CN205421886U - Novel instrument formula elevator shaft operating platform - Google Patents

Novel instrument formula elevator shaft operating platform Download PDF

Info

Publication number
CN205421886U
CN205421886U CN201620178910.3U CN201620178910U CN205421886U CN 205421886 U CN205421886 U CN 205421886U CN 201620178910 U CN201620178910 U CN 201620178910U CN 205421886 U CN205421886 U CN 205421886U
Authority
CN
China
Prior art keywords
steel pipe
platform
channel
scaffold
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620178910.3U
Other languages
Chinese (zh)
Inventor
杨怀印
王晓龙
郑黄海
刘海宾
安凯佳
许世超
刘统
辛金辉
李栋梁
李靖
赵梅
齐峥峥
杨伟鹏
杨楠
刘晓华
周莺
赵小翠
赵宏杰
刘洋
李丽
杨哲
邓艳红
王文娟
张许星
殷文娟
阮金贵
潘冰
朱艳彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingmei Shenma Construction and Engineering Group Co Ltd
Original Assignee
Pingmei Shenma Construction and Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingmei Shenma Construction and Engineering Group Co Ltd filed Critical Pingmei Shenma Construction and Engineering Group Co Ltd
Priority to CN201620178910.3U priority Critical patent/CN205421886U/en
Application granted granted Critical
Publication of CN205421886U publication Critical patent/CN205421886U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a novel instrument formula elevator shaft operating platform, including lower part inclined support surface frame to and the longitudinal support steel pipe of the four piece parallels of setting on lower part inclined support surface frame, be provided with the operation platform who is located lower part inclined support surface frame top on vertical steel pipe, be provided with the top scaffold of setting on vertical steel pipe above the operation platform, the channel -section steels that lower part inclined support surface frame set up including two parallel slopes, the upper surface of channel -section steel weld the horizontal steel pipe of two calcaneus branches struts and welding in proper order and fix a position the steel pipe at channel -section steel surface, the longitudinal support steel pipe is connected with the longitudinal support steel pipe simultaneously. The utility model discloses simple structure, commonality are strong, the turnover is nimble, and can hang to the working face with the help of the tower crane along with the building floor, need not to begin to set up the scaffold and extend to the top always from the basis bottom of construction thing, greatly reduced construction expense tubular product for, and swiftly efficient safely, and then improved efficiency of construction and security, reduced construction cost, improved enterprise competitiveness.

Description

Tool type hoistway operation platform
Technical field
This utility model relates to the interior apparatus field of elevator, a kind of tool-type operating platform of operation in elevator.
Background technology
Development and scientific and technical continuous progress along with society, the especially continuous propelling of urbanization, rise sheer from level ground like the mushrooms after rain with high-rise, the Super High building as representative, and in the building of Gao Ting, elevator is indispensable a kind of instrument up and down, and elevator is built safely and fast, also it is a highly important link in monolithic architecture thing building.
The operating platform of traditional elevator well shear wall formwork, is to use fastener and steel pipe, starts to set up scaffold from foundation bottom, until the work surface of each floor.So set up scaffold take a lot of work, time-consuming, waste material, scaffold holding time length used and to set up speed slow, main is that potential safety hazard is big, is the major hazard source of construction.
Therefore, improve construction operating platform in existing elevator, improve efficiency of construction, reduce potential safety hazard, and reduce construction cost, be a good problem to study.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, this utility model provides a kind of simple structure, highly versatile, has enough to meet the need tool-type operating platform flexibly, work surface, safe and efficient high efficiency elevator tool-type operating platform can be winched to by tower crane with building floor.
The purpose of this utility model is achieved in that
Tool type hoistway operation platform, including lower tilt bracing frame, and the four parallel longitudinal bracing steel pipes 10 being arranged on lower tilt bracing frame, being provided with the operating platform being positioned at above lower tilt bracing frame on described longitudinal steel pipe 10, described operating platform is provided above the top scaffold 1 being arranged on longitudinal steel pipe 10;
Described lower tilt bracing frame includes the channel-section steel 13 (V word is processed in channel-section steel lower end) that two parallel oblique are arranged, and the upper surface of channel-section steel 13 is welded with the two horizontal steel pipes of calcaneus branches support 12 successively and is welded on channel-section steel 13 surface, the longitudinal bracing steel pipe positioning steel tube 11 being simultaneously connected with longitudinal bracing steel pipe 10;Described channel-section steel 13 lower end is supported on elevator doorway, and upper end rides on the elevator wall that elevator door is relative;
It is provided with suspension ring 9 on described channel-section steel 13;
Described operating platform includes with longitudinal steel pipe 10 by scaffold 8 under fastener connecting platform, by tying up the lower lumps of wood 7 that silk is fixed under platform on scaffold 8, it is arranged below the lower bolster 2 on wood 7, and 4 pieces of side templates 3 that are vertical with lower bolster 2 and that be fixed on the lower lumps of wood 7;It is connected with the upper lumps of wood 5 being arranged on platform on scaffold 6 fixing above described side template 3, the described upper lumps of wood 5 is provided with cope match-plate pattern 4;
It is provided with the rectangular opening of through hole in the middle of described cope match-plate pattern 4, with lower bolster 2 as the end below described rectangular opening, defines, with the side template 3 being arranged on lower bolster 2 surrounding, the groove having on for wall;
Described operating platform is pressed closer on floor by jackscrew.
Actively beneficial effect:This utility model simple structure, highly versatile, turnover are flexible, and work surface can be winched to building floor by tower crane, just extend all the way up without starting setting up scaffold from the foundation bottom building thing, greatly reduce construction tubing expense, and safe and efficient efficiency is high, and then improve efficiency of construction and safety, reduce construction cost, improve enterprise competitiveness.
Accompanying drawing explanation
Fig. 1 is structural representation one of the present utility model;
Fig. 2 is structural representation two of the present utility model;
Fig. 3 is structural representation three of the present utility model;
Figure is: scaffold 8, suspension ring 9, longitudinal bracing steel pipe 10, longitudinal bracing steel pipe positioning steel tube 11, the horizontal steel pipe of bracing frame 12, channel-section steel 13 under scaffold 6, the lower lumps of wood 7, platform on top scaffold 1, lower bolster 2, side template 3, cope match-plate pattern 4, the upper lumps of wood 5, platform.
Detailed description of the invention
Below in conjunction with the accompanying drawings, this utility model is described further:
As shown in Figure 1, tool type hoistway operation platform, including lower tilt bracing frame, and the four parallel longitudinal bracing steel pipes 10 being arranged on lower tilt bracing frame, being provided with the operating platform being positioned at above lower tilt bracing frame on described longitudinal steel pipe 10, described operating platform is provided above the top scaffold 1 being arranged on longitudinal steel pipe 10;
Described lower tilt bracing frame includes the channel-section steel 13 that two parallel oblique are arranged, and the upper surface of channel-section steel 13 is welded with the two horizontal steel pipes of calcaneus branches support 12 successively and is welded on channel-section steel 13 surface, the longitudinal bracing steel pipe positioning steel tube 11 being simultaneously connected with longitudinal bracing steel pipe 10;Described channel-section steel 13 lower end is supported on elevator doorway, and upper end rides on the elevator wall that elevator door is relative;
It is provided with suspension ring 9 on described channel-section steel 13;
As shown in Figure 2, described operating platform includes with longitudinal steel pipe 10 by scaffold 8 under fastener connecting platform, by tying up the lower lumps of wood 7 that silk is fixed under platform on scaffold 8, it is arranged below the lower bolster 2 on wood 7, and 4 pieces of side templates 3 that are vertical with lower bolster 2 and that be fixed on the lower lumps of wood 7;It is connected with the upper lumps of wood 5 being arranged on platform on scaffold 6 fixing above described side template 3, the described upper lumps of wood 5 is provided with cope match-plate pattern 4;
As it is shown on figure 3, be provided with the rectangular opening of through hole in the middle of described cope match-plate pattern 4, with lower bolster 2 as the end below described rectangular opening, define, with the side template 3 being arranged on lower bolster 2 surrounding, the groove having on for wall.
Embodiment
1, two 16 channel-section steels 13 are as the bottom supporting member of this operating platform, use the round steel of Ф 20 as the horizontal steel pipe of bracing frame 12, two short steel pipes are weldingly fixed on the two ends of two channel-section steels 12, away from upper end 500cm, away from lower end 800cm.Welding two suspension ring 9 in the middle and upper part of two channel-section steels 13, use tower crane that the assembled good lower tilt bracing frame including channel-section steel 13 is lifted up into elevator, one end is placed on next layer of elevator doorway crossbeam of work surface, and upper end withstands in the hoistway wall on opposite, elevator doorway.
2, use the steel pipe of Ф 48 wall thickness 3.5mm and fastener to set up scaffold, the most just arrive work surface.
3, iron wire is utilized 80 × 100 times lumps of wood 7 spacing 100mm to be fixed under platform on the steel pipe of scaffold 8 at operating platform, assembled lower bolster on the lower lumps of wood, under platform on scaffold 8 and platform between scaffold 6 by be assembled in the middle of template 1000 × 1000 groove, relatively place the circulation material needed for construction working face.
4, two Ф 32 jackscrews are used to be pressed closer by work platforms in sill side, elevator doorway, it is ensured that operating platform is stable.
Embodiment: operating platform assembles at the scene, size according to elevator, floor height, carry out unwrapping wire at the scene, the blanking carrying out rod member according to drawing size makes, assembling sequence: by two horizontal steel-pipe weldings of bracing frame on channel-section steel, channel-section steel carries out after having welded positioning, fixing, flitch installed by vertical scaffold and scaffold board is assembled into operating platform, jackscrew reinforces operating platform.This layer of elevator inner wall construction is complete by after plank dismounting, and the circulation material after removing is placed in the groove of operating platform, unclamps jackscrew, operating platform winches to last layer floor, and circulation primary is carried out.
This utility model simple structure, highly versatile, turnover are flexible, and work surface can be winched to building floor by tower crane, just extend all the way up without starting setting up scaffold from the foundation bottom building thing, greatly reduce construction tubing expense, and safe and efficient efficiency is high, and then improve efficiency of construction and safety, reduce construction cost, improve enterprise competitiveness.
The above is preferred implementation of the present utility model; it should be pointed out that, for those skilled in the art, on the premise of without departing from this utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (6)

1. tool type hoistway operation platform, it is characterized in that: include lower tilt bracing frame, and the four parallel longitudinal bracing steel pipes (10) being arranged on lower tilt bracing frame, being provided with, on described longitudinal steel pipe (10), the operating platform being positioned at above lower tilt bracing frame, described operating platform is provided above the top scaffold (1) being arranged on longitudinal steel pipe (10).
Tool type hoistway operation platform the most according to claim 1, it is characterized in that: described lower tilt bracing frame includes the channel-section steel (13) that two parallel oblique are arranged, the upper surface of channel-section steel (13) is welded with the horizontal steel pipe of two calcaneus branches support (12) successively and is welded on channel-section steel (13) surface, longitudinal bracing steel pipe positioning steel tube (11) being simultaneously connected with longitudinal bracing steel pipe (10);Described channel-section steel (13) lower end is supported on elevator doorway, and upper end rides on the elevator wall that elevator door is relative.
Tool type hoistway operation platform the most according to claim 2, it is characterised in that: it is provided with suspension ring (9) on described channel-section steel (13).
Tool type hoistway operation platform the most according to claim 1, it is characterized in that: described operating platform includes with longitudinal steel pipe (10) by scaffold (8) under fastener connecting platform, by tying up the lower lumps of wood (7) that silk is fixed on scaffold under platform (8), the lower bolster (2) being arranged below on wood (7), and 4 pieces of side templates (3) that are vertical with lower bolster (2) and that be fixed on the lower lumps of wood (7);Described side template (3) top is connected fixing with the upper lumps of wood (5) being arranged on scaffold on platform (6), and the described upper lumps of wood (5) is provided with cope match-plate pattern (4).
Tool type hoistway operation platform the most according to claim 4, it is characterized in that: in the middle of described cope match-plate pattern (4), be provided with the rectangular opening of through hole, with lower bolster (2) as the end below described rectangular opening, it is that wall defines the groove having on to be arranged on the side template (3) of lower bolster (2) surrounding.
Tool type hoistway operation platform the most according to claim 1, it is characterised in that: described operating platform is pressed closer in lift port sill side by jackscrew.
CN201620178910.3U 2016-03-09 2016-03-09 Novel instrument formula elevator shaft operating platform Expired - Fee Related CN205421886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620178910.3U CN205421886U (en) 2016-03-09 2016-03-09 Novel instrument formula elevator shaft operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620178910.3U CN205421886U (en) 2016-03-09 2016-03-09 Novel instrument formula elevator shaft operating platform

Publications (1)

Publication Number Publication Date
CN205421886U true CN205421886U (en) 2016-08-03

Family

ID=56533256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620178910.3U Expired - Fee Related CN205421886U (en) 2016-03-09 2016-03-09 Novel instrument formula elevator shaft operating platform

Country Status (1)

Country Link
CN (1) CN205421886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115897981A (en) * 2022-12-28 2023-04-04 中交一公局集团有限公司 Can have enough to meet need elevator well construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115897981A (en) * 2022-12-28 2023-04-04 中交一公局集团有限公司 Can have enough to meet need elevator well construction platform

Similar Documents

Publication Publication Date Title
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN203499229U (en) Operating platform for construction of elevator shaft
CN206233546U (en) A kind of elevator hoistways workbench
CN203188942U (en) Novel multifunctional racking platform
CN210636796U (en) High-rise elevator shaft jacking formwork system
CN209837765U (en) Reverse Demolition of Reinforced Concrete Structure Temporary Support Conversion Device
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN205421886U (en) Novel instrument formula elevator shaft operating platform
CN214834720U (en) Tool type unilateral formwork system
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN205224045U (en) Examine and repair gate slot second phase concrete construction device
CN106995187A (en) A kind of concrete batten transport of small space and installation tool group
CN203475801U (en) Telescopic steel platform for elevator shaft
CN203654754U (en) Double-layered overhanging type discharging platform
CN205955165U (en) Elevator shaft operation platform
CN210508326U (en) Liftable well operation platform
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN211257761U (en) Lifting type elevator shaft operating platform
CN212295581U (en) Instrument formula elevartor shaft operation platform
CN203320922U (en) Supporting device for forming of elevator shaft template
CN205894641U (en) Elevartor shaft lifting platform
CN203905436U (en) Steel chimney annular installation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20210309