CN207363080U - A kind of bilayer plaster tablet suspended ceiling structure - Google Patents

A kind of bilayer plaster tablet suspended ceiling structure Download PDF

Info

Publication number
CN207363080U
CN207363080U CN201721331936.8U CN201721331936U CN207363080U CN 207363080 U CN207363080 U CN 207363080U CN 201721331936 U CN201721331936 U CN 201721331936U CN 207363080 U CN207363080 U CN 207363080U
Authority
CN
China
Prior art keywords
plasterboard
suspended ceiling
bilayer
plate
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721331936.8U
Other languages
Chinese (zh)
Inventor
郭丽芳
姜海峰
姜兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Donghai Construction Group Co., Ltd.
Original Assignee
Shenzhen Donghai Decoration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Donghai Decoration Group Co Ltd filed Critical Shenzhen Donghai Decoration Group Co Ltd
Priority to CN201721331936.8U priority Critical patent/CN207363080U/en
Application granted granted Critical
Publication of CN207363080U publication Critical patent/CN207363080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of double-deck plaster tablet suspended ceiling structure, including upper and lower two layers of plasterboard, the upper end of upper strata plasterboard is both provided with a connecting plate, pass through more than one screw connection between the connecting plate bottom surface and plasterboard, and pasted and connected by glue, the outboard end of connecting plate is provided with more than one shackle, a connecting line is loaded in each shackle, the outboard end of connecting line is all connected with a lifting plate, and lifting plate upper end can be with the hoisting structure of activity adjustment with one.The utility model is simple in structure, in lifting, can solve the problems, such as to cause plasterboard stress point cracking when lifting because of local pressure in the prior art by power uniformly respectively on each point of plasterboard.

Description

A kind of bilayer plaster tablet suspended ceiling structure
Technical field
It the utility model is related to a kind of double-deck plaster tablet suspended ceiling structure.
Background technology
At present, plaster tablet suspended ceiling becomes a kind of ceiling decoration popularized the most in interior decoration engineering, but plasterboard is hung There is very universal problem of Cracking in the longer aisle plaster tablet suspended ceiling of top especially length, all construction personnel of this order and vast Owner has a headache very much.Since plasterboard is easy to crack, thus installing when slightly accidentally may also can there is a phenomenon where cracking, Work efficiency is greatly reduced, and the plasterboard after cracking obtains what is more renewed, and this also increases cost.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of double-deck plaster tablet suspended ceiling structure, can be uniform by power Respectively on each point of plasterboard, solution causes plasterboard stress point when lifting because of local pressure in the prior art The problem of cracking.
The utility model is achieved through the following technical solutions:A kind of bilayer plaster tablet suspended ceiling structure, including it is upper and lower Two layers of plasterboard, the upper end of upper strata plasterboard are both provided with a connecting plate, pass through one between the connecting plate bottom surface and plasterboard Screw connection more than a, and pasted and connected by glue, the outboard end of connecting plate is provided with more than one shackle, each Load a connecting line in shackle, the outboard end of connecting line is all connected with a lifting plate, and lifting plate upper end, which has one, to live The dynamic hoisting structure adjusted.
As preferable technical solution, the hoisting structure includes a sliding shoe, and sliding shoe is slidably mounted in lifting plate Between in the sliding slot that sets, the outboard end of the sliding shoe is vertically arranged a fixed link, and the plan vertical of fixed link sets a top plate.
As preferable technical solution, a screw hole is provided among the top plate, a piece screw rod, spiral shell are set through screw hole Bar is fitted into the building body at top, and whole plasterboard is fixed.
As preferable technical solution, the upper end of the sliding shoe is provided with lock screw, and lock screw passes through sliding shoe Upper surface with lifting plate compresses.
As preferable technical solution, the connecting line uses wire.
The beneficial effects of the utility model are:The utility model is simple in structure, in lifting, can uniformly distinguish power On each point of plasterboard, solve to cause plasterboard stress point cracking in lifting because of local pressure in the prior art Problem.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the overall structure diagram of the utility model.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine in any way.
This specification(Including any accessory claim, summary and attached drawing)Disclosed in any feature, except non-specifically chatting State, can be replaced by other alternative features that are equivalent or have similar purpose.I.e., unless specifically stated, each feature It is an example in a series of equivalent or similar characteristics.
As shown in Figure 1, including upper and lower two layers of plasterboard 1, the upper end of upper strata plasterboard 1 is both provided with a connecting plate 5, connection By more than one screw connection between 5 bottom surface of plate and plasterboard 1, and pasted and connected by glue, the outside of connecting plate 5 End is provided with more than one shackle, a connecting line 2 is loaded in each shackle, the outboard end of connecting line 2 is all connected with one and hangs Loading board 4,4 upper end of lifting plate can be with the hoisting structures of activity adjustment with one.
Wherein, hoisting structure includes a sliding shoe 3, and sliding shoe 3 is slidably mounted in the sliding slot 8 set among lifting plate, The outboard end of sliding shoe 3 is vertically arranged a fixed link 6, and the plan vertical of fixed link 6 sets a top plate.One is provided among top plate A screw hole, sets a screw rod 7, screw rod 7 is fitted into the building body at top, whole plasterboard is fixed through screw hole.Slide The upper end of block is provided with lock screw, and lock screw is compressed through sliding shoe with lifting the upper surface of plate.Connecting line uses steel Silk thread.
Since the connecting line of more than one is fixedly installed on each point of connecting plate, when lifting, its stress point is equal Even is arranged on connecting plate, and stress point is arranged at a position of connecting plate by traditional mode, therefore this mode is local Stress is to be very easy to cracking.
Furthermore the utility model employs sliding shoe, in this way, sliding shoe any mobile position on lifting plate can be adjusted To put, finally obtain optimal installation site, be typically all fixed structure in traditional approach, the position of installation has been set, But each installation region, installation environment are different, if being difficult to meet to be required using fixed structure.
The beneficial effects of the utility model are:The utility model is simple in structure, in lifting, can uniformly distinguish power On each point of plasterboard, solve to cause plasterboard stress point cracking in lifting because of local pressure in the prior art Problem.
The above, is only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any change or replacement expected without creative work, should be covered within the scope of the utility model. Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.

Claims (5)

  1. A kind of 1. bilayer plaster tablet suspended ceiling structure, it is characterised in that:It is equal including upper and lower two layers of plasterboard, the upper end of upper strata plasterboard A connecting plate is provided with, by more than one screw connection between the connecting plate bottom surface and plasterboard, and passes through glue Connection is pasted, the outboard end of connecting plate is provided with more than one shackle, a connecting line, connecting line are loaded in each shackle Outboard end be all connected with a lifting plate, lifting plate upper end have one can be with the hoisting structure of activity adjustment.
  2. 2. bilayer plaster tablet suspended ceiling structure as claimed in claim 1, it is characterised in that:The hoisting structure includes one and slides Block, sliding shoe are slidably mounted in the sliding slot set among lifting plate, and the outboard end of the sliding shoe is vertically arranged a fixed link, The plan vertical of fixed link sets a top plate.
  3. 3. bilayer plaster tablet suspended ceiling structure as claimed in claim 2, it is characterised in that:A spiral shell is provided among the top plate Hole, sets a screw rod, screw rod is fitted into the building body at top, whole plasterboard is fixed through screw hole.
  4. 4. bilayer plaster tablet suspended ceiling structure as claimed in claim 2, it is characterised in that:The upper end of the sliding shoe is provided with lock Tight screw, lock screw are compressed through sliding shoe with lifting the upper surface of plate.
  5. 5. bilayer plaster tablet suspended ceiling structure as claimed in claim 1, it is characterised in that:The connecting line uses wire.
CN201721331936.8U 2017-10-17 2017-10-17 A kind of bilayer plaster tablet suspended ceiling structure Active CN207363080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721331936.8U CN207363080U (en) 2017-10-17 2017-10-17 A kind of bilayer plaster tablet suspended ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721331936.8U CN207363080U (en) 2017-10-17 2017-10-17 A kind of bilayer plaster tablet suspended ceiling structure

Publications (1)

Publication Number Publication Date
CN207363080U true CN207363080U (en) 2018-05-15

Family

ID=62419510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721331936.8U Active CN207363080U (en) 2017-10-17 2017-10-17 A kind of bilayer plaster tablet suspended ceiling structure

Country Status (1)

Country Link
CN (1) CN207363080U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208805A (en) * 2018-11-05 2019-01-15 钱连山 A kind of gypsum suspended ceiling module, gypsum furred ceiling and building containing it
CN112282174A (en) * 2020-11-03 2021-01-29 温州鼎联服装有限公司 Double-layer gypsum board suspended ceiling structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208805A (en) * 2018-11-05 2019-01-15 钱连山 A kind of gypsum suspended ceiling module, gypsum furred ceiling and building containing it
CN112282174A (en) * 2020-11-03 2021-01-29 温州鼎联服装有限公司 Double-layer gypsum board suspended ceiling structure
CN112282174B (en) * 2020-11-03 2022-07-08 山东沃尔新材料有限公司 Double-layer gypsum board suspended ceiling structure

Similar Documents

Publication Publication Date Title
CN207363080U (en) A kind of bilayer plaster tablet suspended ceiling structure
CN109095343A (en) Assembled hanger
CN204324684U (en) For the lifting tooling of nuclear power plant's fuel screen work
CN204938800U (en) Tower crane rood beam basis
CN204252083U (en) Arch dam bracket hangs plate device by the feet entirely
CN104196249B (en) A kind of concrete slab special hanger with T-shaped rib
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN205530690U (en) Load and unload convenient wallboard and floor connection structure
CN208948679U (en) Assembled hanger
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN104480959A (en) General tower crane supporting base
CN204778496U (en) Platform sling structure of tower crane
CN207827677U (en) A kind of pre-buried hanging apparatus for concrete prefabricated element
CN207620297U (en) A kind of insulating decoration integral board for building exterior wall corner brace Combined hanger
CN106869508B (en) A kind of rotation lifting of assembled architecture steel box column is welded and fixed mounting process in place
CN206957203U (en) Full working scope adaptive type socket joint type disk button steel pipe support system
CN206580444U (en) A kind of urban construction building prefabricated components hanging apparatus
CN206720567U (en) A kind of color steel mast-up structure
CN203667852U (en) Variable cross-section crane suitable for assembly of transmission tower
CN106976795A (en) A kind of color steel mast-up structure
CN204643669U (en) A kind of crane fly jib
CN204510768U (en) A kind of without support operation frame
CN205035962U (en) Light pinhole hollow brick with can be in wall body pre -buried pipeline anyhow
CN207483164U (en) It is exclusively used in the hoisting fixture of pipe gallery reinforcement frame
CN210480591U (en) Steel structure transportation protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518000 room 209, 2 / F, Zheng Jia logistics center, No. 18, Hua Hua Road, Futian District Free Trade Zone, Shenzhen, Guangdong.

Patentee after: Shenzhen Donghai Construction Group Co., Ltd.

Address before: 518000 room 209, 2 / F, Zheng Jia logistics center, No. 18, Hua Hua Road, Futian District Free Trade Zone, Shenzhen, Guangdong.