CN210342719U - Movable operation frame for quickly installing assembled inner wall plate - Google Patents

Movable operation frame for quickly installing assembled inner wall plate Download PDF

Info

Publication number
CN210342719U
CN210342719U CN201920247606.3U CN201920247606U CN210342719U CN 210342719 U CN210342719 U CN 210342719U CN 201920247606 U CN201920247606 U CN 201920247606U CN 210342719 U CN210342719 U CN 210342719U
Authority
CN
China
Prior art keywords
steel pipe
frame
handling frame
assembled
electric block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920247606.3U
Other languages
Chinese (zh)
Inventor
吕军强
张斌
董凯
王岩
鲁传福
祝明
李伟
杜保臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201920247606.3U priority Critical patent/CN210342719U/en
Application granted granted Critical
Publication of CN210342719U publication Critical patent/CN210342719U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a quick installation assembled interior wallboard's removal handling frame belongs to construction technical field. Including handling frame body and electric block, handling frame body bottom four corners department sets up the pulley respectively, and handling frame body top is fixed to be equipped with the mounting bracket that is used for setting up electric block. The handling frame body comprises two right-angled triangle frames and connecting pieces, and the connecting pieces are fixedly arranged between the right-angled triangle frames. The right-angled triangle frame is composed of a first steel pipe, a second steel pipe and a third steel pipe, the first steel pipe and the second steel pipe are used as two right-angle sides, the third steel pipe is used as a bevel side, and the first steel pipe, the second steel pipe and the third steel pipe are fixedly connected through a buckle. The handling frame body in this application is as electric block's fulcrum, carries wallboard hoist to mounted position in with the assembled through electric block, and operating personnel climbs the handling frame body and carries out the welding of wallboard and girder steel mounting in the assembled. The installation is quick, the installation efficiency is greatly improved, and the labor intensity of workers is greatly reduced.

Description

Movable operation frame for quickly installing assembled inner wall plate
Technical Field
The utility model relates to a quick installation assembled interior wallboard's removal handling frame belongs to construction technical field.
Background
Along with the rapid development of the building industry, the steel structure building is favored by architects due to the fact that the steel structure building has good self anti-seismic performance, relatively low manufacturing cost, good structural stability and high installation speed, and the performance of recycling and the like is more accordant with the sustainable development concept required by times. The rapid development of fabricated buildings brings a series of problems about the construction process of fabricated steel structures.
The assembled inner wallboard (ALC board) is a novel building material with excellent performance, has the advantages of light weight, high strength, multiple petals, heat preservation, heat insulation and the like, and has good fire resistance, durability, sound insulation and impermeability, so that the material is widely applied to building engineering. With the wide use of the material, the installation and positioning of the ALC board bring great troubles to the construction, and the ALC board is installed by adopting a plurality of persons to adjust and position in a cooperative way, so that the installation efficiency is low, the potential safety hazard is high, and a large amount of labor force is consumed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a remove handling frame of wallboard in quick installation assembled is provided to above-mentioned prior art, improves the installation effectiveness, practices thrift the labour, shortens installation time.
The utility model provides a technical scheme that above-mentioned problem adopted does: the utility model provides a remove handling frame of wallboard in quick installation assembled, includes handling frame body and electric block, handling frame body bottom four corners department sets up the pulley respectively, the fixed mounting bracket that is used for setting up electric block that is equipped with in handling frame body top.
The handling frame body includes two right angled triangle frames and connecting piece, two the fixed connecting piece that is equipped with between the right angled triangle frame supplies the operation personnel to scramble.
The right-angled triangle frame is composed of a first steel pipe, a second steel pipe and a third steel pipe, the first steel pipe and the second steel pipe are used as two right-angle sides, the third steel pipe is used as a bevel side, the first steel pipe, the second steel pipe and the third steel pipe are fixedly connected through a buckle, and a connecting piece is fixedly arranged on the third steel pipe.
And a plurality of horizontally arranged reinforcing pipes are uniformly arranged in the right-angled triangular frame at intervals.
Compared with the prior art, the utility model has the advantages of: the utility model provides a wallboard moves handling frame in quick installation assembled, the handling frame body is as electric block's fulcrum, carries wallboard hoist to mounted position in with the assembled through electric block in wallboard, and operating personnel climbs the handling frame body and carries out the welding of wallboard and girder steel mounting in the assembled. The installation is quick, the installation efficiency is greatly improved, the labor intensity of workers is greatly reduced, and the wall plate is particularly suitable for buildings with assembled inner wall plates.
Drawings
Fig. 1 is a schematic view of a mobile operation frame for quickly installing an assembled interior wall panel according to an embodiment of the present invention;
fig. 2 is a top view of a mobile operation frame for quickly installing the assembled interior wall panel according to an embodiment of the present invention;
in the figure, a right-angled triangular frame 1, a first steel pipe 1.1, a second steel pipe 1.2, a third steel pipe 1.3, an electric hoist 2, pulleys 3, reinforcing pipes 4, a mounting rack 5, a connecting piece 6 and a fastener 7 are arranged.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments.
As shown in fig. 1, the removal handling frame of wallboard in quick installation assembled in this embodiment, including the handling frame body, the handling frame body includes two right angled triangle frames 1 and connecting piece 6, right angled triangle frame 1 is by the first steel pipe 1.1 of level setting, the perpendicular second steel pipe 1.2 that sets up and the third steel pipe 1.3 that the slope set up constitute, regard first steel pipe 1.1 and second steel pipe 1.2 as the right-angle side, third steel pipe 1.3 as the hypotenuse, the three passes through buckle 7 fixed connection, erect 3 horizontally arranged's connecting piece 6 between the third steel pipe 1.3 of two right angled triangle frames 1, not only can link 2 right angled triangle frames 1 into an organic whole, and can supply the operation personnel to climb. The four corners of the bottom of the operation frame body are respectively provided with the pulleys 3, so that the operation frame body is convenient to move. Be equipped with mounting bracket 5 at handling frame body top through welded fastening, set up electric block 2 on mounting bracket 5, wallboard in the convenient handling assembled.
3 reinforcing pipes 4 which are horizontally arranged are uniformly arranged in the right-angled triangle frame 1 at intervals, the distance is 0.5m, the right-angled triangle is reinforced, and the bearing capacity is increased.
The height of the operation frame body is 2m, and the length of the operation frame body is 1.5 m. When the installation of wallboard in carrying out, utilize the small handcart to transport wallboard to the mounted position below in with the assembled, overlap the wire rope of 2 one ends of electric block at wallboard upper portion 1/3 position in the assembled, utilize electric block 2 to stand wallboard to the mounted position in with the assembled, utilize the crowbar to carry out position control to the interior wallboard. After the installation position is determined, an operator climbs the operation frame body to weld the assembled inner wall plate and the steel beam fixing piece. The used preparation material of this application is local materials, and the cost of manufacture is low and the handling frame body removes conveniently, through wallboard in the electric block handling, has improved wallboard efficiency of construction in the assembled greatly, creates good economic benefits.
In addition to the above embodiments, the present invention also includes other embodiments, and all technical solutions formed by equivalent transformation or equivalent replacement should fall within the protection scope of the claims of the present invention.

Claims (4)

1. The utility model provides a wallboard's removal handling frame in quick installation assembled which characterized in that: including handling frame body and electric block (2), handling frame body bottom four corners department sets up pulley (3) respectively, the fixed mounting bracket (5) that are used for setting up electric block (2) that are equipped with in handling frame body top.
2. The mobile handling frame for quick installation of assembled interior wall panels of claim 1, wherein: the handling frame body includes two right angled triangle frames (1) and connecting piece (6), two fixed connecting piece (6) of being equipped with between right angled triangle frame (1) for the staff climbing.
3. The mobile handling frame for quick-mounting assembled interior wall panels according to claim 2, wherein: the right-angled triangle frame (1) comprises a first steel pipe (1.1), a second steel pipe (1.2) and a third steel pipe (1.3), the first steel pipe (1.1) and the second steel pipe (1.2) serve as two right-angle sides, the third steel pipe (1.3) serves as a bevel side, the three are fixedly connected through a buckle (7), and a connecting piece (6) is fixedly arranged on the third steel pipe (1.3).
4. A mobile operation frame for quick-mounting assembled interior wall panels according to claim 2 or 3, wherein: and a plurality of horizontally arranged reinforcing pipes (4) are uniformly arranged in the right-angled triangular frame (1) at intervals.
CN201920247606.3U 2019-02-27 2019-02-27 Movable operation frame for quickly installing assembled inner wall plate Active CN210342719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920247606.3U CN210342719U (en) 2019-02-27 2019-02-27 Movable operation frame for quickly installing assembled inner wall plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920247606.3U CN210342719U (en) 2019-02-27 2019-02-27 Movable operation frame for quickly installing assembled inner wall plate

Publications (1)

Publication Number Publication Date
CN210342719U true CN210342719U (en) 2020-04-17

Family

ID=70173436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920247606.3U Active CN210342719U (en) 2019-02-27 2019-02-27 Movable operation frame for quickly installing assembled inner wall plate

Country Status (1)

Country Link
CN (1) CN210342719U (en)

Similar Documents

Publication Publication Date Title
CN202755634U (en) Suspension type operational platform
CN201756787U (en) Adjustable hanger platform
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN103615103A (en) Hanging type assembled movable platform
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN211257761U (en) Lifting type elevator shaft operating platform
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN202925871U (en) Movable operating platform for aloft work
CN205777594U (en) A kind of roofing large-span steel girder steel construction twin beams purlin car
CN205840289U (en) A kind of suspension type vertical operating platform
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN205955165U (en) Elevator shaft operation platform
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN204174850U (en) High-altitude stereo cross-operation chassis
CN215666644U (en) A operation ladder for installing factory building outer wall material
CN211974457U (en) Novel roof girder reinforcing auxiliary device
CN214462344U (en) Assembled operating platform for high-altitude in-situ assembly of large-span steel truss
CN211034805U (en) Device for combining rod piece and logistics channel of construction elevator
CN210420883U (en) Bridge construction crossbeam construction operation platform
CN212875115U (en) Installation mechanism of sand making building electric control room
CN212249122U (en) Movable hanging type operating platform
CN211007582U (en) Net piece formula operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant