Lifting platform for construction operation over shaft wall of vertical shaft Download PDFInfo
- Publication number
- CN202300407U CN202300407U CN2011203385718U CN201120338571U CN202300407U CN 202300407 U CN202300407 U CN 202300407U CN 2011203385718 U CN2011203385718 U CN 2011203385718U CN 201120338571 U CN201120338571 U CN 201120338571U CN 202300407 U CN202300407 U CN 202300407U
- Authority
- CN
- China
- Prior art keywords
- lift platform
- platform
- vertical shaft
- lifting platform
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a lifting platform for construction operation over the shaft wall of a vertical shaft, and relates to building construction equipment. The lifting platform comprises an operation traction system and a working lifting platform system. The operation traction system comprises a plurality of winches, a control cabinet, guide pulleys and a lifting bracket. The working lifting platform system comprises a lifting platform on which a lifting slider is arranged. A plurality of fixed antiskid screw rods and anti-friction wheels are arranged along the periphery of the lifting platform. The winches are connected with the control cabinet. Wire cables of the winches are connected with the lifting slider after passing through the guide pulleys and the lifting bracket. The lifting platform has the characteristics of lifting in the vertical shaft and fixation at any point; the problem about that the lifting platform can be started to work at any time under the condition that personnel and equipment are not transferred away from the platform is solved, so that working efficiency is greatly improved by more than twice to triple compared with that of the conventional construction method, and cost is saved; and in addition, the construction safety of the operation personnel and the equipment is ensured, and the lifting platform is practical.
Description
Technical field
The utility model relates to a kind of construction implement, relates in particular to a kind of vertical shaft borehole wall construction operation lift platform.
Background technology
The horizontal consolidation grouting technique of the pressure regulation vertical shaft of existing routine generally all can adopt and set up the building scaffold pipe, set up the operation bed board (setting up one deck about every separated 2m), and drilling machine is installed.Job practices is the boring of manually-operated auger; The operating type of manually-operated grouting; This job practices has following drawback: 1. it is too big to set up the scaffolding work amount, not only will drop into materials such as scaffold and fastener in a large number in the construction, and will drop into human and material resources in a large number and install; Particularly large-scale vertical shaft, the expense of input is sizable.2. frequently shift work plane in the construction; This method shifts work plane speed and slowly (sets up scaffold on one side; Set up working platform on one side; On one side transfer equipment, equipment and personnel), cause the overlong time of construction, the surge shaft borehole wall horizontal consolidation grouting construction duration can not be satisfied total duration requirement of surge shaft Construction Plan under a lot of situation; 3. the more important thing is be difficult for to ensure operating personnel and equipment facility construction safety, particularly large-scale, construct that section is changeable, in the vertical shaft of complicated condition, equipment, the frequent transhipment of personnel are the hidden danger that causes security incident all might take place at any time.In this case; The operating type of the horizontal consolidation grouting of surge shaft has just become to influence one of key factor of surge shaft construction period; How to change the operating type of the horizontal consolidation grouting of surge shaft, creating safe, quick and convenient and novel construction method cost saving just becomes the research topic that needs to be resolved hurrily.
Summary of the invention
Problem to above-mentioned prior art existence; The utility model provides a kind of vertical shaft borehole wall construction operation lift platform, has the fixing characteristics of upper and lower up-down and arbitrfary point in vertical shaft, has solved personnel and facility and can not leave just can start shooting the at any time problem of work of platform; Improved operating efficiency so greatly; Than more than the fast 2-3 of job practices times of tradition routine, it shortens the time of construction greatly, has practiced thrift cost; And saved a large amount of scaffolds and bed board input, also saved the input that the scaffold human and material resources are installed.Guaranteed operating personnel and equipment facility construction safety in addition, very practical.
The technical scheme of the utility model is: a kind of vertical shaft borehole wall construction operation lift platform; Comprise operation trailer system and work lift platform system; Said operation trailer system comprises some hoist engines, switch board, swings to pulley and hoisting bracket; Said work lift platform system comprises lift platform, and lift platform has been provided with weighty slider, and lift platform is equipped with anti-skidding screw mandrel of plurality of fixed and anti-frictional resistance wheel along periphery; Hoist engine is connected with switch board, and the steel cable of hoist engine is through swinging to behind pulley and the hoisting bracket and playing a weighty slider and be connected.
As preferably, said lift platform comprises upper platform and lower floor's platform, is equipped with the aisle plate on the upper platform, and lower floor's platform comprises radiation brace summer and centre frame, plays a weighty slider and is arranged on lower floor's platform.
As preferably, said fixing anti-skidding screw mandrel comprises screw mandrel, and screw mandrel one end is connected on the bearing through bearing pin, and the other end connects the friction locating piece through bearing pin, and the polished rod place of screw mandrel is socketed with gate seat, and bearing and gate seat all are welded on the lift platform.
As preferably, said anti-frictional resistance wheel comprises the fixed bearing that is arranged on the lift platform, and freely movable bearing is connected with fixed bearing by bolt through cushion block, on the fixed pin shaft of freely movable bearing roller is installed.
As preferably, said hoisting bracket comprises carrier base, and carrier base is provided with pulley and returns rope hanging point axle, and the steel cable of hoist engine is guided lift platform into through pulley.
The beneficial effect of the utility model is: the utility model has comprised operation trailer system and work lift platform system.It provides a synchronous work lift platform; This platform has the job platform of confession personnel and equipment work; And the fixing characteristics of upper and lower up-down and arbitrfary point in vertical shaft are arranged; Solve personnel and facility and can not leave just can start shooting the at any time problem of work of platform, improved operating efficiency so greatly.Use the novel construction method of the utility model need not set up scaffold, saved a large amount of scaffolds and bed board input, also saved the input that the scaffold human and material resources are installed.The about 300t of material requires such as scaffold tube, and the about 20t of lift platform structural member, single cost of materials can practice thrift more than 70 ten thousand.Since the work lift platform can be manned member and equipment upper and lower up-down and arbitrfary point in well fix; It is fast that this method shifts work plane speed; Than more than the fast 2-3 of job practices times of tradition routine; Construction period can practice thrift more than 3 months, and it shortens the time of construction greatly, and this job practices can make the surge shaft borehole wall consolidation grouting construction period reach total duration requirement of surge shaft Construction Plan; The prior new job practices of the utility model that is to use has guaranteed operating personnel and equipment facility construction safety; Particularly in the vertical shaft of large-scale, changeable, the complicated condition of construction section; Equipment, personnel are along with the work lift platform is transported stably, and work not only fast but also has safely also obtained abundant guarantee.The design tractive force of operation trailer system is greater than more than 2 times of work lift platform system works total load; It is as safe as a house when therefore lift platform is constructed; Can solve fully bigger, the job execution in the darker vertical shaft, the engineering quantity that runs into during like power station large-scale pressure regulation vertical shaft borehole wall consolidation grouting is big, the engineering time is long, the masty difficult problem of safety guarantee; Effective reduction of erection time and improve the efficient of consolidation grouting in the surge shaft, also cost saving investment greatly.
The utility model solved vertical shaft borehole wall construction operation fast, the difficult problem of safety, economical savings; Confirm through reality; The Φ 6m-Φ 30m and the above vertical shaft borehole wall comprise that engineering such as consolidation grouting can accomplish with the utility model, and it has not only improved construction speed, also practices thrift steel resources greatly, reduces construction cost; Produce remarkable economic efficiency and social benefit, very practical.
Description of drawings
Fig. 1 is to use the front view of the utility model construction state;
Fig. 2 is the vertical view of use the utility model construction state shown in Figure 1;
Fig. 3 is the partial enlarged view at A place among Fig. 1;
Fig. 4 is the sectional view along A-A line among Fig. 3;
Fig. 5 is the partial enlarged view at B place among Fig. 1;
Fig. 6 is the front view of the utility model lift platform;
Fig. 7 is the vertical view of the utility model lift platform shown in Figure 6;
Fig. 8 is the vertical view of lower floor's platform;
Fig. 9 is the vertical view of upper platform;
Figure 10 is the front view of the utility model hoisting bracket;
Figure 11 is the vertical view of the utility model hoisting bracket shown in Figure 10;
Figure 12 is the sectional view along B-B line among Figure 10;
Figure 13 is the front view of the operating type Construction Arrangement of conventional vertical shaft horizontal consolidation grouting;
Figure 14 is the vertical view of the operating type Construction Arrangement of conventional vertical shaft horizontal consolidation grouting.
The specific embodiment
Like Figure 13 and shown in Figure 14, the horizontal consolidation grouting technique of the pressure regulation vertical shaft of existing routine generally all can adopt and set up the building scaffold pipe, set up the operation bed board (setting up one deck about every separated 2m), and drilling machine is installed.Job practices is the boring of manually-operated auger; The operating type of manually-operated grouting; This job practices has following drawback: 1. it is too big to set up the scaffolding work amount, not only will drop into materials such as scaffold and fastener in a large number in the construction, and will drop into human and material resources in a large number and install; Particularly large-scale vertical shaft, the expense of input is sizable.2. frequently shift work plane in the construction; This method shifts work plane speed and slowly (sets up scaffold on one side; Set up working platform on one side; On one side transfer equipment, equipment and personnel), cause the overlong time of construction, the surge shaft borehole wall horizontal consolidation grouting construction duration can not be satisfied total duration requirement of surge shaft Construction Plan under a lot of situation; 3. the more important thing is be difficult for to ensure operating personnel and equipment facility construction safety, particularly large-scale, construct that section is changeable, in the vertical shaft of complicated condition, equipment, the frequent transhipment of personnel are the hidden danger that causes security incident all might take place at any time.
A kind of embodiment as the utility model; To shown in Figure 12, a kind of vertical shaft borehole wall construction operation lift platform comprises operation trailer system and work lift platform system like Fig. 1; Said operation trailer system comprises some hoist engine 1, switch board 8, swings to pulley 3 and hoisting bracket 4; Said work lift platform system comprises lift platform 5, and lift platform 5 has been provided with weighty slider, and lift platform 5 is equipped with anti-skidding screw mandrel 6 of plurality of fixed and anti-frictional resistance wheel 7 along periphery.
Hoist engine is arranged at by the vertical shaft top, and hoist engine 1 is connected with switch board 8, and some groups of hoist engines 1 are by switch board 8 centralized operations, and the steel cable 2 of every group of hoist engine 1 is connected with a weighty slider with hoisting bracket 4 backs through swinging to pulley 3.Under switch board 8 operations, hoist engine 1 moves up and down in vertical shaft through steel cable 2 traction lift platforms 5.
Said lift platform 5; It is the working load carrying platform of work lift platform system, and all on this platform, lift platform 5 adopts i iron, channel-section steel and angle steel to process for staff and construction equipment, facility material; Comprise upper platform 51 and lower floor's platform 52; Upper platform 51 is the bed board frame, lays guidance tape above that, is assembled into working platform.Lower floor's platform 52 is a body frame, comprises radiation brace summer and centre frame, plays weighty slider and is arranged on lower floor's platform 52.
When lift platform 5 is fixed on that certain is a bit worked in the vertical shaft; Except the steel cable of hoist engine 12 is held lift platforms 5 can not move; The some groups of fixing anti-skidding screw mandrels 6 that the platform periphery is installed also prop up the borehole wall 9; It can make lift platform 5 horizontal location, and lift platform 5 can only be risen can not descend.Said fixing anti-skidding screw mandrel 6 is processed by shaped steel and round steel.Comprise screw mandrel 61, screw mandrel 61 1 ends are connected on the bearing 62 through bearing pin, and the other end connects friction locating piece 64 through bearing pin, and the polished rod place of screw mandrel 61 is socketed with gate seat 63, and bearing 62 all is welded on the lift platform 5 with gate seat 63.Adjustment screw mandrel 61 just can be through the friction locating piece 64 roof pressure boreholes wall 9 horizontal fixed lift platforms 5; When lift platform 5 has falling tendency, gate seat 63 is pushed down the polished rod of screw mandrel 61, because the friction locating piece 64 roof pressure boreholes wall 9; Whole lift platform 5 is lockable, and lift platform 5 can not glide; When lift platform 5 has up trend, owing to the hinged effect of screw mandrel 61, its polished rod and gate seat 63 are thrown off, and friction locating piece 64 unclamps with the borehole wall 9, and lift platform 5 is unrestricted.
Hoisting bracket 4 is the bracing frames of the steel cable 2 of hoist engine 1 being swung to the pulley of going into the well, and also is that platform has drawn the hanging point that weighty slider returns rope.Hoisting bracket 4 not still steel cable 2 swing to support, or platform load support bracket.Said hoisting bracket 4 is processed by materials such as shaped steel and steel plates; Comprise carrier base 41; Carrier base 41 is fixed on the borehole wall 9 through the anchor pole welded and installed at the vertical shaft top; Carrier base 41 is provided with pulley 42 and returns rope hanging point axle 43, and the steel cable 2 of hoist engine 1 is guided lift platform 5 into through pulley 42, and steel cable 2 returns on time rope hanging point axle 43 of restricting through the lifting movable pulley of lift platform.
Security test like the φ 22m in the power station, dark 171m, has in the pressure regulation vertical shaft borehole wall consolidation grouting engineering of gate shaft
Facility and material parameter calculating such as full design Selection hoist engine:
Main platform weight P1=20t (18t such as body frame and bed board, 2t such as screw mandrel and position-limited wheel).
Work live load P2=10t (comprising disk bit, an amount of drilling tool, staff etc.).
Hoist engine lifting force T1=(P1+ P2) * α=51t (the desirable 1.5-2 of safety factor α gets 1.7), 5 hoist engines of design arrangement, hoist engine adopt movable pulley to promote, and every hoist engine pulling force is T2=T1/5/2=5.1t.
Therefore select the hoist engine parameter for use: lifting force T2=5t, hold rope amount S=450m, reel rope speed V=7-9m, cable diameter φ 22mm (disrumpent feelings total pulling force>300kN).
Carry additionally 5 5t bottle gouards moved by hands during the platform duty, safe pulling force can reach 75t, and safety factor reaches 2.5.
By above-mentioned visible, be very secure on the technology construction safety of application the utility model.
Use the utility model to carry out construction sequence: hoist engine 1 makes lift platform 5 segment distance that in vertical shaft, rises locate that (hoist engine 1 stops through steel cable 2 tractions; Fixing anti-skidding screw mandrel 6 props up the borehole wall 9) → staff's construction (pore-creating of borehole wall consolidation grouting engineering, cement injection mortar) → unclamp and fix anti-skidding screw mandrel 6; Cleaning platform periphery obstacle is made preparation → startup hoist engine 1 that lift platform 5 moves to next work plane lift platform 5 is drawn to next work plane.
Using the utility model construction hoisting support all is evenly to arrange along the borehole wall; Hoist engine 1 quantity is matched with it; Each towing point of lift platform 5 rising or falling speeds is balanced, synchronous; And rising difference and can being adjusted by switch board 8 operation of each hoist engine 1 so just can make lift platform 5 synchronous, balance liftings.
The design tractive force of operation trailer system is greater than more than 2 times of work lift platform system works total load; It is as safe as a house when therefore lift platform 5 is constructed; Can solve fully bigger, the job execution in the darker vertical shaft, the engineering quantity that runs into during like power station large-scale pressure regulation vertical shaft borehole wall consolidation grouting is big, the engineering time is long, the masty difficult problem of safety guarantee; Effective reduction of erection time and improve the efficient of consolidation grouting in the surge shaft, also cost saving investment greatly.
Claims (5)
1. vertical shaft borehole wall construction operation lift platform; It is characterized in that: comprise operation trailer system and work lift platform system; Said operation trailer system comprises some hoist engines, switch board, swings to pulley and hoisting bracket; Said work lift platform system comprises lift platform, and lift platform has been provided with weighty slider, and lift platform is equipped with anti-skidding screw mandrel of plurality of fixed and anti-frictional resistance wheel along periphery; Hoist engine is connected with switch board, and the steel cable of hoist engine is through swinging to behind pulley and the hoisting bracket and playing a weighty slider and be connected.
2. vertical shaft borehole wall construction operation lift platform according to claim 1; It is characterized in that: said lift platform comprises upper platform and lower floor's platform; Be equipped with the aisle plate on the upper platform, lower floor's platform comprises radiation brace summer and centre frame, plays weighty slider and is arranged on lower floor's platform.
3. according to the described vertical shaft borehole wall of claim 1 construction operation lift platform; It is characterized in that: said fixing anti-skidding screw mandrel comprises screw mandrel; Screw mandrel one end is connected on the bearing through bearing pin; The other end connects the friction locating piece through bearing pin, and the polished rod place of screw mandrel is socketed with gate seat, and bearing and gate seat all are welded on the lift platform.
4. vertical shaft borehole wall construction operation lift platform according to claim 1; It is characterized in that: said anti-frictional resistance wheel comprises the fixed bearing that is arranged on the lift platform; Freely movable bearing is connected with fixed bearing by bolt through cushion block, on the fixed pin shaft of freely movable bearing roller is installed.
5. vertical shaft borehole wall construction operation lift platform according to claim 1, it is characterized in that: said hoisting bracket comprises carrier base, and carrier base is provided with pulley and returns rope hanging point axle, and the steel cable of hoist engine is guided lift platform into through pulley.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203385718U CN202300407U (en) | 2011-09-09 | 2011-09-09 | Lifting platform for construction operation over shaft wall of vertical shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203385718U CN202300407U (en) | 2011-09-09 | 2011-09-09 | Lifting platform for construction operation over shaft wall of vertical shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202300407U true CN202300407U (en) | 2012-07-04 |
Family
ID=46369329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203385718U Expired - Lifetime CN202300407U (en) | 2011-09-09 | 2011-09-09 | Lifting platform for construction operation over shaft wall of vertical shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202300407U (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913248A (en) * | 2012-11-13 | 2013-02-06 | 广汉金达隧道机械有限公司 | Whole-circle whole invertedly-hanging template and mold-erecting and demolding methods of template |
CN103171948A (en) * | 2013-03-26 | 2013-06-26 | 中国水利水电第七工程局有限公司 | Vertical shaft hoisted cage differential synchronizer |
CN103711491A (en) * | 2013-12-19 | 2014-04-09 | 中国长江三峡集团公司 | Equipment used for vertical shaft concrete lining construction and construction method thereof |
CN104564084A (en) * | 2015-01-16 | 2015-04-29 | 郑州煤炭工业(集团)工程有限公司 | Steel strand jack lifting construction device for vertical shaft sliding die and grouting platform |
CN104727746A (en) * | 2015-03-16 | 2015-06-24 | 李汉臣 | Vertical shaft drill jumbo and construction method thereof |
CN107217861A (en) * | 2017-06-08 | 2017-09-29 | 郑州宇恒环保技术有限公司 | Elevator turnover plate type protective frame |
CN107905792A (en) * | 2017-11-27 | 2018-04-13 | 新疆北方建设集团有限公司 | A kind of embedded shaft excavation construction technology |
CN108750983A (en) * | 2018-06-07 | 2018-11-06 | 东莞理工学院 | A kind of neutron beam window maintenance platform hanging apparatus and its hanging method to work under the radiation |
CN109137969A (en) * | 2018-08-16 | 2019-01-04 | 中国水利水电第八工程局有限公司 | Gallery formula underground chamber high side wall construction equipment and construction method |
CN110271998A (en) * | 2019-08-07 | 2019-09-24 | 油特机械工具(大连)有限公司 | Automation combined type jack up unit for the processing of plurality of specifications cylinder |
GB2585124A (en) * | 2019-06-28 | 2020-12-30 | Gravitricity Ltd | Gravity-based energy storage system |
CN113123793A (en) * | 2021-04-09 | 2021-07-16 | 金诚信矿业管理股份有限公司 | Weak stratum vertical shaft derrick structure and construction method thereof |
-
2011
- 2011-09-09 CN CN2011203385718U patent/CN202300407U/en not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913248A (en) * | 2012-11-13 | 2013-02-06 | 广汉金达隧道机械有限公司 | Whole-circle whole invertedly-hanging template and mold-erecting and demolding methods of template |
CN102913248B (en) * | 2012-11-13 | 2015-12-02 | 广汉金达隧道机械有限公司 | The overall upset hanging template of wholecircle and formwork erection, release method |
CN103171948A (en) * | 2013-03-26 | 2013-06-26 | 中国水利水电第七工程局有限公司 | Vertical shaft hoisted cage differential synchronizer |
CN103711491A (en) * | 2013-12-19 | 2014-04-09 | 中国长江三峡集团公司 | Equipment used for vertical shaft concrete lining construction and construction method thereof |
CN104564084A (en) * | 2015-01-16 | 2015-04-29 | 郑州煤炭工业(集团)工程有限公司 | Steel strand jack lifting construction device for vertical shaft sliding die and grouting platform |
CN104564084B (en) * | 2015-01-16 | 2016-05-18 | 河南锦源建设有限公司 | Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment |
CN104727746A (en) * | 2015-03-16 | 2015-06-24 | 李汉臣 | Vertical shaft drill jumbo and construction method thereof |
CN107217861A (en) * | 2017-06-08 | 2017-09-29 | 郑州宇恒环保技术有限公司 | Elevator turnover plate type protective frame |
CN107905792A (en) * | 2017-11-27 | 2018-04-13 | 新疆北方建设集团有限公司 | A kind of embedded shaft excavation construction technology |
CN108750983A (en) * | 2018-06-07 | 2018-11-06 | 东莞理工学院 | A kind of neutron beam window maintenance platform hanging apparatus and its hanging method to work under the radiation |
CN109137969A (en) * | 2018-08-16 | 2019-01-04 | 中国水利水电第八工程局有限公司 | Gallery formula underground chamber high side wall construction equipment and construction method |
GB2585124A (en) * | 2019-06-28 | 2020-12-30 | Gravitricity Ltd | Gravity-based energy storage system |
GB2585124B (en) * | 2019-06-28 | 2022-03-16 | Gravitricity Ltd | Gravity-based energy storage system |
CN110271998A (en) * | 2019-08-07 | 2019-09-24 | 油特机械工具(大连)有限公司 | Automation combined type jack up unit for the processing of plurality of specifications cylinder |
CN110271998B (en) * | 2019-08-07 | 2024-03-12 | 油特机械工具(大连)有限公司 | Automatic combined lifting device for processing cylinders with various specifications |
CN113123793A (en) * | 2021-04-09 | 2021-07-16 | 金诚信矿业管理股份有限公司 | Weak stratum vertical shaft derrick structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202300407U (en) | Lifting platform for construction operation over shaft wall of vertical shaft | |
CN202544741U (en) | Door-shaped drive drilling machine with twin tower teeth | |
CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN202245811U (en) | Combined curtain wall hoisting equipment | |
CN101446068A (en) | Method for erecting suspension bridge main girder by segmenting and jacking and adopted device for rolling and moving heavy objects | |
CN103183034B (en) | A kind of flexible cable Suspension System Guide rail rope beat dampening mechanism in parallel and method | |
CN208413709U (en) | A kind of unit glass curtain wall ring rail Lift-on/Lift-off System | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN204899184U (en) | Hanging flower basket equipment | |
CN202064840U (en) | Four-drill column drill derrick | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN102230380B (en) | Wedge self-locking type stepping hanging scaffold | |
CN106150057B (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN203173644U (en) | Multifunctional lifting shaft working platform system | |
CN202926333U (en) | Hanging system of whole-circle integral upside down hanging formwork | |
CN103291210B (en) | Gate-type double-tower gear-driven drilling machine | |
CN102587292B (en) | System and method for cradle cantilever construction | |
CN210103238U (en) | Device for elevator subsection well construction | |
CN102061889B (en) | Driller tower hoisting device and using method thereof | |
CN103277104A (en) | Sinking platform in-well hanging equipment and method | |
CN201507113U (en) | Electric climbing-formwork device used for building and construction | |
CN201102869Y (en) | Large arm device of midair-disassembling horizontal lazy-arm type tower crane | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN110374649B (en) | Hanger rail type temporary supporting device and walking method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120704 |