CN2204832Y - Automatic lifting scaffold - Google Patents
Automatic lifting scaffold Download PDFInfo
- Publication number
- CN2204832Y CN2204832Y CN 94209525 CN94209525U CN2204832Y CN 2204832 Y CN2204832 Y CN 2204832Y CN 94209525 CN94209525 CN 94209525 CN 94209525 U CN94209525 U CN 94209525U CN 2204832 Y CN2204832 Y CN 2204832Y
- Authority
- CN
- China
- Prior art keywords
- hoist engine
- integral frame
- wall
- engine support
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to an automatic lifting scaffold. The utility model is characterized in that a support frame and a brace arranged on the frame of a whole body and a bottom form the whole body which is fixed on a wall by wall-through bolts; support frames for hoisters which can independently move from top to bottom are arranged in the frame of the whole body; the support frames for hoisters are fixed on the wall by the brace and the wall-through bolts; a main hoister and an auxiliary hoister for lifting the support frames for hoisters are arranged on the support frames for hoisters; The utility model has the advantages that the main hoister and the auxiliary hoister are compactly arranged on the same frame for hoisters, the auxiliary hoister is used to replace a hand-drive block for lifting, and the level of automation is high; the utility model is suitable to be used as an external scaffold for construction.
Description
The utility model belongs to building operations equipment, particularly a kind of scaffold that is mainly supported by building structure.
At present, in the domestic high-building construction, be outside the building to enclose the external scaffolding construction of putting from bottom to top, completely wrapping the top mostly.Its advantage be external scaffolding with building raise one deck, set up one deck and grow steadily, give safer reliable operating environment of constructor; But steel quantity consumption is big, the labor strength height, and vertical transport is very not convenient.In recent years, some new technologies occurred,, set up the scaffold of certain floor height in the some positions of building periphery, the plug-in form of the employing that has, the employing cantilevered fashion that has is used electronic leading screw integral jacking, or promotes with the elevator facility are whole.As a kind of plug-in lifting false work, framework adopts sleeve structure, is provided with three layer operation platforms, relies on bottle gouard moved by hands to realize the lifting of scaffold.The shortcoming of its existence is that rising or falling speed is slower, can not be in place fast.
The purpose of this utility model is, two groups of hoist engines are set in integral frame, with the fast lifting of realizing integral frame and elevator unit and in place fast.
Automatic integral elevating external scaffolding of the present utility model, form by integral frame, hoist engine, electrical control cabinet, it is characterized in that: bearing support that integral frame and bottom are provided with and diagonal member constitute whole, be fixed on the body of wall by through-wall bolt, integral frame inside is provided with six step standard stagings, between one, two step scaffolds, be provided with the hoist engine support that can independently move up and down, on the 4th step standard staging, be provided with electrical control cabinet; Integral frame top is provided with the horizontal stable pull bar that is connected with body of wall, and integral frame is provided with upper and lower two secondary directive wheels by the wall outside temporarily;
The hoist engine support uses diagonal member and through-wall bolt positioning and fixing on body of wall, and the hoist engine support is provided with main winch that promotes integral frame and the secondary hoist engine that promotes the hoist engine support, and the reel of two hoist engines vertically is provided with mutually; Main winch is located at hoist engine support below with steel cable and suspension hook, is connected with the integral frame bearing support; Secondary hoist engine is located at hoist engine support top with steel cable and suspension hook, is connected by the standard staging of removable pulley with integral frame top.
The using method of automatic integral elevating external scaffolding of the present utility model is: when preparing to promote integral frame, earlier the removable pulley of secondary hoist engine is gone on foot standard staging cross-arm hook with the 5th of integral frame top and be connected, secondary hoist engine hangs up properly with steel cable and suspension hook and hoist engine support; Main winch is thrown off with steel cable and suspension hook and integral frame bearing support; Diagonal member and through-wall bolt and body of wall disengagement with the hoist engine support; Start secondary hoist engine, the hoist engine support is risen to a last floor position, the diagonal member of hoist engine support and through-wall bolt and body of wall are fixed again, the lifting of finishing the hoist engine support is in place.
Again main winch is connected with integral frame bearing support hook with suspension hook with steel cable, the bolt that the integral frame bearing support is connected with body of wall is thrown off; Start main winch, integral frame is risen to a last floor position, fix with through-wall bolt, the lifting of finishing integral frame is in place.
The advantage of automatic integral elevating external scaffolding of the present utility model is: main winch and secondary hoist engine compact Layout on same hoist engine support, a shared power supply and a reducer, economical rationality; Replace using bottle gouard moved by hands to promote by secondary hoist engine, can improve lift work speed; Because automaticity is higher, is convenient to many hoist engine supports and promotes simultaneously.Be applicable to construction external scaffolding when highrise building and multistory building appearance and size are unanimous between the higher and lower levels.
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is the structural representation of automatic integral elevating external scaffolding
As seen from the figure, automatic integral elevating external scaffolding, form by integral frame, hoist engine, electrical control cabinet, it is characterized in that: integral frame 1 constitutes whole with bearing support 2 and diagonal member 3 that the bottom is provided with, be fixed on the body of wall by through-wall bolt 4, integral frame inside is provided with six step standard stagings, between one, two step scaffolds, be provided with the hoist engine support 5 that can independently move up and down, on the 4th step standard staging, be provided with electrical control cabinet 6; Integral frame top is provided with the horizontal stable pull bar 7 that is connected with body of wall, and integral frame is provided with upper and lower two secondary directive wheels 8 by the wall outside temporarily;
The hoist engine support uses diagonal member and through-wall bolt positioning and fixing on body of wall, and the reel that the hoist engine support is provided with main winch 9 that promotes integral frame and 10, two hoist engines of secondary hoist engine that promote the hoist engine support vertically is provided with mutually; Main winch is located at hoist engine support below with steel cable and suspension hook 11, is connected with the integral frame bearing support; Secondary hoist engine is located at hoist engine support top with steel cable and suspension hook 12, is connected with the standard staging on integral frame top by removable pulley 13.
Claims (1)
1, a kind of automatic integral elevating external scaffolding, form by integral frame, hoist engine, electrical control cabinet, it is characterized in that: bearing support that integral frame and bottom are provided with and diagonal member constitute whole, be fixed on the body of wall by through-wall bolt, integral frame inside is provided with six step standard stagings, between one, two step scaffolds, be provided with the hoist engine support that can independently move up and down, on the 4th step standard staging, be provided with electrical control cabinet; Integral frame top is provided with the horizontal stable pull bar that is connected with body of wall, and integral frame is provided with upper and lower two secondary directive wheels by the wall outside temporarily;
The hoist engine support uses diagonal member and through-wall bolt positioning and fixing on body of wall, and the hoist engine support is provided with main winch that promotes integral frame and the secondary hoist engine that promotes the hoist engine support, and the reel of two hoist engines vertically is provided with mutually; Main winch is located at hoist engine support below with steel cable and suspension hook, is connected with the integral frame bearing support; Secondary hoist engine is located at hoist engine support top with steel cable and suspension hook, is connected by the standard staging of removable pulley with integral frame top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94209525 CN2204832Y (en) | 1994-05-04 | 1994-05-04 | Automatic lifting scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 94209525 CN2204832Y (en) | 1994-05-04 | 1994-05-04 | Automatic lifting scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2204832Y true CN2204832Y (en) | 1995-08-09 |
Family
ID=33827188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 94209525 Expired - Fee Related CN2204832Y (en) | 1994-05-04 | 1994-05-04 | Automatic lifting scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2204832Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100351481C (en) * | 2004-04-23 | 2007-11-28 | 金刚工业株式会社 | Guide device for ascend type erecting bed |
CN103526921A (en) * | 2013-10-23 | 2014-01-22 | 华煜建设集团有限公司 | Lower-placed type lifting scaffold for high-rise building |
CN106193570A (en) * | 2016-08-10 | 2016-12-07 | 江苏建筑职业技术学院 | Hanging basket anti-fall anti-shake hooking device and using method thereof |
CN106193569A (en) * | 2016-08-10 | 2016-12-07 | 江苏建筑职业技术学院 | Hanging basket anti-fall anti-shake wind and using method thereof |
-
1994
- 1994-05-04 CN CN 94209525 patent/CN2204832Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100351481C (en) * | 2004-04-23 | 2007-11-28 | 金刚工业株式会社 | Guide device for ascend type erecting bed |
CN103526921A (en) * | 2013-10-23 | 2014-01-22 | 华煜建设集团有限公司 | Lower-placed type lifting scaffold for high-rise building |
CN106193570A (en) * | 2016-08-10 | 2016-12-07 | 江苏建筑职业技术学院 | Hanging basket anti-fall anti-shake hooking device and using method thereof |
CN106193569A (en) * | 2016-08-10 | 2016-12-07 | 江苏建筑职业技术学院 | Hanging basket anti-fall anti-shake wind and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201228207Y (en) | Portable window hoister | |
CN111980391A (en) | Integral hoisting platform and building method of building outer facade construction platform | |
CN211524016U (en) | Double-working-surface guide frame climbing type working platform and system | |
WO2022252633A1 (en) | Method for arranging upside-down hoisting power device in attached lifting scaffold | |
CN211201100U (en) | Civil engineering construction support | |
CN2204832Y (en) | Automatic lifting scaffold | |
CN202577925U (en) | Lifting type platform in elevator shaft | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN201010403Y (en) | Self-lifting construction elevator | |
CN2926741Y (en) | Pipeline repairing apparatus capable of vertically and turning operation | |
CN220432133U (en) | Curtain wall material hoisting device | |
CN115043343A (en) | Light partition board installation construction device and construction method thereof | |
CN2597605Y (en) | Automatic integrated lifting external scaffold | |
CN205802807U (en) | A kind of household building elevator | |
CN109516409A (en) | Flooring construction tower crane turns device for hoisting | |
CN101852008A (en) | Lifting scaffold device | |
CN213865193U (en) | Lifting device for small and medium-sized equipment | |
CN212799368U (en) | Large-scale power equipment hoisting mounting frame | |
CN212154069U (en) | Gallows structure is used in building engineering construction | |
CN220432142U (en) | Building construction tower crane | |
CN2244546Y (en) | Self-lifting guide support adding device for construction elevator cage | |
CN2256418Y (en) | Creeping formwork lifting frame for lift shaft | |
CN2042492U (en) | Dual-purpose vertical lift platform for fixing and load-lifting | |
CN213710277U (en) | Liftable handling frame | |
CN217420433U (en) | Three-way movable operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |