CN207986526U - A kind of cladding panel hoisting structure - Google Patents
A kind of cladding panel hoisting structure Download PDFInfo
- Publication number
- CN207986526U CN207986526U CN201820369719.6U CN201820369719U CN207986526U CN 207986526 U CN207986526 U CN 207986526U CN 201820369719 U CN201820369719 U CN 201820369719U CN 207986526 U CN207986526 U CN 207986526U
- Authority
- CN
- China
- Prior art keywords
- cladding panel
- suspension centre
- floor
- interim suspension
- hands
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005253 cladding Methods 0.000 title claims abstract description 64
- 239000000725 suspension Substances 0.000 claims abstract description 39
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000006243 chemical reaction Methods 0.000 claims abstract description 6
- 241000276425 Xiphophorus maculatus Species 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Abstract
The utility model discloses a kind of cladding panel hoisting structures, including:Several cast-in-place floors, there is position to be installed on the cast-in-place floor, cladding panel is installed at the position to be installed, the cladding panel top edge has the interim suspension centre of cladding panel, it is connected with lifting rope at the interim suspension centre of cladding panel, the lifting rope is connect with crane hook, there is the interim suspension centre of floor on the cast-in-place floor on the position top to be installed, it is connected with bottle gouard moved by hands at the interim suspension centre of floor, when the cladding panel is hung near position to be installed, it is connected with the interim suspension centre of cladding panel by the hook of bottle gouard moved by hands, so as to unload crane hook, cladding panel is set accurately to enter position to be installed using bottle gouard moved by hands, pass through the conversion of tower crane and bottle gouard moved by hands, make positioning and adjustment enhanced convenience and accurate, to improve installation effectiveness and precision.
Description
Technical field
The utility model is related to building fields, more particularly to a kind of cladding panel hoisting structure.
Background technology
Currently, greatly developing assembled architecture, Core Walls Structure uses cast-in-place under normal circumstances, prefabricated in Core Walls Structure external mounting
Cladding panel eventually forms the building type of needs, and under normal circumstances, prefabricated cladding panel heavier-weight, can not manpower installation, and
Tower crane lifting can not be accurately positioned due to position and setting, so how the installation of Labor-saving high-efficiency, high quality is this
Field technology personnel are always in the problem of thinking.
Invention content
The purpose of this utility model is that:Overcome the above-mentioned problems in the prior art, proposes a kind of cladding panel lifting
Structure makes positioning and adjustment enhanced convenience and accurate, to improve installation effectiveness by the conversion of tower crane and bottle gouard moved by hands
And precision.
The purpose of this utility model is realized by following technical proposals:
A kind of cladding panel hoisting structure, including:Several cast-in-place floors have position to be installed, institute on the cast-in-place floor
Installation cladding panel at position to be installed is stated, the cladding panel top edge has the interim suspension centre of cladding panel, the cladding panel interim
Lifting rope is connected at suspension centre, the lifting rope is connect with crane hook, has building on the cast-in-place floor on the position top to be installed
Layer interim suspension centre is connected with bottle gouard moved by hands at the interim suspension centre of floor, when the cladding panel is hung near position to be installed, leads to
The hook for crossing bottle gouard moved by hands is connected with the interim suspension centre of cladding panel, so as to unload crane hook, is made using bottle gouard moved by hands outer
Hanging plate accurately enters position to be installed.
A kind of cladding panel hoisting structure of the utility model, the interim suspension centre of cladding panel include:It is set on cladding panel
Built-in fitting, be provided on the built-in fitting and withhold hole, it is described withhold to be connected through a screw thread to be provided in hole withhold, it is described to withhold
Top is connected with conversion suspension centre.
A kind of cladding panel hoisting structure of the utility model, the suspension centre of converting is platy structure, on the platy structure
Be uniformly distributed there are three connecting hole, three connecting holes respectively with withhold, bottle gouard moved by hands and lifting rope are connect.
A kind of cladding panel hoisting structure of the utility model, the interim suspension centre of floor are located at the top of position to be installed
On the cast-in-place floor of first layer or the second layer.
A kind of cladding panel hoisting structure of the utility model, the cladding panel lower part, which is provided at both ends with, slips rope.
A kind of cladding panel hoisting structure of the utility model, the bottle gouard moved by hands face close to the interim suspension centre of cladding panel and floor
When suspension centre at be provided at both ends with shackle.
According to above-mentioned technical proposal, the utility model has the beneficial effects that:It proposes a kind of cladding panel hoisting structure, passes through tower
The conversion with bottle gouard moved by hands is hung, makes positioning and adjustment enhanced convenience and accurate, to improve installation effectiveness and precision.
Description of the drawings
Fig. 1 is a kind of cladding panel hoisting structure schematic diagram of the utility model;
Fig. 2 is a kind of cladding panel hoisting structure partial schematic diagram of the utility model.
Specific implementation mode
The utility model is further described with reference to specific embodiments and the drawings.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain
The utility model is not used to limit the utility model.
If Fig. 1-2 is a kind of embodiment of cladding panel hoisting structure of the utility model, a kind of cladding panel hoisting structure, packet
It includes:Several cast-in-place floors 1 have position 9 to be installed on the cast-in-place floor 1, cladding panel 2 are installed at the position 9 to be installed,
2 top edge of the cladding panel has an interim suspension centre 6 of cladding panel, and lifting rope 7 is connected at the interim suspension centre of the cladding panel 6, described
Lifting rope 7 is connect with crane hook 4, has the interim suspension centre 5 of floor, the building on the cast-in-place floor 1 on 9 top of position to be installed
It is connected with bottle gouard moved by hands 3 at the interim suspension centre of layer 5 and passes through bottle gouard moved by hands 3 when the cladding panel 2 is hung near position 9 to be installed
Hook is connected with the interim suspension centre of cladding panel 6, so as to unload crane hook 4, makes cladding panel 2 accurately using bottle gouard moved by hands 3
Entrance position 9 to be installed, this structure, can by lift up rapidly early period, reach installation site near when be converted to manually
Cucurbit accurately adjusts, and improves installation effectiveness and installation quality.
In order to smoothly be converted between tower crane and bottle gouard moved by hands 3, the interim suspension centre of the cladding panel 6 includes:It is set to
Built-in fitting on cladding panel 2 is provided on the built-in fitting and withholds hole, it is described withhold to be connected through a screw thread to be provided in hole withhold
61,61 tops of withholding are connected with conversion suspension centre 62.
In order to be independent of each other in suspension centre transfer process, the suspension centre 62 of converting is platy structure, on the platy structure
Be uniformly distributed there are three connecting hole, three connecting holes respectively with withhold 61, bottle gouard moved by hands 3 and lifting rope 7 is connect.
In order to improve working efficiency, the interim suspension centre 5 of floor is located at the first layer or second of the top of position 9 to be installed
On the cast-in-place floor 1 of layer namely the interim suspension centre of the same floor 5 can lift two layers of cladding panel 2.
In order to make cladding panel when closing on installed position, operating personnel are easy to operation, and 2 lower part both ends of the cladding panel are set
It is equipped with and slips rope 8.
In order to quickly dismount bottle gouard moved by hands 3, the bottle gouard moved by hands 3 is hung temporarily close to the interim suspension centre 6 of cladding panel and floor
It is provided at both ends with shackle at point 5
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
All any modification, equivalent and improvement etc., should be included in the utility model made by within the spirit and principle of utility model
Protection domain within.
Claims (6)
1. a kind of cladding panel hoisting structure, which is characterized in that including:Several cast-in-place floors have on the cast-in-place floor and wait pacifying
Holding position installs cladding panel at the position to be installed, and the cladding panel top edge has the interim suspension centre of cladding panel, described outer
Lifting rope is connected at the interim suspension centre of hanging plate, the lifting rope is connect with crane hook, the cast-in-place floor on the position top to be installed
It is upper that there is the interim suspension centre of floor, it is connected with bottle gouard moved by hands at the interim suspension centre of floor, the cladding panel is hung to position to be installed
When neighbouring, it is connected by the interim suspension centre of hook and cladding panel of bottle gouard moved by hands, so as to unload crane hook, using manual
Cucurbit makes cladding panel accurately enter position to be installed.
2. a kind of cladding panel hoisting structure according to claim 1, it is characterised in that:The interim suspension centre packet of cladding panel
It includes:The built-in fitting being set on cladding panel is provided on the built-in fitting and withholds hole, it is described withhold to be connected through a screw thread in hole set
It is equipped with and withholds, the top of withholding is connected with conversion suspension centre.
3. a kind of cladding panel hoisting structure according to claim 2, it is characterised in that:The suspension centre of converting is plate knot
Structure is uniformly distributed on the platy structure there are three connecting hole, three connecting holes respectively with withhold, bottle gouard moved by hands and lifting rope
Connection.
4. a kind of cladding panel hoisting structure according to claim 1, it is characterised in that:The interim suspension centre of floor, which is located at, to be waited for
On the first layer of the top of installation site or the cast-in-place floor of the second layer.
5. a kind of cladding panel hoisting structure according to claim 1, it is characterised in that:Cladding panel lower part both ends are arranged
Slip rope.
6. a kind of cladding panel hoisting structure according to claim 1, it is characterised in that:The bottle gouard moved by hands is close to cladding panel
It is provided at both ends with shackle at interim suspension centre and the interim suspension centre of floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820369719.6U CN207986526U (en) | 2018-03-19 | 2018-03-19 | A kind of cladding panel hoisting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820369719.6U CN207986526U (en) | 2018-03-19 | 2018-03-19 | A kind of cladding panel hoisting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207986526U true CN207986526U (en) | 2018-10-19 |
Family
ID=63827346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820369719.6U Expired - Fee Related CN207986526U (en) | 2018-03-19 | 2018-03-19 | A kind of cladding panel hoisting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207986526U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653516A (en) * | 2019-01-25 | 2019-04-19 | 成都建工第二建筑工程有限公司 | Concrete and hung plate construction method for hanging |
-
2018
- 2018-03-19 CN CN201820369719.6U patent/CN207986526U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653516A (en) * | 2019-01-25 | 2019-04-19 | 成都建工第二建筑工程有限公司 | Concrete and hung plate construction method for hanging |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207030727U (en) | A kind of hanging device | |
CN205151516U (en) | Simple and easy hoist and mount of prefabricated wallboard | |
CN207986526U (en) | A kind of cladding panel hoisting structure | |
CN207276111U (en) | Large space light cellular partition board mast-up | |
CN202081640U (en) | Lifting formwork used for building of elevator shaft | |
CN206220565U (en) | A kind of marine Simple module metaplasia work building of achievable integral hoisting | |
CN106121259B (en) | The hanging apparatus and its hanging method of embedded integrated outer wall plate | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN207363080U (en) | A kind of bilayer plaster tablet suspended ceiling structure | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
WO2022233156A1 (en) | Method for disposing lifting power apparatus in attached lifting/lowering scaffold | |
CN108529404A (en) | A kind of build uses elevator | |
CN204355947U (en) | Large-scale without eye plate lifting beam device | |
CN205500626U (en) | Climbing mechanism in tower crane | |
CN204823625U (en) | Lift cage door counter weight mechanism | |
CN212639669U (en) | Prefabricated staircase hoist and mount hoist | |
CN203961142U (en) | A kind of prepared roofing | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN103058083B (en) | Bolt sphere truss gig | |
CN207108235U (en) | A kind of oil drum Current Collector Sleave | |
CN205935718U (en) | Hoist device of embedded integral side fascia | |
CN206375594U (en) | A kind of multi-functional bar of lying prone of the assembled being connected with structure | |
JP3237888U (en) | A stylized unloading platform suitable for core tube steel frame structures | |
CN210313106U (en) | Guide rail lifting appliance device | |
CN210457366U (en) | High-rise ALC wallboard corollary equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 |
|
CF01 | Termination of patent right due to non-payment of annual fee |