CN205151516U CN201520889664.8U CN201520889664U CN205151516U CN 205151516 U CN205151516 U CN 205151516U CN 201520889664 U CN201520889664 U CN 201520889664U CN 205151516 U CN205151516 U CN 205151516U
Authority
CN
China
Prior art keywords
prefabricated panel
suspension bracket
hole
pipe link
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520889664.8U
Other languages
Chinese (zh)
Inventor
姜凯宁
段晓录
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei crystal building Polytron Technologies Inc
Original Assignee
Hebei Jing Tong Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jing Tong Building Technology Co Ltd filed Critical Hebei Jing Tong Building Technology Co Ltd
Priority to CN201520889664.8U priority Critical patent/CN205151516U/en
Application granted granted Critical
Publication of CN205151516U publication Critical patent/CN205151516U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a simple and easy hoist and mount of prefabricated wallboard belongs to architectural equipment technical field, is somebody's turn to do the concrete prefabrication wallboard that includes of hoist and mount, and long limit one side of prefabrication wallboard is equipped with two and is used for hanging the hole of getting, sets up to hang respectively on two holes and gets the subassembly to be connected with the crane through wire rope, hanging and getting the subassembly including a door style of calligraphy gallows, the both sides of prefabricated wallboard are arranged in to two free ends of gallows to pass the hole of prefabricated wallboard through the connecting rod, the both ends of connecting rod and the cooperation of the both ends of gallows are equipped with the lug at the middle part of gallows, sell the hub connection between lug and the rings. The utility model discloses a hoisting structure is simple, simple to operate, and the security when hoisting moreover is high.

Description

A kind of simple and easy hoisting of prefabricated panel
Technical field
The utility model relates to Architectural Equipment technical field, especially a kind of simple and easy hoisting instrument for hoisting prefabricated ash wall body plate.
Background technology
Along with the development of society, the living standard of rural people is more and more higher, and increasing family starts lid new house, and owing to using prefabricated board to build a house and can reduce cost and can calculate casual labourer's phase, therefore most people build a house choice for use prefabricated boards.
In prefabricated board manufacturing enterprise, in order to deposit, transport and installing, need to move prefabricated board, because its material is that cement is built, weight is comparatively large, needs special hoisting structure.Traditional lifting mode needs to sling being connected hanging device by four angles of lifting components with steel cable, has following drawback:
1, concrete prefabricated wallboard center of gravity is not easy to grasp, and can not realize smoothly directly slinging from structure corner.
If 2 also need repeatedly to adjust the locality being beneficial to installation with traditional lifting mode, there is inefficiency, there is the deficiencies such as potential safety hazard.
In addition, punch in addition, lift after utilizing steel wire penetrating hole on prefabricated board, this mode lifts and connects trouble, easy slippage during use, and just very easily cause the accident, the lighter wastes material, and severe one causes casualties.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of simple and easy hoisting of prefabricated panel, and this hoisting structure is simple, easy for installation, and safety during lifting is high.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of simple and easy hoisting of prefabricated panel, it is characterized in that comprising prefabricated panel, the side, long limit of described prefabricated panel is provided with two for hanging the hole of getting, two holes arrange to hang respectively and gets assembly, and be connected with crane by steel rope; Described hanging is got assembly and is comprised door type suspension bracket, two free ends of suspension bracket are placed in the both sides of prefabricated panel, and by the hole of pipe link through prefabricated panel, the two ends of pipe link coordinate with the two ends of suspension bracket, hanger is provided with, pinned connection between hanger and suspension ring at the middle part of suspension bracket.
Be further qualified said structure, described pipe link is a circular pin, and its one end is provided with the limiting stopper preventing pipe link from coming off.
Be further qualified said structure, described suspension ring are U-shaped structure, and two free end is provided with the hole coordinated with described bearing pin, and bearing pin is through hanger, and the two ends of suspension ring are flattened.
Be further qualified said structure, described hanger is the steel plate of one end with round end, and its other end relative with blunt end welds with the interlude of suspension bracket.
Adopt the beneficial effect that produces of technique scheme to be: the utility model utilizes two to hang to get assembly and is arranged on the side of prefabricated panel, and coordinates steel rope, realize prefabricated panel and laterally hang and get; Hanging in installation gets in component process, by two through holes reserved on prefabricated panel, align with through hole in the hole at suspension bracket two ends, pipe link is utilized to penetrate through hole, and be connected with the hole on suspension bracket, complete the connection of hanging and getting assembly and prefabricated panel, this connection mode only need to two hole, then penetrate pipe link, connect accurately, twine the mode of tying up relative to steel rope, simple and fast, Assembly &Disassembly hangs to be got assembly and only needs a few seconds, shortens the time of hoisting prefabricated wallboard greatly, improves the efficiency of construction; In addition, be provided with limiting stopper in one end of pipe link, can prevent pipe link from coming off hanging in the process of getting, damage prefabricated panel, avoid the generation of safety misadventure; The utility model utilizes the connection mode of hanger and suspension ring, and this is the connection mode of gauge member, does not need to process separately, reduces equipment cost.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model;
Fig. 2 hangs the structural representation getting assembly in Fig. 1;
Wherein: 1, steel rope, 2, hang and get assembly, 2-1, suspension ring, 2-2, hanger, 2-3, suspension bracket, 2-4, pipe link, 3, prefabricated panel.
Detailed description of the invention
1 is known with reference to the accompanying drawings, the utility model is specifically related to a kind of simple and easy hoisting of prefabricated panel, specifically comprise prefabricated panel 3, hang and get assembly 2, steel rope 1 and outside crane, its main improvement is provided with two for hanging the through hole got in the side, long limit of prefabricated panel 3, two through holes arrange to hang respectively and gets assembly 2, and be connected with crane by steel rope 1, get assembly 2 be arranged on the through hole of prefabricated panel 3 hanging, utilize crane to complete to hang and get, relative to the form of traditional steel rope bondage prefabricated panel 3, its easy to connect, simple and fast;
Of the present utility model hanging is got assembly 2 and is specifically comprised door type suspension bracket 2-3, two free ends of suspension bracket 2-3 are placed in the both sides of prefabricated panel 3, and by the hole of pipe link 2-4 through prefabricated panel 3, the two ends of pipe link 2-4 coordinate with the two ends of suspension bracket 2-3, hanger 2-2 is provided with, pinned connection between hanger 2-2 and suspension ring 2-1 at the middle part of suspension bracket 2-3.Hanging in installation gets in assembly 2 process, by two through holes reserved on prefabricated panel 3, align with through hole in the hole at suspension bracket 2-3 two ends, pipe link 2-4 is utilized to penetrate through hole, and be connected with the hole on suspension bracket, complete the connection of hanging and getting assembly 2 and prefabricated panel 3, this connection mode only need to two hole, then penetrate pipe link 2-4, connect accurately, twine the mode of tying up relative to steel rope, simple and fast, Assembly &Disassembly hangs to be got assembly and only needs a few seconds, shortens the time of hoisting prefabricated wallboard greatly, improves the efficiency of construction;
In addition, in order to prevent pipe link from coming off hanging in the process of getting, prefabricated panel is damaged, avoid the generation of safety misadventure, be provided with in pipe link 2-4 one end of circle the limiting stopper preventing pipe link 2-4 from coming off, the welding of this limiting stopper, with on the end face of pipe link, limits it and moves axially.
Suspension ring 2-1 of the present utility model is U-shaped structure, and two free end is provided with the hole coordinated with bearing pin, and bearing pin is through hanger 2-2, and the two ends of suspension ring 2-1 are flattened.Hanger 2-2 is the steel plate of one end with round end, and its other end relative with blunt end welds with the interlude of suspension bracket 2-3.Suspension ring 2-1 and the hanger 2-2 of this structure can commercially directly buy, and be then welded in the middle part of suspension bracket 2-3, play the effect of connecting steel wire ropes and suspension bracket 2-3, cost reduces greatly.
The utility model in use, very simple, 2 are hung and get assembly 2 and be structure as a whole, hang on crane by steel rope 1, hang when getting prefabricated panel 3, only suspension bracket 2-3 need be placed in the thickness direction of prefabricated panel 3, then allow the through hole on prefabricated panel 3 align with the sky at suspension bracket 2-3 two ends, then Lian Gekong is pierced in one end of pipe link 2-4, ensure that the length of pipe link 2-4 is greater than the span of suspension bracket 2-3.Hang get time, due to the weight of prefabricated panel 3, can ensure that the hole of pipe link 2-4 and suspension bracket 2-3 closely cooperates, not come off, complete fast and hang the work of getting.When dismantling, also only need extract pipe link 2-4 out can complete.

Claims (4)

1. the simple and easy hoisting of a prefabricated panel, it is characterized in that comprising prefabricated panel (3), the side, long limit of described prefabricated panel (3) is provided with two for hanging the hole of getting, and two holes arranges to hang respectively and gets assembly (2), and be connected with crane by steel rope (1); Described hangs the suspension bracket (2-3) got assembly (2) and comprise door type, two free ends of suspension bracket (2-3) are placed in the both sides of prefabricated panel (3), and by the hole of pipe link (2-4) through prefabricated panel (3), the two ends of pipe link (2-4) coordinate with the two ends of suspension bracket (2-3), hanger (2-2) is provided with, pinned connection between hanger (2-2) and suspension ring (2-1) at the middle part of suspension bracket (2-3).
2. the simple and easy hoisting of a kind of prefabricated panel according to claim 1, it is characterized in that described pipe link (2-4) is a circular pin, its one end is provided with the limiting stopper preventing pipe link (2-4) from coming off.
3. the simple and easy hoisting of a kind of prefabricated panel according to claim 1, it is characterized in that described suspension ring (2-1) are U-shaped structure, two free end is provided with the hole coordinated with described bearing pin, and bearing pin is through hanger (2-2), and the two ends of suspension ring (2-1) are flattened.
4. the simple and easy hoisting of a kind of prefabricated panel according to claim 1 or 3, it is characterized in that described hanger (2-2) is for one end is with the steel plate of round end, its other end relative with blunt end welds with the interlude of suspension bracket (2-3).
CN201520889664.8U 2015-11-10 2015-11-10 Simple and easy hoist and mount of prefabricated wallboard Active CN205151516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520889664.8U CN205151516U (en) 2015-11-10 2015-11-10 Simple and easy hoist and mount of prefabricated wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520889664.8U CN205151516U (en) 2015-11-10 2015-11-10 Simple and easy hoist and mount of prefabricated wallboard

Publications (1)

Publication Number Publication Date
CN205151516U true CN205151516U (en) 2016-04-13

Family

ID=55687232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520889664.8U Active CN205151516U (en) 2015-11-10 2015-11-10 Simple and easy hoist and mount of prefabricated wallboard

Country Status (1)

Country Link
CN (1) CN205151516U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107445044A (en) * 2017-08-01 2017-12-08 深圳海龙建筑科技有限公司 Prefabricated components turning device and method for turning
CN108487647A (en) * 2018-05-31 2018-09-04 中国二十二冶集团有限公司 Tall and big wallboard mounting device
CN108547463A (en) * 2018-05-31 2018-09-18 中国二十二冶集团有限公司 Tall and big autoclaved aerated concrete batten installation equipment and installation method
CN109914680A (en) * 2019-01-29 2019-06-21 杨威德 A kind of wallboard, carrier and wallboard construction method
CN110578338A (en) * 2019-09-20 2019-12-17 中山志特铝模科技有限公司 System capable of moving aluminum alloy template integrally and operation method
CN112374350A (en) * 2020-11-24 2021-02-19 陆建生 Motor casing casting is with hanging device of getting
CN117536478A (en) * 2023-11-17 2024-02-09 广东省水利水电第三工程局有限公司 Ground continuous wall dismantling block lifting appliance, ground continuous wall dismantling method and cofferdam dismantling method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107445044A (en) * 2017-08-01 2017-12-08 深圳海龙建筑科技有限公司 Prefabricated components turning device and method for turning
CN108487647A (en) * 2018-05-31 2018-09-04 中国二十二冶集团有限公司 Tall and big wallboard mounting device
CN108547463A (en) * 2018-05-31 2018-09-18 中国二十二冶集团有限公司 Tall and big autoclaved aerated concrete batten installation equipment and installation method
CN109914680A (en) * 2019-01-29 2019-06-21 杨威德 A kind of wallboard, carrier and wallboard construction method
CN110578338A (en) * 2019-09-20 2019-12-17 中山志特铝模科技有限公司 System capable of moving aluminum alloy template integrally and operation method
CN112374350A (en) * 2020-11-24 2021-02-19 陆建生 Motor casing casting is with hanging device of getting
CN117536478A (en) * 2023-11-17 2024-02-09 广东省水利水电第三工程局有限公司 Ground continuous wall dismantling block lifting appliance, ground continuous wall dismantling method and cofferdam dismantling method

Similar Documents

Publication Publication Date Title
CN205151516U (en) Simple and easy hoist and mount of prefabricated wallboard
CN204689393U (en) A kind of crane hanging hook assembly structure
CN202016811U (en) Hoisting device of high-rise building
CN206220565U (en) A kind of marine Simple module metaplasia work building of achievable integral hoisting
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN205170159U (en) Can hang hoist that hangs in overhead traveling crane
CN204355947U (en) Large-scale without eye plate lifting beam device
CN202575684U (en) Prefabricated-slab hoisting tool
CN203754232U (en) Simple steel rail lifting tool
CN208561446U (en) Large scale prefabricated concrete component lifts anticreep constructing device
CN203345968U (en) Tower crane
CN209177844U (en) A kind of template lift up rapidly device
CN202321938U (en) Automatic open/close type brick cage
CN103420263A (en) Prefabricated plate hoisting tool
CN206599375U (en) A kind of door type steel structure hoisting instrument
CN205472276U (en) Simple and easy automatic hopper that opens and shuts
CN206580444U (en) A kind of urban construction building prefabricated components hanging apparatus
CN205772948U (en) Super High Core Walls Structure soil dead man
CN205709483U (en) Automatically-unhooked hanger
CN205134923U (en) Adjustable distance of encorbelmenting hang mechanism
CN203033690U (en) Bolt sphere truss elevator
CN204846898U (en) Mainboard container
CN202687853U (en) High-altitude hoisting device
CN204727507U (en) For the overlength attachment rod member of tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 056800 Weixian Economic Development Zone, Hebei, No. Venture Street, No. 11

Patentee after: Hebei crystal building Polytron Technologies Inc

Address before: 056800 Weixian Economic Development Zone, Hebei, No. Venture Street, No. 11

Patentee before: Hebei Jing Tong building technology Co., Ltd