CN204899180U - Steel construction jar body aerial working platform simply sets up device - Google Patents

Steel construction jar body aerial working platform simply sets up device Download PDF

Info

Publication number
CN204899180U
CN204899180U CN201520650224.7U CN201520650224U CN204899180U CN 204899180 U CN204899180 U CN 204899180U CN 201520650224 U CN201520650224 U CN 201520650224U CN 204899180 U CN204899180 U CN 204899180U
Authority
CN
China
Prior art keywords
platform support
platform
tank body
steel structural
jar body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520650224.7U
Other languages
Chinese (zh)
Inventor
宋紫洋
张未东
胡平
杨法言
张洪江
孙小强
王迪
王小明
王明光
贾洪波
张韶华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201520650224.7U priority Critical patent/CN204899180U/en
Application granted granted Critical
Publication of CN204899180U publication Critical patent/CN204899180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a steel construction jar body aerial working platform simply sets up device, by platform support crossbeam, platform support stand, platform support bracing, platform support railing, platform support couple, platform support slot, steel construction jar body section of thick bamboo wall, work platform springboard and safety rope are constituteed, be equipped with platform support slot on the steel construction jar body section of thick bamboo wall, platform support slot one side is equipped with the platform support, be equipped with platform support railing and platform support couple on the platform support, the platform support is formed and is welded and linked to each other by platform support crossbeam, platform support stand and platform support bracing, platform support crossbeam is adjacent is equipped with the work platform springboard between two, steel construction jar body section of thick bamboo wall encircles and is equipped with a plurality of platform supports. The utility model discloses can reach simple manufacture, utilize waste and old materials to retrieve the preparation, more be suitable for site operation and fungible tradition scaffold, improve and set up and dismounting speed, save material and the beneficial effect who shortens the engineering time.

Description

A kind of steel structural tank body aerial work platform is simple and easy sets up device
Technical field
The utility model belongs to steel structural tank body mounting technique field, particularly relates to that a kind of steel structural tank body aerial work platform is simple and easy sets up device.
Background technology
1, along with the development of metallurgical and chemical industry, increasing tall and big cylinder of steel body, steel stack occur thereupon.Disposable integral has lifted very difficult, usually needs segmentation to carry out.General lifting step is: first lift bottom first stage, crane is withdrawn from the arena, then for ensureing safety and the quality requirement of welding operation between epimere and hypomere, just must set up full hall scaffold and lay springboard, carry out security maintenance is the working space that welder creates safe enough, crane is marched into the arena and is carried out top lifting again, complete assembled welding job, complete remaining several sections successively by that analogy.Due to above-mentioned lifting step, therefore will cause repeatedly the expense of having bad luck of scaffold tube, springboard, lease expenses and the labour cost set up, unnecessary crane One-Shift Costs and set up time duration that scaffold delays.
2, provide a kind of technical scheme, adopt the waste and old material such as angle steel, channel-section steel, steel pipe in job site to be made into simple and easy scaffold, realize the effect of simple installation, handling safety, convenient disassembly, stopped the shortcoming of above-mentioned lifting.
Utility model content
The utility model provides that a kind of steel structural tank body aerial work platform is simple and easy sets up device, can reach and make simple, utilize waste and scrap to reclaim and make, more applicable site operation and alternative traditional pin hand cradle, improve and set up and dismounting speed, save the beneficial effect of material and shortening engineering time.
The technical problem that the utility model solves realizes by the following technical solutions: the utility model provides that a kind of steel structural tank body aerial work platform is simple and easy sets up device, by platform support crossbeam, platform support column, platform support diagonal brace, platform support railing, platform support is linked up with, platform support slot, steel structural tank body barrel, job platform springboard and safety rope composition, described steel structural tank body barrel is provided with platform support slot, described platform support slot side is provided with platform support, described platform support is provided with platform support railing and platform support hook.
Especially, described platform support is by platform support crossbeam, and platform support column and platform support diagonal brace form and be weldingly connected.
Especially, described platform support slot and steel structural tank body barrel are weldingly connected, and described platform support hook and platform rack beam are weldingly connected, and described platform support hook embeds with platform support slot and is connected.
Especially, the upper, middle and lower place of described platform support railing is respectively equipped with one safety rope.
Especially, be provided with job platform springboard between adjacent two of described platform support crossbeam, connected by iron wire colligation between described job platform springboard and platform rack beam.
Especially, described steel structural tank body barrel is around being provided with multiple platform support.
The beneficial effects of the utility model are:
1, the utility model utilizes waste and scrap to make, more applicable site operation, saves material, reduces costs.
2, the utility model fitting operation simple and fast and safety, after steel bracket dismounting, material still can recycling.
3, namely the utility model solves and repeatedly sets up and remove the time and expense that scaffold wastes, and in turn ensure that the economy of lifting, that reduces crane enters starts, saves scaffold rental charge and peace tears expense open.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is platform support top view of the present utility model;
Fig. 3 is top view of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further:
1-platform support crossbeam in figure, 2-platform support column, 3-platform support diagonal brace, 4-platform support railing, 5-platform support is linked up with, 6-platform support slot, 7-steel structural tank body barrel, 8-job platform springboard, 9-safety rope.
Embodiment:
The utility model is by platform support crossbeam 1, platform support column 2, platform support diagonal brace 3, platform support railing 4, platform support hook 5, platform support slot 6, steel structural tank body barrel 7, job platform springboard 8 and safety rope 9 form, and described steel structural tank body barrel 7 is provided with platform support slot 6, described platform support slot 6 side is provided with platform support, and described platform support is provided with platform support railing 4 and platform support hook 5.
Described platform support is by platform support crossbeam 1, and platform support column 2 and platform support diagonal brace 3 form and be weldingly connected.
Described platform support slot 6 and steel structural tank body barrel 7 are weldingly connected, and described platform support hook 5 and platform rack beam 1 are weldingly connected, and described platform support hook 5 embeds with platform support slot 6 and is connected.
The upper, middle and lower place of described platform support railing 4 is respectively equipped with one safety rope 9.
Be provided with job platform springboard 8 between adjacent two of described platform support crossbeam 1, connected by iron wire colligation between described job platform springboard 8 and platform rack beam 1.
Described steel structural tank body barrel 7 is around being provided with multiple platform support.
The quantity of required support is determined, then according to the construction drawing number of carrying out material, making, welding according to the diameter of tank structure and the length of springboard.
The subject matter of tank body overhead connection is as workman provides operating platform, and that improves that docking speed critical is scaffold sets up speed.When tank body keeps flat scene, carry out setting up of scaffold with next meter of position this section of tank body is suitable for reading immediately, before lifting starts, scaffold completes.
Tool making and assembling process:
The first step: be made into simple platform rack beam 1, platform support column 2 and platform support diagonal brace 3 with angle steel, simple platform support railing 4 is become with steel pipe manufacturing, be made into simple platform with angle steel and prop up hanger 5, finally on structure steel fabrication platform, each Member Welding is become simple platform support, and platform support hook 5 is welded on simple platform rack beam 1.
Second step: make simple platform support slot 6 on steel structure platform, after the steel structural tank body merogenesis that need install is marched into the arena, simple platform support slot 6 is welded to 1 ~ 1.5m place, tank body interface bottom, unified slot absolute altitude suitable for reading, spacing is determined by springboard length and tank body radius and is not more than 2m.
3rd step: the single simple platform support installing made is saved on merogenesis tank body to each, the platform support hook made by angle steel on single platform support during installation inserts in the platform support slot 6 that tank body has welded, after tank body one encloses single platform support installing, platform support is laid job platform springboard 8, and with iron wire by firm for job platform springboard 8 colligation on platform support crossbeam 1, the safety rope 9 be made up of steel wire together is respectively established, for platform safety protection be hanging safety belt in the upper, middle and lower of platform support railing 4.
4th step: when steel structural tank body respectively saves after simple platform installs, carry out tank body merogenesis lifting operation, when tank body divides internode welding, welder is by cat ladder carries out the welding of tank body internode to ease of Use platform, again by this simple platform support removing after construction.

Claims (6)

1. a steel structural tank body aerial work platform is simple and easy sets up device, it is characterized in that: by platform support crossbeam, platform support column, platform support diagonal brace, platform support railing, platform support is linked up with, platform support slot, steel structural tank body barrel, job platform springboard and safety rope composition, described steel structural tank body barrel is provided with platform support slot, and described platform support slot side is provided with platform support, and described platform support is provided with platform support railing and platform support hook.
2. a kind of steel structural tank body aerial work platform according to claim 1 is simple and easy sets up device, it is characterized in that: described platform support is by platform support crossbeam, and platform support column and platform support diagonal brace form and be weldingly connected.
3. a kind of steel structural tank body aerial work platform according to claim 1 is simple and easy sets up device, it is characterized in that: described platform support slot and steel structural tank body barrel are weldingly connected, described platform support hook and platform rack beam are weldingly connected, and described platform support hook embeds with platform support slot and is connected.
4. a kind of steel structural tank body aerial work platform according to claim 1 is simple and easy sets up device, it is characterized in that: the upper, middle and lower place of described platform support railing is respectively equipped with one safety rope.
5. a kind of steel structural tank body aerial work platform according to claim 1 is simple and easy sets up device, it is characterized in that: be provided with job platform springboard between adjacent two of described platform support crossbeam, connected by iron wire colligation between described job platform springboard and platform rack beam.
6. a kind of steel structural tank body aerial work platform according to claim 1 is simple and easy sets up device, it is characterized in that: described steel structural tank body barrel is around being provided with multiple platform support.
CN201520650224.7U 2015-08-26 2015-08-26 Steel construction jar body aerial working platform simply sets up device Active CN204899180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520650224.7U CN204899180U (en) 2015-08-26 2015-08-26 Steel construction jar body aerial working platform simply sets up device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520650224.7U CN204899180U (en) 2015-08-26 2015-08-26 Steel construction jar body aerial working platform simply sets up device

Publications (1)

Publication Number Publication Date
CN204899180U true CN204899180U (en) 2015-12-23

Family

ID=54921367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520650224.7U Active CN204899180U (en) 2015-08-26 2015-08-26 Steel construction jar body aerial working platform simply sets up device

Country Status (1)

Country Link
CN (1) CN204899180U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625584A (en) * 2018-05-09 2018-10-09 五冶集团上海有限公司 A kind of tower body equipment temporary platform and its assemble method
CN109944428A (en) * 2019-03-06 2019-06-28 中水电第十一工程局(郑州)有限公司 The work in combination platform and its installation method of steel structural overhead installation
CN110593544A (en) * 2019-10-14 2019-12-20 云南建投安装股份有限公司 Steel column safety operation platform
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method
CN112317996A (en) * 2020-10-14 2021-02-05 河钢股份有限公司承德分公司 Movable support for assembling and welding large-scale barrel structural member
CN113653310A (en) * 2021-09-22 2021-11-16 广州文船重工有限公司 Aerial work platform
CN116241061A (en) * 2023-01-30 2023-06-09 中国十七冶集团有限公司 Reusable vertical operation platform setting method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625584A (en) * 2018-05-09 2018-10-09 五冶集团上海有限公司 A kind of tower body equipment temporary platform and its assemble method
CN109944428A (en) * 2019-03-06 2019-06-28 中水电第十一工程局(郑州)有限公司 The work in combination platform and its installation method of steel structural overhead installation
CN110593544A (en) * 2019-10-14 2019-12-20 云南建投安装股份有限公司 Steel column safety operation platform
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method
CN112317996A (en) * 2020-10-14 2021-02-05 河钢股份有限公司承德分公司 Movable support for assembling and welding large-scale barrel structural member
CN113653310A (en) * 2021-09-22 2021-11-16 广州文船重工有限公司 Aerial work platform
CN116241061A (en) * 2023-01-30 2023-06-09 中国十七冶集团有限公司 Reusable vertical operation platform setting method

Similar Documents

Publication Publication Date Title
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN101476410B (en) Mounting and demounting method for roof plate formwork support platform of concrete silo
CN202358849U (en) Small-size suspension crane
CN203878965U (en) Device for construction of elevator shaft
CN103437563B (en) Mounting method for steel skeleton of large steel structure factory building
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN201703776U (en) Inverted lifting device of storage tank
CN203474231U (en) Steel bar tower safety hoisting device
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN204983692U (en) Concrete panel's hoist device
CN108792924B (en) Reinforcing steel bar positioning frame
CN203200719U (en) Hanging type slope pouring template device
CN201062431Y (en) Lifting device of cantilever scaffold
CN211473342U (en) Overhanging scaffold upright rod with anti-skid device
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204609267U (en) A kind of suspension bracket for tank inside construction
CN211283476U (en) Be used for inclined roofing precast beam hoist device of assembled concrete structure
CN204569127U (en) Steel upright post hoisting jig
CN204980945U (en) Supplementary tower crane dismounting device
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN201924585U (en) Fixed device for reinforcing bottom of upright rod of suspension scaffold for building
CN215482358U (en) Bridge high pier steel bar installation operation device
CN103084817B (en) The installation method of industry cylindrical furnace radiating furnace tube
CN101492961B (en) Method for making removable job platform for coal gas discharging chimney

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant