CN218403566U - Lifting device for building electrical construction - Google Patents

Lifting device for building electrical construction Download PDF

Info

Publication number
CN218403566U
CN218403566U CN202222119705.8U CN202222119705U CN218403566U CN 218403566 U CN218403566 U CN 218403566U CN 202222119705 U CN202222119705 U CN 202222119705U CN 218403566 U CN218403566 U CN 218403566U
Authority
CN
China
Prior art keywords
bearing plate
base
lifting device
building electrical
electrical construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222119705.8U
Other languages
Chinese (zh)
Inventor
陈强
张鹏飞
李新红
张建宽
段宗兵
高传旺
郑文杰
贾强
侯亚伟
舒龙
杨磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Longyu Coal Chemical Co ltd
Original Assignee
Henan Longyu Coal Chemical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Longyu Coal Chemical Co ltd filed Critical Henan Longyu Coal Chemical Co ltd
Priority to CN202222119705.8U priority Critical patent/CN218403566U/en
Application granted granted Critical
Publication of CN218403566U publication Critical patent/CN218403566U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to a construction technical field, concretely relates to elevating gear for building electrical construction. The device comprises a base and a bearing plate, wherein an air cylinder is arranged on the base, the output end of the air cylinder is fixedly connected with the bottom of the bearing plate, a plurality of stand columns are also arranged on the base, and the top of a sleeve is fixedly connected with the bottom of the bearing plate; supporting mechanisms are arranged on the periphery of the base; the loading board is provided with an opening, a door cover is arranged on the loading board corresponding to the opening, a rope ladder is further arranged below the opening, and a rope ladder placing box mounted at the bottom of the loading board is further arranged on one side of the rope ladder. The top of loading board is provided with the railing, the solar photovoltaic board is installed in the outside of railing. The utility model discloses can let the constructor need not the operation of standing, can effectually reduce constructor's intensity of labour, on need not constructor self and carrying operation instrument and electrical equipment spare part and go up the loading board, make things convenient for constructor construction operation, be convenient for remove.

Description

Lifting device for building electrical construction
Technical Field
The utility model relates to a construction technical field, concretely relates to elevating gear is used in building electrical construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object in a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. The constructor often needs to ascend during the building construction, and during the ascending operation, the constructor needs to be sent to an operation construction point by using a lifting device.
Lifting device's among the prior art structure is comparatively simple, the function singleness, and constructor stands usually and carry out the construction operation on lifting device when using, and instrument and electrical equipment spare part that the work progress was used need constructor self to carry, and it has constructor construction inconvenience, intensity of labour is big, the inconvenient problem of removal.
Disclosure of Invention
The utility model discloses a solve current elevating gear constructor and have the construction inconvenient, intensity of labour is big, remove inconvenient problem when using, provide a building elevating gear for electrical construction, the device need not the constructor construction of standing, need not constructor self and carries construction operation instrument, can effectually reduce constructor's intensity of labour.
In order to realize the purpose, the technical scheme of the utility model is that: a lifting device for building electrical construction comprises a base and a bearing plate, wherein an air cylinder is arranged on the base, the output end of the air cylinder is fixedly connected with the bottom of the bearing plate, a plurality of stand columns are further arranged on the base, sleeves in sliding connection with the stand columns are sleeved on the stand columns, and the tops of the sleeves are fixedly connected with the bottom of the bearing plate; all be provided with supporting mechanism around the base, the cylinder is used for driving the loading board and rises or descend.
The cross section of the bearing plate is of a triangular structure, an opening is formed in the bearing plate, a door cover is arranged on the bearing plate corresponding to the opening, a rope ladder is further arranged below the opening, and a rope ladder placing box mounted at the bottom of the bearing plate is further arranged on one side of the rope ladder; the top of the bearing plate is provided with a railing, the outer side of the railing is provided with a solar photovoltaic panel, and one side of the railing is also provided with a plurality of hooks; the middle part of loading board is provided with the seat board, still be provided with the storage tank on the loading board, can hang the instrument bag on the couple, the instrument bag can be used to place the used instrument of construction operation process.
Furthermore, a power box is arranged on one side of the air cylinder and is positioned on the base, the power box is connected with the air cylinder through a wire, and the power box is used for supplying power to the air cylinder.
Further, still be provided with the balancing weight on the base, the bottom of base still is provided with a plurality of universal wheels, and this device of being convenient for of universal wheel removes.
Further, supporting mechanism includes fixed block, loop bar, supporting seat and bolt, fixed block and base fixed connection, the bottom fixed mounting of fixed block has a slide cartridge, the loop bar cover is established in the slide cartridge, and with slide cartridge sliding connection, supporting seat fixed mounting is in the bottom of loop bar. After moving this device to the construction site, accessible supporting mechanism supports the base, prevents that constructor from removing this device when construction operation, plays safety guarantee's effect to constructor.
Furthermore, a plurality of positioning holes are formed in the loop bar, a through hole matched with the positioning holes is formed in the lower end of the sliding barrel, one end of the plug pin sequentially penetrates through the through hole and the positioning holes and extends out of the sliding barrel, and the plug pin is used for fixing the loop bar and the sliding barrel.
Further, the inside bilateral symmetry of opening is provided with the jack-post, the top of rope ladder is provided with the connecting plate, set up on the connecting plate with jack-post assorted trepanning, the rope ladder passes through the connecting plate to be hung and establishes on the jack-post, and the rope ladder is convenient for constructor to climb on the loading board, can save constructor's physical power.
Furthermore, a storage battery is further arranged on the bearing plate and connected with the solar photovoltaic panel through a lead, and the solar photovoltaic panel can convert solar energy into electric energy and transmit the electric energy to the storage battery through the lead for storage.
Through the technical scheme, the beneficial effects of the utility model are that:
the utility model discloses can be according to the height of the high free adjustment loading board of construction point, can let constructor need not the operation of standing, can effectually reduce constructor's intensity of labour, need not constructor self and carry construction operation instrument and electrical equipment spare part and erection equipment and go up to the loading board on, make things convenient for constructor construction operation, be convenient for remove.
The utility model discloses in the use, supporting mechanism can support the base, prevents that constructor this device from removing when the construction operation, has strengthened the stability of this device, has improved the factor of safety of this device.
The utility model discloses a couple can be used to hang the instrument bag, can place the instrument that uses among the construction operation process in the instrument bag, and the storage tank on the loading board can be used to place used electrical equipment spare part and erection equipment among the construction operation process, makes things convenient for constructor at any time to use instrument and electrical equipment spare part.
Drawings
Fig. 1 is a first schematic structural view of a lifting device for building electrical construction of the present invention;
fig. 2 is a schematic structural view of a lifting device for building electrical construction of the present invention;
fig. 3 is a third schematic structural view of the lifting device for building electrical construction of the present invention;
fig. 4 is an enlarged view at a in fig. 2.
The reference numbers in the figures are: 1 is the base, 2 is the loading board, 3 is the cylinder, 4 is the opening, 401 is the jack-post, 5 is the door closure, 6 is the rope ladder, 601 is the connecting plate, 7 is the seat board, 8 is the railing, 9 is the solar photovoltaic board, 10 is the battery, 11 is the couple, 12 is the sleeve pipe, 13 is the stand, 14 places the box for the rope ladder, 15 is the power supply box, 16 is the balancing weight, 17 is the universal wheel, 18 is the fixed block, 19 is the slide cartridge, 20 is the loop bar, 21 is the locating hole, 22 is the bolt, 23 is the supporting seat, 24 is the storage tank.
Detailed Description
The invention will be further explained with reference to the drawings and the detailed description below:
as shown in fig. 1 to 4, a lifting device for building electrical construction comprises a base 1 and a bearing plate 2, wherein a cylinder 3 is arranged on the base 1, an output end of the cylinder 3 is fixedly connected with the bottom of the bearing plate 2, the base 1 is further provided with a plurality of upright columns 13, sleeves 12 which are slidably connected with the upright columns 13 are sleeved on the upright columns 13, in the embodiment, the base is provided with 3 upright columns and 3 sleeves 12, the upright columns 13 are distributed in a triangular shape, the stability of the bearing plate 2 is improved, each upright column 13 is provided with a plurality of mounting holes, the lower end of each sleeve 12 is provided with a limiting hole which is matched with the mounting holes, one of the mounting holes and the limiting holes is provided with a limiting bolt for stably fixing the upright columns 13 and the sleeves 12, and the top of the sleeve 12 is fixedly connected with the bottom of the bearing plate 2; all be provided with supporting mechanism around base 1, every supporting mechanism installs in the outside middle part of base 1.
The cross section of the bearing plate 2 is of a triangular structure, an opening is formed in the bearing plate 2, a door cover 5 is arranged on the bearing plate 2 corresponding to the opening 4, the door cover 5 is rotatably connected with the bearing plate 2 through a hinge, a rope ladder 6 is further arranged below the opening 4, the rope ladder 6 is convenient for workers to climb onto the bearing plate 2, a rope ladder placing box 14 mounted at the bottom of the bearing plate 2 is further arranged on one side of the rope ladder 6, the lower portion of the rope ladder placing box 14 is of an arc-shaped structure, and when the device is not used, the rope ladder 6 can be rolled up and placed into the rope ladder placing box 14; the top of the bearing plate 2 is provided with a railing 8, the railing 8 plays a role of safety protection for constructors, a solar photovoltaic panel 9 is installed on the outer side of the railing 8, a plurality of hooks 11 are further arranged on one side of the railing 8, and 3 hooks 11 are installed on the railing 8 in the embodiment; the middle part of loading board 2 is provided with seat board 7, still be provided with storage tank 24 on the loading board 2, this device is when using, and constructor can be with sitting and be under construction on seat board 7, the effectual intensity of labour who reduces constructor slows down constructor's fatigue.
A power supply box 15 is arranged on one side of the air cylinder 3, the power supply box 15 is positioned on the base 1, and the power supply box 15 is connected with the air cylinder 3 through a conducting wire.
Still be provided with balancing weight 16 on the base 1, install 2 balancing weights 16 on the base 1 in this embodiment, and the symmetry sets up the both sides at cylinder 3, and balancing weight 16 can increase base 1's gravity, makes this device more stable in the use, and base 1's bottom still is provided with 4 universal wheels 17, and every universal wheel 17 is fixed in the position that the bottom of base 1 is close to four corners, is convenient for remove this device.
The supporting mechanism comprises a fixed block 18, a loop bar 20, a supporting seat 23 and a bolt 22, the fixed block 18 is fixedly connected with the base 1, a sliding barrel 19 is fixedly mounted at the bottom of the fixed block 18, the loop bar 20 is sleeved in the sliding barrel 19 and is in sliding connection with the sliding barrel 19, and the supporting seat 23 is fixedly mounted at the bottom of the loop bar 20.
The loop bar 20 is provided with a plurality of positioning holes 21, the lower end of the sliding cylinder 19 is provided with a through hole matched with the positioning holes 21, and one end of the bolt 22 sequentially penetrates through the through hole and the positioning holes 21 and extends out of the sliding cylinder 19. After the device is moved to a construction operation site, the bolt 22 of each supporting mechanism is pulled out, then the loop bar 20 slides downwards, the universal wheel 17 is in a suspended state, the supporting seat 23 at the bottom of the loop bar 20 is contacted with the ground, then the bolt 22 is inserted into the positioning hole 21 and the through hole, the sliding cylinder 19 and the loop bar 20 are fixed, and the four supporting mechanisms play a role in supporting the base 1.
The inside bilateral symmetry of opening 4 is provided with jack-post 401, and the tip of every jack-post 401 is fixed mounting still has limit baffle, the top of rope ladder 6 is provided with connecting plate 601, seted up on the connecting plate 601 with jack-post 401 assorted trepanning, rope ladder 6 hangs through connecting plate 601 and establishes on jack-post 401, and two connecting plates 601 are installed at the top of rope ladder 6, and two connecting plates 601 are hung respectively on the jack-post 401 of the inside bilateral symmetry installation of opening 1.
Still be provided with battery 10 on the loading board 2, battery 10 passes through the wire and connects solar photovoltaic board 9, solar photovoltaic board 9 can be with solar energy transformation electric energy to store in transmitting the electric energy to battery 10 through the wire, and is specific, and battery 10 also can be connected with cylinder 3 as stand-by power supply, and when power supply box 15 goes wrong, can start cylinder 3 decline loading board 2, mountable light on railing 8 simultaneously, battery 10 can be for the light power supply.
When the device is used, the device is firstly moved to a place needing construction operation, the bolt 22 of each supporting mechanism is pulled out, the height of the loop bar 20 is adjusted, each universal wheel 17 is in a suspended state, the supporting seat 23 is in contact with the ground, then the bolt 22 penetrates through the positioning hole 21 and the through hole to fix the loop bar 20 and the sliding barrel 19, the supporting mechanism further plays a role in supporting the base 1, then the rope ladder 6 is taken out of the rope ladder placing box 14, a tool bag is hung on the hook 11 on the railing 8, and parts of electrical equipment used for construction are placed in the storage box 24.
Starting cylinder 3, the push rod that makes cylinder 3 promotes loading board 2 and rises, makes loading board 2 remove and stops behind the height of electrical equipment construction operation point, at the in-process that loading board 2 rises, rope ladder 6 constantly stretches out, then constructor accessible rope ladder 6 climbs the bottom of loading board 2, upwards promotes to open door closure 5 from opening 4 to loading board 2 on, then sits and carries out the construction operation on seat board 4. After the constructor has completed the construction work, it can be lowered again from the loading floor 2 through the opening 4 and the rope ladder 6.
The above-mentioned embodiments are only preferred embodiments of the present invention, and do not limit the scope of the present invention, so that equivalent changes or modifications made by the technical solutions according to the claims of the present invention should be included in the claims of the present invention.

Claims (7)

1. A lifting device for building electrical construction comprises a base (1) and is characterized by further comprising a bearing plate (2), wherein a cylinder (3) is arranged on the base (1), the output end of the cylinder (3) is fixedly connected with the bottom of the bearing plate (2), a plurality of stand columns (13) are further arranged on the base (1), sleeves (12) which are in sliding connection with the stand columns (13) are sleeved on the stand columns (13), and the tops of the sleeves (12) are fixedly connected with the bottom of the bearing plate (2); the periphery of the base (1) is provided with a supporting mechanism;
the cross section of the bearing plate (2) is of a triangular structure, an opening (4) is formed in the bearing plate (2), a door cover (5) is arranged on the bearing plate (2) corresponding to the opening (4), a soft ladder (6) is further arranged below the opening (4), and a soft ladder placing box (14) installed at the bottom of the bearing plate (2) is further arranged on one side of the soft ladder (6); a railing (8) is arranged at the top of the bearing plate (2), a solar photovoltaic panel (9) is arranged on the outer side of the railing (8), and a plurality of hooks (11) are further arranged on one side of the railing (8); the middle part of the bearing plate (2) is provided with a seat plate (7), and the bearing plate (2) is further provided with a storage box (24).
2. The lifting device for building electrical construction according to claim 1, wherein a power box (15) is arranged on one side of the cylinder (3), the power box (15) is positioned on the base (1), and the power box (15) is connected with the cylinder (3) through a wire.
3. The lifting device for building electrical construction according to claim 1, wherein the base (1) is further provided with a counterweight (16), and the bottom of the base (1) is further provided with a plurality of universal wheels (17).
4. The lifting device for building electrical construction according to claim 1, wherein the supporting mechanism comprises a fixing block (18), a sleeve rod (20), a supporting seat (23) and a bolt (22), the fixing block (18) is fixedly connected with the base (1), a sliding cylinder (19) is fixedly mounted at the bottom of the fixing block (18), the sleeve rod (20) is sleeved in the sliding cylinder (19) and is slidably connected with the sliding cylinder (19), and the supporting seat (23) is fixedly mounted at the bottom of the sleeve rod (20).
5. The lifting device for building electrical construction as claimed in claim 4, wherein the loop bar (20) is provided with a plurality of positioning holes (21), the lower end of the sliding cylinder (19) is provided with a through hole matched with the positioning holes (21), and one end of the bolt (22) passes through the through hole and the positioning holes (21) in sequence and extends out of the sliding cylinder (19).
6. The lifting device for building electrical construction according to claim 1, wherein the shaft posts (401) are symmetrically arranged on two sides inside the opening (4), the top of the rope ladder (6) is provided with a connecting plate (601), the connecting plate (601) is provided with a sleeve hole matched with the shaft posts (401), and the rope ladder (6) is hung on the shaft posts (401) through the connecting plate (601).
7. The lifting device for building electrical construction according to claim 1, wherein a storage battery (10) is further disposed on the bearing plate (2), and the storage battery (10) is connected to the solar photovoltaic panel (9) through a wire.
CN202222119705.8U 2022-08-12 2022-08-12 Lifting device for building electrical construction Active CN218403566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222119705.8U CN218403566U (en) 2022-08-12 2022-08-12 Lifting device for building electrical construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222119705.8U CN218403566U (en) 2022-08-12 2022-08-12 Lifting device for building electrical construction

Publications (1)

Publication Number Publication Date
CN218403566U true CN218403566U (en) 2023-01-31

Family

ID=85026984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222119705.8U Active CN218403566U (en) 2022-08-12 2022-08-12 Lifting device for building electrical construction

Country Status (1)

Country Link
CN (1) CN218403566U (en)

Similar Documents

Publication Publication Date Title
CN111980391A (en) Integral hoisting platform and building method of building outer facade construction platform
CN106136561A (en) Electrician can backpack Self-unlocking lifting tool bag
CN213572947U (en) Constructional column outer wall side instrument formula operation platform
CN218403566U (en) Lifting device for building electrical construction
CN214693196U (en) Energy-saving lifting device for fire engineering construction
CN211548713U (en) A suspension type scaffold frame for square chimney
CN212888292U (en) Movable automatic lifting rack of drilling machine for reinforcing railway retaining wall
CN210767753U (en) Lifting device for building engineering
CN212154069U (en) Gallows structure is used in building engineering construction
CN212562370U (en) Scaffold for building construction
CN214697088U (en) Flange flatness detects with support tool equipment that ascends a height
CN210759347U (en) Mounting equipment
CN212224199U (en) Scaffold convenient to adjust for power equipment overhaul
CN211444795U (en) Elevator for construction machinery
CN220954726U (en) Suspension construction work tool
CN221116897U (en) Photovoltaic module overhauls device
CN217128893U (en) Scaffold
CN214785777U (en) Safe lifting platform for construction
CN2204832Y (en) Automatic lifting scaffold
CN210917032U (en) Bridge construction is with safe support bracket
CN218815094U (en) Scaffold for building construction
CN211444796U (en) Glass curtain wall mounting crane
CN215855005U (en) Movable elevator for high-altitude operation
CN213710271U (en) Scaffold with material lifting device
CN215332620U (en) Be applicable to indoor outer cat ladder for fitment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant