CN201103243Y - Leveling device for plane pouring - Google Patents
Leveling device for plane pouring Download PDFInfo
- Publication number
- CN201103243Y CN201103243Y CNU2007201847275U CN200720184727U CN201103243Y CN 201103243 Y CN201103243 Y CN 201103243Y CN U2007201847275 U CNU2007201847275 U CN U2007201847275U CN 200720184727 U CN200720184727 U CN 200720184727U CN 201103243 Y CN201103243 Y CN 201103243Y
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- nut
- usefulness
- built
- leveling unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a leveling device used for pouring flat, which is a construction equipment for leveling and dividing when whole ground of buildings is poured; the leveling device comprises a beam, a carriage at the bottom of the beam and also comprises nuts, wherein, the upper corresponding face and the lower corresponding face of the beam are provided with a large hole and a small hole which are communicated and have circle centers on a same axial center line; the carriage comprises a screw rod, an adjusting nut and a spacer, wherein, the screw rod is helically matched and connected with the nut positioned in the large hole, the adjusting nut below the beam and the spacer. Compared with the prior art, the leveling device has more flexible level location and accurate level control; the system can also be reused, thus greatly reducing cost for the construction.
Description
Technical field
The utility model discloses a kind of plane and build the leveling unit of usefulness, is a kind of construction equipment of levelling and lattice when being used for whole building ground and building, and can improve the integral level degree of building on ground.
Background technology
In the work progress of industry and civilian construction, the cast-in-situ concrete terrace must be to required concrete leveling absolute altitude of building before building.
Building operations industry in the past is when carrying out the levelling absolute altitude, often adopt and bury reinforcement bar in advance underground, red paint is smeared at top, upper end at reinforcement bar, determine the concrete height of building with the position height that the red paint mark is established, after building initial set, prescind will exposing the reinforcing bar of building outside the top layer, polish with red paint.Adopt the method for this levelling absolute altitude, exist very big problem: first, owing to will bury a large amount of reinforcing bars in advance underground, on every reinforcing bar, make marks, error can appear unavoidably, it is big more to build area, exists the possibility of error just big more, and the planeness of concrete surface can not get effective control all the time so; The second, use a large amount of reinforcing bars not only to increase construction cost, and just be deposited in after building in the terrace, long-time after because the problem such as get rusty of reinforcement bar also can impact building itself.
In recent years, when building operations levelling absolute altitude, also adopt in such a way.Being exactly first joints cement mortar rail bar, the square crossing of rail bar is overlapped to form frame, is the terrace absolute altitude with the suitable for reading of every rail bar.Its shortcoming is: the first, and mortar rail bar is made complicated, need reach identical standard, and consume material is made the time that maintenance needs a week again, is damaged easily again in construction, thereby influences the absolute altitude precision; Second, it all must be cut, walks clearly after building, otherwise can be because rail bar and the old and new different with the material of building ground build bonding problem such as bad, and cause day and problems such as crack, back, seepage, and cut the rail bar is thing when quite taking a lot of work, the short slot that also it will have been stayed after having cleared up fills up smooth, is difficult to guarantee the smooth precision of integral terrace after filling up.
The utility model content
The utility model is at the deficiencies in the prior art, and purpose is to provide a kind of simple in structure, leveling unit that usefulness is built on the obvious results plane, and this device helps regulating height, and reusable.
The purpose of this utility model is achieved in that the bracing frame that comprises crossbeam and bottom thereof, it is characterized in that: also include nut, the upper and lower corresponding surface of crossbeam is respectively equipped with on same axial line and the macropore that communicate in the center of circle, aperture, bracing frame comprises screw rod, adjusting nut and keeper, and screw rod is all spiral being connected with adjusting nut, the keeper of the nut that places macropore, crossbeam below.
Described crossbeam is the hollow type rectangular structure, and the screw in the nut equates that with the pore size of aperture the height of nut is not more than crossbeam thickness.Its middle cross beam is the construction needs for the square structure, and is convenient to the fixing of nut; The effect of hollow type structure mainly is to alleviate the measurement overall weight, helps convenient in carrying, and saves cost.Purpose to the qualification of nut height is to be: after nut is fit into macropore, the end face of nut is equal with the last plane of crossbeam, the bottom surface of nut then places on the crossbeam inwall at aperture place, and this moment nut and aperture and macropore central axis all on same straight line.
Support frame as described above quantity serves as preferred with two, evenly is located at position, the crossbeam left and right sides; Correspondingly, the macropore on the crossbeam, aperture, nut all are set to preferably with about two correspondences.This qualification effect is to be supported by left and right sidesing supporting frame, makes crossbeam keep balance.The quantity of bracing frame also can promptly be supported in the intersection of diagonal place of the baseplane of crossbeam for single, and this mode also can reach effect of the present utility model, just operates difficultly, and influenced by external force and influences level.The quantity of bracing frame can also still be considered the construction cost problem for more than two, so bracing frame quantity is got two left and right ends of distribution crossbeam as of the present utility model preferred.
An area minimum lateral of described crossbeam is provided with a core body, and the vestibule on the crossbeam of the corresponding end with it of the size of this core body is suitable.When being used for large-area flooring levelling native system is interconnected.
Described keeper adopts expansion bolt, helps combining firmly with the bottom surface, makes equipment the back is installed steadily.
When the utility model is used in flooring levelling when building, its operating principle is: earlier basic unit's ground line is cleaned out, water seasoning makes ground fully moistening, determines the layout of crossbeam again according to ground shape.Generally arrange continuously, the crossbeam of this device long side direction head and the tail tandem according to ground is connected along the longer sides direction of earth construction; And ground than short side direction on place this device and be advisable with interior spacing with 6 meters, promptly the spacing between two crossbeams arranged side by side is controlled in 6 meters; On ground line, play the lattice line of ink marker then, according to the position correspondence in the hole on the crossbeam at surface drilling, the degree of depth in hole is advisable with about 2.5 centimetres, influence its supporting capacity to prevent to get to the pre-buried reinforcing bar in the floor, then expansion bolt is placed one by one in the hole and the abundant and bloated reality in ground, the screw rod of screwing on then, put on the screw rod with nut that it matches after insert in the aperture of crossbeam, again an end that is provided with internal thread in the nut is inserted by macropore and it is screwed on the screw rod and get final product with sleeve barrel tool, build required absolute altitude by adjusting nut control, and about adjust its levelness, adjust the back is fixed crossbeam by nut screwing clamping smoothness.When build finish after, with instrument nut is back-outed, split out crossbeam, the expansion bolt of again screw rod being back-outed, expansion bolt finally is fixed in the ground concrete, the part of dismounting can be reused.
When this device is applied in basic unit when building, keeper can omit and not use, and directly the bottom of screw rod is fixed, and only dismantles the crossbeam and the nut of this device after building, and screw rod and adjusting nut stay in the concrete structure that solidifies.
Below in conjunction with description of drawings and specific embodiment the utility model is further specified:
Description of drawings
Fig. 1 is an overall structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of nut.
The specific embodiment
Press Fig. 1, shown in Figure 2, the leveling unit of usefulness is built on a kind of plane, comprises bracing frame 1, crossbeam 2, nut 3 parts such as grade.Crossbeam 2 is the hollow type rectangular structure, be respectively equipped with macropore 21, aperture 22 on the crossbeam 2 upper and lower corresponding surfaces, and the center of circle of macropore 21 and aperture 22 is on same axial line.Nut 3 places macropore 21, and the external diameter of nut 3 is less than the aperture of macropore 21, and this gap is reserved by the sleeve barrel tool of nutting 3 usefulness, and the screw 31 of nut 3 equates with the pore size of aperture 22.When nut 3 was inserted in the macropore 21 fully, the bottom surface of nut 3 placed on the plane of crossbeam 2 inner chambers at aperture 22 places, so the section area of the nut 3 of this structure is greater than the section area of aperture 22.
Wherein bracing frame 1 quantity serves as preferred with two, evenly is located at position, crossbeam 2 left and right sides; Correspondingly, the macropore 21 on the crossbeam 2, aperture 22, nut 3 all are set to preferably with about two correspondences.
Claims (6)
1, the leveling unit of usefulness is built on a kind of plane, the bracing frame (1) that comprises crossbeam (2) and bottom thereof, it is characterized in that: also include nut (3), the upper and lower corresponding surface of crossbeam (2) is respectively equipped with on same axial line and the macropore that communicate (21) in the center of circle, aperture (22), bracing frame (1) comprises screw rod (11), adjusting nut (12) and keeper (13), and screw rod (11) is all spiral being connected with adjusting nut (12), the keeper (13) of the nut (3) that places macropore (21), crossbeam (2) below.
2, the leveling unit of usefulness is built on a kind of plane according to claim 1, it is characterized in that: described crossbeam (2) is the hollow type rectangular structure.
3, the leveling unit of usefulness is built on a kind of plane according to claim 1, it is characterized in that: the screw (31) in the nut (3) equates that with the pore size of aperture (22) height of nut (3) is not more than crossbeam (2) thickness.
4, the leveling unit of usefulness is built on a kind of plane according to claim 1, it is characterized in that: support frame as described above (1) quantity serves as preferred with two, evenly is located at crossbeam (2) position, the left and right sides; Correspondingly, the macropore (21) on the crossbeam (2), aperture (22), nut (3) all are set to preferably with about two correspondences.
5, the leveling unit of usefulness is built on a kind of plane according to claim 1, it is characterized in that: an area minimum lateral of described crossbeam (2) is provided with a core body (23), and the vestibule on the crossbeam (2) of the corresponding end with it of size of this core body (23) is suitable.
6, the leveling unit of usefulness is built on a kind of plane according to claim 1, it is characterized in that: described keeper (13) adopts expansion bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201847275U CN201103243Y (en) | 2007-10-26 | 2007-10-26 | Leveling device for plane pouring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201847275U CN201103243Y (en) | 2007-10-26 | 2007-10-26 | Leveling device for plane pouring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201103243Y true CN201103243Y (en) | 2008-08-20 |
Family
ID=39950267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201847275U Expired - Fee Related CN201103243Y (en) | 2007-10-26 | 2007-10-26 | Leveling device for plane pouring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201103243Y (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102042461B (en) * | 2009-10-22 | 2012-05-30 | 中冶天工建设有限公司 | Evenness adjusting methods for industrial factory building T-shaped groove and platform thereof |
CN102912498A (en) * | 2012-11-09 | 2013-02-06 | 无锡市新康纺机有限公司 | Lower keel installing tool for roving machine |
CN103321131A (en) * | 2013-07-08 | 2013-09-25 | 无锡商业职业技术学院 | Sandy soil laying leveling device |
CN103526917A (en) * | 2013-10-24 | 2014-01-22 | 无锡商业职业技术学院 | Sandy soil laying leveling device and sandy soil laying method |
CN105220883A (en) * | 2015-10-28 | 2016-01-06 | 中国建筑第八工程局有限公司 | Monolithic ground level controller and construction method thereof |
CN105421776A (en) * | 2015-11-09 | 2016-03-23 | 中冶天工集团有限公司 | Device for leveling super-flat floor and method for conducting super-flat floor construction through device |
CN105442852A (en) * | 2015-12-28 | 2016-03-30 | 福建工程学院 | Pedestal loading hole lifting tool |
CN105908958A (en) * | 2016-06-06 | 2016-08-31 | 浙江亚厦装饰股份有限公司 | Auxiliary tool for unifying elevations |
CN108222405A (en) * | 2017-10-13 | 2018-06-29 | 桐乡建格家居有限公司 | A kind of interior decoration method |
CN108590142A (en) * | 2018-02-10 | 2018-09-28 | 林文芳 | A kind of standard struck off for sandy soil |
CN109338887A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of leveling unit and construction method of cast-in-situ box girder |
CN109914812A (en) * | 2018-12-30 | 2019-06-21 | 广东材通实业有限公司 | A kind of floor leveling construction accessory part and its application method |
CN110107091A (en) * | 2019-06-18 | 2019-08-09 | 陈武豪 | A kind of adjustable flooring control device and application method |
CN110284226A (en) * | 2019-07-12 | 2019-09-27 | 天津宏大纺织科技有限公司 | External lower keel horizontal adjusting device of automatic doffing roving frame |
CN110424740A (en) * | 2019-07-12 | 2019-11-08 | 熊家奎 | A kind of leveling unit and method |
CN110424687A (en) * | 2019-08-08 | 2019-11-08 | 中冶天工集团有限公司 | A kind of disposable floating screed leveling unit of composite exterior wall and construction method |
-
2007
- 2007-10-26 CN CNU2007201847275U patent/CN201103243Y/en not_active Expired - Fee Related
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102042461B (en) * | 2009-10-22 | 2012-05-30 | 中冶天工建设有限公司 | Evenness adjusting methods for industrial factory building T-shaped groove and platform thereof |
CN102912498A (en) * | 2012-11-09 | 2013-02-06 | 无锡市新康纺机有限公司 | Lower keel installing tool for roving machine |
CN103321131A (en) * | 2013-07-08 | 2013-09-25 | 无锡商业职业技术学院 | Sandy soil laying leveling device |
CN103526917A (en) * | 2013-10-24 | 2014-01-22 | 无锡商业职业技术学院 | Sandy soil laying leveling device and sandy soil laying method |
CN105220883A (en) * | 2015-10-28 | 2016-01-06 | 中国建筑第八工程局有限公司 | Monolithic ground level controller and construction method thereof |
CN105421776A (en) * | 2015-11-09 | 2016-03-23 | 中冶天工集团有限公司 | Device for leveling super-flat floor and method for conducting super-flat floor construction through device |
CN105442852A (en) * | 2015-12-28 | 2016-03-30 | 福建工程学院 | Pedestal loading hole lifting tool |
CN105442852B (en) * | 2015-12-28 | 2017-07-28 | 福建工程学院 | A kind of pedestal loading hole above carries instrument |
CN105908958A (en) * | 2016-06-06 | 2016-08-31 | 浙江亚厦装饰股份有限公司 | Auxiliary tool for unifying elevations |
CN108457442A (en) * | 2017-10-13 | 2018-08-28 | 桐乡建格家居有限公司 | A kind of room finishing system and decoration method |
CN108265980B (en) * | 2017-10-13 | 2021-01-19 | 杭州建格科技有限公司 | Interior decoration method |
CN108301528A (en) * | 2017-10-13 | 2018-07-20 | 杭州建格科技有限公司 | A kind of walling system and decoration method |
CN108222405A (en) * | 2017-10-13 | 2018-06-29 | 桐乡建格家居有限公司 | A kind of interior decoration method |
CN108265980A (en) * | 2017-10-13 | 2018-07-10 | 杭州建格科技有限公司 | A kind of interior decoration method |
CN108301528B (en) * | 2017-10-13 | 2021-01-19 | 杭州建格科技有限公司 | Wall system and decoration method |
CN108457442B (en) * | 2017-10-13 | 2021-01-19 | 杭州建格科技有限公司 | Interior decoration system and decoration method |
CN108222405B (en) * | 2017-10-13 | 2021-01-19 | 杭州建格科技有限公司 | Interior decoration method |
CN108590142A (en) * | 2018-02-10 | 2018-09-28 | 林文芳 | A kind of standard struck off for sandy soil |
CN109338887A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of leveling unit and construction method of cast-in-situ box girder |
CN109914812A (en) * | 2018-12-30 | 2019-06-21 | 广东材通实业有限公司 | A kind of floor leveling construction accessory part and its application method |
CN110107091A (en) * | 2019-06-18 | 2019-08-09 | 陈武豪 | A kind of adjustable flooring control device and application method |
CN110424740A (en) * | 2019-07-12 | 2019-11-08 | 熊家奎 | A kind of leveling unit and method |
CN110284226A (en) * | 2019-07-12 | 2019-09-27 | 天津宏大纺织科技有限公司 | External lower keel horizontal adjusting device of automatic doffing roving frame |
CN110424687A (en) * | 2019-08-08 | 2019-11-08 | 中冶天工集团有限公司 | A kind of disposable floating screed leveling unit of composite exterior wall and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201103243Y (en) | Leveling device for plane pouring | |
CN103321111B (en) | Streetcar track connects the construction method of paving | |
CN107268424A (en) | Can fast leveling precast assembly bridge pier structure and its construction method | |
CN202913420U (en) | Reusable positioning device for installing foundation bolts | |
CN2825832Y (en) | Surface level control device for concrete casting | |
CN103255717A (en) | Method for constructing hit-preventing wall | |
CN108951322A (en) | A kind of ballastless track structure sedimentation lifting apparatus and its lifting method | |
CN212984489U (en) | Template connection structure on high-strength curve ultra-flat ground | |
CN104499434A (en) | Movable formwork for casting of wide-body box girder and construction method | |
CN102251657A (en) | Arching formwork erecting method for assembled framework beam plate | |
CN103088842A (en) | Rubble retaining wall reinforced single-face pattern plate support system and construction method | |
CN204849798U (en) | Rag bolt fixed bolster | |
CN204402504U (en) | A kind of tunnel steel form lining trolley | |
CN201172971Y (en) | Construction control device for controlling flatness of concrete primary pulp ground | |
CN102797223A (en) | Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method | |
CN107237461A (en) | A kind of full suspending rotary steel structure stairway structure and construction method | |
CN206625260U (en) | A kind of detachable late poured band support post | |
CN104196165B (en) | Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof | |
CN201794297U (en) | Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs | |
CN207846228U (en) | A kind of simple prestressed concrete beam beam face embedded sleeve barrel positioning mold | |
CN203834370U (en) | Arch ring steel formwork trolley for circular arch culvert | |
CN207277718U (en) | Full suspending rotary steel structure stairway structure | |
CN103114572A (en) | Underground diaphragm wall guide wall movable mold frame | |
CN206646817U (en) | The form bracing system of the cast-in-place decorative panel of staged Arc Stand | |
CN103243910B (en) | Hydraulic pressure controlled reinforced concrete structure bed die vertical supporting system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080820 Termination date: 20151026 |
|
EXPY | Termination of patent right or utility model |