CN204778496U - Platform sling structure of tower crane - Google Patents

Platform sling structure of tower crane Download PDF

Info

Publication number
CN204778496U
CN204778496U CN201520324359.4U CN201520324359U CN204778496U CN 204778496 U CN204778496 U CN 204778496U CN 201520324359 U CN201520324359 U CN 201520324359U CN 204778496 U CN204778496 U CN 204778496U
Authority
CN
China
Prior art keywords
lifting rope
hanging scaffold
hole
tower crane
rope hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520324359.4U
Other languages
Chinese (zh)
Inventor
缪家戌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Fifth Construction Group Co.,Ltd.
Zhang Guoyin
Original Assignee
Chengdu Kechuang Jiasi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kechuang Jiasi Technology Co Ltd filed Critical Chengdu Kechuang Jiasi Technology Co Ltd
Priority to CN201520324359.4U priority Critical patent/CN204778496U/en
Application granted granted Critical
Publication of CN204778496U publication Critical patent/CN204778496U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a platform sling structure of tower crane, include: the platform sling, can with the davit of platform sling relative slip, its characterized in that, the platform sling is equipped with first lifting rope hole, second lifting rope hole and third lifting rope hole that mutual line is regular triangle, and wherein, first lifting rope, second lifting rope and third lifting rope pass respectively first lifting rope hole, second lifting rope hole and third lifting rope hole to first lifting rope, second lifting rope and third lifting rope combine in a bit. The technical scheme of the utility model the amplitude of fluctuation of lifting rope in the time of can effectually alleviating the hoist and mount object to reach accurate hoist and mount position and protection ground operating personnel's mesh.

Description

A kind of hanging scaffold structure of tower crane
Technical field
The utility model relates to tower crane apparatus field, especially relates to a kind of hanging scaffold structure of tower crane.
Background technology
Tower crane is a kind of weight-lifting equipment the most frequently used on building ground, with a section spreading (height) (being called for short " standard knot "), be used for the raw MAT'L of the construction such as reinforcing bar, wood stupefied, cement concrete, steel pipe of lifting construction, the arm of tower crane is provided with the hanging scaffold connecting lifting rope, change lifting rope length and raise by mobile hanging scaffold or reduce hoisting object, carry out horizontal movement by swinging boom.
In the prior art; tower crane is when hoisting object; suspension hook can be provided with in the bottom of lifting rope; by object is lifted on suspension hook; thus carry out up and down or the movement of horizontal direction, especially when carrying out horizontal direction mobile, can there is the swing of different amplitude in lifting rope usually; both had influence on the particularity of object Hoisting Position, again serious security threat had been caused to the safety of ground operating personnel.
Summary of the invention
In view of the defect that above-mentioned prior art exists, the purpose of this utility model is the hanging scaffold structure proposing a kind of tower crane.
The purpose of this utility model will be achieved by the following technical programs: a kind of hanging scaffold structure of tower crane, comprise: hanging scaffold, can with the arm of described hanging scaffold relative sliding, described hanging scaffold is provided with the first lifting rope hole that mutual line is equilateral triangle, the second lifting rope hole and the 3rd lifting rope hole, wherein, first lifting rope, the second lifting rope and the 3rd lifting rope are each passed through described first lifting rope hole, the second lifting rope hole and the 3rd lifting rope hole, and the first lifting rope, the second lifting rope and the 3rd lifting rope are incorporated into a bit.
Preferably, the hanging scaffold structure of above-mentioned a kind of tower crane, described hanging scaffold is connected by pulley with described arm.
Preferably, the hanging scaffold structure of above-mentioned a kind of tower crane, the shape of described hanging scaffold is circular or square.
Preferably, the hanging scaffold structure of above-mentioned a kind of tower crane, the length of described first lifting rope, the second lifting rope and the 3rd lifting rope is equal.
Outstanding effect of the present utility model is: 1) by arranging the lifting rope hole of equilateral triangle on hanging scaffold, positive triangular pyramid can be formed in solid space by the lifting rope in lifting rope hole, in the junction hoisting object of three lifting ropes, when moving in the horizontal direction, the amplitude of swing can be reduced; 2) length of three lifting ropes is equal, can ensure that the power that it acts on three lifting ropes is identical, be unlikely to situations such as toppling when hoisting object.
Below just accompanying drawing in conjunction with the embodiments, is described in further detail detailed description of the invention of the present utility model, is easier to understand, grasp to make technical solutions of the utility model.
Accompanying drawing explanation
Fig. 1 is the hanging scaffold structural representation of the tower crane of the present embodiment.
Detailed description of the invention
As shown in Figure 1, the hanging scaffold structure of a kind of tower crane of the present embodiment, comprise: hanging scaffold 1, can with the arm 2 of hanging scaffold 1 relative sliding, hanging scaffold 1 is provided with the first lifting rope hole 102, lifting rope hole 101, second and the 3rd lifting rope hole 103 that mutual line is equilateral triangle, wherein, the first lifting rope 3, second lifting rope 4 and the 3rd lifting rope 5 are each passed through the first lifting rope hole 102, lifting rope hole 101, second and the 3rd lifting rope hole 103, and the first lifting rope 3, second lifting rope 4 and the 3rd lifting rope 5 are incorporated into a bit.
First lifting rope 3 and the second lifting rope 4, the 3rd lifting rope 5 be combined with each other on one point, under mutual line is the first lifting rope hole 102, lifting rope hole 101, second of equilateral triangle and the effect in the 3rd lifting rope hole 103, object for lifting can keep it to have good stability, can not occur significantly to rock, and, first lifting rope 3 is equal with the length of the second lifting rope 4, the 3rd lifting rope 5, can ensure that it reaches the object of synchronization action.
Concrete, hanging scaffold 1 is connected by pulley 6 with arm 2, because hanging scaffold 1 needs the height changing hoisting object with arm 2 relative sliding, it can be made to reach the state of normal work by the connection of pulley 6.
Concrete, the shape of hanging scaffold 1 is circular or square, and the shape of rule is conducive on hanging scaffold 1, offer the lifting rope hole that line is equilateral triangle, but is not limited only to the shape of rule, and those skilled in the art are without the need to creative work and available scheme.
The utility model still has numerous embodiments, all employing equivalents or equivalent transformation and all technical schemes formed, and all drops within protection domain of the present utility model.

Claims (4)

1. the hanging scaffold structure of a tower crane, comprise: hanging scaffold, can with the arm of described hanging scaffold relative sliding, it is characterized in that, described hanging scaffold is provided with the first lifting rope hole that mutual line is equilateral triangle, the second lifting rope hole and the 3rd lifting rope hole, wherein, the first lifting rope, the second lifting rope and the 3rd lifting rope are each passed through described first lifting rope hole, the second lifting rope hole and the 3rd lifting rope hole, and the first lifting rope, the second lifting rope and the 3rd lifting rope are incorporated into a bit.
2. the hanging scaffold structure of a kind of tower crane according to claim 1, is characterized in that, described hanging scaffold is connected by pulley with described arm.
3. the hanging scaffold structure of a kind of tower crane according to claim 1, is characterized in that, the shape of described hanging scaffold is circular or square.
4. the hanging scaffold structure of a kind of tower crane according to claim 1, is characterized in that, the length of described first lifting rope, the second lifting rope and the 3rd lifting rope is equal.
CN201520324359.4U 2015-05-20 2015-05-20 Platform sling structure of tower crane Expired - Fee Related CN204778496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520324359.4U CN204778496U (en) 2015-05-20 2015-05-20 Platform sling structure of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520324359.4U CN204778496U (en) 2015-05-20 2015-05-20 Platform sling structure of tower crane

Publications (1)

Publication Number Publication Date
CN204778496U true CN204778496U (en) 2015-11-18

Family

ID=54518588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520324359.4U Expired - Fee Related CN204778496U (en) 2015-05-20 2015-05-20 Platform sling structure of tower crane

Country Status (1)

Country Link
CN (1) CN204778496U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106219420A (en) * 2016-07-06 2016-12-14 徐州市久发工程机械有限责任公司 A kind of fast erecting traveling tower crane
CN114572874A (en) * 2022-01-24 2022-06-03 杭州大杰智能传动科技有限公司 Monitoring control system and method for intelligent tower crane lifting hook loosening process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106219420A (en) * 2016-07-06 2016-12-14 徐州市久发工程机械有限责任公司 A kind of fast erecting traveling tower crane
CN114572874A (en) * 2022-01-24 2022-06-03 杭州大杰智能传动科技有限公司 Monitoring control system and method for intelligent tower crane lifting hook loosening process
CN114572874B (en) * 2022-01-24 2023-06-02 杭州大杰智能传动科技有限公司 Monitoring control system and method for intelligent tower crane lifting hook loosening process

Similar Documents

Publication Publication Date Title
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN201686432U (en) 800 tons of hanging row
CN103708360B (en) Luffing jib tower crane and its standard section introduction system and standard section introduction method
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN109095343A (en) Assembled hanger
CN212198153U (en) Lifting hook for building construction tower crane
CN207243306U (en) Tower crane two sides jacks stock
CN201334306Y (en) Hoisting machine for upright post member
CN205114843U (en) Prefabricated post hoist device with unhook function
CN206244301U (en) A kind of architectural engineering tower crane anti-sway control device
CN207844841U (en) A kind of great diameter and long pile cages decentralization suspender
CN203820283U (en) Lifting frame
CN206665952U (en) A kind of novel hanging tool
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN203998745U (en) The tower machine suspension hook disconnected rope anti-drop device of rushing to summit
CN104925679A (en) Hanging scaffold structure of tower crane
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN220766256U (en) Folding lifting appliance
CN112279076A (en) Crane hook assembly with self-locking function
CN207079898U (en) Outer hanging basket structure
CN204490327U (en) Joist steel hoisting clamp
CN211366754U (en) A light and easy-to-install tower crane
CN205500545U (en) Hoisting device for tower crane
CN112173958A (en) Lifting steel cable connecting piece for constructional engineering construction
CN202164058U (en) Full circle girder erecting crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhang Guoyin

Inventor before: Miao Jiaxu

TR01 Transfer of patent right

Effective date of registration: 20161222

Address after: 330000 Jiangxi city of Nanchang province Wanli District happiness Road No. 207

Patentee after: Jiangxi Fifth Construction Group Co.,Ltd.

Address before: 330000 Jiangxi Province, Nanchang District of East Lake City Cultural Road No. 356 No. 5 Building 2 unit 1106

Patentee before: Zhang Guoyin

Effective date of registration: 20161222

Address after: 330000 Jiangxi Province, Nanchang District of East Lake City Cultural Road No. 356 No. 5 Building 2 unit 1106

Patentee after: Zhang Guoyin

Address before: 610000 Sichuan city of Chengdu province Jinjiang District East Street No. 139 Building 1 3 floor No. 4

Patentee before: CHENGDU KECHUANG JIASI TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20170520