CN109914680A - A kind of wallboard, carrier and wallboard construction method - Google Patents
A kind of wallboard, carrier and wallboard construction method Download PDFInfo
- Publication number
- CN109914680A CN109914680A CN201910087619.3A CN201910087619A CN109914680A CN 109914680 A CN109914680 A CN 109914680A CN 201910087619 A CN201910087619 A CN 201910087619A CN 109914680 A CN109914680 A CN 109914680A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- load portion
- plate body
- transport load
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present embodiments relate to technical field of building construction, disclose a kind of wallboard construction method, comprising: a, dig chisel transport load portion;B, tensile elements are installed;C, it carries;D, it repairs, installs and carry for lengthening the wallboard increased, it is simple to operate, used resource material, which is easy to obtain from construction site, is easy construction, and significant effect greatly reduces the labor intensity of construction personnel, the time cycle for saving construction improves the efficiency of construction;A kind of wallboard is also disclosed, installs and carries for lengthening the wallboard increased, the transport load portion being carved with for carrying is dug on wallboard, overcome the plate body for lengthening increase at present and be not easy the problem carried;A kind of carrier is also disclosed, installs and carries for lengthening the wallboard increased, hand push frame can press to auxiliary wheel ground connection, and auxiliary wheel and auxiliary support bar are supported hand push frame, reach laborsaving, the advantages of convenient transportation.
Description
Technical field
The present embodiments relate to technical field of building construction, and in particular to a kind of wallboard, carrier and wallboard construction party
Method.
Background technique
Building wall board is a part important during building is built, and flourish various new building materials at present, such as aerating plate,
Composite plate, hollow plate, cement plate etc..
It in order to reduce complexity and the construction time of construction, is commercially produced, is occurred in the market various new
Structural sheeting is all to increase traditional brick, lengthens, form wallboard, the size arrived done at present can achieve 6 meters long
It is 120 centimeters wide, therefore the wallboard of a piece of such size is holded up, equal to the brick for having built traditional 50-200 block.
However, length is longer since wallboard is larger, the heavier-weight of wallboard, about 50-100 kilograms, construction have one
Fixed difficulty, more difficult manpower is to move, and two people lift, and it is inconvenient to set about, it is not easy to hold such aerating plate.So construct
Condition, the condition of transport, artificial condition is all relatively harsh, is unfavorable for constructing, and existing carrier is also not easy pair
Longer wallboard is transported, and since wallboard weight is heavier, the strength that construction personnel needs to take is larger, and the labour of construction personnel is strong
Spend larger, construction is time-consuming more, and efficiency is lower.
Summary of the invention
For this purpose, the embodiment of the present invention provides a kind of wallboard, carrier and wallboard construction method, with solve in the prior art by
It is not easy the problem of transporting and being constructed caused by the lengthening of wallboard increases.
To achieve the goals above, embodiments of the present invention provide the following technical solutions:
In one embodiment of embodiments of the present invention, a kind of wallboard construction method is provided, is included the following steps,
A, digging chisel, transport load portion of the production for carrying are carried out on the plate body of wallboard;B, the transport bearing position in step a is set
Install tensile elements additional;C, plate body is carried using the tensile elements in step b, being transported on carrier then will by carrier
Plate body transports commitment positions;D, plate body is erect using the tensile elements in step b, tensile elements is dismantled, then to fortune
Defeated bearing position, which is set, carries out reinforcement gap.
By using above-mentioned technical proposal, this construction method is simple to operate, and used resource material is easy from applying
Work scene, which obtains, is easy construction, and significant effect greatly reduces the labor intensity of construction personnel, saves week time of construction
Phase improves the efficiency of construction.
Preferably, digging holes or is open on plate body described in step a or notch forms the transport load portion.
By using above-mentioned technical proposal, can be realized by tools such as electric drills, construction site electric drill is easy to obtain,
Easy to operate, this Side fascia can carry out coating in advance, and painting, the work such as tiling, the ornamental work of such wallboard just need not
It constructs at the scene, reaches time saving, the advantages of saving of labor.
Preferably, the transport load portion in step a is arranged more than two.
It, can be according to the weight of wallboard, the number in the arrangement transport load portion of size reasonable by using above-mentioned technical proposal
Amount, to reach easy to operate and labour-saving effect.
Preferably, tensile elements described in step b are handle or hanging ring or hook.
By using above-mentioned technical proposal, tensile elements can be attached to by tools such as pliers the digging chisel in step a
Position considers the materials difficulty of tensile elements and cost and can reach easy-to-operate effect and the tensile elements that select.
Preferably, the transport load portion digs hole at chisel two for plate body on the position on top and is formed, the tensile elements
For the hanging ring that transport bearing position is set is arranged in.
By using above-mentioned technical proposal, according to the state of the shape and structure of plate body and horizontal transport, selection is so
Set-up mode, so that reaching laborsaving and efficient effect in work progress convenient for manipulation.
In another embodiment of the invention, a kind of wallboard, including plate body are provided, chisel is dug on the plate body and is formed with fortune
Defeated load portion.
By using above-mentioned technical proposal, a kind of wallboard easy to carry is devised, digs and is carved with for carrying on wallboard
Load portion is transported, by digging scalpriform on plate body into transport load portion, tensile elements can be installed in transport load portion, so that plate
It can facilitate and be carried, overcome the plate body for lengthening increase at present and be not easy the problem carried.
In yet another embodiment of the present invention, a kind of carrier is provided, including vehicle frame and two is mounted side by side on vehicle frame
On traveling wheel, the vehicle frame includes hand push frame and supporting plate, and traveling wheel is mounted on one end on hand push frame close to supporting plate, the hand
Push bracket is fixedly connected with auxiliary support bar far from one end bottom of supporting plate, and the bottom end of the auxiliary support bar is fixedly installed with auxiliary
Wheel.
By using above-mentioned technical proposal, when supporting plate turns to the horizontal position of traveling wheel side, hand push frame is towards far
Side from supporting plate tilts upwards, after needing the thing carried to be put on supporting plate, pushes hand push frame and conveniently pushes away to carrier
It is dynamic.Hand push frame can press to auxiliary wheel ground connection, and auxiliary wheel and auxiliary support bar are supported hand push frame,
Reach laborsaving, the advantages of convenient transportation.
Preferably, the auxiliary support bar and the auxiliary wheel are respectively arranged with two or more.
By using above-mentioned technical proposal, auxiliary wheel can be multiple according to being arranged, for maintaining the stabilization of carrier.
Preferably, the hand push frame is fixedly connected with the cyclic annular controls being arranged along the vertical direction far from one end of supporting plate.
By using above-mentioned technical proposal, operator can hold cricoid controls and push to carrier, energy
The hand griping position of differing tilt angles is enough adapted to, the stress of operator is preferable, reaches labour-saving effect.
Embodiment according to the present invention has the advantages that
1, a kind of construction method is provided, installs and carries for lengthening the wallboard increased, it is simple to operate, it is used
Resource material be easy to obtain from construction site and be easy construction, significant effect greatly reduces the labor intensity of construction personnel, saves
The time cycle for having saved construction, improve the efficiency of construction;
2, a kind of wallboard is provided, installs and carries for lengthening the wallboard increased, the fortune being carved with for carrying is dug on wallboard
Defeated load portion can install tensile elements in transport load portion, enable plate by digging scalpriform on plate body into transport load portion
Enough facilitate and carried, overcomes the plate body for lengthening increase at present and be not easy the problem carried;
3, a kind of carrier is provided, installs and carries for lengthening the wallboard increased, when supporting plate turns to traveling wheel side
Horizontal position when, the side that hand push frame is directed away from supporting plate tilts upwards, after needing the thing carried to be put on supporting plate, under
Press the convenient promotion to carrier of hand push frame.Hand push frame can press to auxiliary wheel ground connection, so that auxiliary wheel and auxiliary branch
The advantages of strut can be supported hand push frame, reach laborsaving, convenient transportation.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art
Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only
It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis
The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for
Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical
Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated
Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is a kind of flow chart for wallboard construction method that one embodiment of the invention provides;
Fig. 2 is a kind of structural schematic diagram for wallboard that another embodiment of the present invention provides;
Fig. 3 is a kind of structural schematic diagram for carrier that another embodiment of the present invention provides;
Fig. 4 is the mounting structure cross-sectional view of the auxiliary wheel for the carrier that the embodiment of the present invention provides.
In figure: 1, plate body;2, load portion is transported;3, tensile elements;4, vehicle frame;41, hand push frame;42, supporting plate;5, traveling wheel;
6, auxiliary support bar;61, reinforcing rod;7, auxiliary wheel;8, controls.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation
Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one
Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
The term on cited such as "upper", "lower", " left side ", the right side in this specification ", " centre ", is merely convenient to describe
Be illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and is changing technology without essence
It inside holds, when being also considered as the enforceable scope of the present invention.
Embodiment one
Referring to Fig. 1, a kind of wallboard construction method, comprising the following steps:
A, transport load portion 2 of the production for carrying on the plate body of wallboard 1;Load portion 2 is transported by digging on plate body 1
It holes or is open or the formation such as notch, transport load portion 2 can be dug more than at chisel one or at one, the tools such as electric drill can be passed through
It is realized, construction site electric drill is easy to obtain, and easy to operate, this Side fascia can carry out coating in advance, painting, tiling etc.
The advantages of work, the ornamental work of such wallboard need not just construct at the scene, reach time saving, saving of labor;
B, 2 position of load portion is transported in step a install tensile elements 3 additional;Tensile elements 3 can be handle or hanging ring or hook
Son etc. can be attached to tensile elements 3 by tools such as pliers the position of the digging chisel in step a;
C, plate body 1 is carried using the tensile elements 3 in step b, being transported on carrier then will by carrier
Plate body 1 transports commitment positions, and commitment positions are usually to be already installed in the base position on other wallboards or raising ground, adds
After having filled tensile elements 3, construction personnel is facilitated to move using tensile elements 3 to wallboard, greatly reduce labor intensity, saved
Construction time, improve the efficiency of construction;
D, plate body 1 is erect using the tensile elements 3 in step b, tensile elements 3 is dismantled, then to transport load portion 2
Position carries out reinforcement gap.
This construction method is simple to operate, and used resource material, which is easy to obtain from construction site, is easy construction, effect
Fruit is significant, greatly reduces the labor intensity of construction personnel, saves the time cycle of construction, improves the efficiency of construction.
Embodiment two
A kind of wallboard, including plate body 1 dig chisel on plate body 1 and are formed with transport load portion 2, dig on plate body 1 and be carved with hole or opening
Or load portion 2 is transported in the formation such as notch.By digging scalpriform on plate body 1 into transport load portion 2, can pacify in transport load portion 2
Tensile elements 3 are filled, plate is facilitated and is carried, the plate body 1 for lengthening increase at present is overcome and is not easy the problem carried,
As shown in Fig. 2, the both ends medium position at 1 top of plate body digs the formation transport load portion 2 for being carved with inclined hole respectively and is equipped with
Hanging ring.
Embodiment three
Such as Fig. 3, a kind of carrier is mounted side by side on the traveling wheel 5 on vehicle frame 4 including vehicle frame 4 and two, and vehicle frame 4 includes
Hand push frame 41 and supporting plate 42, traveling wheel 5 is mounted on one end on hand push frame 41 close to supporting plate 42, when supporting plate 42 turns to traveling wheel
When the horizontal position of 5 sides, the side that hand push frame 41 is directed away from supporting plate 42 tilts upwards, and the thing carried will be needed to be put into support
After on plate 42, the convenient promotion to carrier of hand push frame 41 is pushed.
And for lengthening the wallboard increased, when manipulating carrier, since wallboard is heavier, the labor intensity of operator compared with
Greatly.
In conjunction with Fig. 3 and Fig. 4, hand push frame 41 is fixedly connected with auxiliary support bar 6, auxiliary branch far from one end bottom of supporting plate 42
The bottom end of strut 6, which is fixedly mounted, is rotatably connected on the bottom end of auxiliary support bar 6 with auxiliary wheel 7, auxiliary wheel 7, so that auxiliary
Wheel 7 can original place rotation, convenient in the handling process adjust move ahead, adjust auxiliary support bar 6 between be fixedly connected with difference
With the reinforcing rod 61 connected vertically of auxiliary support bar 6, reinforcing rod 61 is used to increase the strength of stability of auxiliary support bar.
Auxiliary support bar 6 and auxiliary wheel 7 can be installed more than at one or at one, be equipped at two in the present embodiment, wall
When plate is heavier, hand push frame 41 can press to the ground connection of auxiliary wheel 7, enable auxiliary wheel 7 and auxiliary support bar 6 to hand push
The advantages of frame 41 is supported, and reaches laborsaving, convenient transportation.
Hand push frame 41 is fixedly connected with the cyclic annular controls 8 being arranged along the vertical direction far from one end of supporting plate 42.Operator
Member can hold cricoid controls 8 and push to carrier, can adapt to the hand griping position of differing tilt angles, operator
The stress of member is preferable, reaches labour-saving effect.
Meanwhile the wallboard for increasing lengthening reduces carrying height, is easy by there is the region of height limitation because of inclination.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this
On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore,
These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.
Claims (10)
1. a kind of wallboard construction method, it is characterised in that: include the following steps,
A, digging chisel, transport load portion (2) of the production for carrying are carried out on the plate body of wallboard (1);
B, transport load portion (2) position in step a installs tensile elements (3) additional;
C, plate body (1) is carried using the tensile elements (3) in step b, being transported on carrier then will by carrier
Plate body (1) transports commitment positions;
D, plate body (1) is erect using the tensile elements (3) in step b, tensile elements (3) is dismantled, then to transport load
Portion (2) position carries out reinforcement gap.
2. a kind of wallboard construction method according to claim 1, it is characterised in that: dig chisel on plate body described in step a (1)
Hole or opening or notch form the transport load portion (2).
3. a kind of wallboard construction method according to claim 1, it is characterised in that: transport load portion (2) described in step a
Setting is more than two.
4. a kind of wallboard construction method according to claim 1, it is characterised in that: tensile elements described in step b (3) are handle
Hand or hanging ring or hook.
5. a kind of wallboard construction method according to claim 1, it is characterised in that: the transport load portion (2) is plate body
(1) it digs hole at chisel two on the position on top to be formed, the tensile elements (3) are setting hanging in transport load portion (2) position
Ring.
6. a kind of wallboard, including plate body (1), it is characterised in that: dig chisel on the plate body (1) and be formed with transport load portion (2).
7. a kind of wallboard according to claim 6, it is characterised in that: dug on the plate body (1) and hole or be open or notch
Form the transport load portion (2).
8. a kind of carrier, it is characterised in that: it is mounted side by side on the traveling wheel (5) on vehicle frame (4) including vehicle frame (4) and two,
The vehicle frame (4) includes hand push frame (41) and supporting plate (42), and traveling wheel (5) is mounted on hand push frame (41) close to supporting plate (42)
One end, the hand push frame (41) are fixedly connected with auxiliary support bar (6), the Auxiliary support far from one end bottom of supporting plate (42)
The bottom end of bar (6) is fixedly installed with auxiliary wheel (7).
9. a kind of carrier according to claim 8, it is characterised in that: the auxiliary support bar (6) and the auxiliary vehicle
Wheel (7) is respectively arranged with two or more.
10. a kind of carrier according to claim 9, it is characterised in that: the hand push frame (41) is far from supporting plate (42)
One end is fixedly connected with the cyclic annular controls (8) being arranged along the vertical direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910087619.3A CN109914680A (en) | 2019-01-29 | 2019-01-29 | A kind of wallboard, carrier and wallboard construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910087619.3A CN109914680A (en) | 2019-01-29 | 2019-01-29 | A kind of wallboard, carrier and wallboard construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109914680A true CN109914680A (en) | 2019-06-21 |
Family
ID=66960986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910087619.3A Pending CN109914680A (en) | 2019-01-29 | 2019-01-29 | A kind of wallboard, carrier and wallboard construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109914680A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112081350A (en) * | 2020-08-25 | 2020-12-15 | 林佳亮 | Wall body strutting arrangement of removal assembly jig |
CN112482784A (en) * | 2020-11-17 | 2021-03-12 | 吉首大学 | Installation device applicable to assembly type building wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103640834A (en) * | 2013-12-17 | 2014-03-19 | 中太建设集团股份有限公司 | Small-size transporter |
CN204978753U (en) * | 2015-09-24 | 2016-01-20 | 胡岳明 | Transport cart |
CN205151516U (en) * | 2015-11-10 | 2016-04-13 | 河北晶通建筑科技有限公司 | Simple and easy hoist and mount of prefabricated wallboard |
CN209479715U (en) * | 2019-01-29 | 2019-10-11 | 杨威德 | A kind of carrier |
-
2019
- 2019-01-29 CN CN201910087619.3A patent/CN109914680A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103640834A (en) * | 2013-12-17 | 2014-03-19 | 中太建设集团股份有限公司 | Small-size transporter |
CN204978753U (en) * | 2015-09-24 | 2016-01-20 | 胡岳明 | Transport cart |
CN205151516U (en) * | 2015-11-10 | 2016-04-13 | 河北晶通建筑科技有限公司 | Simple and easy hoist and mount of prefabricated wallboard |
CN209479715U (en) * | 2019-01-29 | 2019-10-11 | 杨威德 | A kind of carrier |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112081350A (en) * | 2020-08-25 | 2020-12-15 | 林佳亮 | Wall body strutting arrangement of removal assembly jig |
CN112482784A (en) * | 2020-11-17 | 2021-03-12 | 吉首大学 | Installation device applicable to assembly type building wall |
CN112482784B (en) * | 2020-11-17 | 2022-02-01 | 吉首大学 | Installation device applicable to assembly type building wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109914680A (en) | A kind of wallboard, carrier and wallboard construction method | |
WO2017016369A1 (en) | Tower crane for assembling power transmission tower | |
CN109989416A (en) | Steady stake platform and construction method for offshore wind farm single-pile foundation piling construction | |
CN204527220U (en) | Transport trolley | |
CN209479715U (en) | A kind of carrier | |
CN206359109U (en) | Tower hanging apparatus and tower hoisting structure | |
CN107381376B (en) | Device and method for hoisting by utilizing curtain wall embedded part | |
CN206987115U (en) | A kind of partition wall for playing support floor effect | |
CN208166344U (en) | Pipe installing vertical-horizontal means of transport | |
CN208932809U (en) | Lifting appliance for square jacking pipe | |
CN206088474U (en) | Beamer | |
CN217229926U (en) | Tensile hanging flower basket that building engineering used | |
CN211664614U (en) | Vertical transport means | |
CN210033431U (en) | Support frame for reinforced concrete dado and dado template of large-section vertical shaft | |
CN210825156U (en) | Template hoist and mount and transport means | |
CN219157423U (en) | Foldable box girder diaphragm construction hanging basket | |
CN108285085A (en) | Pipe installing vertical-horizontal means of transport and transportation resources | |
CN213174824U (en) | Pile pouring machine equipment | |
CN218029074U (en) | Concrete pouring spreader | |
CN209683871U (en) | Steel reinforcement cage transport vehicle | |
CN210658041U (en) | Movable hanging basket for construction of side part of viaduct | |
CN216069728U (en) | Auxiliary carrying device for material bags for buildings | |
CN107829754A (en) | Chamber | |
CN209940409U (en) | Tool for laying templates on two sides of main beam | |
CN221194210U (en) | High hanging flower basket support of security |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190621 |