CN108285085A - Pipe installing vertical-horizontal means of transport and transportation resources - Google Patents

Pipe installing vertical-horizontal means of transport and transportation resources Download PDF

Info

Publication number
CN108285085A
CN108285085A CN201810258696.6A CN201810258696A CN108285085A CN 108285085 A CN108285085 A CN 108285085A CN 201810258696 A CN201810258696 A CN 201810258696A CN 108285085 A CN108285085 A CN 108285085A
Authority
CN
China
Prior art keywords
mast
frame body
main frame
bracket
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810258696.6A
Other languages
Chinese (zh)
Other versions
CN108285085B (en
Inventor
沈源
种荣耀
王宾
郑勇攀
吴昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201810258696.6A priority Critical patent/CN108285085B/en
Publication of CN108285085A publication Critical patent/CN108285085A/en
Application granted granted Critical
Publication of CN108285085B publication Critical patent/CN108285085B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides Pipe installing vertical-horizontal means of transport and transportation resources, wherein Pipe installing vertical-horizontal means of transport includes:It lifts chassis, including main frame body, is connected to the mast-up of main frame body and for being arranged in the shackle member of pipeline suspension and support afterwards in place in lifting chassis lifting, shackle member is connected to main frame body;The bracket of support pipeline, is positioned on main frame body;The vertical lifting structure that chassis is lifted for vertical transport, is connected to mast-up;For the translation structure of horizontal transport bracket, it is connected to bracket.Vertical lifting structure is vertically moved up or down lifting chassis, bracket and pipeline, and shackle member is clamped pipeline suspension and support after lifting in place, recycles translation structure movable support bracket and pipeline.It is simple that inventive pipeline installs vertical-horizontal means of transport production method, easy to operate, the pipeline high-altitude that effectively solves problem difficult to install, reduces the required artificial of pipe laying, construction efficiency is greatly improved, can repeatedly be used in turn.

Description

Pipe installing vertical-horizontal means of transport and transportation resources
Technical field
The present invention relates to the installing engineerings in the realm of building construction, and in particular to Pipe installing vertical-horizontal means of transport and Transportation resources.
Background technology
With socio-economic development, " tall and big special new difficult " building is on the increase, and floor height is higher and higher, architectural engineering erector Cheng Gongneng is stronger and stronger, pipeline becomes increasingly complex, caliber size constantly increases, and pipe laying is increasingly on pipeline suspension and support Difficulty using traditional artificial handling and is installed often time-consuming and laborious.The development of building trade also proposed installing engineering new It is required that, it is necessary to a kind of solution pipeline vertical transport, the scheme of overhead horizontal transport difficult are provided.
Invention content
In order to solve pipeline vertical transport, the existing difficulty of overhead horizontal transport, it is vertical that the present invention provides Pipe installings Horizontal transport tool and transportation resources.
Pipe installing vertical-horizontal means of transport provided by the invention, including:
Chassis is lifted, the lifting chassis includes main frame body, is connected to the mast-up of the main frame body and for described Lifting chassis lifting is arranged in the shackle member of pipeline suspension and support afterwards in place, and the shackle member is connected to the main frame body;
For the bracket of support pipeline, the bracket is positioned on the main frame body;
Vertical lifting structure for lifting chassis described in vertical transport, the vertical lifting structure are connected to the lifting Frame;And
For the translation structure of bracket described in horizontal transport, the translation structure is connected to the bracket.
Present invention is mainly used for vertical and horizontal transport pipelines.Using be connected to lifting chassis vertical lifting structure to rise Drop chassis, bracket and pipeline are vertically moved up or down, and shackle member is clamped pipeline suspension and support after lifting in place, and translation structure is recycled to move Dynamic bracket and pipeline.Inventive pipeline installation vertical-horizontal means of transport production method is simple, easy to operate, the pipe effectively solved Road high-altitude problem difficult to install not only reduces the required artificial of pipe laying, greatly improves construction efficiency, Er Qieke To be repeatedly used in turn.
Inventive pipeline install vertical-horizontal means of transport further improvement lies in that, the translation structure be drawstring.
Inventive pipeline install vertical-horizontal means of transport further improvement lies in that, the main frame body be rectangle frame Body is connected with bracing piece between two long sides of the main frame body, and the mast-up is arch, and the both ends of the mast-up are distinguished It is formed with a supporting leg, two supporting legs are connected to two long sides of the main frame body.
The further improvement of inventive pipeline installation vertical-horizontal means of transport is that the bracket is set to same lifting Between two supporting legs of frame, and the width of the bracket is less than the spacing between two supporting legs.
The further improvement of inventive pipeline installation vertical-horizontal means of transport is that the vertical lifting structure is to fall Chain is formed with the lifting lug for being connected to the jack at the top of the mast-up.
The further improvement of inventive pipeline installation vertical-horizontal means of transport is that the mast-up is hung including first It shelves and is fixed in the first end of the main frame body with the second mast-up, first mast-up, second mast-up is detachable Ground is connected to the second end of the main frame body.
Inventive pipeline install vertical-horizontal means of transport further improvement lies in that, the shackle member include be separately connected Two card slots in the both sides of the first end of the main frame body, the card slot is opening up, and the card slot is formed with to be set for blocking Reveal all the details portion and the width of the pipeline suspension and support are more than the opening portion in the portion of revealing all the details.
Inventive pipeline install vertical-horizontal means of transport further improvement lies in that, the bracket includes parallel two Multiple support chips of supporting rod, the connecting rod for being connected to two supporting rods and the arc for puting on the supporting rod side, often The shaft of one supporting rod is vertically connected at the arc side of each support chip, and the both ends of each supporting rod are prolonged upwards Stretch setting.
The present invention also provides Pipe installing vertical-horizontal transportation resources, include the following steps:
Determine the transporting position of pipeline;
Bracket is provided, pipeline is positioned on the bracket;
Translation structure is provided, the translation structure is connected to the bracket;
The lifting chassis with main frame body, mast-up and shackle member is provided, the mast-up and the shackle member are set to institute It states on main frame body, the bracket is positioned on the main frame body;
Vertical lifting structure is provided, the vertical lifting structure is connected to the mast-up;
The vertical lifting structure is driven, the vertical lifting structure vertical is made to transport the lifting chassis;
After the lifting chassis is by the isometry position of vertical transport to the transporting position, the shackle member is arranged in Pipeline suspension and support;
The translation structure is driven, the translation structure level is made to transport the bracket to the transporting position.
Inventive pipeline installs vertical-horizontal transportation resources, uses lifting chassis and vertical lifting structure vertical pallet for transporting And pipeline, rear that lifting chassis position is kept to be ignorant of, translation structure drives bracket and pipeline to be carried out as support platform to lift chassis It moves horizontally, it is easy to operate, easy to use, adjustable extent is big, time saving and energy saving, have the advantages that prominent and effect.
Inventive pipeline install vertical-horizontal transportation resources further improvement lies in that, the mast-up include first lifting Frame and the second mast-up, first mast-up are fixed in the first end of the main frame body, and second mast-up is removably It is connected to the second end of the main frame body;Wherein, before the step that the bracket is positioned on the main frame body, from described Second mast-up is dismantled on main frame body, it, will be under dismounting after the step that the bracket is positioned on the main frame body Second mast-up come is installed on the main frame body.
Description of the drawings
Fig. 1 is the stereoscopic schematic diagram of the Pipe installing vertical-horizontal means of transport of present pre-ferred embodiments.
Fig. 2 is the structural schematic diagram of the lifting chassis of embodiment in Fig. 1.
Fig. 3 is the structure enlargement diagram of the part A of embodiment in Fig. 2.
Fig. 4 is the structure enlargement diagram of the part B of embodiment in Fig. 2.
Fig. 5 is the structural schematic diagram of the bracket of embodiment in Fig. 1.
Fig. 6 is the flow chart that inventive pipeline installs vertical-horizontal transportation resources.
Specific implementation mode
In order to solve pipeline vertical transport, the existing difficulty of overhead horizontal transport, it is vertical that the present invention provides Pipe installings Horizontal transport tool and transportation resources.
Vertical-horizontal means of transport and transportation resources are installed to inventive pipeline in the following with reference to the drawings and specific embodiments Preferred embodiment is described further.Those skilled in the art can understand the present invention easily by the content disclosed by this specification Other advantages and effect.
In conjunction with shown in Fig. 1 to Fig. 4, the preferred embodiment that inventive pipeline installs vertical-horizontal means of transport includes lifting bottom Frame 10, bracket 20, vertical lifting structure (not shown) and translation structure (not shown).It includes body frame to lift chassis 10 Body 11, the mast-up for being connected to main frame body 11 and shackle member 13.Shackle member 13 is used to limit afterwards in place in the lifting lifting of chassis 10 Chassis 10 is lifted, shackle member 13 is connected to main frame body 11, and is connected in pipeline suspension and support;Bracket 20 is used for support pipeline, bracket 20 are positioned on main frame body 11;Vertical lifting structure is used to lift lifting chassis 10, and vertical lifting structure, which is connected to, hangs It shelves;For translation structure for pulling bracket 20 to move horizontally, translation structure is connected to bracket 20.Specifically, translation structure is Drawstring, vertical lifting structure are jack.Mast-up includes the first mast-up 121 and the second mast-up 122, clamping in the present embodiment Part is for being clamped pipeline suspension and support.Preferably, shackle member is connected to the end of main frame body 11.
Present invention is mainly used for vertical and horizontal transport pipelines.The pulley end of jack is fixed on to the position preassigned It sets, the hook end of jack is hooked on the mast-up of lifting chassis 10, the jack in the present invention is connected to lifting chassis 10 simultaneously Lifting chassis 10 is set to lift, and bracket 20 is placed on the main frame body 11 of lifting chassis 10, pipeline is positioned on bracket 20, therefore is controlled Jack lifting processed can control pipeline progress vertical transport;After transport in place, the shackle member 13 lifted on chassis 10 is clamped pipeline Suspension and support makes lifting chassis 10 and the relative position of pipeline suspension and support remain unchanged;Drawstring is connected to bracket 20, and artificial pull is drawn Rope can make bracket 20 that pipeline be driven to do the movement in horizontal direction, realize the horizontal transport of pipeline.
Further, main frame body 11 is rectangle framework, and bracing piece 111 is connected between two long sides of main frame body 11. Pipeline is cylindrical, therefore the main frame body 11 of rectangle framework is more advantageous to the stationarity for improving pipeline transportation.
Further, mast-up is arch, and the both ends of mast-up are respectively formed with a supporting leg, and two supporting legs are separately connected In two long sides of main frame body 11.The lifting lug for being connected to jack is formed at the top of mast-up.Jack is connected to lifting lug to control Chassis 10 is lifted to lift.
Further, bracket 20 is set between two supporting legs of same mast-up, and the width of bracket 20 is less than two Spacing between supporting leg.Mast-up is enclosed set on the outside of bracket 20, and mast-up is enclosed with bracket 20 sets the space to be formed for housing Pipeline, and mast-up can play pipeline certain position-limiting action, improve stability when transport, it is easy to operate.Support Frame 20 may pass through mast-up and moved horizontally under the pulling of drawstring.
Further, mast-up includes the first mast-up 121 and the second mast-up 122, and the first mast-up 121 is fixed in master The first end of frame body 11, the second mast-up 122 are removably attachable to the second end of main frame body 11.First by the second lifting when use Frame 122 is disassembled from main frame body 11, and the first end of pipeline is positioned between the first mast-up 121 and bracket 20, then is adjusted Second mast-up 122 is finally installed on main frame body 11 by the position of homogeneous tube road second end.Dismountable mast-up is managed convenient for placing Road.Preferably, the second mast-up 122 is connected to lifting chassis 10 by latch assembly 123.
Further, in this embodiment shackle member 13 includes the two of the both sides for the first end for being connected to main frame body 11 A card slot, card slot is opening up, and card slot is formed with portion and width the opening more than portion of revealing all the details of revealing all the details that pipeline suspension and support is set for card Oral area.Shackle member 13 prevents lifting chassis 10 from moving left and right for after promoting lifting chassis 10 in place and pipeline suspension and support card jail, Specifically, pipeline suspension and support is arranged in the portion of revealing all the details, and the width of opening portion is more than portion of revealing all the details, and is played guiding shackle member 13 and is clamped To the effect of pipeline suspension and support, keep operation simpler, conveniently.The shape of above-mentioned shackle member 13, position be preferred embodiment but It is not limited thereto, as long as can realize that shackle member 13 can be connected to pipe after lifting chassis 10 is lifted to designated position Road suspension and support is to realize the fixation of position between lifting chassis 10 and pipeline suspension and support.
Referring to figure 1 and figure 5, further, bracket 20 includes two parallel supporting rods 201, is connected to two branch Multiple support chips 202 of the connecting rod 203 of strut 201 and the arc on the upside of supporting rod 201, the bar of each supporting rod 201 Body is vertically connected at the arc side of each support chip 202.The support chip 202 of multiple arcs is set on supporting rod 201, arc Support chip 202 can more preferably be bonded the shape of pipeline, to improve stability when 20 supporting pipeline of bracket.Connecting rod 203 is not only Play the role of connecting two supporting rods 201, while being bound for drawstring.
Further, the both ends of each supporting rod 201 upwardly extend setting.The both ends of supporting rod 201 are set up, and are had Effect prevents pipeline double swerve in transportational process, improves stability.
In the present embodiment, two channel steels are welded and fixed by main frame body 11 by four coating steel pipes;Channel steel, mast-up etc. Scantling, duct length, the diameter lifted according to scene take appropriate value;Support chip 202 is 2mm thickness curved plates, radian 120°;Supporting rod 201 is diameter 30mm steel pipes, 30 ° of bending two ends;202 uniform welding of support chip of three arcs is fixed on Supporting rod 201;And in the interconnecting piece weld diameter 8mm Ribbed Bars in the shaft of supporting rod 201 and knee as connecting rod 203, for binding drawstring;201 length of supporting rod, support chip 202 radius taken according to the duct length and diameter of on-site hoisting Appropriate value.
The present invention also provides Pipe installing vertical-horizontal transportation resources, as shown in fig. 6, including the following steps:
Step 101:Determine the transporting position of pipeline;
Step 102:Bracket 20 is provided, pipeline is positioned on bracket 20;
Step 103:Translation structure is provided, translation structure is connected to bracket 20;
Step 104:Lifting chassis 10 with main frame body 11, mast-up and shackle member 13, mast-up and shackle member are provided 13 are set on main frame body 11, and bracket 20 is positioned on main frame body 11;
Step 105:Vertical lifting structure is provided, vertical lifting structure is connected to mast-up;
Step 106:Vertical lifting structure is driven, vertical lifting structure vertical transport lifting chassis 10 is made;
Step 107:After lifting chassis 10 is by the isometry position of vertical transport to transporting position, shackle member 13 is arranged in Pipeline suspension and support;
Step 108:Driving translation structure, makes translation structure level pallet for transporting 20 to transporting position.
Specifically, in the present embodiment, vertical lifting structure be jack, translation structure be drawstring, this for preferred embodiment and It is not limited.Pipeline transportation in place after, removing pipeline can be transported next time.
Inventive pipeline installs vertical-horizontal transportation resources, uses lifting chassis 10 and vertical lifting structure vertical transport support Frame 20 and pipeline, rear to keep 10 position of lifting chassis motionless, it is branch that translation structure, which drives bracket 20 and pipeline to lift chassis 10, Support platform is moved horizontally, easy to operate, easy to use, adjustable extent is big, time saving and energy saving, has the advantages that protrusion and work( Effect.
In step 107, shackle member 13 is arranged in pipeline suspension and support, ensures that the position of lifting chassis 10 immobilizes, prevents Chassis 10 is only lifted in movable support bracket 20 to occur mobile and make troubles to transport.Specifically, if lifting chassis 10, bracket 20 It is moved horizontally under the action of being translatable structure together with pipeline, then the manpower and materials on the one hand expended are larger, are on the other hand used for The length for the jack for lifting and keeping duct height position constant needs to adjust therewith, inconvenient.
In step 108, bracket 20 carry pipeline, translation structure drive under, with lift chassis 10 be support platform into For row when moving horizontally, the center of gravity contraposition of bracket 20 and pipeline is located at the top of lifting chassis 10, it is ensured that the stability of transport and Safety.
Further, step 105 includes:Mast-up includes the first mast-up 121 and the second mast-up 122, the first lifting Frame 121 is fixed in the first end of main frame body 11, and the second mast-up 122 is removably attachable to the second end of main frame body 11;Wherein, Before the step that bracket 20 is positioned on main frame body 11, the second mast-up 122 is dismantled from main frame body 11, in by bracket 20 It is positioned over after the step on main frame body 11, the second mast-up 122 disassembled is installed on main frame body 11.
Bracket 20 is moved across two supporting legs of the first mast-up 121 and the second mast-up 122 in horizontal transport It is dynamic, it effectively prevent bracket 20 danger that position deviation is excessive or even falls occur during moving horizontally.
Inventive pipeline is installed in vertical-horizontal transportation resources, and what lifting chassis 10 played act as:With vertical lifting knot Structure matches, vertical transport bracket 20 and pipeline;During 20 horizontal transport of bracket, for bracket 20 provide vertical supporting and Platform.
Inventive pipeline is installed in vertical-horizontal transportation resources, is provided for the horizontal transport of bracket 20 using lifting chassis 10 The advantages of vertical supporting, is that bracket 20 is that mobile platform is translatable to lift chassis 10, is not restricted, is moved by jack length Dynamic range is more wide in range, flexible.In practice of construction, lifting chassis 10 and bracket 20 can be adjusted according to on-site actual situations Shape, length etc..
Inventive pipeline installs vertical-horizontal means of transport and transportation resources, and tool construction is simple, and method is easy to operate, behaviour Facilitate, the pipeline high-altitude effectively solved problem difficult to install, not only reduces the required artificial of pipe laying, greatly carry High construction efficiency, and can repeatedly be used in turn.
It the above is only presently preferred embodiments of the present invention, limitation in any form not done to the present invention, although this Invention is disclosed above with preferred embodiment, and however, it is not intended to limit the invention, any person skilled in the art, In the range of not departing from technical solution of the present invention, when the technology contents using the disclosure above make a little change or are modified to With variation equivalent embodiment, as long as being the content without departing from technical solution of the present invention, according to the technical essence of the invention to Any simple modification, equivalent change and modification made by upper embodiment, in the range of still falling within technical solution of the present invention.
It should be noted that structure, ratio, size etc. depicted in this specification institute accompanying drawings, only coordinating The bright revealed content of book is not limited to the enforceable limit of the present invention so that those skilled in the art understands and reads Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not It influences under the effect of present invention can be generated and the purpose that can reach, should all still fall in disclosed technology contents In the range of capable of covering.

Claims (10)

1. a kind of Pipe installing vertical-horizontal means of transport, which is characterized in that including:
Chassis is lifted, the lifting chassis includes main frame body, is connected to the mast-up of the main frame body and in the lifting Chassis lifts the shackle member for being arranged in pipeline suspension and support afterwards in place, and the shackle member is connected to the main frame body;
For the bracket of support pipeline, the bracket is positioned on the main frame body;
Vertical lifting structure for lifting chassis described in vertical transport, the vertical lifting structure are connected to the mast-up; And
For the translation structure of bracket described in horizontal transport, the translation structure is connected to the bracket.
2. Pipe installing vertical-horizontal means of transport as described in claim 1, it is characterised in that:The translation structure is to draw Rope.
3. Pipe installing vertical-horizontal means of transport as described in claim 1, it is characterised in that:The main frame body is rectangle Framework, bracing piece is connected between two long sides of the main frame body, and the mast-up is arch, the both ends point of the mast-up It is not formed with a supporting leg, two supporting legs are connected to two long sides of the main frame body.
4. Pipe installing vertical-horizontal means of transport as claimed in claim 3, it is characterised in that:The bracket is set to same hang Between two supporting legs shelved, and the width of the bracket is less than the spacing between two supporting legs.
5. Pipe installing vertical-horizontal means of transport as claimed in claim 3, it is characterised in that:The vertical lifting structure is Jack is formed with the lifting lug for being connected to the jack at the top of the mast-up.
6. Pipe installing vertical-horizontal means of transport as claimed in claim 3, it is characterised in that:The mast-up includes first Mast-up and the second mast-up, first mast-up are fixed in the first end of the main frame body, and second mast-up is removable It is connected to the second end of the main frame body with unloading.
7. Pipe installing vertical-horizontal means of transport as described in claim 1, it is characterised in that:The shackle member includes difference Two card slots of the both sides of the first end of the main frame body are connected to, the card slot is opening up, and the card slot, which is formed with, to be used for Reveal all the details portion and the width that card sets the pipeline suspension and support are more than the opening portion in the portion of revealing all the details.
8. Pipe installing vertical-horizontal means of transport as described in claim 1, it is characterised in that:The bracket includes parallel Multiple supports of two supporting rods, the connecting rod for being connected to two supporting rods and the arc for puting on the supporting rod side Piece, the shaft of each supporting rod are vertically connected at the arc side of each support chip, the both ends of each supporting rod Upwardly extend setting.
9. a kind of Pipe installing vertical-horizontal transportation resources, which is characterized in that include the following steps:
Determine the transporting position of pipeline;
Bracket is provided, pipeline is positioned on the bracket;
Translation structure is provided, the translation structure is connected to the bracket;
The lifting chassis with main frame body, mast-up and shackle member is provided, the mast-up and the shackle member are set to the master On frame body, the bracket is positioned on the main frame body;
Vertical lifting structure is provided, the vertical lifting structure is connected to the mast-up;
The vertical lifting structure is driven, the vertical lifting structure vertical is made to transport the lifting chassis;
After the lifting chassis is by the isometry position of vertical transport to the transporting position, the shackle member is arranged in pipeline Suspension and support;
The translation structure is driven, the translation structure level is made to transport the bracket to the transporting position.
10. Pipe installing vertical-horizontal transportation resources as claimed in claim 9, which is characterized in that the mast-up includes the One mast-up and the second mast-up, first mast-up are fixed in the first end of the main frame body, and second mast-up can Releasably it is connected to the second end of the main frame body;Wherein, before the step that the bracket is positioned on the main frame body, Second mast-up is dismantled from the main frame body, it, will after the step that the bracket is positioned on the main frame body Second mast-up disassembled is installed on the main frame body.
CN201810258696.6A 2018-03-27 2018-03-27 Pipeline installation vertical and horizontal transport tool and transport method Active CN108285085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810258696.6A CN108285085B (en) 2018-03-27 2018-03-27 Pipeline installation vertical and horizontal transport tool and transport method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810258696.6A CN108285085B (en) 2018-03-27 2018-03-27 Pipeline installation vertical and horizontal transport tool and transport method

Publications (2)

Publication Number Publication Date
CN108285085A true CN108285085A (en) 2018-07-17
CN108285085B CN108285085B (en) 2023-06-13

Family

ID=62833799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810258696.6A Active CN108285085B (en) 2018-03-27 2018-03-27 Pipeline installation vertical and horizontal transport tool and transport method

Country Status (1)

Country Link
CN (1) CN108285085B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113022745A (en) * 2021-03-19 2021-06-25 上海二十冶建设有限公司 Horizontal transportation tool for steam turbine condenser and application method thereof

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06129705A (en) * 1992-10-13 1994-05-13 Fujita Corp Elevatable air-conditioning grille
JPH0726724A (en) * 1993-07-06 1995-01-27 Benkan Corp Auxiliary fitting for suspending up vertical piping unit and suspending up method using thereof
JPH07196281A (en) * 1993-12-28 1995-08-01 Komatsu Ltd Cradle
JPH07215655A (en) * 1994-02-07 1995-08-15 Mitsubishi Heavy Ind Ltd Pallet device
JPH10160040A (en) * 1996-11-27 1998-06-16 Takasago Thermal Eng Co Ltd Vertical piping construction, temporarily fixing device therefor, and piping bent preventing jig for vertical piping construction
JP2005282891A (en) * 2004-03-29 2005-10-13 Takasago Thermal Eng Co Ltd Unit method of horizontally laying duct
CN202321443U (en) * 2011-12-02 2012-07-11 中建三局第三建设工程有限责任公司 Process pipe roller transportation means
CN102701064A (en) * 2012-06-01 2012-10-03 安徽同曦金鹏铝业有限公司 Hanging basket for aluminum profiles
CN103231877A (en) * 2013-04-03 2013-08-07 中国科学院理化技术研究所 Horizontal cold box system
CN203612811U (en) * 2013-11-25 2014-05-28 森松(江苏)海油工程装备有限公司 Horizontal module hoisting system
CN204224149U (en) * 2014-08-29 2015-03-25 于孟成 Steel structure secondary member hoisting device
CN204623199U (en) * 2015-04-28 2015-09-09 浙江吉俱泰汽车内饰有限公司 A kind of fixed connection structure of automobile cushion
CN204879067U (en) * 2015-07-24 2015-12-16 陈斌 Pipeline travelling cradle
CN205034618U (en) * 2015-08-24 2016-02-17 中国建筑第八工程局有限公司 Underground pipe gallery's pipeline transport device
CN205601883U (en) * 2016-04-21 2016-09-28 重庆科技学院 Conveyer of large aperture oil gas pipeline
CN206088147U (en) * 2016-08-31 2017-04-12 浙江飞龙管业有限公司 Can automatic move pipe support of pipe fitting in production line
CN206971764U (en) * 2017-06-05 2018-02-06 中国建筑第八工程局有限公司 The purlin crane system of Steel Structure Installation
CN217519342U (en) * 2022-04-01 2022-09-30 天津城建大学 High-rise water delivery pipeline installation device

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06129705A (en) * 1992-10-13 1994-05-13 Fujita Corp Elevatable air-conditioning grille
JPH0726724A (en) * 1993-07-06 1995-01-27 Benkan Corp Auxiliary fitting for suspending up vertical piping unit and suspending up method using thereof
JPH07196281A (en) * 1993-12-28 1995-08-01 Komatsu Ltd Cradle
JPH07215655A (en) * 1994-02-07 1995-08-15 Mitsubishi Heavy Ind Ltd Pallet device
JPH10160040A (en) * 1996-11-27 1998-06-16 Takasago Thermal Eng Co Ltd Vertical piping construction, temporarily fixing device therefor, and piping bent preventing jig for vertical piping construction
JP2005282891A (en) * 2004-03-29 2005-10-13 Takasago Thermal Eng Co Ltd Unit method of horizontally laying duct
CN202321443U (en) * 2011-12-02 2012-07-11 中建三局第三建设工程有限责任公司 Process pipe roller transportation means
CN102701064A (en) * 2012-06-01 2012-10-03 安徽同曦金鹏铝业有限公司 Hanging basket for aluminum profiles
CN103231877A (en) * 2013-04-03 2013-08-07 中国科学院理化技术研究所 Horizontal cold box system
CN203612811U (en) * 2013-11-25 2014-05-28 森松(江苏)海油工程装备有限公司 Horizontal module hoisting system
CN204224149U (en) * 2014-08-29 2015-03-25 于孟成 Steel structure secondary member hoisting device
CN204623199U (en) * 2015-04-28 2015-09-09 浙江吉俱泰汽车内饰有限公司 A kind of fixed connection structure of automobile cushion
CN204879067U (en) * 2015-07-24 2015-12-16 陈斌 Pipeline travelling cradle
CN205034618U (en) * 2015-08-24 2016-02-17 中国建筑第八工程局有限公司 Underground pipe gallery's pipeline transport device
CN205601883U (en) * 2016-04-21 2016-09-28 重庆科技学院 Conveyer of large aperture oil gas pipeline
CN206088147U (en) * 2016-08-31 2017-04-12 浙江飞龙管业有限公司 Can automatic move pipe support of pipe fitting in production line
CN206971764U (en) * 2017-06-05 2018-02-06 中国建筑第八工程局有限公司 The purlin crane system of Steel Structure Installation
CN217519342U (en) * 2022-04-01 2022-09-30 天津城建大学 High-rise water delivery pipeline installation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113022745A (en) * 2021-03-19 2021-06-25 上海二十冶建设有限公司 Horizontal transportation tool for steam turbine condenser and application method thereof

Also Published As

Publication number Publication date
CN108285085B (en) 2023-06-13

Similar Documents

Publication Publication Date Title
CN102060232B (en) Transportation method for refractory brick for stove construction
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN108285085A (en) Pipe installing vertical-horizontal means of transport and transportation resources
CN202746764U (en) Lifting bracket for pipeline butting adjustment
CN208166344U (en) Pipe installing vertical-horizontal means of transport
CN209353734U (en) For installing the double-track device of curtain wall
CN204983692U (en) Concrete panel's hoist device
CN216807824U (en) Pipeline mobile device for hydraulic engineering
CN108275582B (en) Movable device based on material transportation and hoisting and operation method thereof
CN102001583A (en) Semi-automatic brick hanging fixture
CN213265442U (en) Movable assembled gantry crane
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN213893292U (en) Platform is deposited to portable reinforcing bar
CN210683055U (en) Device convenient to building material transport
CN210676780U (en) Movable support for manufacturing steel reinforcement framework mesh
CN208561605U (en) A kind of packaged type handling apparatus of concrete tower
CN106285000A (en) Whole spelling template transporter and conveyer method thereof
CN221761307U (en) Transfer device for material interlayer transportation based on attached lifting scaffold
CN201980854U (en) Semi-automatic brick-suspending clamp
CN203768846U (en) Simple expressway wall-collision-preventing formwork construction vehicle
CN205966845U (en) Valve snail steel bar support rod frame
CN217780649U (en) Building pipeline erects lifting machine
CN111005477A (en) Construction device for light partition board and use method thereof
CN109941900A (en) A kind of sound barrier plate simply installs equipment
CN214399592U (en) Tower crane lengthening arm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant