CN2256418Y - Creeping formwork lifting frame for lift shaft - Google Patents

Creeping formwork lifting frame for lift shaft Download PDF

Info

Publication number
CN2256418Y
CN2256418Y CN 95246278 CN95246278U CN2256418Y CN 2256418 Y CN2256418 Y CN 2256418Y CN 95246278 CN95246278 CN 95246278 CN 95246278 U CN95246278 U CN 95246278U CN 2256418 Y CN2256418 Y CN 2256418Y
Authority
CN
China
Prior art keywords
outrigger
derrick
bearing beam
shaft
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95246278
Other languages
Chinese (zh)
Inventor
胡颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95246278 priority Critical patent/CN2256418Y/en
Application granted granted Critical
Publication of CN2256418Y publication Critical patent/CN2256418Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to a creeping formwork lifting frame for a lift shaft, which is composed of a shaft frame, a shaft frame bearing beam, an outer frame, an outer frame bearing beam, a hanging cage, a steel cable, a hoisting machine, etc. The utility model is characterized in that the shaft frame bearing beam and the outer frame bearing beam are both supported on the wall of a lift shaft and are fixed on a floor by bolts, the shaft frame and the outer frame are respectively fastened on the shaft frame bearing beam and the outer frame bearing beam by bolts, the shaft frame creeps along with the lifting of the shaft wall, the shaft frame and the outer frame mutually creep up through hand operation or electric power, and the utility model creeps up through hand operation or electric power. The utility model has the characteristic that vertical transportation and the creeping formwork are organically combined into a whole, and has the advantages of simple structure, convenient disassembly, assembly and operation, high lifting stability, low price, etc.

Description

Elevator creeping formwork raising legs
The utility model relates to the derrick that building operation is used, particularly a kind of elevator creeping formwork raising legs.
In the construction of skyscraper, the vertical transport facility of selecting generally has tower crane, concrete pump, derrick etc. usually.Tower crane cost height wherein, complex structure, inconvenience maintenance; The concrete pump is pump concrete separately, and limitation is big; And derrick must be set up from ground, the waste steel, and installing/dismounting is loaded down with trivial details.
The purpose of this utility model provides a kind of simple in structure, is convenient to dismounting and operation, small investment, high efficiency, and the elevator raising legs that vertical transport and creeping formwork organically are combined as a whole.
Technical solution of the present utility model is: the derrick bolt up is on the derrick bearing beam, and this bearing beam is supported on hoistway wall, the two ends of bearing beam by bolted on flooring.In addition, the outside of derrick also is with outrigger, and this outrigger is arranged on the outrigger bearing beam with bolt, and this bearing beam is to be supported on hoistway wall, and is arranged on the flooring that is higher than the derrick bearing beam with bolt.Draw-beam on the outrigger is provided with bottle gouard moved by hands or the electric block that the derrick that climbs is used, the also available tower crane derrick that climbs.The derrick outside is provided with guide rail, and the outrigger inboard also is provided with leading sheave, utilizes guide rail and pulley, can make when climbing mutually between outrigger and the derrick to play the guiding role.Crown four limits are provided with the lifting outrigger, and the two ends of this outrigger are provided with the bottle gouard moved by hands or the electric block of be used to climb outrigger and template.The top of derrick is provided with the head sheave beam, and there is head sheave the upper end, and ground is provided with land wheel, winch, and cage or hopper are arranged in the derrick.
The utility model is compared with existing tower crane, concrete pump, derrick, has following advantage: 1. creeping formwork and derrick organically are combined as a whole, have improved work efficiency; 2. derrick is supported on the hoistway wall, and climbs, save steel along with the rising of hoistway wall, good in economic efficiency; 3. simple in structure, be convenient to dismounting and operation; 4. climb and adopt guide rail to contact, reduced the lifting resistance, promote good stability with pulley.
Below in conjunction with accompanying drawing the utility model is illustrated:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the A-A section drawing of Fig. 1.
As shown in Figure 1, 2, the utility model is by head sheave beam 1, head sheave 2, outrigger 3, bottle gouard moved by hands or electric block 4,5, steel wire rope 6, internal mold 7, external mold 8, Bolt 9, outrigger 10, derrick 11, the borehole wall 12, guide rail 13, cage 14, Spandrel girder 15, bolt 16, land wheel 17, hoist engine 18, draw-beam 19, Pull bar 20, pulley 21, outrigger spandrel girder 22, flooring 23, steel wire rope 24 Common formation.
Embodiment: derrick bearing beam 15 is supported on hoistway wall 12, and bolt up is in flooring 23 tops, and derrick 11 bolt ups are in derrick bearing beam 15 upper ends.Derrick 11 outsides are with outrigger 10, and also bolt up is on outrigger bearing beam 22 for outrigger 10, and outrigger bearing beam 22 also is supported on the hoistway wall 12, also is anchored on flooring 23 tops with bolt 16.The draw-beam 19 on outrigger 10 tops is provided with the bottle gouard moved by hands or the electric block 5 of derrick 11 usefulness of climbing.Derrick 11 is provided with guide rail 13, and outrigger 10 respectively is provided with 4 pulleys 21 up and down.During formwork, outrigger 10 is connected as a single entity by pull bar 20 and internal mold 7, and internal mold 7 is connected as a single entity with external mold 8 usefulness bolts 9.Four limits, derrick 11 tops are provided with lifting outrigger 3, and lifting outrigger 3 is provided with bottle gouard moved by hands or the electric block 4 that is used to promote internal mold 7, external mold 8 and outrigger 10.Derrick 11 tops are provided with head sheave beam 1, head sheave beam 1 is provided with head sheave 2, ground is provided with land wheel 17 and winch 18, be provided with cage (or hopper) 14 in the derrick 11, steel rope 24 is pulled to head sheave beam 1 from ground, as the guide rail of cage 14, steel rope 6 is connected in winch 18 by head sheave 2 and land wheel 17 with cage 14.
During use, water the high ferro-concrete hoistway wall 12 of two floors by drawing earlier, should reserve the hole of placing bearing beam 15,22.When hoistway wall 12 intensity reach 20Mpa, derrick bearing beam 15 is inserted in the hole that hoistway wall 12 reserve, be anchored on the flooring 23 with bolt 16, with derrick 11 bolt ups on derrick bearing beam 15.Then outrigger bearing beam 22 is inserted in the hole of hoistway wall 12 reservations, be anchored on the flooring 23 with bolt 16, again outrigger 10 is enclosed within derrick 11 outsides, bolt up is on outrigger bearing beam 22, continue the high hoistway wall 12 of pouring first floor with pull bar 20 and bolt 9 well, with 8 of internal molds 7, external mold.When the intensity for the treatment of newly to water hoistway wall 12 reaches 20MPa, with bottle gouard moved by hands 4 outrigger 10 that climbs, internal mold 7, external mold 8, when climbing outrigger 10, should loosen earlier and outrigger bearing beam 22 bonded assembly bolts, make outrigger 10 be in supreme restrained condition down, when climbing, pulley 21 on the outrigger 10 rises along the guide rail on the derrick 11 13, and at this moment, the weight bearing of outrigger 10 is on derrick 11, assigned position climbs, standby outrigger bearing beam 22 is inserted in the hole of hoistway wall 12 reservations, put down outrigger 10, the outrigger bearing beam is anchored on the flooring 23 with bolt 16, the sheet bolt is anchored on outrigger 10 on the outrigger bearing beam 22, unloads the outrigger bearing beam 22 of original position when not climbing.Subsequently, formwork continues the high hoistway wall 12 of pouring first floor, then with bottle gouard moved by hands 5 derrick 11 that climbs, before climbing, should loosen earlier and derrick bearing beam 15 bonded assembly bolts, make derrick 11 be in the supreme state of constraint down, when climbing, the guide rail 13 on the derrick 11 rises along the pulley on the outrigger 10 21, at this moment, the weight bearing of derrick 11 is on outrigger 10, and the assigned position that climbs inserts standby derrick bearing beam 15 in the hole of hoistway wall 12 reservations, put down derrick 11, with bolt 16 derrick bearing beam 15 is anchored on the flooring 23, derrick 11 is anchored on the derrick bearing beam 15, unload the derrick bearing beam 15 of former placement when not climbing with bolt.Like this, can carry out the circulation second time, reciprocation cycle, hoistway wall 12 constantly pouring raises, and derrick 11 also constantly climbs thereupon.During hoisting heavy, start winch 18, can realize cage (or hopper) 14 up-and-down movements.In case of necessity, derrick 11 can be set up driving lever, in order to surpluses such as lifting reinforcing bars.
When building is not high, also the derrick in the utility model 11 can be set up from the elevator basis, and be set up and be higher than building, only climbing shuttering separately.

Claims (3)

1, a kind of elevator creeping formwork raising legs, by head sheave beam (1), head sheave (2), steel rope (6), outrigger (10), derrick (11), cage (14), derrick bearing beam (15), land wheel (17), winch (18), outrigger bearing beam compositions such as (22), it is characterized in that: derrick (11) bolt up is on derrick bearing beam (15), bearing beam (15) is supported on hoistway wall (12), its two ends are anchored on the flooring (23) by bolt (16), the outside of derrick (11) is with outrigger (10), outrigger (10) is arranged on the outrigger bearing beam (22) with bolt, this bearing beam (22) is supported on hoistway wall (12), be arranged on the flooring (23) that is higher than derrick bearing beam (15) by bolt (16), thereby derrick (11) and outrigger (10) are climbed mutually.
2, elevator creeping formwork raising legs according to claim 1, it is characterized in that: four limits, derrick (11) top are provided with lifting outrigger (3), the two ends of outrigger (3) are provided with the bottle gouard moved by hands or the electric block (4) of be used to climb outrigger (10), internal mold (7), external mold (8), outrigger (10) top is provided with draw-beam (19), and lifting outrigger (19) is provided with the bottle gouard moved by hands or the electric block (5) of the derrick (11) that is used to climb.
3, elevator creeping formwork raising legs according to claim 1, it is characterized in that: derrick (11) outside is equipped with guide rail (13), outrigger (10) inboard also is provided with pulley (21), is guiding with guide rail (13) and pulley (21), and derrick (11) and outrigger (10) are climbed mutually.
CN 95246278 1995-12-06 1995-12-06 Creeping formwork lifting frame for lift shaft Expired - Fee Related CN2256418Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95246278 CN2256418Y (en) 1995-12-06 1995-12-06 Creeping formwork lifting frame for lift shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95246278 CN2256418Y (en) 1995-12-06 1995-12-06 Creeping formwork lifting frame for lift shaft

Publications (1)

Publication Number Publication Date
CN2256418Y true CN2256418Y (en) 1997-06-18

Family

ID=33885885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95246278 Expired - Fee Related CN2256418Y (en) 1995-12-06 1995-12-06 Creeping formwork lifting frame for lift shaft

Country Status (1)

Country Link
CN (1) CN2256418Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113777A (en) * 2015-09-11 2015-12-02 中国建筑第八工程局有限公司 Structural construction equipment with cooperative transmission by beams in multiple layers and climb method thereof
CN105836578A (en) * 2016-04-20 2016-08-10 北京大赢电气有限公司 Two-person two-section type elevator
CN105908967A (en) * 2016-06-29 2016-08-31 江苏省苏中建设集团股份有限公司 Self-elevating elevator shaft shear wall creeping formwork operation platform and construction method thereof
CN106542469A (en) * 2015-09-18 2017-03-29 中国电力科学研究院 A kind of insulated elevating platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113777A (en) * 2015-09-11 2015-12-02 中国建筑第八工程局有限公司 Structural construction equipment with cooperative transmission by beams in multiple layers and climb method thereof
CN105113777B (en) * 2015-09-11 2017-09-26 中国建筑第八工程局有限公司 The structure construction equipment and its method of climbing of power transmission are cooperateed with using multilayer beam
CN106542469A (en) * 2015-09-18 2017-03-29 中国电力科学研究院 A kind of insulated elevating platform
CN105836578A (en) * 2016-04-20 2016-08-10 北京大赢电气有限公司 Two-person two-section type elevator
CN105908967A (en) * 2016-06-29 2016-08-31 江苏省苏中建设集团股份有限公司 Self-elevating elevator shaft shear wall creeping formwork operation platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN2923635Y (en) Single-column towing type elevator
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN210048319U (en) Traction type construction elevator with foldable top beam
CN216341336U (en) Adjustable inverted frame structure of 750 x 750mm cross-section holding rod system
CN2256418Y (en) Creeping formwork lifting frame for lift shaft
CN2703832Y (en) Elevator well creeping formwork hoisting frame
CN205873594U (en) Special construction elevator of cooling tower section of thick bamboo wall
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN2486661Y (en) Climbing formwork lifting frame for elevator shaft
CN216810895U (en) Elevator shaft operation platform
CN214885625U (en) Multi-point prefabricated part mounting platform
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN2224191Y (en) Self-lifting tower crane capable of carrying person
CN208122299U (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system
CN208934392U (en) Construction mould bases
CN2170986Y (en) Movable form board
CN209924424U (en) Creeping formwork device with safety structure
CN218665035U (en) Hoisting device for large steel plate bin
CN217201555U (en) Novel traction type built-in construction elevator
CN219044810U (en) Simple material lifting device in hoistway
CN2703076Y (en) non-column self-climbing formwork
CN217079762U (en) A frame that slides for assembled steel construction building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee