CN206784891U - A kind of prefabricated hoistway operation platform - Google Patents

A kind of prefabricated hoistway operation platform Download PDF

Info

Publication number
CN206784891U
CN206784891U CN201720639638.9U CN201720639638U CN206784891U CN 206784891 U CN206784891 U CN 206784891U CN 201720639638 U CN201720639638 U CN 201720639638U CN 206784891 U CN206784891 U CN 206784891U
Authority
CN
China
Prior art keywords
platform
frame leg
skeleton
welding
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720639638.9U
Other languages
Chinese (zh)
Inventor
秦亮
王春锋
孟凡勇
李强
周放
荆汉秋
赵海滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201720639638.9U priority Critical patent/CN206784891U/en
Application granted granted Critical
Publication of CN206784891U publication Critical patent/CN206784891U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

A kind of prefabricated hoistway operation platform, belongs to operating platform technical field in architectural engineering.Including:Platform skeleton (1), frame leg (2), frame leg bearing diagonal (3), hanger (4), platform panel (5);Frame leg (2) welds with platform skeleton (1) one side centered vertical, frame leg bearing diagonal (3) one end at frame leg (2) bottom 100mm with welding, the other end is connected the opposite side welding on side, the corner vertical welding of hanger (4) and platform skeleton (1) with platform skeleton (1) and frame leg (2);Platform panel (5) welds with platform skeleton (1).Advantage is, time saving and energy saving, and operating efficiency is high, saves construction cost.

Description

A kind of prefabricated hoistway operation platform
Technical field
The utility model belongs to operating platform technical field in architectural engineering, in particular, provides a kind of prefabricated elevator Operating platform.
Background technology
Hoistway operation platform sets up scaffold using wall box out more in construction, and this method has vertical rod missing Caused by stress performance and the shortcomings that stability difference, certain potential safety hazard be present and set up scaffold and take a lot of work material.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated elevator hoistway construction platform, solves wall box out and set up pin Stress performance and the problems such as stability difference caused by hand cradle.Made, structure, made simply using channel-section steel, installation convenience, It can have enough to meet the need, reuse, improve efficiency, ensure safety, reduce construction cost.
The utility model includes:Platform skeleton 1, frame leg 2, frame leg bearing diagonal 3, hanger 4, platform panel 5.Frame leg 2 is with putting down One side centered vertical welding of platform skeleton 1, the one end of frame leg bearing diagonal 3 at the bottom 100mm of frame leg 2 with welding, the other end and platform bone Frame 1 and frame leg 2 connect the opposite side welding on side, the corner vertical welding of hanger 4 and platform skeleton 1.Platform panel 5 and platform skeleton 1 welding.Component connection is completed, and forms an overall hoistway operation platform.
First by according to the actual length and width dimensions of elevator, 14# channel-section steels are cut shorter 5cm than elevator actual size.It is logical Cross vertical welding connected mode and be combined into a rectangular framework, three horizontal 14# channel-section steels branch are welded among platform skeleton Support, form platform skeleton 1;Two 14# channel-section steels with story height equal length are cut again.Two 14# channel-section steels pass through 12# channel-section steels It is welded to connect, its width is shorter 20cm than elevator door opening width, and the spacing of 12# channel-section steels is 500mm.Respectively at two Vertical welding length 150mm 14# channel-section steels at 14# channel-section steels one end 100mm.It is welded and fixed with A-frame, forms frame leg 2;Again Two 14# channel-section steels are cut, length is that the hypotenuse of the formation of elevator depth size and story height is grown, and is tiltedly propped up for frame leg Support 3;Then the steel plate thick not less than 8mm is used to make hanger 4 of the internal diameter for 50mm;Using steel plate thick 5mm according to elevator Actual size cut platform panel 5.
The utility model advantage is to make simply, and flexible and convenient operation, stress performance and stability are good, when saving safe Between, time saving and energy saving, operating efficiency is high, saves construction cost.
Brief description of the drawings
Fig. 1 is component diagram of the present utility model.
Fig. 2 is that schematic diagram is completed in the connection of hoistway operation platform assembly.
Fig. 3 is hoistway operation platform using installation schematic diagram.
Fig. 4 is that the construction of hoistway operation layer is completed, schematic diagram after the form removable of elevator interior wall.
Fig. 5 is that the turnover of prefabricated operating platform is hoisted to last layer using process diagram.
In figure, platform skeleton 1, frame leg 2, frame leg bearing diagonal 3, hanger 4, platform panel 5.
Embodiment
The utility model includes:Platform skeleton 1, frame leg 2, frame leg bearing diagonal 3, hanger 4, platform panel 5.Frame leg 2 is with putting down One side centered vertical welding of platform skeleton 1, the one end of frame leg bearing diagonal 3 at the bottom 100mm of frame leg 2 with welding, the other end and platform bone Frame 1 and frame leg 2 connect the opposite side welding on side, the corner vertical welding of hanger 4 and platform skeleton 1.Platform panel 5 and platform skeleton 1 welding.Component connection is completed, and forms an overall hoistway operation platform.
For invention, features and effects of the present utility model can be further appreciated that, following examples are hereby enumerated, and coordinate Accompanying drawing describes in detail as follows:
The first step:Platform skeleton 1, the frame that will be made first according to the actual length and width dimensions of elevator and the height of floor Leg 2, frame leg bearing diagonal 3, hanger 4, platform panel 5 are according to design drawing position firm welding.
Second step:Then by the steel wire penetrating hanger 4 on tower crane, it is hoisted to above elevator, vertically at the uniform velocity falls In completed elevator, its leg 2 is seated on the floor for having completed elevator doorway, support as the strong point Whole operation platform.On inspection after safety, the steel wire rope of tower crane is released.
3rd step:Layer construction to be operated is completed, i.e., elevator inner side template is passed through with the steel wire rope on tower crane again after removing Hanger 4, by prefabricated operating platform lifting to a upper floor.

Claims (1)

  1. A kind of 1. prefabricated hoistway operation platform, it is characterised in that:Including:Platform skeleton (1), frame leg (2), frame leg bearing diagonal (3), hanger (4), platform panel (5);Frame leg (2) welds with platform skeleton (1) one side centered vertical, frame leg bearing diagonal (3) one With being welded at frame leg (2) bottom 100mm, the other end is connected the opposite side welding on side, hanger with platform skeleton (1) and frame leg (2) at end (4) with the corner vertical welding of platform skeleton (1);Platform panel (5) welds with platform skeleton (1).
CN201720639638.9U 2017-06-02 2017-06-02 A kind of prefabricated hoistway operation platform Active CN206784891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720639638.9U CN206784891U (en) 2017-06-02 2017-06-02 A kind of prefabricated hoistway operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720639638.9U CN206784891U (en) 2017-06-02 2017-06-02 A kind of prefabricated hoistway operation platform

Publications (1)

Publication Number Publication Date
CN206784891U true CN206784891U (en) 2017-12-22

Family

ID=60715232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720639638.9U Active CN206784891U (en) 2017-06-02 2017-06-02 A kind of prefabricated hoistway operation platform

Country Status (1)

Country Link
CN (1) CN206784891U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098428A (en) * 2018-09-06 2018-12-28 重庆建工住宅建设有限公司 A kind of elevator hoistway construction platform
CN110939263A (en) * 2019-12-26 2020-03-31 中国十九冶集团(防城港)设备结构有限公司 Special operating frame for installing shear wall template in elevator shaft and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098428A (en) * 2018-09-06 2018-12-28 重庆建工住宅建设有限公司 A kind of elevator hoistway construction platform
CN109098428B (en) * 2018-09-06 2023-11-21 重庆建工住宅建设有限公司 Elevator shaft construction platform
CN110939263A (en) * 2019-12-26 2020-03-31 中国十九冶集团(防城港)设备结构有限公司 Special operating frame for installing shear wall template in elevator shaft and using method thereof

Similar Documents

Publication Publication Date Title
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN203173644U (en) Multifunctional lifting shaft working platform system
CN202831601U (en) Lifting type structural construction operation platform for elevator shaft
CN204185120U (en) Mobile unit dolly in place
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN206233546U (en) A kind of elevator hoistways workbench
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN205296799U (en) Construction of elevator well and protection platform
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN205975659U (en) Tower crane steel structure foundation
CN203475801U (en) Telescopic steel platform for elevator shaft
CN203947754U (en) Elevator shaft tool-type operating platform
CN206799012U (en) A kind of concrete batten transport of small space and installation tool group
CN215631485U (en) Bearing type elevator shaft working platform
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN203905436U (en) Steel chimney annular installation platform
CN205421886U (en) Novel instrument formula elevator shaft operating platform
CN210195198U (en) Elevartor shaft moving platform
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN203320922U (en) Supporting device for forming of elevator shaft template
CN204126237U (en) A kind of elevator hoistway construction platform
CN105781610A (en) Safety cabin for manual hole digging operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant