CN101852008A - Lifting scaffold device - Google Patents

Lifting scaffold device Download PDF

Info

Publication number
CN101852008A
CN101852008A CN 201010191641 CN201010191641A CN101852008A CN 101852008 A CN101852008 A CN 101852008A CN 201010191641 CN201010191641 CN 201010191641 CN 201010191641 A CN201010191641 A CN 201010191641A CN 101852008 A CN101852008 A CN 101852008A
Authority
CN
China
Prior art keywords
lifting
hanging basket
scaffold
outrigger
rack body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010191641
Other languages
Chinese (zh)
Inventor
刘玉伟
刘传
王志学
苗永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010191641 priority Critical patent/CN101852008A/en
Publication of CN101852008A publication Critical patent/CN101852008A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a lifting scaffold device, which comprises a lifting scaffold. A cradle is connected below the lifting scaffold. An external wall can be decorated by using the cradle structure when the main structure of a high-rise building is constructed. The lifting scaffold device has the advantages of saving time, shortening construction period, along with simpleness and convenience.

Description

A kind of lifting scaffold device
Technical field
The invention belongs to building and use scaffold field, particularly a kind of lifting scaffold device.
Background technology
At present, the frequent scaffold that uses of high-building construction has two kinds: a class is traditional fixed exterior wall scaffold.Promptly up set up support body from ground, whenever reach a certain height (about 8 layers to 10 layers) do one deck cantilever steel girder, set up the exterior wall scaffold support body again.So circulation, set up the highrise building top layer always after, along with the decoration of exterior wall engineering is successively removed from top layer.Need with a large amount of steel pipes, fastener, girder steel and maintenance network, material therefor roughly is directly proportional with the height of building; Another kind of is nearly more than ten years new technology---building operations attached lift scaffolds of wideling popularize of country.Attached lift scaffold only need be set up certain altitude and be attached on high building project (exterior wall) structure by fastening devicess such as through-wall bolts, rely on self jacking equipment and device, can successively climb with the engineering structures construction, have anti-topple, falling proof device, and can realize the external scaffolding of lift work.Adhering to supporting form has respectively: 1, rail mounted.Promptly guide tracked, angle the rail formula, transfer the rail formula, cover rail formula, anchor rail formula.2, cover frame.3, guide bracket formula.Power form has respectively: 1, manual, adopt the hand draw ring chain block.2, electronic, adopt electronic a chain of cucurbit.3, elevator adopts electronic hoisting equipment.4, hydraulic pressure adopts hydraulic power unit.
But the scaffold system of this structure can only be realized the construction to outer wall body, and the part operation of decoration of exterior wall need be waited until that the exterior wall construction is all finished and adheres to scaffold and climb behind the top layer, successively descend and construct, be that construction construction and the decoration of exterior wall construction of outer wall body can not intersect simultaneously and carries out, institute so that chief engineer's phase prolong.
Summary of the invention
Can't carry out the deficiency of decoration of exterior wall engineering in body of wall construction construction simultaneously at the scaffold that exists in the prior art, the purpose of this invention is to provide a kind of lifting scaffold device.
Technical scheme of the present invention is achieved in that a kind of lifting scaffold device, comprises lifting false work, connects a hanging basket below lifting false work, and hanging basket is used to safeguard the construction of decorative engineerings such as masonry, energy-conserving plate material and surface lining.
Preferably, the hanging basket lifting appliance is installed on the described hanging basket, is used to realize the automatic lifting of hanging basket, when the exterior wall decoration construction, hoisting scaffold that need not be often, the convenient like this height of regulating at any time, make things convenient for workman's operation, the construction of wall construction and decoration of exterior wall is not disturbed mutually.Lifting appliance can be manual or electric block or hoist engine etc.In order to control conveniently, described lifting appliance and control device thereof are mounted on the described hanging basket.
Described scaffold can be the building operations attached lift scaffold of promoting the use of at present, more preferably, described scaffold is arranged on the outside of body of wall, comprise rack body, hoisting mechanism and outrigger, stretch out two outriggers in the body of wall on the adjacent two layers floor respectively, its at the middle and upper levels or the outrigger of lower floor's floor be provided with hoisting mechanism, the rack body both sides are equipped with groove, the outrigger end is inserted groove and is cooperated also and can slide mutually with groove formation convex-concave, and hoisting mechanism is connected in rack body so that rack body is promoted.
Preferably, described hoisting mechanism adopts elevator, and elevator is fixedly mounted on described outrigger or the rack body, elevator and on rope rack body is connected with outrigger.
The invention has the beneficial effects as follows: when carrying out the outer wall body construction, can utilize barrel structure the exterior wall of bottom to be carried out the working procedure of decorative parts, make the construction of top body of wall construction construction and bottom decoration of exterior wall to carry out simultaneously, work progress is simple and convenient, saves time and has shortened the duration.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of an embodiment of the present invention;
Fig. 3 is Fig. 2 partial structurtes schematic diagrames;
Among the figure: 1 scaffold, 2 lifting appliances, 3 hanging baskets, 4 outriggers, 5 elevators, 6 rack bodies, 7 grooves.
The specific embodiment
The present invention is described further in conjunction with the accompanying drawings:
Embodiment: as shown in Figure 1, be structural representation of the present invention, a kind of lifting scaffold device, comprise lifting false work 1, below lifting false work 1, connect a hanging basket 3, hanging basket 3 two ends directly link to each other with scaffold 1 by rope respectively, or pulley or assembly pulley link to each other hanging basket 3 with lifting false work 1 excessively all, hanging basket 3 is used to safeguard masonry, the construction of decorative engineering such as energy-conserving plate material and surface lining, lifting false work 1 only need be set up certain altitude and be attached on high building project (exterior wall) structure by fastening devicess such as through-wall bolts, rely on self jacking equipment and device, can successively climb with the engineering structures construction, and can realize lift work; Then when the top body of wall was built construction by lifting false work 1, the decoration of exterior wall personnel then can carry out decoration construction to exterior wall by the hanging basket of bottom.
Hanging basket lifting appliance 2 is installed on the hanging basket, be used to realize the lifting of hanging basket 3, hoisting scaffold 1 that need not be often, can freely control lifting by the decoration of exterior wall constructor according to the external wall construction progress, the convenient like this height of regulating at any time makes things convenient for workman's operation, and lifting appliance 2 can be manual or electric block or hoist engine etc., as shown in Figure 1 lifting appliance 2 with and control device be mounted on the hanging basket 3, operate to make things convenient for the external wall construction personnel.
As Fig. 2, show a kind of outrigger formula lifting false work shown in 3, scaffold 1 highly is generally three story heights, be arranged on the outside of body of wall, comprise rack body 6, hoisting mechanism and outrigger 4, stretch out two outriggers 4 in the body of wall on the adjacent two layers floor respectively, one end of outrigger 4 is fixed on the floor in the building engineering structure, the other end of outrigger 4 stretches out floor and inserts the groove 7 of rack body 6 both sides respectively and form convex-concaves with groove 7 and cooperates also and can slide mutually, wherein the outrigger 4 of one deck floor is provided with hoisting mechanism, rack body 6 is promoted, hoisting mechanism adopts elevator 5, the rope of elevator 5 directly or by pulley or assembly pulley links to each other with the bottom of support respectively, rack body connects a hanging basket 36 times, lifting appliance on the hanging basket 3 is an electric winch, the rope at hanging basket 3 two ends links to each other with support by pulley, controller control hoist engine is synchronized with the movement, guarantee that hanging basket 3 is horizontal all the time, make things convenient for workman's operation, when elevator 5 promotes support to certain altitude, basecoat outrigger 4 exposes, these outrigger 4 dismountings are replaced on the top floor, simultaneously also with elevator 5 to bringing Forward, so repeatedly, support finally is thus lifted to the highest point of construction work, removes after construction finishes, like this when major project is finished, the decoration of exterior wall is also finished thereupon, and the time of having saved has shortened the duration.

Claims (7)

1. a lifting scaffold device comprises lifting false work, it is characterized in that: connect a hanging basket below lifting false work.
2. lifting scaffold device according to claim 1 is characterized in that being equipped with on the described hanging basket hanging basket lifting appliance that is used to realize the hanging basket lifting.
3. lifting scaffold device according to claim 2 is characterized in that described lifting appliance is manual or electric block or hoist engine.
4. lifting scaffold device as claimed in claim 3 is characterized in that described lifting appliance and control device thereof are mounted on the described hanging basket.
5. according to described lifting scaffold device one of in the claim 1 to 3, it is characterized in that described scaffold is arranged on the outside of body of wall, comprise rack body, hoisting mechanism and outrigger, stretch out two outriggers in the body of wall on the adjacent two layers floor respectively, its at the middle and upper levels or the outrigger of lower floor's floor be provided with hoisting mechanism, the rack body both sides are equipped with groove, and the outrigger end is inserted groove and cooperated also and can slide mutually with groove formation convex-concave, and hoisting mechanism is connected in rack body so that rack body is promoted.
6. lifting scaffold device according to claim 5 is characterized in that described hoisting mechanism adopts elevator, and elevator is fixedly mounted on described outrigger or the rack body, elevator and on rope rack body is connected with outrigger.
7. according to described lifting scaffold device one of in the claim 1 to 3, it is characterized in that described scaffold is the building operations attached lift scaffold.
CN 201010191641 2010-06-04 2010-06-04 Lifting scaffold device Pending CN101852008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010191641 CN101852008A (en) 2010-06-04 2010-06-04 Lifting scaffold device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010191641 CN101852008A (en) 2010-06-04 2010-06-04 Lifting scaffold device

Publications (1)

Publication Number Publication Date
CN101852008A true CN101852008A (en) 2010-10-06

Family

ID=42803676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010191641 Pending CN101852008A (en) 2010-06-04 2010-06-04 Lifting scaffold device

Country Status (1)

Country Link
CN (1) CN101852008A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561672A (en) * 2012-01-06 2012-07-11 西安理工大学 Attached scaffold mechanism for high-rise building
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN106193567A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN112012465A (en) * 2020-07-20 2020-12-01 中建三局集团有限公司 Integral hanging basket for decorating outer vertical surface of squat silo and construction method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0486126A2 (en) * 1990-11-13 1992-05-20 Figgie International Inc. Mason's scaffold
CN2120840U (en) * 1992-04-20 1992-11-04 李志雄 Bridging support lift scaffold
CN2149446Y (en) * 1993-02-01 1993-12-15 陈胜坤 Scoffolds for high building construction
JPH08199801A (en) * 1995-01-25 1996-08-06 Nihon Bisoh Co Ltd Crawler type traveling device for suspending gondola cage
CN1260434A (en) * 1999-08-23 2000-07-19 陈胜坤 Multiple self-locked elevating scaffold
CN2435463Y (en) * 2000-07-25 2001-06-20 北京市建筑工程研究院 Integral climbing and split lowering scaffold
CN2491552Y (en) * 2001-07-11 2002-05-15 成军 Electric mould lifting construction device
CN2494860Y (en) * 2001-09-07 2002-06-12 成军 Outrigger supporting type lifting scaffold
CN101200976A (en) * 2007-11-27 2008-06-18 吴杰 Lifting scaffold for construction of chimney and shaft inner wall
CA2673727A1 (en) * 2008-07-24 2010-01-24 Roberto Ubaldo Arduino Sani Multi-point suspended scaffold
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
CN101696598A (en) * 2009-09-24 2010-04-21 中冶建工有限公司 Wholly lifted construction external frame

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0486126A2 (en) * 1990-11-13 1992-05-20 Figgie International Inc. Mason's scaffold
CN2120840U (en) * 1992-04-20 1992-11-04 李志雄 Bridging support lift scaffold
CN2149446Y (en) * 1993-02-01 1993-12-15 陈胜坤 Scoffolds for high building construction
JPH08199801A (en) * 1995-01-25 1996-08-06 Nihon Bisoh Co Ltd Crawler type traveling device for suspending gondola cage
CN1260434A (en) * 1999-08-23 2000-07-19 陈胜坤 Multiple self-locked elevating scaffold
CN2435463Y (en) * 2000-07-25 2001-06-20 北京市建筑工程研究院 Integral climbing and split lowering scaffold
CN2491552Y (en) * 2001-07-11 2002-05-15 成军 Electric mould lifting construction device
CN2494860Y (en) * 2001-09-07 2002-06-12 成军 Outrigger supporting type lifting scaffold
CN101200976A (en) * 2007-11-27 2008-06-18 吴杰 Lifting scaffold for construction of chimney and shaft inner wall
CA2673727A1 (en) * 2008-07-24 2010-01-24 Roberto Ubaldo Arduino Sani Multi-point suspended scaffold
CN101696598A (en) * 2009-09-24 2010-04-21 中冶建工有限公司 Wholly lifted construction external frame
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561672A (en) * 2012-01-06 2012-07-11 西安理工大学 Attached scaffold mechanism for high-rise building
CN102561672B (en) * 2012-01-06 2014-06-04 西安理工大学 Attached scaffold mechanism for high-rise building
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN106193567A (en) * 2016-07-15 2016-12-07 中建五局第三建设有限公司 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN106193567B (en) * 2016-07-15 2019-04-02 中建五局第三建设有限公司 Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN112012465A (en) * 2020-07-20 2020-12-01 中建三局集团有限公司 Integral hanging basket for decorating outer vertical surface of squat silo and construction method

Similar Documents

Publication Publication Date Title
CN101845883B (en) Climbing scaffold system and construction method
CN103979383B (en) Building operation multiple layer up-down plateform system
CA2713161A1 (en) Load transportation system
CN201826516U (en) Novel attached lifting scaffold
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN101566005B (en) Chimney hydraulic mould lifting device
CN101852008A (en) Lifting scaffold device
CN102296808A (en) Template hoisting system for building
CN201826542U (en) Self-climbing protective screening
CN102733608B (en) Construction method for spray head layer of granulation tower
CN201144515Y (en) Steel structure high altitude construction platform
CN202441045U (en) Rail-type electric attached lifting scaffold
CN202926333U (en) Hanging system of whole-circle integral upside down hanging formwork
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN2853976Y (en) Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN206000194U (en) A kind of elevator hoistways soft or hard safeguard structure
CN205892406U (en) Elevator well structure
JP2008196210A (en) Portable simplified elevator
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN203499232U (en) Attached lifting scaffold
CN203654707U (en) Detachable gantry installation frame
CN2435463Y (en) Integral climbing and split lowering scaffold
JP5773343B2 (en) Method for constructing multi-story building and lifting device for multi-story scaffold used therefor
CN2204832Y (en) Automatic lifting scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101006