CN102001583A - Semi-automatic brick hanging fixture - Google Patents

Semi-automatic brick hanging fixture Download PDF

Info

Publication number
CN102001583A
CN102001583A CN 201010597227 CN201010597227A CN102001583A CN 102001583 A CN102001583 A CN 102001583A CN 201010597227 CN201010597227 CN 201010597227 CN 201010597227 A CN201010597227 A CN 201010597227A CN 102001583 A CN102001583 A CN 102001583A
Authority
CN
China
Prior art keywords
door
hole
crossbeam
rod
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010597227
Other languages
Chinese (zh)
Inventor
张晓宁
夏春
罗贵方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN 201010597227 priority Critical patent/CN102001583A/en
Publication of CN102001583A publication Critical patent/CN102001583A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a semi-automatic brick hanging fixture, and belongs to a vertical transportation tool of a brick supporter for brick kiln construction. The semi-automatic brick hanging fixture mainly comprises a hook (1), an operating handle (5), a support (10), jaws (12) and a door-type hanger, wherein the hook (1) is connected with the support (10) through a hanger rod (2), and a hanger sleeve (3) is arranged on the hanger rod (2); and one end of the operating handle (5) is fixedly connected with the side of the hanger sleeve (3), and the door-type hanger bestrides the two jaws (12) and are connected with the two jaws (12). The semi-automatic brick hanging fixture has the advantages of simple structure and low manufacturing cost, and is easy to manufacture, and the jaws are opened and closed instantaneously by rotating the hanger sleeve and changing the lifting action point in the construction of vertical transportation of materials, accordingly, the construction process is simple and fast.

Description

S. A. suspended block anchor clamps
Technical field
The invention belongs to the anchor clamps field, relate in particular to the S. A. suspended block anchor clamps of a kind of stove construction with the brick holder.
Background technology
In the heat generator work progress; refractory material is piled up on the brick supporting plate; rise to each layer discharging platform by the stokehold winding tower again; by roller-way ad hoc on the discharging platform or light rail directly into stove; roller-way or light rail extend to platform inside furnace; the brick supporting plate advances in the stove, utilizes the electric block that hangs under the protection canopy in the stove that it is winched to then and builds the place by laying bricks or stones.In stove during the suspended block supporting plate, steel rope inserted compile the rigging pocket in brick supporting plate bottom, between material and steel rope, insert breast board, in order to avoid in the vertical transport process, material can be scattered.Because the workyard is narrower and small, the material on the platform inside furnace, breast board are too scattered, are unfavorable for safe construction, and complicated operating process has reduced operating efficiency.
Summary of the invention
Technical matters to be solved by this invention is: at the problems referred to above, providing a kind of can simple operations reach the S. A. suspended block anchor clamps that the material in holder of automatic clamping brick and the protection tile holder is not scattered.
The present invention solves its technical matters and adopts following technical scheme:
S. A. suspended block anchor clamps provided by the invention are a kind of stove construction vertical transport instruments with the brick holder, mainly are made up of drop hanger, operating handle, support, pawl and door-shaped hanging bracket, and wherein: drop hanger links to each other with support by suspension rod; Suspension rod is provided with hanging sleeve, and an end of operating handle and the sidepiece of hanging sleeve are fixedly linked; Door-shaped hanging bracket is across above two pawls and be attached thereto.
The profile of described drop hanger is " day " font, and the hole on top is the suppending hole that electric block colludes, and lower end is welded with a steel pipe that is used to connect suspension rod.Distance described steel pipe upper end 40-55mm place is welded with one makes suspension rod be sleeved on boss on the suspension hook.
The top of suspension rod links to each other with drop hanger by pin and welds; The pad cap that it is 110-125mm that the bottom of suspension rod is welded with two spacings, and the support of suspension rod suit is between described two pad caps.
Described hanging sleeve is a steel pipe, has the groove of " L " shape on steel pipe, is welded with base plate in the lower end of steel pipe, is drilled with the hole in the base plate, and the bottom of suspension rod links to each other by this Kong Shiyong bearing pin and welds.
Described door-shaped hanging bracket has one or two, and each door-shaped hanging bracket is made up of with the link rod that links to each other with these crossbeam two ends crossbeam.
When adopting a door-shaped hanging bracket, the crossbeam center perforate of this door-shaped hanging bracket is welded with the pipe that the body of rod with suspension rod interlocks below the hole.The upper end of two link rods adopts bearing pin to flexibly connect with the crossbeam two ends respectively, and the hole on the otic placode at the hole of the lower end of two link rods and pawl middle part adopts bearing pin to flexibly connect; The hole of two brace lower ends that every link rod also links to each other by sidepiece with it respectively with the otic placode of pawl sidepiece on the hole adopt bearing pin to flexibly connect.
When adopting two door-shaped hanging brackets, the two ends of the crossbeam on the top of each door-shaped hanging bracket flexibly connects with the upper end of a link rod respectively by bearing pin, and the lower end of each link rod adopts the otic placode flexible connection of bearing pin and pawl.The crossbeam of two door-shaped hanging brackets is linked to be " worker " font with channel-section steel, at interior four angle steel plate reinforcements of " worker " font, in the perforate of channel-section steel center, is welded with the pipe that the body of rod with suspension rod interlocks below the hole.
Described support is " day " font square frame, is made by channel-section steel, is drilled with the hole of the crossbeam of the door type frame that is used to connect pawl at the two ends of square frame sidepiece.Have the hole of the body of rod that is used to connect suspension rod in the centre of the channel-section steel at square frame middle part.
Described two pawls all have a framework of being made by angle steel, by two door type frames that are symmetrically distributed two frameworks are connected as a single entity, and are provided with a plurality of well-distributed horizontal bars in the framework.Described door type frame is made up of with the montant that links to each other with the crossbeam two ends crossbeam, and collude the montant bottom, and whole door type frame is made by channel-section steel for the shape of " cross break is colluded ".
The present invention compared with prior art has following main beneficial effect:
1. simple in structure, make easily.
Two pincers worker can be finished the making of this invention in one day, if the processing of pipeline system sub-unit is more saved artificial.
2. be easy to promote.
The making material requested of parts such as the drop hanger that is adopted, suspension rod, crossbeam, support and pawl is common bar, sheet material, shaped steel and bolt etc., and cost of manufacture is low.
3. safe in utilization.
Pawl and guardrail are as a whole, and when pawl was closed, guardrail has played protective effect to material, has prevented that effectively material from falling, and was safe in utilization.
4. simple to operate, laborsaving.
In vertically transporting the material construction, by the rotation hanging sleeve, change lifts point of action, and moment is finished the unlatching and the closed action of pawl, makes work progress simple, quick.
Description of drawings
Fig. 1 is the block diagram of S. A. suspended block anchor clamps.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Among the figure: 1. suspension hook; 2. suspension rod; 3. hanging sleeve; 4. sell; 5. operating handle; 6. crossbeam; 7. bearing pin; 8. link rod; 9. otic placode; 10. support; 11. pad cap; 12. pawl.
The specific embodiment
In order to understand the present invention better, technical scheme of the present invention is described further below in conjunction with embodiment and accompanying drawing.
S. A. suspended block anchor clamps provided by the invention are a kind of stove construction vertical transport instruments with the brick holder, its structure such as Fig. 1, Fig. 2 and shown in Figure 3, mainly be made up of drop hanger 1, operating handle 5, support 10, pawl 12 and door-shaped hanging bracket, wherein: drop hanger 1 links to each other with support 10 by suspension rod 2.Suspension rod 2 is provided with hanging sleeve 3, and an end of operating handle 5 and the sidepiece of hanging sleeve 3 are fixedly linked.Door-shaped hanging bracket is across above two pawls 12 and be attached thereto.
Described drop hanger 1 can adopt the steel plate of thick 20mm to make, and profile is " day " font, and the hole on top is the suppending hole that electric block colludes, and it is that 100mm, internal diameter are the steel pipe of 70mm that lower end is welded with length, and this steel pipe is used to connect suspension rod 2.
Described suspension rod 2 is the rod iron of the long 760mm of main body, and minister 500mm, diameter are 64mm on the rod iron, and minister 260mm, diameter are 46mm under the rod iron.Suspension rod 2 penetrates in the steel pipe of drop hanger 1 bottom, is welded with boss apart from the place of steel pipe upper end 50mm, and suspension rod 2 is sleeved on the suspension hook 1.The top of suspension rod 2 is drilled with perforation apart from the position of steel pipe upper end 410mm, and the pin 4 of insertion diameter 25mm also welds, and makes pin 4 exceed the both sides 40mm of suspension rod 2 diameters, exceeds hanging sleeve 3 simultaneously, changes in the translot of " L " shape groove on the hanging sleeve 3 so that lift point of action.The bottom of suspension rod 2 is welded with two pad caps 11, and support 10 is sleeved between on the suspension rod 2 two the pad caps 11, and the gaps between two pad caps 11 are 120mm.
Described hanging sleeve 3 is the steel pipe of long 220mm, internal diameter 90mm, opens the groove of " L " shape on steel pipe, and the width of groove is 28mm, is welded with base plate in the steel pipe lower end, opens the hole of diameter 50mm in the base plate, and suspension rod 2 lower diameter are that the rod iron of 46mm penetrates this hole.
Described door-shaped hanging bracket has one or two.Each door-shaped hanging bracket is made up of with the link rod 8 that links to each other with crossbeam 6 two ends crossbeam 6.
When adopting a door-shaped hanging bracket, the hole that diameter 50mm is opened in crossbeam 6 centers of this door-shaped hanging bracket, the pipe of weldering length 40mm, internal diameter 50mm is sleeved on suspension bracket on the body of rod of suspension rod 2 below the hole; It is that 10mm, long steel plate for 500mm, the wide 40mm of being are made that two link rods 8 can adopt thickness, and the hole of the hole of its upper end and crossbeam 6 terminations adopts bearing pin 7 to flexibly connect, and bearing pin 7 flexible connections are adopted in the hole on the otic placode 9 at the hole of its lower end and pawl 12 middle parts.For the purpose of steadily, the hole of two brace lower ends that every link rod 8 also links to each other by sidepiece with it respectively with the otic placode 9 of pawl 12 sidepieces on the hole adopt bearing pin 7 to flexibly connect, this kind structure is not drawn.
When adopting two door-shaped hanging brackets, it is that 10mm, long steel plate for 1080mm, the wide 80mm of being are made that the crossbeam 6 on the top of each door-shaped hanging bracket adopts thickness, two ends boring on the steel plate, and pitch-row is 1000mm.The crossbeam 6 usefulness channel-section steels of two door-shaped hanging brackets are linked to be " worker " font, interior four angle steel plate reinforcements at " worker " font, the hole of diameter 50mm is opened in the channel-section steel center, and the pipe of weldering length 40mm, internal diameter 50mm is sleeved on suspension bracket on the body of rod of suspension rod 2 below the hole; Link rod 8 has four, and employing thickness is that 10mm, long steel plate for 500mm, the wide 40mm of being are made, the two ends boring of link rod 8, and pitch-row is 450mm, adopts bearing pin 7 to flexibly connect with the hole and the hole on the otic placode 9 of four terminations of crossbeam 6 steel plates respectively.
Described support 10 can adopt the channel-section steel of long 820mm, wide 460mm, high 100mm to make, and in the boring of the two ends of channel-section steel sidepiece, pitch of holes is 400mm.The middle part of support 10 is welded into the cross section for " " shape with channel-section steel, and length is that the member of 810mm is integrally welded, in the perforate of the centre of support 10, support 10 is sleeved between two pad caps 11 on the suspension rod 2.
Described two pawls 12, its structure is as shown in Figure 1 to Figure 3: it is the framework of long 1150mm, wide 1000mm that two pawls 12 are equipped with a part of being made by angle steel, by two door type frames that are symmetrically distributed two frameworks are connected as a single entity, increase a plurality of horizontal bars (guardrail) in the framework, spacing is 120mm.Described door type frame is made up of with the montant that links to each other with the crossbeam two ends crossbeam, and collude the montant bottom, and whole door type frame is the shape of " cross break is colluded ", is made by channel-section steel, adopts bearing pin 7 flexible connections in the hole that the termination of crossbeam is drilled with on 10 4 jiaos on hole and the support.
S. A. suspended block anchor clamps provided by the invention are used for the working brick holder of vertical transport stove, during use, by the rotation hanging sleeve, two centers of gravity on the suspension rod are lifted the position to be controlled respectively, the unlatching that reaches pawl is with closed, and pawl and guardrail are as a whole, makes work progress safety, simple.Specifically be to adopt following using method:
The brick supporting plate is advanced in the stove, with electric block in the stove S. A. suspended block anchor clamps are winched to brick supporting plate top, the S. A. suspended block anchor clamps of this moment should be opening, opening is the lower position of pin 4 at hanging sleeve 3 " L " shape groove, at this moment lift drop hanger 1, last pad cap 11 lifts suspension bracket 6, suspension bracket 6 lifts otic placode 9 by link rod 8, making pawl 12 is that move laterally at the center with the bearing pin on the support 10 7, pawl 12 is opened the size of size greater than the brick supporting plate, and pawl 12 is dropped on the operator's station, and the lower edge of aiming at the brick supporting plate is colluded in the bottom of pawl 12, rotating operating handle 5, make the groove alignment pin 4 of the vertical direction of hanging sleeve 3, when lifting drop hanger 1, pawl 12 leaves operator's station in a flash, it is that move to the inside at the center with the bearing pin on the support 10 7 that the deadweight of pawl 12 drives pawl 12, blocks the brick supporting plate after pawl 12 closures.
Effect: after the suspended block supporting plate adopts the present invention in stove, make the handling process quick, guardrail has been stopped the contingent potential safety hazard of shaking of material in the handling process, more helps construction, illustrates that effect of the present invention is remarkable.
More than explanation only is an Application Example of the present invention, can not limit the present invention's interest field certainly with this, and therefore the equivalence of being done according to the present patent application claim changes, and still belongs to protection scope of the present invention.

Claims (10)

1. S. A. suspended block anchor clamps, it is characterized in that the vertical transport instrument of a kind of stove construction with the brick holder, mainly be made up of drop hanger (1), operating handle (5), support (10), pawl (12) and door-shaped hanging bracket, wherein: drop hanger (1) links to each other with support (10) by suspension rod (2); Suspension rod (2) is provided with hanging sleeve (3), and the sidepiece of an end of operating handle (5) and hanging sleeve (3) is fixedly linked; Door-shaped hanging bracket is across in the top of two pawls (12) and be attached thereto.
2. S. A. suspended block anchor clamps according to claim 1 is characterized in that the profile of described drop hanger (1) is " day " font, and the hole on top is the suppending hole that electric block colludes, and lower end is welded with a steel pipe that is used to connect suspension rod (2).
3. S. A. suspended block anchor clamps according to claim 2 is characterized in that distance described steel pipe upper end 40-55mm place is welded with one and makes suspension rod (2) be sleeved on boss on the suspension hook (1).
4.. S. A. suspended block anchor clamps according to claim 1, the top that it is characterized in that suspension rod (2) links to each other with drop hanger (1) by pin (4) and welds; The pad cap (11) that it is 110-125mm that the bottom of suspension rod (2) is welded with two spacings, and the support (10) of suspension rod (2) suit is between described two pad caps.
5. S. A. suspended block anchor clamps according to claim 1, it is characterized in that described hanging sleeve (3) is a steel pipe, the groove that has " L " shape on steel pipe is welded with base plate in the lower end of steel pipe, be drilled with the hole in the base plate, the bottom of suspension rod (2) links to each other by this Kong Shiyong bearing pin and welds.
6. S. A. suspended block anchor clamps according to claim 1 is characterized in that described door-shaped hanging bracket has one or two, and each door-shaped hanging bracket is made up of with the link rod (8) that links to each other with these crossbeam two ends crossbeam (6).
7. S. A. suspended block anchor clamps according to claim 6, when it is characterized in that adopting a door-shaped hanging bracket, the crossbeam of this door-shaped hanging bracket (6) center perforate is welded with the pipe that the body of rod with suspension rod (2) interlocks below the hole; The upper end of two link rods (8) adopts bearing pin to flexibly connect with crossbeam (6) two ends respectively, and the hole on the otic placode (9) at the hole of the lower end of two link rods (8) and pawl (12) middle part adopts bearing pin to flexibly connect; The hole of two brace lower ends that every link rod (8) also links to each other by sidepiece with it respectively with the otic placode (9) of pawl (12) sidepiece on the hole adopt bearing pin to flexibly connect.
8. S. A. suspended block anchor clamps according to claim 6, when it is characterized in that adopting two door-shaped hanging brackets, the two ends of the crossbeam on the top of each door-shaped hanging bracket (6) flexibly connects with the upper end of a link rod (8) respectively by bearing pin, and the lower end of each link rod (8) adopts otic placode (9) flexible connection of bearing pin and pawl (12); The crossbeam of two door-shaped hanging brackets (6) is linked to be " worker " font with channel-section steel, at interior four angle steel plate reinforcements of " worker " font, in the perforate of channel-section steel center, is welded with the pipe that the body of rod with suspension rod (2) interlocks below the hole.
9. S. A. suspended block anchor clamps according to claim 1 is characterized in that described support (10) is " day " font square frame, are made by channel-section steel, are drilled with the hole of the crossbeam of the door type frame that is used to connect pawl (12) at the two ends of square frame sidepiece; Have the hole of the body of rod that is used to connect suspension rod (2) in the centre of the channel-section steel at square frame middle part.
10. S. A. suspended block anchor clamps according to claim 1, it is characterized in that described two pawls (12) all have a framework of being made by angle steel, by two door type frames that are symmetrically distributed two frameworks are connected as a single entity, are provided with a plurality of well-distributed horizontal bars in the framework; Described door type frame is made up of with the montant that links to each other with the crossbeam two ends crossbeam, and collude the montant bottom, and whole door type frame is made by channel-section steel for the shape of " cross break is colluded ".
CN 201010597227 2010-12-21 2010-12-21 Semi-automatic brick hanging fixture Pending CN102001583A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010597227 CN102001583A (en) 2010-12-21 2010-12-21 Semi-automatic brick hanging fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010597227 CN102001583A (en) 2010-12-21 2010-12-21 Semi-automatic brick hanging fixture

Publications (1)

Publication Number Publication Date
CN102001583A true CN102001583A (en) 2011-04-06

Family

ID=43809334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010597227 Pending CN102001583A (en) 2010-12-21 2010-12-21 Semi-automatic brick hanging fixture

Country Status (1)

Country Link
CN (1) CN102001583A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI415784B (en) * 2011-09-26 2013-11-21
CN104339160A (en) * 2014-08-28 2015-02-11 浙江吉利罗佑发动机有限公司 Clamping turnover mechanism
CN107352392A (en) * 2017-08-16 2017-11-17 张连杰 A kind of semi-automatic dress brick manipulator
CN110002335A (en) * 2019-03-20 2019-07-12 广州飞机维修工程有限公司 A kind of adjustable vertical lifting device of aircraft nose landing gear

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10326537A1 (en) * 2003-06-12 2005-01-05 M & S Haslinger Lifting method for filled brick baskets, involves abutting retainers of lifting pliers with bottom surface of brick basket, whereby retainers are loosened at least partly by weight of brick basket
CN2887822Y (en) * 2006-03-24 2007-04-11 中国第一冶金建设有限责任公司 Hanger brick basket clamp
CN201056851Y (en) * 2007-07-12 2008-05-07 四川方大新型建材科技开发有限责任公司 Brick clamper
CN201980854U (en) * 2010-12-21 2011-09-21 中国一冶集团有限公司 Semi-automatic brick-suspending clamp

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10326537A1 (en) * 2003-06-12 2005-01-05 M & S Haslinger Lifting method for filled brick baskets, involves abutting retainers of lifting pliers with bottom surface of brick basket, whereby retainers are loosened at least partly by weight of brick basket
CN2887822Y (en) * 2006-03-24 2007-04-11 中国第一冶金建设有限责任公司 Hanger brick basket clamp
CN201056851Y (en) * 2007-07-12 2008-05-07 四川方大新型建材科技开发有限责任公司 Brick clamper
CN201980854U (en) * 2010-12-21 2011-09-21 中国一冶集团有限公司 Semi-automatic brick-suspending clamp

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI415784B (en) * 2011-09-26 2013-11-21
CN104339160A (en) * 2014-08-28 2015-02-11 浙江吉利罗佑发动机有限公司 Clamping turnover mechanism
CN104339160B (en) * 2014-08-28 2016-08-24 科力远混合动力技术有限公司 Clamping switching mechanism
CN107352392A (en) * 2017-08-16 2017-11-17 张连杰 A kind of semi-automatic dress brick manipulator
CN110002335A (en) * 2019-03-20 2019-07-12 广州飞机维修工程有限公司 A kind of adjustable vertical lifting device of aircraft nose landing gear

Similar Documents

Publication Publication Date Title
CN102060232B (en) Transportation method for refractory brick for stove construction
CN205932941U (en) A device for handling of precast box girder template
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN102001583A (en) Semi-automatic brick hanging fixture
CN202449788U (en) Special crane device for wall bricks
CN102381625B (en) Large-diameter reinforcing steel bar lifting tongs
CN103863937A (en) Lifting appliance for large aluminum alloy round bars while leaving out of well
CN201980854U (en) Semi-automatic brick-suspending clamp
CN202089680U (en) Automatic lifting hook
CN212101636U (en) Automatic tubular pile hoist
CN203474231U (en) Steel bar tower safety hoisting device
CN211338549U (en) Steel ingot clamp
CN204529090U (en) Electric precipitation anode plate hanging apparatus
CN203699679U (en) Lifting appliance for lifting wire coil
CN202346582U (en) Large diameter steel bar hoisting clamp
CN104743437A (en) Electric precipitation anode plate hoisting device
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN210286475U (en) Prefabricated section lifting device
CN208234378U (en) A kind of safty hoisting device
CN207811062U (en) A kind of special hanger of nuclear power plant's concrete barrel shape disposal container
CN220449520U (en) General crucible hoist and mount frock of casting
CN205087793U (en) Integral of vertical reinforcement of growing up rises hoist
CN202245682U (en) Hoisting device for row pipeline
CN217102742U (en) Hoisting equipment for flat plate type aluminum alloy
CN102756988A (en) Movable sling for mounting expansion joint of comb plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406