CN212154069U - Gallows structure is used in building engineering construction - Google Patents
Gallows structure is used in building engineering construction Download PDFInfo
- Publication number
- CN212154069U CN212154069U CN202020053512.5U CN202020053512U CN212154069U CN 212154069 U CN212154069 U CN 212154069U CN 202020053512 U CN202020053512 U CN 202020053512U CN 212154069 U CN212154069 U CN 212154069U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- motor
- square frame
- building engineering
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a gallows structure for building engineering construction, including support column, square frame and storing basket, the equal fixedly connected with inserted block in both sides of square frame, the surface of inserted block is pegged graft through the slot and is had the support column, the equal fixedly connected with connecting rod in four corners department of square frame upper surface, one side of connecting rod is provided with the motor, the output swing joint of motor has the transfer line, the surperficial swing joint of transfer line has the book line post, the surperficial swing joint of book line post has the stay cord, the one end of stay cord is through solid fixedly connected with storing basket, the inside wall fixedly connected with carrier net of square frame. This gallows structure for building engineering construction through the setting of motor, spiral post, stay cord and storing basket, with motor external power supply during the use, and then makes the drive rod drive the spiral post and rotate, makes the spiral post drive the stay cord rolling then to make the storing basket reach the effect of going up and down, made things convenient for constructor transmission construction material.
Description
Technical Field
The utility model relates to a construction gallows technical field specifically is a gallows structure for building engineering construction.
Background
The building construction refers to the production activity in the engineering construction implementation stage, is the construction process of various buildings, also can be said to change various lines on the design drawing into a real object in the appointed place, it includes foundation engineering construction, main structure construction, roofing engineering construction and decoration engineering construction, the construction operation place is called "construction site" or "construction site", also called building site, the portal frame is according to the daily production needs of medium and small factories carrying equipment, warehouse in and out, the needs of hoisting and maintaining heavy equipment and material transportation, the new small-sized hoisting hanger is developed, it is suitable for manufacturing moulds, steam repair factories, mines, earth construction sites and the occasions needing hoisting, the common use of material transportation and constructors in the building construction is both realized, the hoisting mechanization can be reduced, the manpower can be reduced, the production operation cost can be reduced, the working efficiency is improved.
Current crane is when transmitting construction material, and stability is relatively poor, and adjusts the effect of hoist and mount height relatively poor, consequently the utility model provides a portal frame for building engineering construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a gallows structure for building engineering construction has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a gallows structure for building engineering construction, includes support column, square frame and storing basket, the equal fixedly connected with inserted block in both sides of square frame, the surface of inserted block is pegged graft through the slot and is had the support column, the equal fixedly connected with connecting rod in four corners department of square frame upper surface, one side of connecting rod is provided with the motor, the output swing joint of motor has the transfer line, the surperficial swing joint of transfer line has the book line post, the surperficial swing joint of book line post has the stay cord, the one end of stay cord is through solid fixedly connected with storing basket, the inside wall fixedly connected with of square frame bears the net.
Optionally, threaded holes are formed in the two sides of the supporting column and the two sides of the inserting block, and fixing bolts are connected to the inner threads of the threaded holes.
Optionally, a motor cover is arranged outside the motor, and waterproof paint is arranged on the surface of the motor cover.
Optionally, one end of the supporting column is fixedly connected with a connecting block, and the bottom of the connecting block is fixedly connected with a base.
Optionally, both sides of the wire winding column are movably connected with limiting circular plates, and the diameters of the limiting circular plates are twenty centimeters.
Optionally, one side of the connecting rod is fixedly connected with a stop lever, and anti-skid patterns are arranged on the surface of the stop lever.
(III) advantageous effects
The utility model provides a gallows structure for building engineering construction possesses following beneficial effect:
this gallows structure is used in building engineering construction, through the motor, the spiral post, the setting of stay cord and storing basket, with motor external power supply during the use, and then make the drive lever drive the spiral post and rotate, then make the spiral post drive the stay cord rolling, thereby make the storing basket reach the effect of lift, constructor transmission construction material has been made things convenient for, through square frame, the setting of inserted block and slot, insert the inserted block in the slot during the use, rotatory fixing bolt again, then make square frame fix on the support column, thereby through the not slot of grafting co-altitude, the hoist and mount height of adjusting construction material has been reached, setting through the pin, constructor has been prevented to fall on the carrier net, setting through the motor cover, the effect of protection motor has been played.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the wire winding post of the present invention;
FIG. 3 is a schematic view of the structure of the load-bearing net of the present invention;
fig. 4 is a schematic view of the cross-sectional structure of the motor cover of the present invention.
In the figure: 1. a support pillar; 2. a square frame; 3. a storage basket; 4. inserting a block; 5. a slot; 6. a connecting rod; 7. a motor; 8. a transmission rod; 9. a wire winding post; 10. pulling a rope; 11. fixing blocks; 12. a carrying net; 13. a threaded hole; 14. fixing the bolt; 15. a motor cover; 16. connecting blocks; 17. a base; 18. a limiting circular plate; 19. a stop lever.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a hanging bracket structure for construction of building engineering comprises a supporting column 1, a square frame 2 and a storage basket 3, wherein inserting blocks 4 are fixedly connected to two sides of the square frame 2, the surface of each inserting block 4 is provided with the supporting column 1 through inserting slots 5 in an inserting mode, the inserting blocks 4 and the slots 5 are arranged through the square frame 2, when the hanging bracket structure is used, the inserting blocks 4 are inserted into the slots 5, fixing bolts 14 are rotated, then the square frame 2 is fixed on the supporting column 1, the lifting height of construction materials is adjusted through inserting the slots 5 with different heights, connecting rods 6 are fixedly connected to four corners of the upper surface of the square frame 2, a motor 7 is arranged on one side of each connecting rod 6, a transmission rod 8 is movably connected to the output end of the motor 7, a winding column 9 is movably connected to the surface of the transmission rod 8, a stay rope 10 is movably connected to the surface of the winding column 9, one end of the stay rope, through the arrangement of the motor 7, the coiling column 9, the pull rope 10 and the storage basket 3, when in use, the motor 7 is externally connected with a power supply, so that the transmission rod 8 drives the coiling column 9 to rotate, and then the coiling column 9 drives the pull rope 10 to roll, so that the storage basket 3 achieves the lifting effect, construction personnel can conveniently transmit construction materials, a bearing net 12 is fixedly connected to the inner side wall of the square frame 2, threaded holes 13 are respectively formed in two sides of the support column 1 and the insert block 4, fixing bolts 14 are connected to the internal threads of the threaded holes 13, a motor cover 15 is arranged outside the motor 7, the motor 7 is protected through the arrangement of the motor cover 15, waterproof paint is arranged on the surface of the motor cover 15, a connecting block 16 is fixedly connected to one end of the support column 1, a base 17 is fixedly connected to the bottom of the connecting block 16, limiting circular plates 18 are movably connected to two sides of the coiling column 9, and, one side fixedly connected with pin 19 of connecting rod 6 has prevented through the setting of pin 19 that constructor from bearing the weight of and falling from net 12, and anti-skidding decorative pattern has been seted up on the surface of pin 19. The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
As an optimal technical solution of the utility model: the bottom of base 17 is provided with prick ground needle, has improved the stability of device.
To sum up, this gallows structure for building engineering construction, during the use, through motor 7, the coil of wire post 9, stay cord 10 and storing basket 3's setting, with motor 7 external power supply during the use, and then make transfer line 8 drive coil of wire post 9 and rotate, then make coil of wire post 9 drive stay cord 10 rolling, thereby make storing basket 3 reach the effect of going up and down, the constructor transmission construction material has been made things convenient for, through square frame 2, the setting of inserted block 4 and slot 5, during the use with inserted block 4 insert in the slot 5, rotatory fixing bolt 14 again, then make square frame 2 fix on support column 1, thereby through the slot 5 of grafting co-altitude, the hoist and mount height of adjusting the construction material has been reached, setting through pin 19, constructor has been prevented to fall from bearing net 12, setting through motor cover 15, the effect of protection motor 7 has been played.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a gallows structure for building engineering construction, includes support column (1), square frame (2) and storing basket (3), its characterized in that: the utility model discloses a storage basket, including square frame (2), the equal fixedly connected with in both sides of square frame (2) inserted block (4), the surface of inserted block (4) is pegged graft through slot (5) and is had support column (1), the equal fixedly connected with connecting rod (6) of four corners department of square frame (2) upper surface, one side of connecting rod (6) is provided with motor (7), the output swing joint of motor (7) has transfer line (8), the surface swing joint of transfer line (8) has book line post (9), the surface swing joint of book line post (9) has stay cord (10), the one end of stay cord (10) is through solid piece (11) fixedly connected with storage basket (3), the inside wall fixedly connected with bearing net (12) of square frame (2).
2. The hanger structure for construction of building engineering according to claim 1, wherein: threaded holes (13) are formed in the two sides of the supporting column (1) and the inserting block (4), and fixing bolts (14) are connected to the inner threads of the threaded holes (13).
3. The hanger structure for construction of building engineering according to claim 1, wherein: the motor is characterized in that a motor cover (15) is arranged outside the motor (7), and waterproof paint is arranged on the surface of the motor cover (15).
4. The hanger structure for construction of building engineering according to claim 1, wherein: one end fixedly connected with connecting block (16) of support column (1), the bottom fixedly connected with base (17) of connecting block (16).
5. The hanger structure for construction of building engineering according to claim 1, wherein: both sides of the wire coiling column (9) are movably connected with limiting circular plates (18), and the diameters of the limiting circular plates (18) are twenty centimeters.
6. The hanger structure for construction of building engineering according to claim 1, wherein: one side fixedly connected with pin (19) of connecting rod (6), anti-skidding decorative pattern has been seted up on the surface of pin (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020053512.5U CN212154069U (en) | 2020-01-11 | 2020-01-11 | Gallows structure is used in building engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020053512.5U CN212154069U (en) | 2020-01-11 | 2020-01-11 | Gallows structure is used in building engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212154069U true CN212154069U (en) | 2020-12-15 |
Family
ID=73707508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020053512.5U Expired - Fee Related CN212154069U (en) | 2020-01-11 | 2020-01-11 | Gallows structure is used in building engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212154069U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112942775A (en) * | 2021-01-29 | 2021-06-11 | 中建七局第二建筑有限公司 | Installation operation platform for housing construction |
-
2020
- 2020-01-11 CN CN202020053512.5U patent/CN212154069U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112942775A (en) * | 2021-01-29 | 2021-06-11 | 中建七局第二建筑有限公司 | Installation operation platform for housing construction |
CN112942775B (en) * | 2021-01-29 | 2022-05-31 | 中建七局第二建筑有限公司 | Installation operation platform for housing construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113968543B (en) | Assembled building hoisting accessory | |
CN212154069U (en) | Gallows structure is used in building engineering construction | |
CN210048319U (en) | Traction type construction elevator with foldable top beam | |
CN106703509B (en) | Suspension type fence hoisting equipment and hoisting method thereof | |
CN213326235U (en) | Stable and anti-shaking lifting device for building construction | |
CN206972169U (en) | Drilling equipment | |
CN206336964U (en) | A kind of support top formula lifting pipeline apparatus and system | |
CN208485534U (en) | A kind of construction lifting appliance | |
CN106744404A (en) | Method for hoisting mill housing by using movable tower | |
CN210736039U (en) | Material lifting device for building construction | |
CN213923842U (en) | Wallboard lifting device in assembled | |
CN212001094U (en) | Static pile pressing machine for civil and architectural engineering | |
CN210767753U (en) | Lifting device for building engineering | |
CN213204893U (en) | Lifting type construction platform for house building engineering | |
CN216863409U (en) | Hoisting device for large-diameter pipe jacking construction | |
CN216997469U (en) | Small-size hoist device is used in municipal construction | |
CN218403566U (en) | Lifting device for building electrical construction | |
CN212799383U (en) | Hoisting accessory is used in building engineering construction | |
CN218893407U (en) | Material lifting device for building construction | |
CN221370335U (en) | Glass curtain wall installs loop wheel machine | |
CN220264908U (en) | Suspension device for installation of power equipment | |
CN215402719U (en) | Auxiliary lifting appliance for building construction | |
CN221397013U (en) | Building construction building materials handling equipment is built in room | |
CN220318390U (en) | Hanging basket fixing structure on double-layer reinforced concrete flower frame beam | |
CN218815094U (en) | Scaffold for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201215 Termination date: 20220111 |