Hanging system of whole-circle integral upside down hanging formwork Download PDF

Info

Publication number
CN202926333U
CN202926333U CN2012205950793U CN201220595079U CN202926333U CN 202926333 U CN202926333 U CN 202926333U CN 2012205950793 U CN2012205950793 U CN 2012205950793U CN 201220595079 U CN201220595079 U CN 201220595079U CN 202926333 U CN202926333 U CN 202926333U
Authority
CN
China
Prior art keywords
template
wholecircle
bed die
formwork
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012205950793U
Other languages
Chinese (zh)
Inventor
杨党荣
周平
刘仲伟
邱天文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGHAN JINDA TUNNELING MACHINERY CO Ltd
Original Assignee
GUANGHAN JINDA TUNNELING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGHAN JINDA TUNNELING MACHINERY CO Ltd filed Critical GUANGHAN JINDA TUNNELING MACHINERY CO Ltd
Priority to CN2012205950793U priority Critical patent/CN202926333U/en
Application granted granted Critical
Publication of CN202926333U publication Critical patent/CN202926333U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses a hanging system of a whole-circle integral upside down hanging formwork, which is suitable for the whole-circle integral upside down hanging formwork. The hanging system of the whole-circle integral upside down hanging formwork comprises a formwork support framework, a formwork assembly, a bottom die support device and a formwork lifting device, wherein the formwork assembly comprises a whole-circle side die and a slope bottom die, the bottom die support device is hung and supported by reinforced bars of a concrete ring layer, the formwork lifting device comprises at least three winches, the centerline of a formwork is used as the center of each winch, the winches are centrally symmetrical and are uniformly distributed, each winch is respectively connected with the formwork support framework by a steel wire rope, the whole-circle side die is connected with the formwork support frame, each winch adopts two groups of movable pulleys, the lifting speed is improved by four times, each winch is respectively provided with a double-stage brake, and each winch is reliable, stable and safe in running, and is mainly used for the upside down hanging formwork during shaft construction from top to bottom.

Description

The whole upset hanging template of wholecircle suspension
Technical field
The utility model relates to the To Construction of Silo field, especially a kind of Hoisting System of the wholecircle template for To Construction of Silo.
Background technology
At present, the concrete conventional lining mode of power station pressure regulation vertical shaft mainly contains two kinds: the one, and adopt combined steel formwork to build, template is taken off, formwork erection all adopts manual type, utilizes the scaffold of setting up to come formwork.But this mode construction working amount is large, and construction is long circulation timei, and construction speed is slow.The second way is to adopt vertical shaft hydraulic slip-form mode to water building lining, and the vertical shaft hydraulic slip-form is the comparatively ripe mode of present pressure regulation vertical shaft lining cutting.
According to shaft structure pattern and layout feature, its hydraulic slip-form system mainly is comprised of template system, operation platform system, hydraulic lifting system and accessory system etc.Take the bottom of precoating as the basis, establish at a certain distance one, metal support bar, the hollow hydraulic jack is sleeved on every cramp bar, by bolt, the top of the base of hydraulic jack and cantilever hoisting frame is linked together, template is suspended on the cantilever hoisting frame, and hoisting frame adopts the surrounding space frame structure.Template and scaffold adopt adjusts the screw mandrel stretching.For the ease of construction, lay plank at the top of scaffold, with stacking equipment and material, bottom suspension suspension bracket platform concrete coating and watering, spray are protected.Adopt the mode of serial or parallel connection to be connected with hydraulic control system the grouping of all hydraulic jack.Like this, along with concrete the solidifying in template bottom, when template lower floor concrete reached demoulding condition, the operation hydraulic mechanism drove all hydraulic jack, just can drive hoisting frame, scaffold, template etc. along the cramp bar upward sliding, until can build the position of one deck concrete.So circulation is until the vertical shaft top.Sliding mode design can be with reference to the relevant requirements in standard GB/T J113-87 " Technical code for construction using hydraulic slip formworks ", but this kind lining cutting mode can only be built from bottom to top.
It is stable that the lining cutting mode of vertical shaft hydraulic slip-form requires to excavate the location geologic structure, the guarantee construction safety.For the broken unstable situation of geologic structure, especially thin when borehole wall surrounding rock body, when one-tenth well condition is very poor, excavation area and the degree of depth of vertical shaft are larger, and the borehole wall may cave in, and the application shaft hydraulic slip-form can not guarantee construction safety.For safety and the construction speed that guarantees to construct, can only adopt limit Wa Dajing, limit to beat the parallel operations construction operation method that anchor pole linked network concrete, limit water the reversal of the natural order of things concrete guard wall.Therefore breast wall concrete can only be poured into a mould from top to bottom in this case, can not be with conventional hydraulic slip-form lining cutting.But how to hang upside down concrete, become the difficult problem that needs solve.
If the reversal of the natural order of things concrete construction according to prior art, adopts the large-scale combined steel form to build, on the one hand, set up the construction working amounts such as scaffold, formwork large, construction is long circulation timei, can not in time seal the country rock of exposed fragmentation.And combined steel formwork builds the reversal of the natural order of things concrete to large well excavating sequences construction serious interference, and is very large on the construction speed impact of whole engineering.
Hang upside down long deficiency of concrete construction duration in order to overcome existing large-scale combined steel form, proposed to carry out top-down concrete pouring construction with a kind of whole upset hanging template of wholecircle that can hang upside down concrete construction, to shorten the constructure scheme of construction period.in imagination, the whole upset hanging template of this wholecircle comprises the pattern board supporting framework, the template assembly, be connected to the mould plate supporting device between template assembly and pattern board supporting framework, the template assembly comprises that wholecircle side form and die face are the inclined-plane bed die of frustum cone side, the die face baseline of described inclined-plane bed die and the axial line of wholecircle side form are the angle of acute angle, match with the wholecircle side form in the upper end of inclined-plane bed die, the lower end is positioned at the outside of wholecircle side form, reduction along with the concreting position, wholecircle side form and inclined-plane bed die also will descend thereupon, thereby consist of progressively downward concreting position in storehouse, this just needs to consider the fixing of a complete set of template, the demoulding and lifting, also to consider the uniformity that template is stressed.
For addressing the above problem, also can follow beyond example at present, but obviously can not indiscriminately imitate the suspension that has the vertical shaft sliding formwork now.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of whole upset hanging template of wholecircle suspension that is applicable to the whole upset hanging template of wholecircle.
the technical scheme that its technical problem that solves the utility model adopts is: the whole upset hanging template of wholecircle suspension, the whole upset hanging template of this wholecircle comprises the pattern board supporting framework, the template assembly, the template assembly comprises wholecircle side form and inclined-plane bed die, described suspension comprises bed die supporting arrangement and template hoisting device, described bed die supporting arrangement adopts the hang support of reinforcing bar as relying on take the concrete ring layer, described template hoisting device comprises at least three hoist engines, each hoist engine is centered by template center's line, be centrosymmetric and evenly distribute, each hoist engine is connected with described pattern board supporting framework by wire rope respectively, the wholecircle side form is connected on the pattern board supporting framework.
Described each hoist engine adopts two groups of movable pulley, and promoting multiplying power is four.
Described each hoist engine all is connected with the center switch board.
Described each hoist engine is provided with two stage shut.
Also be provided with mechanical locking on described each hoist engine, mechanical locking is comprised of reel block plate and the latch of the reel ends that is arranged on hoist engine, be evenly equipped with on the reel block plate on same circumference with the corresponding pin hole of latch.
Further that described hoist engine is provided with cantilevered fixed pulley bracing frame take wellhead platform as the basis in the edge of wellhead platform correspondence.
Be further, be provided with the reinforcing bar via hole on described inclined-plane bed die, the bed die fixture of described bed die supporting arrangement for removably connecting with reinforcing bar one to one with the reinforcing bar via hole.
Further that described inclined-plane bed die and wholecircle side form removably connect.
Be further, described inclined-plane bed die is connected with wholecircle side form bearing pin, is respectively arranged with bearing pin and corresponding bar shaped pin hole on inclined-plane bed die and upper wholecircle side form, and when the inclined-plane bed die engaged with the wholecircle side form, on gravity direction, bearing pin did not contact with the bar shaped pin hole.
Be further, the template of described wholecircle side form is alternately connected to form by arc large form and the splicing trapezoid template that removably connects with it, the arc large form is connected with the pattern board supporting framework by the cantilever support beam that is provided with the roller hanger, the roller hanger is take the cantilever support beam as roller track, and described mould plate supporting device is arranged between pattern board supporting framework and arc large form.
The beneficial effects of the utility model are: for the whole upset hanging template of wholecircle provides reliable, stable, safe suspension solutions.
Description of drawings
Fig. 1 is the schematic diagram of existing vertical shaft hydraulic slip-form.
Fig. 2 is the schematic diagram of the whole upset hanging template of wholecircle in the utility model.
Fig. 3 is the schematic diagram (A of Fig. 2 to) of pattern board supporting framework in Fig. 2.
Fig. 4 is the composition of template hoisting device in the utility model and arranges schematic diagram.
Fig. 5 is the partial schematic diagram that in the utility model, the wholecircle side form is connected with template hoisting device.
Fig. 6 is the partial schematic diagram that in the utility model, the inclined-plane bed die is hung support.
Fig. 7 is the partial schematic diagram that in the utility model, the wholecircle side form is connected with the inclined-plane bed die.
Fig. 8 is the partial schematic diagram of wholecircle side form in the utility model.
Fig. 9 is the front view of hoist engine in the utility model.
Figure 10 is the front view of reel block plate in Fig. 9.
be labeled as 1-pole-climbing, 2-hollow hydraulic jack, 3-support frame, 4-template system, 5-support jack, the 6-hanger of walking on stage in figure, the 7-template hoisting device, 8-wholecircle side form, 9-inclined-plane bed die, 10-pattern board supporting framework, the 11-working platform, 12-excavates wall, the 13-wellhead platform, 14-concrete ring layer, the 15-reinforcing bar, 16-bed die fixture, 18-bar shaped pin hole, the 19-bearing pin, 20-cantilever support beam, 21-roller hanger, the 22-support jack, the 23-hoist engine, the 24-wire rope, 25-fixed pulley bracing frame, the 26-movable pulley, 80-template center line, 81-arc large form, 82-splices trapezoid template, 90-die face baseline, 91-reinforcing bar via hole, 92-bed die support bracket, the little template in 93-inclined-plane, the 230-reel, 231-reel block plate, the 232-latch, the 233-pin hole, the 234-mechanical brake.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 1, existing vertical shaft hydraulic slip-form mainly is comprised of template system, operation platform system, hydraulic lifting system and accessory system etc.Take the bottom of precoating as the basis, establish at a certain distance 1 one of pole-climbings, hollow hydraulic jack 2 is sleeved in every pole-climbing 1, by bolt, the top of the base of hollow hydraulic jack 2 and cantilever hoisting frame is linked together, template is suspended on and forms template system 4 on the cantilever hoisting frame, and the cantilever hoisting frame adopts the annular space frame construction.Template and support frame 3 adopt adjusts the screw mandrel stretching.
For the ease of construction, lay plank at the top of support frame 3, with stacking equipment and material, the bottom hangs the hanger 6 of walking on stage, and is convenient to concrete coating and watering, operation is protected in spray.Adopt the mode of serial or parallel connection to be connected with hydraulic control system all hollow hydraulic jack 2 groupings.Like this, along with concrete the solidifying in template bottom, when template lower floor concrete reached demoulding condition, the operation hydraulic mechanism drove all hollow hydraulic jack 2, just can drive hoisting frame, support frame 3, template system 4 etc. along pole-climbing 1 upward sliding, until can build the position of one deck concrete.So circulation is until the vertical shaft top.As seen, existing vertical shaft sliding formwork does not have bed die, it is take pole-climbing 1 and hollow hydraulic jack 2 as hitch, as with existing vertical shaft slding form operation retaining wall, can't solve that concreting is closely knit, build the problem of assembling reinforcement and concrete load-bearing in the storehouse, Template Location, the template demoulding on template and bed die, use existing hydraulic slip-form technology and can only realize building from bottom to top.
as Fig. 2~shown in Figure 10, in the utility model, the whole upset hanging template of wholecircle comprises pattern board supporting framework 10, the template assembly, template hoisting device 7, be connected to the mould plate supporting device between template assembly and pattern board supporting framework 10, described template assembly comprises wholecircle side form 8 and inclined-plane bed die 9, the template suspension mainly comprises bed die supporting arrangement and template hoisting device 7, the bed die supporting arrangement adopts the hang support of reinforcing bar 15 as relying on take concrete ring layer 14, described template hoisting device 7 comprises at least three hoist engines 23, each hoist engine 23 is centered by template center's line 80, be centrosymmetric and evenly distribute, each hoist engine 23 is connected with described pattern board supporting framework 10 by wire rope 24 respectively, wholecircle side form 8 is connected on pattern board supporting framework 10, wholecircle side form 8 provides hanging point by template hoisting device, inclined-plane bed die 9 provides hanging point by the reinforcing bar 15 of concrete ring layer 14, the outer end of inclined-plane bed die 9 is resisted against on excavation wall 12.Such scheme had both been considered the suspension of side form, had also considered the suspension of bed die, and due to the hoist engine 23 that has more than three, jointly stressed, sling point is uniform, guarantees the stressed uniformity of template, thereby can guarantee the safety of hanging, template can be fixed, and lifting as required after the demoulding.The number of units of hoist engine and the rated load weight of separate unit, impact resistance, wirerope diameter, Rong Shengliang be according to place and load bearing requirements Rational choice, and this belongs to those skilled in the art and can draw according to respective country standard and Force Calculation, does not introduce in detail.
Preferred each hoist engine 23 adopts two groups of movable pulley 26, and promoting multiplying power is four, thereby controls maximum lifting velocity, improves safety, also is convenient to template in place.
Preferred each hoist engine 23 all is connected with the center switch board, and the design centre switch board can be controlled each hoist engine 23 and can move simultaneously, when needed also can single movement, thus the raising safety also is convenient to template in place.
As shown in Figure 9, preferably each hoist engine 23 is provided with two stage shut, and the mode of a mechanical brake 234 namely respectively is set at the power shaft two ends of hoist engine reducer.
As shown in Figure 9 and Figure 10; be preferably on each hoist engine 23 and also be provided with mechanical locking; mechanical locking is comprised of reel block plate 231 and the latch 232 of the reel ends that is arranged on hoist engine 23; be evenly equipped with a plurality of pin holes 233 on same circumference on reel block plate 231; thereby utilize this reel block plate 231 as the mechanical lock price fixing; when hoist engine 23 is shut down; manually latch 232 is inserted pin hole 233; guarantee every decline predetermined altitude energy safety locking; this predetermined altitude is determined according to the height of concrete ring layer, so that further safety guarantee to be provided.
As shown in Figure 2, described each hoist engine 23 is take wellhead platform 13 as the basis, be provided with cantilevered fixed pulley bracing frame 25 in the edge of wellhead platform 13 correspondence, be always vertical hanging to guarantee pattern board supporting framework 10, its jib-length is adaptive with the demoulding gap of wholecircle side form 8.
Concrete, as Fig. 2, Fig. 6 and shown in Figure 7, described bed die supporting arrangement can arrange like this, be provided with reinforcing bar via hole 91 on described inclined-plane bed die 9, the bed die fixture 16 that configuration and reinforcing bar via hole 91 removably connect with reinforcing bar 15 one to one, this just hangs inclined-plane bed die 9 fixing, during the demoulding, take off bed die fixture 16 and again be fixed on reinforcing bar 15, the utilization deadweight can be down to inclined-plane bed die 9 position corresponding to lower-layer concrete ring layer 14.Bed die fixture 16 need to be considered with the structure of inclined-plane bed die 9 suitable in when design, preferably adopt so that the reinforcing bar clip of dismounting coordinates the wedge that has with the gradient coupling of inclined-plane bed die 9 as bed die fixture 16.
Usually the described wholecircle side form 8 of design and inclined-plane bed die 9 removably connect, and dismounting wholecircle side form 8 is connected with inclined-plane bed die 9, thereby wholecircle side form 8 and inclined-plane bed die 9 can be distinguished the demoulding.
As shown in Figure 6 and Figure 7, wholecircle side form 8 is connected bearing pin and is connected with the inclined-plane bed die, be respectively arranged with bearing pin 19 and corresponding bar shaped pin hole 18 on inclined-plane bed die 9 and wholecircle side form 8, when inclined-plane bed die 9 engages with wholecircle side form 8, on gravity direction, bearing pin 19 is gapped with bar shaped pin hole 18, bearing pin 19 does not contact with bar shaped pin hole 18, like this when building, wholecircle side form 8 is not subjected to concrete gravity and only bears concrete pressure, prevents from building the gravity of storehouse inner concrete to pattern board supporting framework 10 and template hoisting device transmission.
The template of described wholecircle side form 8 is alternately connected to form by arc large form 81 and the splicing trapezoid template 82 that removably connects with it, arc large form 81 is connected with pattern board supporting framework 10 by the cantilever support beam 20 that is provided with roller hanger 21, roller hanger 21 is take cantilever support beam 20 as roller track, be provided with support jack 22 as mould plate supporting device between pattern board supporting framework 10 and arc large form 81, the axis of support jack 22 parallels with cantilever support beam 20, arc large form 81 can be connected with pattern board supporting framework 10 is flexible, be convenient to the demoulding.After the demoulding, arc large form 8 can be driven by template hoisting device 7 and drop to next concreting position in storehouse.

Claims (10)

1. the whole upset hanging template of wholecircle suspension, the whole upset hanging template of this wholecircle comprises pattern board supporting framework (10), the template assembly, the template assembly comprises wholecircle side form (8) and inclined-plane bed die (9), it is characterized in that: described suspension comprises bed die supporting arrangement and template hoisting device (7), described bed die supporting arrangement adopts the hang support of reinforcing bar (15) as relying on take concrete ring layer (14), described template hoisting device (7) comprises at least three hoist engines (23), each hoist engine (23) is centered by template center's line (80), be centrosymmetric and evenly distribute, each hoist engine (23) is connected with described pattern board supporting framework (10) by wire rope (24) respectively, wholecircle side form (8) is connected on pattern board supporting framework (10).
2. the whole upset hanging template of wholecircle as claimed in claim 1 suspension, it is characterized in that: described each hoist engine (23) adopts two groups of movable pulley (26), and promoting multiplying power is four.
3. the whole upset hanging template of wholecircle as claimed in claim 1 suspension, it is characterized in that: described each hoist engine (23) all is connected with the center switch board.
4. the whole upset hanging template of wholecircle as claimed in claim 1 suspension, it is characterized in that: described each hoist engine (23) is provided with two stage shut.
5. the whole upset hanging template of wholecircle as claimed in claim 1 suspension, it is characterized in that: also be provided with mechanical locking on described each hoist engine (23), mechanical locking is comprised of reel block plate (231) and the latch (232) of the reel that is arranged on hoist engine (23) (230) end, be evenly equipped with on reel block plate (231) on same circumference with the corresponding pin hole (233) of latch (232).
6. the whole upset hanging template of as described in any one claim in claim 1~5 wholecircle suspension, it is characterized in that: described each hoist engine (23) is provided with cantilevered fixed pulley bracing frame (25) take wellhead platform (13) as the basis in the edge correspondence of wellhead platform (13).
7. the whole upset hanging template of as described in any one claim in claim 1~5 wholecircle suspension, it is characterized in that: be provided with reinforcing bar via hole (91) on described inclined-plane bed die (9), the bed die fixture (16) of described bed die supporting arrangement for removably connecting with reinforcing bar (15) one to one with reinforcing bar via hole (91).
8. the whole upset hanging template of as described in any one claim in claim 1~5 wholecircle suspension, it is characterized in that: described wholecircle side form (8) and inclined-plane bed die (9) removably connect.
9. the whole upset hanging template of wholecircle as claimed in claim 8 suspension, it is characterized in that: described wholecircle side form (8) is connected 9 with the inclined-plane bed die) the bearing pin connection, be respectively arranged with bearing pin (19) and corresponding bar shaped pin hole (18) on inclined-plane bed die (9) and wholecircle side form (8), when inclined-plane bed die (9) with wholecircle side form (8) when engaging, on gravity direction, bearing pin (19) is gapped with bar shaped pin hole (18).
10. the whole upset hanging template of as described in any one claim in claim 1~5 wholecircle suspension, it is characterized in that: the template of described wholecircle side form (8) is alternately connected to form by arc large form (81) and the splicing trapezoid template (82) that removably connects with it, arc large form (81) is connected with pattern board supporting framework (10) by the cantilever support beam (20) that is provided with roller hanger (21), roller hanger (21) is take cantilever support beam (20) as roller track, described mould plate supporting device is arranged between pattern board supporting framework (10) and arc large form (81).
CN2012205950793U 2012-11-13 2012-11-13 Hanging system of whole-circle integral upside down hanging formwork Expired - Fee Related CN202926333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012205950793U CN202926333U (en) 2012-11-13 2012-11-13 Hanging system of whole-circle integral upside down hanging formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012205950793U CN202926333U (en) 2012-11-13 2012-11-13 Hanging system of whole-circle integral upside down hanging formwork

Publications (1)

Publication Number Publication Date
CN202926333U true CN202926333U (en) 2013-05-08

Family

ID=48216307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012205950793U Expired - Fee Related CN202926333U (en) 2012-11-13 2012-11-13 Hanging system of whole-circle integral upside down hanging formwork

Country Status (1)

Country Link
CN (1) CN202926333U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488205A (en) * 2018-12-06 2019-03-19 中建地下空间有限公司 A kind of sinking method shaft excavation machine drilling stroke and control pressurer system
CN109484981A (en) * 2018-12-06 2019-03-19 中建地下空间有限公司 A kind of multiple spot lift for the rotary shaft excavation machine of method of sinking
CN109812261A (en) * 2018-12-06 2019-05-28 中信重工机械股份有限公司 A kind of underwater tool attitude detection system
CN115354844A (en) * 2022-09-19 2022-11-18 上海建工集团股份有限公司 Integral sliding type steel platform system for circular deep foundation pit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488205A (en) * 2018-12-06 2019-03-19 中建地下空间有限公司 A kind of sinking method shaft excavation machine drilling stroke and control pressurer system
CN109484981A (en) * 2018-12-06 2019-03-19 中建地下空间有限公司 A kind of multiple spot lift for the rotary shaft excavation machine of method of sinking
CN109812261A (en) * 2018-12-06 2019-05-28 中信重工机械股份有限公司 A kind of underwater tool attitude detection system
CN115354844A (en) * 2022-09-19 2022-11-18 上海建工集团股份有限公司 Integral sliding type steel platform system for circular deep foundation pit
CN115354844B (en) * 2022-09-19 2024-02-09 上海建工集团股份有限公司 Integral sliding-down type steel platform system for round deep foundation pit

Similar Documents

Publication Publication Date Title
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN201826516U (en) Novel attached lifting scaffold
CN202300407U (en) Lifting platform for construction operation over shaft wall of vertical shaft
CN202926333U (en) Hanging system of whole-circle integral upside down hanging formwork
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN102444271B (en) Suspended scaffolding
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN109667416B (en) Elevator shaft integral lifting operation platform and lifting method thereof
CN209873584U (en) Hang basket template and demolish device
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN103821356A (en) Construction equipment and system of elevator shaft shear wall
CN202483154U (en) High bearing capacity suspending scaffold
CN202926332U (en) Whole-circle integral upside down hanging formwork
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN202441045U (en) Rail-type electric attached lifting scaffold
CN110777826B (en) Cofferdam hoisting and lowering construction device and cofferdam hoisting and lowering construction method
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN109626249B (en) Simple three-dimensional positioning installation and load bearing device and using method
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN103277104A (en) Sinking platform in-well hanging equipment and method
CN205591926U (en) Do not have self -supporting modularization shaft of surely restricting and dig step construction equipment
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN212743357U (en) Reverse construction method hanging die template
CN101852008A (en) Lifting scaffold device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20151113

EXPY Termination of patent right or utility model