected.Climbing frame integral installation generally requires structure construction and coordinates, and needs time-out portion Subregion construction, so that climbing frame is installed, often leads to the main body duration delayed.
(2) dangerous big.Owing to there is the process of an interim conversion, climbing frame is being installed and danger in unloading process It is the maximum moment, owing to this kind of construction can cause being dismounted for multiple times, therefore there is titanic peril.
(3) cross-operation, working procedure interts complicated, takies climbing frame resource many, and needs huge climbing frame to assemble field Ground.
Summary of the invention
The technical problem to be solved be to provide a kind of economic and environment-friendly, construct convenient, safely and effectively face frontier defense Construction method is received in the super-high buildings variable cross-section integrated form lifting operation platform protected.
In order to solve above-mentioned technical problem, receive in the super-high buildings variable cross-section integrated form lifting operation platform that the present invention provides Construction method, first, cantilever steel girder is fixed on floor, promotes integrated form lifting operation platform, when integrated form lifts When operating platform rises at non-variable cross-section, unclamp the bolt of fixing cantilever steel girder on the floor at non-variable cross-section, will encorbelment The front end of girder steel is fixing with integrated form lifting operation platform to be connected, and uses the other floor that is connected to put down with integrated form descending operation Integrated form lifting operation platform is inwardly drawn by the calabash between platform, moves integrated form lifting operation platform to position several times, integrated Formula lifting operation platform is fixedly mounted on after moving position on the floor at non-variable cross-section.
According to design, described cantilever steel girder requires that the channel-section steel selecting the 3.0m length of respective strengths model is welded.
Described cantilever steel girder uses and requires that the pre-embedded bolt selecting respective strengths model is fixed according to design.
Described integrated form lifting operation platform uses electric block to promote.
Described integrated form lifting operation platform uses bottle gouard moved by hands to carry out interior receipts by several times.
Space between integrated form lifting operation platform, plane is welded with scaffold board with riffled iron, and facade hangs punching net Sheet.
Construction method, its advantage is received in using the super-high buildings variable cross-section integrated form lifting operation platform of technique scheme As follows:
(1) the site operation duration is not impacted.Climbing frame climbs and the time used by interior receipts is about half working day, can To construct in the construction technology intermission after utilizing concreting to complete, it is not take up the main body construction time.
(2) dangerous little.Constructing by this patent, climbing frame only carries out partial disassembly, it is not necessary to carries out repeatedly entirety and tears open Dress, reduces construction risk.
(3) place is saved.Reduce the place demand of repeatedly integral disassembly, assembly support body.
(4) cost-effective.Construction technology is easy, compared to traditional handicraft, has the biggest saving for manpower, material.
High-rise building exterior building profile due to moulding need to carry out variable cross-section time, receive in integrated form lifting operation platform Process construction method, it is not necessary to integrated form lifting operation platform is dismounted again, complete aerial interior receipts.Present invention process is constructed Easy, quick, can effectively save the human and material resources shared by the interior receipts of conventional ultra high layer variable cross-section climbing frame, place, the duration etc. one Series cost, reduces construction risk simultaneously.
In sum, present invention process easy construction, quick, receive in effectively saving conventional ultra high layer variable cross-section climbing frame A series of costs such as shared human and material resources, place, duration, reduce construction risk simultaneously.Can use with large-scale popularization.
Accompanying drawing explanation
Fig. 1 is the 1st step schematic diagram of the construction of the embodiment of the present invention.
Fig. 2 is the 2nd step schematic diagram of the construction of the embodiment of the present invention.
Fig. 3 is the 3rd step schematic diagram of the construction of the embodiment of the present invention.
Fig. 4 is the 4th step schematic diagram of the construction of the embodiment of the present invention.
Fig. 5 is the 5th step schematic diagram of the construction of the embodiment of the present invention.
Fig. 6 is the 6th step schematic diagram of the construction of the embodiment of the present invention.
Fig. 7 is the 7th step schematic diagram of the construction of the embodiment of the present invention.
Fig. 8 is the 8th step schematic diagram of the construction of the embodiment of the present invention.
Fig. 9 is the 9th step schematic diagram of the construction of the embodiment of the present invention.
Figure 10 is the 10th step schematic diagram of the construction of the embodiment of the present invention.
Figure 11 is the 11st step schematic diagram of the construction of the embodiment of the present invention.
Figure 12 is the 12nd step schematic diagram of the construction of the embodiment of the present invention.
Detailed description of the invention
The invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings.
Seeing Fig. 1 to Figure 12, as a example by sky converges center projects, this engineering office building structure has 3 variable cross-sections, becomes every time and cuts Face is by receiving 1300mm in two-layer batter post.This integrated form lifting operation platform 2 takes the treatment measures will drawn in support body.Overhang steel According to design, beam 1 requires that the channel-section steel selecting the 3.0m length of respective strengths model is welded, first, cantilever steel girder 1 uses basis Design requires that the pre-embedded bolt selecting respective strengths model is fixed on floor 3, uses electric block 4 to be connected to floor 3 and collection Between accepted way of doing sth lifting operation platform 2, integrated form lifting operation platform 2 is promoted, when integrated form lifting operation platform 2 climbs To time at non-variable cross-section, unclamp the bolt of fixing cantilever steel girder 1 on the floor 3 at non-variable cross-section, by the front end of cantilever steel girder 1 Fix with integrated form lifting operation platform 2 and be connected, use other being connected between floor 3 and integrated form lifting operation platform 2 Bottle gouard moved by hands 5 each for integrated form lifting operation platform 2 200mm is inwardly drawn, for the last time by integrated form lifting operation platform 2 Inside drawing 300mm, divide and move integrated form lifting operation platform 2 to position 6 times, integrated form lifting operation platform 2 uses attached after moving position to Bearing 6 to be fixedly mounted on the floor 3 at non-variable cross-section by integrated form lifting operation platform 2.Integrated form lifting operation platform 2 Between space, plane is welded with scaffold board with riffled iron, facade extension punching mesh sheet.In variable cross-section, the time receiving needs unnecessary every time Support body and seat in the plane dismantle.Need to pay special attention to need to carry out strict calculating for different engineerings, notice that structure stress whether can Enough meet climbing frame to encorbelment demand.

Claims (6)

1. receive a construction method in super-high buildings variable cross-section integrated form lifting operation platform, it is characterized in that: first, cantilever steel girder It is fixed on floor, integrated form lifting operation platform is promoted, when integrated form lifting operation platform rises to non-variable cross-section During place, unclamp the bolt of fixing cantilever steel girder on the floor at non-variable cross-section, the front end of cantilever steel girder is lifted with integrated form Operating platform is fixing to be connected, and uses the other calabash being connected between floor and integrated form lifting operation platform by integrated form liter Fall operating platform inwardly draws, and moves integrated form lifting operation platform to position several times, after integrated form lifting operation platform moves position to It is fixedly mounted on the floor at non-variable cross-section.
Construction method, its feature is received in super-high buildings variable cross-section integrated form lifting operation platform the most according to claim 1 It is: according to design, described cantilever steel girder requires that the channel-section steel selecting the 3.0m length of respective strengths model is welded.
Receiving construction method in super-high buildings variable cross-section integrated form lifting operation platform the most according to claim 1 and 2, it is special Levy and be: described cantilever steel girder uses and requires that the pre-embedded bolt selecting respective strengths model is fixed according to design.
Receiving construction method in super-high buildings variable cross-section integrated form lifting operation platform the most according to claim 1 and 2, it is special Levy and be: described integrated form lifting operation platform uses electric block to promote.
Receiving construction method in super-high buildings variable cross-section integrated form lifting operation platform the most according to claim 1 and 2, it is special Levy and be: described integrated form lifting operation platform uses bottle gouard moved by hands to carry out interior receipts by several times.
Receiving construction method in super-high buildings variable cross-section integrated form lifting operation platform the most according to claim 1 and 2, it is special Levying and be: the space between integrated form lifting operation platform, plane is welded with scaffold board with riffled iron, facade hangs punching mesh sheet.
CN201610560241.0A 2016-07-15 2016-07-15 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform Active CN106193567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610560241.0A CN106193567B (en) 2016-07-15 2016-07-15 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610560241.0A CN106193567B (en) 2016-07-15 2016-07-15 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform

Publications (2)

Publication Number Publication Date
CN106193567A true CN106193567A (en) 2016-12-07
CN106193567B CN106193567B (en) 2019-04-02

Family

ID=57475250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610560241.0A Active CN106193567B (en) 2016-07-15 2016-07-15 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform

Country Status (1)

Country Link
CN (1) CN106193567B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806237A (en) * 2017-11-28 2018-03-16 中建局集团建设发展有限公司 A kind of high building hydraulic climbing protecting screen and its construction method
CN114250965A (en) * 2021-12-28 2022-03-29 中国建筑第二工程局有限公司 Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2232469Y (en) * 1995-11-22 1996-08-07 大连第一建筑工程公司 Hydraulic self-lifting scaffold
CN2268748Y (en) * 1996-05-07 1997-11-26 沈海晏 Guide railing synchronously lifting scaffold
CN101852008A (en) * 2010-06-04 2010-10-06 刘玉伟 Lifting scaffold device
CN103291066A (en) * 2013-06-01 2013-09-11 山东天齐置业集团股份有限公司 Auxiliary device for wall-attached frame for construction lifts, and strengthening method of auxiliary device
CN104234439A (en) * 2014-09-03 2014-12-24 中铁十六局集团城市建设发展有限公司 Angle regulating device and angle regulating method in integrated frame lifting process
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN105484505A (en) * 2015-11-24 2016-04-13 中建三局集团有限公司 Variable angle vertical concrete structure climbing device and use method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2232469Y (en) * 1995-11-22 1996-08-07 大连第一建筑工程公司 Hydraulic self-lifting scaffold
CN2268748Y (en) * 1996-05-07 1997-11-26 沈海晏 Guide railing synchronously lifting scaffold
CN101852008A (en) * 2010-06-04 2010-10-06 刘玉伟 Lifting scaffold device
CN103291066A (en) * 2013-06-01 2013-09-11 山东天齐置业集团股份有限公司 Auxiliary device for wall-attached frame for construction lifts, and strengthening method of auxiliary device
CN104234439A (en) * 2014-09-03 2014-12-24 中铁十六局集团城市建设发展有限公司 Angle regulating device and angle regulating method in integrated frame lifting process
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN105484505A (en) * 2015-11-24 2016-04-13 中建三局集团有限公司 Variable angle vertical concrete structure climbing device and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806237A (en) * 2017-11-28 2018-03-16 中建局集团建设发展有限公司 A kind of high building hydraulic climbing protecting screen and its construction method
CN114250965A (en) * 2021-12-28 2022-03-29 中国建筑第二工程局有限公司 Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof

Also Published As

Publication number Publication date
CN106193567B (en) 2019-04-02

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN205348727U (en) A promote formula operation platform for in shaft
CN106193567A (en) Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN102888894A (en) Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN102003078A (en) Assembling method of net rack
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN103061514A (en) Long-span steel structure corridor construction method
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN202706495U (en) Ladder type air basket
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN205602927U (en) Integral type hauler and leading wheel fixing device
CN102733612B (en) Mounting method of electric hoist orbit
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN102817467A (en) Operating platform for high-altitude installation of steel structure
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN113387281A (en) Alternate conversion attachment system of externally attached tower crane and construction method
CN211622525U (en) Can have enough to meet need elevartor shaft construction operation platform
CN209942195U (en) Construction operation platform of high-rise hollow area
CN205348728U (en) A promote formula operation platform bearing structure for in shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant