CN208105573U - A kind of walling system - Google Patents
A kind of walling system Download PDFInfo
- Publication number
- CN208105573U CN208105573U CN201721917087.4U CN201721917087U CN208105573U CN 208105573 U CN208105573 U CN 208105573U CN 201721917087 U CN201721917087 U CN 201721917087U CN 208105573 U CN208105573 U CN 208105573U
- Authority
- CN
- China
- Prior art keywords
- component
- top surface
- extension
- side wall
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
- E04H1/1266—Cubicles for dressing; Toilets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/56—Fastening frames to the border of openings or to similar contiguous frames
- E06B1/60—Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
- E03F5/0408—Floor drains for indoor use specially adapted for showers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
- E04F19/0486—Corner filling pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/06—Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements
- E04F19/061—Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements used to finish off an edge or corner of a wall or floor covering area
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/56—Fastening frames to the border of openings or to similar contiguous frames
- E06B1/58—Fastening frames to the border of openings or to similar contiguous frames by filling up the joints, e.g. by cementing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Finishing Walls (AREA)
- Floor Finish (AREA)
- Residential Or Office Buildings (AREA)
- Joining Of Corner Units Of Frames Or Wings (AREA)
- Wing Frames And Configurations (AREA)
Abstract
The utility model discloses a kind of walling systems, including ground structure, top surface structure and side wall;The top surface structure includes top surface wall and at least one layer of top surface decorative layer;Side wall lower part, which is equipped with, matches first component with the ground structure, and side wall top, which is equipped with, matches second component with the top surface decorative layer.The utility model is by the connection between first component realization metope and ground and to the levelling of ground, and the installation of skirting is very convenient, and high degree reduces difficulty of construction;It is directly attached by second component between side wall and top surface structure, the stable structure of junction is not easy to crack;The constructing operation of junction is very easy, and high degree reduces difficulty of construction, improves construction efficiency, shortens construction period.
Description
Technical field
The utility model belongs to interior decoration technology, more particularly, to a kind of walling system.
Background technique
Building is fitted up, after completing construction to meet people's lives demand.When being fitted up, side
Wall, top surface, ground are required to be fitted up, and surface layer is arranged to achieve the effect that decoration.But during finishing, metope
It is larger with the difficulty of construction at the junction of top surface, metope and ground cooperation, influence construction efficiency.Firstly, metope and top surface
Junction connection effect is poor, and flatness is low, and phenomenon of cracking easily occurs after being used for a long time.Secondly, at metope and ground cooperation
The depth of parallelism is difficult to ensure the case where skirting can not be installed often occur.
Utility model content
The utility model for overcome the deficiencies in the prior art, provide it is a kind of construction be easy, high-efficient walling system and
Decoration method.
To achieve the goals above, the utility model uses following technical scheme:A kind of interior decoration method, including ground
Structure, top surface structure and side wall;The top surface structure includes top surface wall and at least one layer of top surface decorative layer;The side
Wall lower part, which is equipped with, matches first component with the ground structure, and side wall top is equipped with and the top surface decorative layer
Match second component.The connection between metope and ground is realized by first component in the utility model, and passes through the first structure
Part realizes that, to the levelling of ground, without carrying out the measurement of blanket type during construction, high degree reduces worker's
Workload, it is time saving and energy saving;It is laid with cement directly on blank ground structure and strikes off, constructing operation is simple, high degree
Shorten construction period, improve construction efficiency;Secondly as ground structure flatness has obtained effective guarantee, when in decoration
It is achievable parallel between ground structure and side wall bottom surface when the skirting of embedded, realize that the space of installation skirting is equidistant everywhere,
Effectively prevent skirting can not install or skirting and side wall bottom surface between need the occurrence of carrying out joint filling, for skirt
The installation of line is very convenient, and high degree reduces difficulty of construction;
It is directly attached by second component between side wall and top surface structure, the constructing operation letter to junction
Just, high degree reduces difficulty of construction;And the stable structure of junction, even if will not crack after being used for a long time
The case where;Meanwhile when the color of side wall and connecting elements is inconsistent, between the two without carrying out bonding operation, to even
The constructing operation for meeting place is very easy, and high degree reduces difficulty of construction, improves construction efficiency, shortens engineering week
Phase.
Further, the ground structure includes screed-coat and the surface layer on screed-coat, the first component and institute
Screed-coat is stated to match;First component directly gives screed-coat and provides datum plane, levelling compared to traditional mistake object of reference
For mode, the Pingdu degree of screed-coat upper surface is high;And due to the presence of benchmark, so that more without repeating in leveling procedures
Secondary measurement, the workload for reducing worker of high degree and the technical difficulty of construction improve construction efficiency.
Further, the first component has the first extension matched with the screed-coat;Prolong provided with first
Extending portion is, it can be achieved that the quick levelling of ground structure;When install connecting elements and guarantee the first extension be parallel to the horizontal plane
Afterwards, it directly lays cement in ground structure, is paved with after cement to the first extension position, struck off by plank or steel bar more
Remaining cement;When striking off, plank or steel bar both ends are respectively placed on the first extension of two connecting elements in left and right, Zhi Houyan
Extension is mobile, that is, can guarantee and strike off completely along horizontal line to cement, so that the ground structure after the completion of can guarantee is complete
It is smooth and horizontal;Under this kind of mode, the ground structure after striking off has absolute flatness, without carrying out during construction
The measurement of blanket type, the workload for reducing worker of high degree are time saving and energy saving;Directly water is laid on blank ground structure
Mud simultaneously strikes off, and constructing operation is simple, and high degree shortens construction period, improves construction efficiency;And prolong due to first
Extending portion is vertical with member bodies, it is ensured that the architectural surface after being installed is vertical with ground holding.
Further, the second component is equipped with the second extension matched with the top surface structure;Can be passed through
Two extensions are directly realized by the levelling of top surface structure, and the top surface structure after being installed keeps surfacing, to improve yin
Flatness at angle, the case where avoiding junction out-of-flatness generation, wall shape are more aesthetically pleasing.
Further, the flank wall is equipped with architectural surface in vitro, and the first component is equipped with and the architectural surface phase
The third extension of cooperation;The face that the third extension is matched with architectural surface is set as rough surface;The third extension
Upper surface is equipped with multiple grooves to form the rough surface;By the setting of third extension, so that the dress on the wall of side
Finish coat is installed using layer or hardened structure, has abandoned the flat process of traditional multiple painting wall, base, architectural surface can directly exist
It buys, can also directly transport after the completion of factory process to construction site on the market, so that high degree shortens engineering week
Phase improves construction efficiency;It, only need to be by layer or hardened structure after the position of connecting elements is fixed and when installation architectural surface
Architectural surface be directly stacked on the first extension, it is low for the construction technical requirement of worker, reduce to technical staff
Man's Demands, the reduction recruitment cost of high degree;Meanwhile architectural surface surfacing, it ensure that the metope after being installed
It with good flatness, and eliminates in work progress to the artificial levelling process of metope, further increases construction efficiency.
In conclusion the utility model has the following advantages that:1, the junction constructing operation between metope and top surface, ground
Simply, difficulty of construction is reduced, construction period is shortened, improves construction efficiency;2, the ground flat degree after striking off is high, is not easy out
Existing error;3, constructing operation is simple, and construction period is short;4, skirting is easy for installation, reduces difficulty of construction.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of side wall and the first fit system of ground in the utility model.
Fig. 3 is the structural schematic diagram of side wall and second of ground fit system in the utility model.
Fig. 4 is the structural schematic diagram of first component in Fig. 3.
Fig. 5 is the structural schematic diagram of side wall and the first fit system of top surface in the utility model.
Fig. 6 is the structural schematic diagram of side wall and second of top surface fit system in the utility model.
Fig. 7 is the structural schematic diagram of second component in Fig. 6.
Fig. 8 is the structural schematic diagram of side wall and the third fit system of top surface in the utility model.
Fig. 9 is the structural schematic diagram of second component in Fig. 8.
Specific embodiment
In order to make those skilled in the art better understand the utility model, below in conjunction with the utility model reality
The attached drawing in example is applied, the technical solutions in the embodiments of the present invention are clearly and completely described.
As shown in figures 1-8, a kind of walling system, including ground structure, top surface structure, side wall 11 and be set to side
Architectural surface 12 outside wall 11;The side wall 11 is equipped with first component 13 and second component 14, and first structure
Part 13 is set to 11 lower part of side wall, matches with the ground structure;The second component 14 is set to the flank wall
11 top of body, matches with the top surface structure;By the connection between first component realization metope and ground and to ground
It is levelling, the installation of skirting is very convenient, and high degree reduces difficulty of construction;It is straight between side wall and top surface structure
It connected second component to be attached, the stable structure of junction is not easy to crack;The constructing operation of junction is very easy, pole
Big degree reduces difficulty of construction, improves construction efficiency, shortens construction period.
Specifically, the side wall 11 can be cement wall, brick wall, lightgage steel joist wall etc.;It, can also in other embodiments
To be cement wall, brick wall etc. by base after flat;In other embodiments, it can also be in cement wall, brick wall, lightgage steel joist
Wall after setting metope screed-coat 15 is levelling on former wall after the completion of the buildings such as wall;Architectural surface 12 is on the market
The ceramic tile patch directly bought, the model and material of ceramic tile are not specifically limited;Wood can be used in the metope screed-coat 15
Work plate, plasterboard, calcium silicate board or other one of materials for wall construction, wherein calcium silicate board is preferably used,
Metope can be made to have the effect of good fire prevention, moisture-proof, sound insulation, heat-insulated;Certainly, above-mentioned material is not the limit to protection scope
System, other, which meet the material of condition or material, can be used.
As shown in Fig. 2, the ground structure includes surface layer 22, screed-coat 21 and ground layer 23, the surface layer is set to institute
It states on screed-coat;The first component 13 is made of aluminium alloy or stainless steel, and entire first component 13 is integrally formed and is made,
Manufacture is easy and securely intensity is big;The first component 13 is made of aluminium alloy or stainless steel, and entire first component 13 is one
Body formed to be made, manufacture is easy and securely intensity is big;13 side of first component is matched with the side wall 11, another
Side is equipped with the first extension 132, which is equipped with screw hole, so as to be mounted on first component 13 by screw
On the wall of side;First extension 132 is directed out by the first component 13 and is extended to form, and the first extension 132 hangs down
Directly it is arranged in the first component 13;First extension 132 is matched with the screed-coat 21, and the upper surface of screed-coat
Concordant with 132 upper surface of the first extension, which can also be made of other for levelling material of cement production systD.
The surface layer 22 can be one such for floor, ceramic tile, stone material, rock beam etc.;Further, the first component 13
It is equipped with skirting 10, the junction between metope and ground is protected by the skirting 10;The skirting can be adopted
It is made of materials such as metal, the wooden facing, stone material, rock materials.
In other embodiments, as shown in figure 3, we are in the first component 13 in order to preferably fix skirting
Provided with two Connection protrusions 134 matched with the skirting, when installing skirting, the side wall and Connection protrusion of skirting
134 are connected, and realize the firm installation to skirting;In order to enable skirting is bonding with Connection protrusion more secured, we will
The Connection protrusion is set as hollow, so that foring the chamber for accommodating glue in Connection protrusion, can store more
Opening is arranged on Connection protrusion side wall for glue, and glue can be Nian Jie with skirting by the opening, realizes it between skirting
Securely connection.
Preferably, the first component 13 is equipped with the first positioning region 135 and the second positioning region 136, and this is second fixed
Position portion 136 is located at 135 lower section of the first positioning region;Between between first positioning region 135 and first extension 132
Away from for 15mm, the spacing between second positioning region 136 and first positioning region 135 is 12mm;Certainly, in other implementations
In example, the spacing between first positioning region 135 and first extension 132 can also be directly disposed as 12mm, thus not
Second positioning region 136 is set;Certainly, the above-mentioned numerical value being mentioned to is optimal case, not for the restriction of protection scope, tool
Body numerical value can need voluntarily to be adjusted according to construction.
In other embodiments, as illustrated in figures 4-5, the first component 13 is equipped with third extension 133, and third extends
Portion 133 is equally directed out by 13 side of first component and is extended to form;Preferably, the third extension 133 and described the
One extension 132 is arranged in parallel;The third extension 133 is arranged above the first extension 132, and third extension 133
There is spacing between first extension 132, be used for installation floor and skirting;The interconnecting piece 134, first positions
Portion 135, the second positioning region 136 are arranged between third extension 133 and first extension 132.
The architectural surface is set on the third extension 133, due to needing to be bonded between the two, in order to enhance the two
Adhesive effect, the face that third extension 133 is matched with metope is set rough surface by we;Specifically, the third extends
133 upper surface of portion is equipped with multiple grooves to form the rough surface, and multiple groove is strip, and along third extension
Evenly spaced distribution in 133 width direction;More glue can be held in groove, to ensure that metope and third extension
Firm connection is able to carry out between 133.
Preferably, 133 lower surface of third extension is equipped with a stopper 138, set in the first component 13
There are two Connection protrusions 134, when installing skirting, skirting room upper end is inserted into the gap between stopper 138 and first component 13
Interior, side wall is connected with the Connection protrusion 134, realizes the firm installation to skirting.
When construction, first counter-lateral quadrents wall 4 carries out that base is flat or carry out levelling, and installation connects respectively on the wall on two opposites of left and right
Connection member is needed to draw a horizontal line on the side wall after base is flat before installation, is later protected connecting elements with extension
It is held in the parallel state of the horizontal line and is fixed on side wall, later install architectural surface to the wall of side;Later directly
It lays cement in ground layer, is paved with after cement to extension position, extra cement is struck off by plank or steel bar(It can also
Using other materials such as gypsum);When striking off, plank or steel bar both ends are respectively placed on two extensions in left and right, edge is prolonged later
Extending portion is mobile, that is, can guarantee and strike off completely along horizontal line to cement, so that the cement layer after the completion of can guarantee is substantially flat
And level, above-mentioned cement layer become screed-coat;After band cement layer is dry, surface layer 22 is directly laid with to screed-coat, to
After the completion of floor is laid with, skirting 10 is installed in the space between floor and architectural surface.
As shown in figures 5-9, the top surface structure includes top surface wall 31 and top surface decorative layer 32, and top surface decorative layer 32 is set
It is set to one layer, top surface decorative layer 32 is connected by keel with top surface wall;Wherein, the top surface wall 31 is to carry out interior decoration
Former wall before, such as cement wall, brick wall, lightgage steel joist wall;The top surface decorative layer 32 can for plasterboard, calcium silicate board,
Ceiling board or other be used for wall construction one of material, wherein preferably use calcium silicate board, can make metope have it is good
Fire prevention well, moisture-proof, sound insulation, heat-insulated effect;Certainly, above-mentioned material is not limiting of its scope, other meet item
The material or material of part can be used.
The inside of the second component 14 is matched with the side wall 11, and outside extends outward to form one second extension
Portion 142, and it is preferred, which is vertically arranged with second component 14, to guarantee that inner corner trim is 90 ° of right angle;Institute
Second component 14 is stated equipped with screw hole, second component 14 can be mounted on the wall of side by screw.
As shown in fig. 6, we are described second in order to enable second component 14 is more stable to the positioning of top surface decorative layer
A positioning side 143 is additionally provided on component 14, which is set to above the extension, and by the second component 14
Outside direct out and extend to form;Spacing between positioning side 143 and extension is just equal to the thickness of top surface decorative layer, from
And by positioning side 143 and extension can the upper and lower surface to top surface decorative layer position, further ensured top surface knot
The flatness and levelness of structure.
The architectural surface upper end is in contact with 142 lower surface of the second extension, when architectural surface be white when, need by
The upper end of architectural surface 12 is connected with 142 lower surface of the second extension, prevents gap, exposes the original of second component 14
Color and the beauty for influencing entire metope;Accordingly it is desirable to by passing through between the upper end of architectural surface 12 and second extension 142
Glue bonding, it is preferred that we set rough surface with what architectural surface 12 was connected for second extension 142 on one side;Tool
Body, 142 lower surface of the second extension is equipped with multiple open slots to form the rough surface, and multiple open slot is
Strip, and the evenly spaced distribution in the width direction of the second extension 142;More glue can be held in open slot, thus
It ensure that and be able to carry out firm connection between architectural surface 12 and the second extension 142.
In other embodiments, as shown in Fig. 6,8, the top surface decorative layer 32 be may be alternatively provided as two layers, two top surfaces decoration
Layer 32 is respectively arranged on the upper and lower sides of extension, and is connected with each other between two top surface decorative layers 32 by screw;Preferably, screw is worn
The extension is crossed, is connected more secured.
In other embodiments, as Figure 6-9, the second component 14 is equipped with the company matched with the decorative layer 12
Socket part 144, the interconnecting piece 144 are directed out by the second component 14 and are extended to form, and interconnecting piece 144 is vertically and second component
14;The upper surface of the decorative layer offsets or be bonded with the interconnecting piece 144, when architectural surface is white, needs decorative cover
The upper end of layer 12 is connected with 144 lower surface of interconnecting piece, prevents gap, exposes the primary colors of second component 14 and influences whole
The beauty of a metope;Accordingly it is desirable to it is Nian Jie by glue is passed through between the upper end of architectural surface 12 and the interconnecting piece 144, preferably
, we set rough surface with what architectural surface 12 was connected for the interconnecting piece 144 on one side;Specifically, the interconnecting piece 144
Lower surface is equipped with multiple open slots to form the rough surface, and multiple open slot is strip, and along the width of interconnecting piece 144
Spend evenly spaced distribution on direction;More glue can be held in open slot, to ensure that architectural surface 12 and interconnecting piece 144
Between be able to carry out firm connection.
In order to enhance aesthetics, as Figure 8-9, second extension 142 is set two by we, and the of lower part
Two extensions 142 are adjacent with the interconnecting piece 144, and gap is provided between second extension 142 and interconnecting piece 144 with shape
At a decorative groove 145, so that side wall top there will be a horizontal straight-line groove after the assembly is completed, meet decoration need
It asks, good appearance;Preferably, the outer end of the interconnecting piece 144, which is folded upward at, forms the first bending part 146, it is described
The outer end of second extension 142 of lower part bends downward the second bending part 147 to be formed, so that the shape of decorative groove is more
It is beautiful;Certainly, the number of the second extension 142 is not limited thereto, or and it is more than two, it will not enumerate.
When installation, it is flat that base first is carried out to the side wall of four sides, or add screed-coat progress levelling on the wall of side;It
Draw a horizontal line respectively on the base of four sides flat side wall or screed-coat afterwards, and the horizontal line of four sides keeps coherent;
And the top surface of second component 14 is overlapped to the horizontal line, and second component 14 is fixed on side wall or screed-coat,
So that 14 holding position of second component of four sides is consistent;Top surface decoration is placed on the extension of second component 14 later, and
It is connected with keel with top surface wall, and the top surface decorative layer of remaining central part is supplemented completely, between adjacent top surface decorative layer
Using bonding connection;The outside of architectural surface alignment second component 14 is installed to the wall of side later, and guarantees decorative cover
Layer top surface offsets or parallel with extension lower surface.
A kind of walling system, includes the following steps:
(1)Counter-lateral quadrents wall 11 carry out base it is flat or carried out by metope screed-coat 15 it is levelling, and on two opposites of left and right
Side wall lower part is installed by the first connecting elements 13 respectively;Specifically, first on the side wall 11 or metope screed-coat 15 after base is flat
A horizontal line is drawn, connecting elements is held in the parallel state of the horizontal line with the first extension 132 later and is fixed on side
On portion's wall, 13 lower part of the first connecting elements after being installed and between ground have spacing;
(2)By in the installation to side wall 11 of architectural surface 12, the bottom of architectural surface 12 is carried out by third extension 133
Support, it is Nian Jie that the lower end surface of the architectural surface and the third extension 133 pass through glue, the side of architectural surface 12 with it is described
Side wall 11 or metope screed-coat 15 are bonded;
(3)Cement is laid with until being paved with to 132 position of the first extension on ground, takes plank or steel bar later and is incited somebody to action
The both ends of plank or steel bar are respectively placed on the first extension 132 of two the first connecting elements 13 in left and right sidewall, later
Control plank or steel bar are moved along extension length direction, and guarantee completely strikes off cement along horizontal line, so that
Cement layer forms screed-coat 21;
(4)Floor is laid with to screed-coat 21, and skirting 10 is packed between floor and the first connecting elements 13;
Further, the skirting 10 and the Connection protrusion 134 are Nian Jie by glue, and part glue is received to chamber when bonding
It is interior, and glue is Nian Jie with skirting by the opening in Connection protrusion, positions to skirting;
(5)a:It is put down in base or second component is installed on the top of the four sides side wall by metope screed-coat after levelling respectively
14, the position between four second components 14 is consistent, and has spacing between the top and top surface of second component 14;Specifically
, when installation, first draws a horizontal line, and the horizontal line of four sides on the base of four sides flat side wall or screed-coat respectively
Keep coherent;The top surface of second component 14 is overlapped to the horizontal line later, and second component 14 is fixed on side wall
Or on screed-coat, so that 14 holding position of second component of four sides is consistent;
b:The part that top surface decorative layer 32 corresponds on the wall of four sides is first installed to second component 14, it will by keel
Above-mentioned top surface decorative layer 32 is connected with top surface wall 31;
c:The top surface decorative layer supplement of middle section vacancy is complete, for filling up the top surface decorative layer of middle section vacancy
32 are equally lifted on top surface wall 31 using keel, are bonded between adjacent top surface decorative layer by glue.
Preferably, the top surface decorative layer 32 may be configured as two layers, that is to say, that can be in the top surface that assembly is completed
One layer of top surface decorative layer 32 is re-layed in decorative layer 32, is connected between two layers of top surface decorative layer 32 by screw.
Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments.
Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
The range of the utility model protection all should belong in every other embodiment.
Claims (4)
1. a kind of walling system, including ground structure, top surface structure and side wall(11);It is characterized in that:The top surface knot
Structure includes top surface wall(31)With at least one layer of top surface decorative layer(32);The side wall(11)Lower part is equipped with and the ground
Structure matches first component(13), the side wall(11)Top is equipped with and the top surface decorative layer(32)Match second
Component(14);The side wall and the first component(13)Between be equipped with architectural surface screed-coat(15).
2. a kind of walling system according to claim 1, it is characterised in that:The ground structure includes screed-coat(21)With
Surface layer on screed-coat(22), the first component(13)With the screed-coat(21)It matches;The first component
(13)With with the screed-coat(21)The first extension matched(132).
3. a kind of walling system according to claim 1, it is characterised in that:The second component(14)Be equipped with it is described
The second extension that top surface structure matches(142).
4. a kind of walling system according to claim 1, it is characterised in that:The flank wall is equipped with architectural surface in vitro
(12), the first component(13)It is equipped with and the architectural surface(12)The third extension matched(133), third extension
Portion(133)With architectural surface(12)The face matched is set as rough surface.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2017213260684 | 2017-10-13 | ||
CN201721326068 | 2017-10-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208105573U true CN208105573U (en) | 2018-11-16 |
Family
ID=62661762
Family Applications (10)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711497231.8A Active CN108301528B (en) | 2017-10-13 | 2017-12-31 | Wall system and decoration method |
CN201721917087.4U Active CN208105573U (en) | 2017-10-13 | 2017-12-31 | A kind of walling system |
CN201711497232.2A Active CN108265980B (en) | 2017-10-13 | 2017-12-31 | Interior decoration method |
CN201820247497.0U Active CN208792663U (en) | 2017-10-13 | 2018-02-12 | A kind of room finishing system |
CN201810143475.4A Active CN108222405B (en) | 2017-10-13 | 2018-02-12 | Interior decoration method |
CN201810143480.5A Active CN108457442B (en) | 2017-10-13 | 2018-02-12 | Interior decoration system and decoration method |
CN201811174503.5A Pending CN109267712A (en) | 2017-10-13 | 2018-10-09 | A kind of wall decoration method |
CN201811174506.9A Pending CN109267671A (en) | 2017-10-13 | 2018-10-09 | A kind of decoration method of indoor wall system |
CN201811174513.9A Pending CN109162582A (en) | 2017-10-13 | 2018-10-09 | A kind of installation method of doorframe |
CN201811174511.XA Pending CN109138519A (en) | 2017-10-13 | 2018-10-09 | A kind of decoration method of modularization toilet |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711497231.8A Active CN108301528B (en) | 2017-10-13 | 2017-12-31 | Wall system and decoration method |
Family Applications After (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711497232.2A Active CN108265980B (en) | 2017-10-13 | 2017-12-31 | Interior decoration method |
CN201820247497.0U Active CN208792663U (en) | 2017-10-13 | 2018-02-12 | A kind of room finishing system |
CN201810143475.4A Active CN108222405B (en) | 2017-10-13 | 2018-02-12 | Interior decoration method |
CN201810143480.5A Active CN108457442B (en) | 2017-10-13 | 2018-02-12 | Interior decoration system and decoration method |
CN201811174503.5A Pending CN109267712A (en) | 2017-10-13 | 2018-10-09 | A kind of wall decoration method |
CN201811174506.9A Pending CN109267671A (en) | 2017-10-13 | 2018-10-09 | A kind of decoration method of indoor wall system |
CN201811174513.9A Pending CN109162582A (en) | 2017-10-13 | 2018-10-09 | A kind of installation method of doorframe |
CN201811174511.XA Pending CN109138519A (en) | 2017-10-13 | 2018-10-09 | A kind of decoration method of modularization toilet |
Country Status (1)
Country | Link |
---|---|
CN (10) | CN108301528B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708515A (en) * | 2018-08-10 | 2018-10-26 | 金螳螂精装科技(苏州)有限公司 | A kind of splits closing device |
CN109868958A (en) * | 2019-04-04 | 2019-06-11 | 苏州金螳螂文化发展股份有限公司 | A kind of closing-in structure and method of wall top surface gypsum board and wall surface dry-hang stone |
CN110259050A (en) * | 2019-06-24 | 2019-09-20 | 中冶建工集团有限公司 | LED light strip skirting and wall surface integrated formula structure and its construction method |
CN110552483B (en) * | 2019-08-30 | 2020-12-11 | 江苏尚瑞鸿涛装饰设计工程有限公司 | Ground fine leveling process |
CN110886469A (en) * | 2019-12-03 | 2020-03-17 | 廖丹霞 | Two-in-one skirting line and installation method for invisible door system |
CN111519739B (en) * | 2020-05-21 | 2021-04-02 | 广州市第四装修有限公司 | Modularized decoration method for toilet leak-proof groove |
CN113719049B (en) * | 2020-05-25 | 2023-04-28 | 浙江雅迪乐木业有限公司 | Decoration method for inner wall surface of house |
CN112962919A (en) * | 2021-02-23 | 2021-06-15 | 北京梵客家居科技有限公司 | Hidden skirting line |
CN113123562B (en) * | 2021-03-10 | 2022-08-16 | 杭州晶晟装饰设计工程有限公司 | Skirting line |
CN115306266B (en) * | 2022-08-05 | 2024-01-09 | 中国建筑第八工程局有限公司 | Anti-vibration sliding door closing-in connection structure |
Family Cites Families (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3378835D1 (en) * | 1982-01-15 | 1989-02-09 | Schmidt Reuter | Hollow floor |
GB9319949D0 (en) * | 1993-09-28 | 1993-11-17 | Inva Dex Limited | Improvements in or relating to drains |
DE19648893A1 (en) * | 1996-11-26 | 1998-05-28 | Dietrich Huebner | Cover batten for ceiling covering |
CN1208108A (en) * | 1997-08-08 | 1999-02-17 | 汪沛 | Fast indoor furnishing method |
GB2357034B (en) * | 1999-12-10 | 2002-01-30 | English Courtyard Ass | Shower tray for able-bodied and disabled use |
IES20000243A2 (en) * | 2000-03-31 | 2001-10-03 | Martin Patrick Shannon | A mounting bracket for mounting a frame in a wall opening |
CN2453090Y (en) * | 2000-11-29 | 2001-10-10 | 刘文利 | Decoration door frame cover adjusted based on thickness of wall |
CN2490282Y (en) * | 2001-07-04 | 2002-05-08 | 张卫民 | Assemblied door and window packet capable of adjusting and disassembly |
CN2599132Y (en) * | 2003-01-23 | 2004-01-14 | 王毓民 | Skirting for wall corner |
KR200325216Y1 (en) * | 2003-06-16 | 2003-09-02 | 조창호 | molding materials for wallpaper execution |
CN201103243Y (en) * | 2007-10-26 | 2008-08-20 | 长业建设集团有限公司 | Leveling device for plane pouring |
CN201141258Y (en) * | 2007-11-07 | 2008-10-29 | 张智勇 | Solid wood door frame |
KR100948585B1 (en) * | 2008-02-19 | 2010-03-18 | 한국원자력연구원 | Method for constructing floor |
US20110197355A1 (en) * | 2010-02-18 | 2011-08-18 | Maax Bath Inc. | Low profile shower base |
CN101876202A (en) * | 2010-06-09 | 2010-11-03 | 安徽省根源光大节能建材有限公司 | Connecting fastener for heat insulation and decoration integrated board |
BE1019716A3 (en) * | 2010-12-23 | 2012-10-02 | Assenti Lux S A | BUILDING ELEMENT FOR MANUFACTURING A SHOWER. |
CN202509703U (en) * | 2012-03-07 | 2012-10-31 | 孔蕾蕾 | Wall corner decoration structure |
CN202787853U (en) * | 2012-06-29 | 2013-03-13 | 青岛港达木建设有限公司 | Combination fastener for decorating |
CN103184796B (en) * | 2013-03-19 | 2015-11-18 | 中国建筑土木建设有限公司 | The accurate leveling unit in cast-in-place one-shot forming concrete building ground and construction method thereof |
CN103410328A (en) * | 2013-08-29 | 2013-11-27 | 中天建设集团有限公司天津分公司 | Method for constructing large-area concrete surface |
CN103806634A (en) * | 2014-01-25 | 2014-05-21 | 浙江宝兰电气有限公司 | Adjustable edge strip installation structure for indoor suspended ceiling |
US9414720B2 (en) * | 2014-01-28 | 2016-08-16 | Alfredo Salvatori S.R.L. | Shower tray |
CN103806615B (en) * | 2014-02-24 | 2015-12-16 | 周松桂 | The installation component of inside-corner decoration plate |
CN203783346U (en) * | 2014-04-17 | 2014-08-20 | 浙江金丰人防设备有限公司 | Special angle steel for civil defense door frame |
AT516533B1 (en) * | 2014-11-28 | 2019-07-15 | Admonter Holzindustrie Ag | Afford Mounting Kit |
CN204850131U (en) * | 2015-06-15 | 2015-12-09 | 刘晓强 | Light -duty assembled panel combination wall structure |
CN105220811A (en) * | 2015-10-09 | 2016-01-06 | 江苏南方雄狮建设工程有限公司 | A kind of wall brick and end face closing device |
CN205330066U (en) * | 2015-12-30 | 2016-06-22 | 苏州苏明装饰股份有限公司 | Double layer plaster tablet furred ceiling structure |
CN205531217U (en) * | 2016-02-04 | 2016-08-31 | 青岛有住信息技术有限公司 | Balcony skirting line structure |
CN205637453U (en) * | 2016-04-13 | 2016-10-12 | 优居优住家居装饰(北京)有限公司 | Installation pendant of movable decorative board |
CN105735603A (en) * | 2016-04-13 | 2016-07-06 | 美好筑家家居装饰(北京)有限公司 | Mounting device for movable decorative plate |
CN205743083U (en) * | 2016-04-19 | 2016-11-30 | 孙健智 | A kind of variable-sized assembly type water-proof chassis mould, water-proof chassis and waterproof compartment |
CN105971181B (en) * | 2016-06-29 | 2017-06-20 | 浙江亚厦装饰股份有限公司 | The installation method of top board side retracting device, furred ceiling and furred ceiling |
CN106120835B (en) * | 2016-08-23 | 2018-08-31 | 青岛城建集团有限公司 | A kind of circle concrete structures toe board panel guide rail and its levelling construction |
CN206205169U (en) * | 2016-11-18 | 2017-05-31 | 浙江铭品装饰工程有限公司 | A kind of shower house water bar installs node |
CN206279708U (en) * | 2016-12-14 | 2017-06-27 | 天津达因建材有限公司 | External corner assembly component |
-
2017
- 2017-12-31 CN CN201711497231.8A patent/CN108301528B/en active Active
- 2017-12-31 CN CN201721917087.4U patent/CN208105573U/en active Active
- 2017-12-31 CN CN201711497232.2A patent/CN108265980B/en active Active
-
2018
- 2018-02-12 CN CN201820247497.0U patent/CN208792663U/en active Active
- 2018-02-12 CN CN201810143475.4A patent/CN108222405B/en active Active
- 2018-02-12 CN CN201810143480.5A patent/CN108457442B/en active Active
- 2018-10-09 CN CN201811174503.5A patent/CN109267712A/en active Pending
- 2018-10-09 CN CN201811174506.9A patent/CN109267671A/en active Pending
- 2018-10-09 CN CN201811174513.9A patent/CN109162582A/en active Pending
- 2018-10-09 CN CN201811174511.XA patent/CN109138519A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CN108301528A (en) | 2018-07-20 |
CN109267671A (en) | 2019-01-25 |
CN109138519A (en) | 2019-01-04 |
CN108222405A (en) | 2018-06-29 |
CN109162582A (en) | 2019-01-08 |
CN108265980B (en) | 2021-01-19 |
CN108265980A (en) | 2018-07-10 |
CN108222405B (en) | 2021-01-19 |
CN208792663U (en) | 2019-04-26 |
CN108457442B (en) | 2021-01-19 |
CN108457442A (en) | 2018-08-28 |
CN108301528B (en) | 2021-01-19 |
CN109267712A (en) | 2019-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208105573U (en) | A kind of walling system | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN105298071A (en) | Aluminum alloy profile embedded in wall, floor and roof | |
CN102535807B (en) | Modular wall tile pre-bonding structure and construction method thereof | |
CN203499216U (en) | Embedded wall solid wood skirting line wood base layer structure | |
CN206971484U (en) | A kind of assembled wall and floor fixed structure | |
CN206957099U (en) | A kind of insulation and decoration acoustic wall board | |
CN208347208U (en) | A kind of new indoor walling system | |
CN108978851A (en) | A kind of improvement room finishing system and decoration method | |
CN102383507A (en) | Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same | |
CN204326296U (en) | A kind of novel construction wall energy-saving system | |
CN201180323Y (en) | Polyurethane support mold pouring heat preservation wall | |
CN207739427U (en) | A kind of walling system | |
CN2934449Y (en) | Combined type natural sandstone board wall surface | |
CN208202203U (en) | A kind of toilet wall body structure | |
CN207739536U (en) | A kind of indoor wall system | |
CN211037664U (en) | Stone material ground and ceramic tile ground handing-over department node structure | |
CN202248387U (en) | Lightgage steel joist gypsum plate vetrified tile decorative wall body | |
CN102359238A (en) | Staggered waterproof heat insulation outer wall brick | |
CN207332617U (en) | A kind of doorframe structure | |
CN207332181U (en) | A kind of wall body structure | |
CN208105602U (en) | A kind of novel wall structure | |
CN111894175A (en) | Assembly type fast wall (inner partition wall) structure and installation method | |
CN208456014U (en) | A kind of decorating wall structure | |
CN204225324U (en) | Wall thermal insulating integration point extension system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |