CN209942195U - Construction operation platform of high-rise hollow area - Google Patents
Construction operation platform of high-rise hollow area Download PDFInfo
- Publication number
- CN209942195U CN209942195U CN201920639012.7U CN201920639012U CN209942195U CN 209942195 U CN209942195 U CN 209942195U CN 201920639012 U CN201920639012 U CN 201920639012U CN 209942195 U CN209942195 U CN 209942195U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- construction operation
- construction
- support member
- supporting component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a construction technical field especially relates to a construction operation platform in high-rise dead zone, and it includes construction platform and supporting component, construction platform includes the framework, the one end butt of framework is on the concrete beam on upper strata, supporting component sets up the multiunit, supporting component with the perpendicular fixed connection of framework, supporting component keeps away from the one end of framework can the butt on the lower floor on the concrete beam, the last fixed control lever that is provided with of supporting component, the control lever is configured to make construction operation platform slope under the effect of external force. The utility model discloses can use repeatedly, need not to build the scaffold frame, reduce the process, promote the convenience.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a construction operation platform in high-rise hollow area.
Background
With the acceleration of the urbanization process in China, more and more high-rise residential buildings are built. In the construction process of high-rise residential buildings, the hollow area of the outdoor corridor is a key and difficult point of construction and is a dangerous construction area. The construction of most hollow areas adopts the I-shaped steel beam to be built on the beam or the scaffold is built on the beam after the steel beam penetrates the wall (the reserved hole needs to be repaired later), and the construction mode has the following problems in the construction process, the construction effect and the construction period:
1. the form of the I-shaped steel beam and the fastener type scaffold is adopted, so that the construction speed is low and the number of construction people is large;
2. after the use is finished, the construction is required to be dismantled, construction operations such as plugging and the like are carried out on the reserved hole, and the number of working procedures is large;
3. the installation and the removal are both high-altitude operation, and the danger is high;
in addition, when the existing hollow area construction operation platform is integrally lifted, the supporting piece is easily clamped with the concrete beam, and inconvenience is brought to construction.
Therefore, a high-rise hollow space construction operation platform is needed to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction operation platform in high-rise hollow out area can solve and has technical problem among the prior art.
To achieve the purpose, the utility model adopts the following technical proposal:
a construction operation platform of high-rise hollow zone comprises: construction platform and supporting component, construction platform includes the framework, the one end of framework can the butt on the concrete beam on upper strata, supporting component sets up the multiunit, supporting component with the perpendicular fixed connection of framework, supporting component keeps away from the one end of framework can the butt on the lower floor on the concrete beam, the last fixed control lever that is provided with of supporting component, the control lever is configured to can make the whole slope of construction operation platform under the effect of external force.
Preferably, the supporting component comprises a first supporting piece and a second supporting piece, the first supporting piece is vertically arranged, one end of the first supporting piece is fixedly connected with the frame body, the other end of the first supporting piece is fixedly provided with an abutting piece perpendicular to the first supporting piece, the abutting piece can abut against the concrete beam on the lower layer, the second supporting piece is obliquely arranged, one end of the second supporting piece is fixedly connected with one end, far away from the first supporting piece, of the frame body, the other end of the second supporting piece is fixedly connected with one end, close to the abutting piece, of the first supporting piece, and the control rod is fixedly connected with the second supporting piece.
Preferably, a connecting rod is fixedly arranged between the first supporting pieces of the multiple groups of supporting assemblies.
Preferably, a plurality of fixing members are arranged on the frame body along the first direction at intervals in parallel.
Preferably, a scaffold board is disposed on the frame, and the scaffold board is fully distributed on the upper surface of the frame.
Preferably, lifting lugs are fixedly arranged on the periphery of the frame body, and through holes for the lifting lugs to pass through are formed in the positions, corresponding to the lifting lugs, of the scaffold board.
Preferably, the number of the lifting lugs is at least two.
Preferably, the scaffold board is connected with the frame body through bolts.
Preferably, the support assembly is made of channel steel.
Preferably, the material of the fixing piece is steel.
The utility model has the advantages that:
the utility model provides a construction operation platform in high-rise dead zone, through setting up supporting component and construction platform, one end of the framework of construction platform can butt on the concrete beam of upper strata, and the supporting component can butt on the concrete beam of lower floor, guarantees that this construction operation platform can stably support in the construction area, guarantees that constructor can stand and construct on construction platform; the construction operation platform can be used repeatedly, a scaffold does not need to be built, and working procedures are reduced; simultaneously, set up the control lever on supporting component and can assist this construction operation platform in the lift process, guarantee through this construction operation platform that the slope promotes and can go on smoothly, can not blocked by the concrete beam.
Drawings
Fig. 1 is a schematic diagram of the construction operation platform of the high-rise hollow area of the utility model.
In the figure:
1-a frame body; 2-a first support; 3-a second support; 4-an abutment; 5-a connecting rod; 6-scaffold board; 7-lifting lugs; 8-a control lever; 9-concrete beam, 10-fixing piece.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some but not all of the elements related to the present invention are shown in the drawings.
As shown in fig. 1, the utility model provides a construction operation platform in high-rise hollow area, it includes: construction platform and supporting component, construction platform includes framework 1, framework 1 can adopt the channel-section steel welding to form, framework 1's one end butt is on the concrete beam 9 of upper strata, supporting component sets up the multiunit, supporting component and the perpendicular fixed connection of framework 1, the supporting component is kept away from framework 1's one end can the butt on the concrete beam 9 of lower floor, the last fixed control lever 8 that is provided with of supporting component, control lever 8 is configured to when this construction operation platform lifts, can make the whole slope of construction operation platform through pull control lever 8, make construction operation platform can promote between different floors.
Further, the supporting component comprises a first supporting piece 2 and a second supporting piece 3, wherein the first supporting piece 2 is vertically arranged, one end of the first supporting piece is fixedly connected with the frame body 1, the other end of the first supporting piece is fixedly provided with an abutting piece 4 perpendicular to the first supporting piece, the abutting piece 4 can abut against the concrete beam 9 on the lower layer, the second supporting piece 3 is obliquely arranged, one end of the second supporting piece is fixedly connected with one end of the frame body 1, the first supporting piece 2 is far away from the one end of the second supporting piece, the other end of the second supporting piece is fixedly connected with one end, close to the abutting piece 4, of the first supporting piece. The first support piece 2, the second support piece 3 and the part fixedly connected with the frame body 1 form a triangle together, so that the structure is stable; ensure that the supporting component provides stable support for the platform.
Optionally, the frame body 1 can be a rectangle, the size of each side of the frame body 1 is slightly smaller than the size of the concrete beam in the hollow area, when the length and width of the frame body 1 is greater than 3m, the supporting component is added in the middle of the frame body 1 to strengthen the support, in order to enable the supporting components to be kept stable, specifically, a connecting rod 5 is fixedly arranged between the first supporting components 2 of the multiple groups of supporting components, the selection is optional, the connecting rod 5 is provided with a plurality of supporting components at intervals along the height direction of the first supporting components 2, the multiple groups of supporting components are guaranteed to form a stable integral structure through the connecting rod 5, the repeated utilization rate of the construction operation platform is improved, meanwhile, the connecting rod 5 can protect an external corridor, when personnel pass through or construct in an outdoor corridor, the protection effect is achieved. The connecting rod 5 may be made of steel commonly used in construction sites.
Further, a plurality of fixing members 10 are provided in parallel at intervals on the frame body 1 in the first direction, and optionally, the fixing members 10 are made of steel materials commonly used in a construction site. Be provided with scaffold board 6 on the framework 1, specifically, scaffold board 6 passes through bolt and framework 1 fixed connection, and scaffold board 6 is full in the upper surface of framework 1, guarantees constructor's safety. In order to facilitate the transportation and the lifting of the construction operation platform, specifically, lifting lugs 7 are fixedly arranged around the frame body 1, through holes for the lifting lugs 7 to pass through are formed in the positions, corresponding to the lifting lugs 7, of the scaffold board 6, and when the construction operation platform is transported and lifted, a tower crane or a crane can lift the construction operation platform through the lifting lugs 7.
The utility model provides a construction operation platform in high-rise dead zone, the one end of the framework 1 of construction platform can butt on the concrete beam 9 of upper strata, and the supporting component can butt on the concrete beam 9 of lower floor, guarantees that this construction operation platform can stably support in the construction region, and this construction operation platform can use repeatedly, need not to build the scaffold, has reduced the process, also need not to carry out high altitude demolition and the operation of building, has improved constructor's security; meanwhile, the control rod 8 is arranged on the supporting assembly to assist the construction operation platform to be lifted by a certain height by the lifting device in the lifting process, then the control rod 8 is pulled by applying external force to enable the construction operation platform to incline by a certain angle, and the abutting part 4 is far away from the concrete beam, so that the construction operation platform is not clamped by the upper concrete beam 9, and the lifting can be smoothly carried out; when the construction operation platform needs to be supported in a construction interval, the construction operation platform is changed from an inclined state to a vertical state by pushing the control rod 8, and the abutting piece 4 at the lower end of the first supporting piece 2 can be smoothly abutted on the concrete beam 9.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.
Claims (10)
1. The utility model provides a construction operation platform in high-rise hollow area which characterized in that includes: construction platform and supporting component, construction platform includes framework (1), the one end of framework (1) can the butt on concrete beam (9) on upper strata, supporting component sets up the multiunit, supporting component with framework (1) perpendicular fixed connection, supporting component keeps away from the one end of framework (1) can the butt on the lower floor concrete beam (9) are last, the last fixed control lever (8) that is provided with of supporting component, control lever (8) are configured as and can make the whole slope of construction operation platform under the effect of external force.
2. The construction operation platform of the high hollow area as claimed in claim 1, wherein the support assembly comprises a first support member (2) and a second support member (3), the first support member (2) is vertically arranged, one end of the first support member is fixedly connected with the frame body (1), the other end of the first support member is fixedly provided with an abutting member (4) perpendicular to the first support member, the abutting member (4) can abut against the concrete beam (9) on the lower layer, the second support member (3) is obliquely arranged, one end of the second support member is fixedly connected with one end of the frame body (1) far away from the first support member (2), the other end of the second support member is fixedly connected with one end of the first support member (2) close to the abutting member (4), and the control rod (8) is fixedly connected with the second support member (3).
3. The construction operation platform of the high hollow area as claimed in claim 2, wherein a connecting rod (5) is fixedly arranged between the first supporting members (2) of the plurality of groups of supporting assemblies.
4. The construction operation platform of the high hollow area as claimed in claim 2, wherein a plurality of fixing members (10) are provided in parallel at intervals on the frame body (1) along the first direction.
5. The construction operation platform of the high-rise hollow area according to claim 2, characterized in that a scaffold board (6) is arranged on the frame body (1), and the scaffold board (6) is fully distributed on the upper surface of the frame body (1).
6. The construction operation platform of the high-rise hollow area as claimed in claim 5, wherein lifting lugs (7) are fixedly arranged around the frame body (1), and through holes for the lifting lugs (7) to pass through are formed in the positions of the scaffold plates (6) corresponding to the lifting lugs (7).
7. A high-rise hollow zone construction operation platform according to claim 6, characterized in that the number of the lifting lugs (7) is at least two.
8. The construction operation platform of the high-rise hollow area as claimed in claim 5, wherein the scaffold board (6) is connected with the frame body (1) by bolts.
9. The high level hollow zone construction work platform of claim 1, wherein the support assembly is made of channel steel.
10. A high-rise hollow area construction operation platform as claimed in claim 4, wherein the material of the fixing member (10) is steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920639012.7U CN209942195U (en) | 2019-05-06 | 2019-05-06 | Construction operation platform of high-rise hollow area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920639012.7U CN209942195U (en) | 2019-05-06 | 2019-05-06 | Construction operation platform of high-rise hollow area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209942195U true CN209942195U (en) | 2020-01-14 |
Family
ID=69131369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920639012.7U Active CN209942195U (en) | 2019-05-06 | 2019-05-06 | Construction operation platform of high-rise hollow area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209942195U (en) |
-
2019
- 2019-05-06 CN CN201920639012.7U patent/CN209942195U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
KR19990072014A (en) | Lift-up method for building buildings from above to the ground | |
CN207144449U (en) | A kind of hoistway operation platform | |
CN105298099A (en) | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN210084736U (en) | A portable lifting hook for installation of people's air defense door | |
CN210002931U (en) | tool type protection system for telescopic adjustment of construction of super high-rise outer frame column | |
CN212866793U (en) | Assembled construction elevator stops layer platform | |
CN202689489U (en) | Frame column construction operation frame | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN209942195U (en) | Construction operation platform of high-rise hollow area | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN213204913U (en) | Modular prefabricated staircase operation platform | |
CN211597658U (en) | Movable overhanging scaffold | |
CN202913705U (en) | Large curtain wall unit plate track lifting device | |
CN113047594A (en) | Movable climbing frame for elevator shaft and erection method thereof | |
CN102121307B (en) | Self-stabilizing operating platform for elevator shaft | |
CN201972391U (en) | Self-stabilizing operation platform of elevator shaft | |
CN211313314U (en) | Steel elevator shaft main structure construction operation platform frame | |
CN216305335U (en) | Assembled elevator shaft operating platform for high-rise building | |
CN206034874U (en) | Elevator shaft combined type integral lifting operation platform | |
CN110805189A (en) | Method for mounting steel structure of daylighting roof | |
CN211622697U (en) | Anti-falling device for building construction | |
CN220451395U (en) | Structural climbing frame attaching supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |