CN2042492U CN 89212050 CN89212050U CN2042492U CN 2042492 U CN2042492 U CN 2042492U CN 89212050 CN89212050 CN 89212050 CN 89212050 U CN89212050 U CN 89212050U CN 2042492 U CN2042492 U CN 2042492U
Authority
CN
China
Prior art keywords
lifting
lift platform
platform
dual
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 89212050
Other languages
Chinese (zh)
Inventor
孙在鲁
黄信芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Building Machinery Institute Of Ministry Of Urban & Rural Construction
Original Assignee
Changsha Building Machinery Institute Of Ministry Of Urban & Rural Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Building Machinery Institute Of Ministry Of Urban & Rural Construction filed Critical Changsha Building Machinery Institute Of Ministry Of Urban & Rural Construction
Priority to CN 89212050 priority Critical patent/CN2042492U/en
Publication of CN2042492U publication Critical patent/CN2042492U/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a dual-purpose lifting platform for finishing buildings and lifting loads, characterized in that a lifting device is arranged on the lifting platform; the lifting height of the lifting device can be improved by means of the lifting platform; the function of the hoisting device can be improved by means of the lifting platform, and the standard sections of the guiding rail of a derrick can be arranged and dismantled. The dual-purpose lifting platform can complete entire installation and construction works by means of the self lifting mechanism and does not need to use other donkey cranes. Thus the installation cost can be greatly saved. Compared with the prior art, the dual-purpose platform can improve the safety of the construction. The utility model has the advantages of high work efficiency, labor saving, and low cost, and the utility model is convenient to convey and does not need auxiliary frames and wind-resisting ropes. The utility model can be suitable to the construction of a low storied building lower than five layers.

Description

Dual-purpose vertical lift platform for fixing and load-lifting
The utility model is a kind of can the finishing building, and dual-purpose lift platform (hereinafter to be referred as dual-purpose platform) that again can hoisting heavy relates to building engineering field.
In the existing building operations, add derrick with crane or hoist engine when lifting; Use scaffold when fitting up, minority unit in charge of construction construction hanging basket or lift platform.The utility model is that finishing platform and crane functions are combined, and relies on lift platform to improve the lifting altitude of lifting gear, relies on lifting gear to enlarge the function and the mounting or dismounting derrick guide rail standard knot of lift platform.
Feature of the present utility model is that lifting gear is installed on the lift platform, and And and self-dependent lifting mechanism are finished whole installations and set up work, needn't use other whiplines.
Existing accompanying drawings is as follows:
Fig. 1 is dual-purpose platform side view, derrick guide rail (3) is contained in one and takes back on the underframe (1) that changes supporting leg and trundle, lifting mechanism (2) is contained in the root of derrick guide rail (3), lift platform (4) relies on a stock (5) that has 16 trundles, can outside derrick guide rail (3), move up and down, can be fixed on derrick guide rail (3) by means of two security insurance pins (6) simultaneously and go up the appropriate location, to carry out fitment operation and slinging work.Lifting gear is made up of column (8), revolving body (9), jib (10), trailer wagon (11), suspension hook (12), manual several parts of winch (7).Column (8) is connected with stock (5) by 4 hinge pins, and hoist rope enters revolving body (9) from column (8) inside, reboots on dolly (11) and the suspension hook (12), is fixed on the arm end at last.Lifting mechanism (2) rotating can drive suspension hook (12) and rise or descend, and finishes slinging work.Can drive trailer wagon (11) with manual winch (7) and move horizontally, realize luffing.With pulling the rope that ties up on jib (10) or the counter-jib, can realize revolution.For the implementation platform lifting, trailer wagon (11) must be moved to jib (10) root And hangs over suspension hook (12) on the column (8), one group of coaster (14) is housed on the wire rope in addition, when carrying out hoisting operation, coaster (14) hangs on the stock (5), when lift platform (4), then coaster (14) is suspended on the derrick guide rail (3).During lifting platform, security insurance pin (6) relies on the effect of inclined-plane and spring, withdraws automatically and stretches out, and realizes location and insurance.In the time will descending platform, move security insurance pin (6) to retracted position by a joystick (13), platform (4) just can descend smoothly.
After finishing the finishing work in the workspace, unload the standard knot of derrick guide rail (3) with lifting gear, pack up the revolution supporting leg, can move another workspace to underframe (1) to manpower and carry out work again.If use several so dual-purpose platforms simultaneously, just can build large-area building below five layers.
Fig. 2 has represented the fall line route of hoist rope: wire rope is drawn from the reel of lifting mechanism (2), enter into tackle pulley (14) through the fixed pulley (15) that is contained on the underframe (1), be incorporated into the movable pulley (16) that is contained on the stock (5) by tackle pulley (14), return tackle pulley (14), enter the fixed pulley (17) that is contained in column (8) lower end again, guide to the pulley (18) that is contained in revolving body (9) top then, be directed to the pulley (19) that is contained on the revolving body (9) downwards, horizontal direction is directed to the pulley (20) on the trailer wagon (11) again, be directed to pulley (21) on the suspension hook (12) by (20), turn back to another pulley (20) on the dolly (11) again, be fixed on the end of jib (10) at last.Tackle pulley (14) has two hooks, and when carrying out lifting operation, (14) hang on the stock (5), and when carrying out the lift platform operation, (14) hang over again on the derrick guide rail (3).The frame plate of pulley (18) can be around the rotation of O point, and the general work situation is hung downwards, when jib (10) is installed, it is moved to position shown in the dotted line, so that promote and rise and pull jib.
Fig. 3 has represented the mechanism principle of security insurance pin: when lift platform (4) rises to certain position, trundle on the security insurance pin (6) can be run into the wedge piece (23) that is contained on the derrick guide rail (3), make spring (22) compression, security insurance pin (6) withdrawal.In case arrive wedge piece (23) end face, spring (22) can eject safety plug (6) again, rides over wedge piece (23) end face, supports lift platform (4), and it can not be fallen down.When lift platform was descended, joystick (13) turned right one to be pushed away, and by leverage, just can move retracted position to security insurance pin (6) to, and lift platform (4) just can descend smoothly.
Fig. 4 represents that column (8) works the process of pulling: pulley (18) is coupled together by hoist rope with jigger (24), jigger (24) is tied up on the derrick guide rail (3) again, and lifting mechanism just can be cocked next column.
Fig. 5 represents to lift by crane the process of jib (10): pulley (18) is supported, and it is suspention jigger (24) down, (24) and jib (10) root is coupled together again, and lifting mechanism just can be sling jib (10) root come.After putting in place, arm root and revolving body (9) are coupled together with bearing pin.
Fig. 6 represents that jib (10) rises and pulls process: jigger (24) is connected with drag-line (25), adorn a short drag-line (26) at revolving body (9) top, by lifting mechanism, just can be cocked next jib, the other end of jigger (24) is connected with drag-line (26), jib has just installed again.
Compare with prior art, the utility model can be with finishing platform and crane functions combination, both improved the lifting altitude of crane, simplified the required auxiliary equipment of loading and unloading derrick again, total in addition cheap and saving mounting cost, be applicable to very much 3~5 one storey buildings, the building operations of particularly numerous small towns dwelling house.

Claims (5)

1, the dual-purpose lift platform of a kind of finishing lifting, comprise underframe [1], lifting mechanism [2], derrick guide rail [3], lift platform [4], stock [5], security insurance pin [6], manual winch [7], column [8], revolving body [9] and jib primary clusterings such as [10], feature of the present utility model is that column [8] and the top jack machinism of settling thereof are housed on the lift platform [4].
2, by the described lift platform of claim 1, it is characterized in that a hoist rope runs through platform lifting mechanism and crampon simultaneously.
3, by the described lift platform of claim 1, it is characterized in that being equipped with one can be rebounded by spring (22) again, and can be moved to the security insurance pin (6) of retracted position by joystick (13) by wedge piece (23) collision compression.
4, by the described lift platform of claim 1, it is characterized in that being equipped with a tackle pulley (14) that has two hooks, when carrying out hoisting operation, tackle pulley is hung on the stock (5), when lift platform, tackle pulley is hung on the derrick guide rail (3).
5, by the described lift platform of claim 1, it is characterized in that being equipped with on the revolving body (9) its frame plate can be around the pulley (18) of fixed point O rotation, and pulley (18) is suspended in down when work, props up to the side top when jib (10) is installed.
CN 89212050 1989-01-18 1989-01-18 Dual-purpose vertical lift platform for fixing and load-lifting Withdrawn CN2042492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 89212050 CN2042492U (en) 1989-01-18 1989-01-18 Dual-purpose vertical lift platform for fixing and load-lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 89212050 CN2042492U (en) 1989-01-18 1989-01-18 Dual-purpose vertical lift platform for fixing and load-lifting

Publications (1)

Publication Number Publication Date
CN2042492U true CN2042492U (en) 1989-08-09

Family

ID=4868244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 89212050 Withdrawn CN2042492U (en) 1989-01-18 1989-01-18 Dual-purpose vertical lift platform for fixing and load-lifting

Country Status (1)

Country Link
CN (1) CN2042492U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556890A (en) * 2012-02-06 2012-07-11 谭锦泉 Self-lifting mounting platform for steel head material hoister and mounting method for mounting platform
CN106429738A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Bottom frame structure used for lifting device
CN106495067A (en) * 2017-01-12 2017-03-15 国网安徽省电力公司检修公司 A kind of lifting shift unit
CN106836764A (en) * 2017-03-20 2017-06-13 无锡市龙海杰机械制造有限公司 The tier building built of small-sized crane is installed
CN109339449A (en) * 2018-11-30 2019-02-15 中国冶集团有限公司 Large-diameter cylinder body interior construction platform and its construction method
CN110923601A (en) * 2019-12-23 2020-03-27 中冶南方工程技术有限公司 Zinc adding device and automatic zinc ingot adding system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556890A (en) * 2012-02-06 2012-07-11 谭锦泉 Self-lifting mounting platform for steel head material hoister and mounting method for mounting platform
CN102556890B (en) * 2012-02-06 2015-06-10 谭锦泉 Self-lifting mounting platform for steel head material hoister and mounting method for mounting platform
CN106429738A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Bottom frame structure used for lifting device
CN106495067A (en) * 2017-01-12 2017-03-15 国网安徽省电力公司检修公司 A kind of lifting shift unit
CN106836764A (en) * 2017-03-20 2017-06-13 无锡市龙海杰机械制造有限公司 The tier building built of small-sized crane is installed
CN109339449A (en) * 2018-11-30 2019-02-15 中国冶集团有限公司 Large-diameter cylinder body interior construction platform and its construction method
CN109339449B (en) * 2018-11-30 2021-06-29 中国一冶集团有限公司 Large-diameter cylinder internal construction platform and construction method thereof
CN110923601A (en) * 2019-12-23 2020-03-27 中冶南方工程技术有限公司 Zinc adding device and automatic zinc ingot adding system

Similar Documents

Publication Publication Date Title
CN110228743A (en) Two-to-one suspension is set in elevator traction than building hoist and its operational method
CN201971567U (en) Small-sized indoor sand hoister
CN214527827U (en) Auxiliary hanging bracket for traffic road and bridge construction
CN2042492U (en) Dual-purpose vertical lift platform for fixing and load-lifting
CN210885034U (en) Lifting device for building engineering
CN204752012U (en) Wall -hanging miniature hoist
CN201010254Y (en) Elastic lock opening device of container
CN214167174U (en) Building materials hoisting accessory for housing construction
CN2057658U (en) Self-lifting type crane
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN212832472U (en) Small-tonnage three-degree-of-freedom crane
CN201105957Y (en) Tower crane engineering special-purpose gin pole hoist
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN101003350B (en) Erecting and mounting method for up-rotation self erecting tower crane
CN112141910A (en) Hoisting accessory is used in high-tonnage construction
CN2199176Y (en) Chain protection type rolled steel sling
CN210393522U (en) Glass curtain wall hoisting device
CN212769473U (en) Anti-swing device based on crane frequency converter
CN212079183U (en) External hoisting device of safe cat ladder
CN218579523U (en) Safety valve hoisting device
CN212712494U (en) Tower crane people-climbing auxiliary device
CN212832481U (en) Marine crane convenient to maintain and overhaul
CN213707569U (en) Building construction hoist device with convenient concatenation of anticollision function
CN217756645U (en) Material hoisting device for operation platform in bin
CN217323142U (en) Glass unit hoisting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee