JPH10160040A - Vertical piping construction, temporarily fixing device therefor, and piping bent preventing jig for vertical piping construction - Google Patents

Vertical piping construction, temporarily fixing device therefor, and piping bent preventing jig for vertical piping construction

Info

Publication number
JPH10160040A
JPH10160040A JP33282296A JP33282296A JPH10160040A JP H10160040 A JPH10160040 A JP H10160040A JP 33282296 A JP33282296 A JP 33282296A JP 33282296 A JP33282296 A JP 33282296A JP H10160040 A JPH10160040 A JP H10160040A
Authority
JP
Japan
Prior art keywords
pipe
vertical
building
temporary fixing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33282296A
Other languages
Japanese (ja)
Other versions
JP3658118B2 (en
Inventor
Yasuhiro Izumi
康博 泉
Shozo Matsui
昭三 松井
Isao Matsumoto
勲 松本
Ryota Kito
良太 鬼頭
Mitsuhisa Nishimura
光久 西村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NISHIMURA KOGYO KK
Takasago Thermal Engineering Co Ltd
Obayashi Corp
Takenaka Komuten Co Ltd
Original Assignee
NISHIMURA KOGYO KK
Takasago Thermal Engineering Co Ltd
Obayashi Corp
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NISHIMURA KOGYO KK, Takasago Thermal Engineering Co Ltd, Obayashi Corp, Takenaka Komuten Co Ltd filed Critical NISHIMURA KOGYO KK
Priority to JP33282296A priority Critical patent/JP3658118B2/en
Publication of JPH10160040A publication Critical patent/JPH10160040A/en
Application granted granted Critical
Publication of JP3658118B2 publication Critical patent/JP3658118B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a vertical piping construction method which can eliminate prefabrication work at a factory and a long lift such as a tower crane, and facilitate connecting work. SOLUTION: On an upper supporting base 14, an upper piping member P1 is fixed temporarily. A lower piping member P2 is set at the receiving part 13a of a frame 13 rising along guide rails 11, 12. The frame 13 is raised by a jack for connecting and fixing work for the piping member P1 and the piping member P2. Temporary fixing of the piping member P1 is released to push up the piping member P2 and temporarily-fix the piping member P2 at the upper supporting base 14. By pushing up and connecting the piping members sequentially in the same way, it is possible to construct vertical piping.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建物の竪配管を構
築する際の竪管の施工方法、及び当該竪管の施工方法に
使用するのに適した竪管施工用の仮固定装置並びに竪管
施工用配管折れ防止治具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a vertical pipe when constructing a vertical pipe of a building, a temporary fixing device for vertical pipe construction suitable for use in the method for constructing a vertical pipe, and a vertical pipe. The present invention relates to a jig for preventing pipe breakage for pipe construction.

【0002】[0002]

【従来の技術】空調設備や衛生設備などの各種建築設備
用の竪配管を高層建築物に配管する場合、竪配管される
所定の複数本の管材をフレームや固定部材などを用いて
竪管ユニットとしてユニット化し、これを建築物側の揚
重機、例えばタワークレーンなどで垂直状態で順次上側
に揚重する工法が従来から採用されている。かかる工法
によれば、竪配管の建築物への取付工事と建築工事の鉄
骨建方とを同時に行え、施工の容易性、工期の短縮化を
図ることが可能であった。
2. Description of the Related Art When vertical pipes for various building equipment such as air conditioning equipment and sanitary equipment are to be piped to a high-rise building, a predetermined plurality of pipes that are vertically piped are connected to a vertical pipe unit using a frame, a fixing member, or the like. Conventionally, a construction method has been employed in which a unit is lifted up vertically in a vertical state by a building-side lifting machine, for example, a tower crane or the like. According to such a construction method, the installation work of the vertical pipe to the building and the construction of the steel frame in the construction work can be performed at the same time, and the easiness of the construction and the shortening of the construction period can be achieved.

【0003】[0003]

【発明が解決しようとする課題】しかしながら前記従来
の方法によれば、構造補強や鉄骨製作の点から、設計段
階での組み込みを早期に決定する必要があり、事後の修
正等が難しかった。しかも工場で竪管ユニットを予めプ
レハブ化するため、工場加工費が別途かかってしまう。
さらにタワークレーンを用いているため、建物における
他の使用者との調整が必要であり、独自に工事を進める
ことができなかった。そのうえ上側の配管をタワークレ
ーンで吊り下げた状態で、下側の配管の芯合わせを行っ
て溶接等による管相互の接続固定作業を行わなければな
らないので、接続作業が容易ではなかった。
However, according to the above-mentioned conventional method, it is necessary to determine the installation at the design stage at an early stage from the viewpoint of structural reinforcement and fabrication of a steel frame, and it is difficult to make subsequent corrections. Moreover, since the vertical pipe unit is prefabricated in the factory in advance, factory processing costs are separately required.
Furthermore, since a tower crane is used, coordination with other users in the building was necessary, and the construction could not proceed independently. In addition, while the upper pipe is suspended by a tower crane, the lower pipe must be centered and the pipes must be connected and fixed by welding or the like, so that the connection work is not easy.

【0004】本発明はかかる点に鑑みてなされたもので
あり、特に早期に施工を決定する必要がなく、また工場
でのプレハブ作業が不要で、しかもタワークレーンなど
のいわゆるロングリフトを用いることなく竪配管の施工
が可能な、竪管の施工方法を提供することを第1の目的
としている。また本発明は、かかる竪管の施工方法を好
適に実施することができる竪管施工用の仮固定装置を提
供することを第2の目的としている。さらに本発明は、
かかる竪管の施工方法を実施する際、配管が曲がったり
折れたりすることを防止できる竪管施工用配管折れ防止
治具を提供することを第3の目的としている。
[0004] The present invention has been made in view of the above point, there is no need to particularly determine the construction at an early stage, no prefabricated work in the factory, and without using a so-called long lift such as a tower crane. It is a first object of the present invention to provide a vertical pipe construction method capable of constructing a vertical pipe. A second object of the present invention is to provide a temporary fixing device for vertical pipe construction that can suitably carry out such a vertical pipe construction method. Furthermore, the present invention
It is a third object of the present invention to provide a pipe bending prevention jig for vertical pipe construction, which can prevent the pipe from being bent or broken when implementing such a vertical pipe construction method.

【0005】[0005]

【課題を解決するための手段】前記第1の目的を達成す
るため、請求項1によれば、建物に竪配管を施工するに
あたり、前記竪配管を構成するための管材のうち上側に
位置する管材を垂直状態で所定の仮固定箇所で建物側に
仮固定し、次いで下側に位置する管材を垂直状態で押し
上げて上側の管材の下部と下側の管材の上部とを接続固
定し、その後前記仮固定を解除すると共に、下側の管材
を前記所定の仮固定箇所での仮固定に必要な位置まで押
し上げることを特徴とする、竪管の施工方法が提供され
る。
According to the first aspect of the present invention, in order to achieve the first object, when a vertical pipe is constructed in a building, the vertical pipe is located at an upper side of a pipe material for forming the vertical pipe. The pipe is temporarily fixed to the building side at a predetermined temporary fixing point in a vertical state, and then the lower tube is pushed up vertically to connect and fix the lower part of the upper pipe and the upper part of the lower pipe, and then A method for constructing a vertical pipe is provided, wherein the temporary fixing is released and the lower tube is pushed up to a position required for temporary fixing at the predetermined temporary fixing place.

【0006】また請求項2によれば、建物に竪配管を施
工するにあたり、前記竪配管を構成するための管材のう
ち、まず最上部に配管される管材を垂直にした状態で所
定の仮固定箇所での仮固定に必要な位置まで押し上げ、
次いで当該管材を前記所定の仮固定箇所で建物側に仮固
定し、その後当該管材の下に配管される他の管材を垂直
にした状態で押し上げて、先の管材の下部と前記他の管
材の上部とを接続固定し、その後前記仮固定を解除する
と共に、前記他の管材を前記所定の仮固定箇所での仮固
定に必要な位置まで押し上げることを特徴とする、竪管
の施工方法が提供される。
According to a second aspect of the present invention, in constructing a vertical pipe in a building, of the pipes constituting the vertical pipe, first, a pipe material to be piped at an uppermost portion is vertically fixed in a predetermined state. Push up to the position required for temporary fixing at the point,
Next, the pipe material is temporarily fixed to the building side at the predetermined temporary fixing point, and then another pipe material piped under the pipe material is pushed up in a vertical state, so that the lower portion of the previous pipe material and the other pipe material are A vertical pipe construction method is provided, wherein the temporary pipe is fixed to the upper portion, and then the temporary fixing is released, and the other pipe material is pushed up to a position necessary for temporary fixing at the predetermined temporary fixing point. Is done.

【0007】このように請求項1、2の竪管の施工方法
によれば、上側に位置する管材を垂直状態で所定の仮固
定箇所で建物側に仮固定し、次いで下側に位置する管材
を垂直状態で押し上げて上側の管材の下部と下側の管材
の上部とを接続固定するようにしているので、管相互の
芯合わせが容易であり、接続作業が従来よりも容易であ
る。しかも下側に位置する管材を押し上げていくのでタ
ワークレーンは不要であり、独自に工事を進めることが
でき、設計段階の早期に工事日程を決定する必要はな
い。管材もプレハブ化によるユニット構成とする必要は
ない。もちろん管材を押し上げる場合、複数の管材を同
時に押し上げれば、複数の配管を迅速に施工できる。管
材を押し上げる手段としては、適宜のジャッキを用いる
ことができる。なおここでいう仮固定とは、少なくとも
落下しないように建物側に固定された状態をいい、管材
の上昇動作を妨げないものであってもよい。
As described above, according to the vertical pipe construction method of the first and second aspects, the pipe material located on the upper side is temporarily fixed to the building side at a predetermined temporary fixing point in a vertical state, and then the pipe material located on the lower side. Is pushed up in a vertical state to connect and fix the lower part of the upper tube and the upper part of the lower tube, so that the pipes can be easily centered and the connection operation is easier than before. Moreover, since the lower tube is pushed up, a tower crane is not required, and the construction can be carried out independently, and there is no need to determine the construction schedule early in the design stage. It is not necessary for the tube material to have a unit configuration by prefabrication. Needless to say, when pushing up a plurality of pipes simultaneously, a plurality of pipes can be constructed quickly. As a means for pushing up the tube, an appropriate jack can be used. Here, the term “temporary fixing” refers to a state in which the pipe is fixed to the building so as not to fall at least, and may be one that does not hinder the upward movement of the pipe.

【0008】これら請求項1、2の竪管の施工方法にお
いて管材を垂直状態で押し上げるにあたり、請求項3に
記載したように、少なくとも当該押し上げ長の長さを有
するガイドレールを予め立設し、当該管材の少なくとも
下端部をこのガイドレールに沿って上昇自在な架台に支
持させ、この架台を上昇させることで当該管材を押し上
げるようにすれば、管材を容易にかつ円滑に垂直に押し
上げることができる。従って、複数の管材を同時に押し
上げる場合も、複数の管材を架台にセットしてこの架台
を上昇させることで、複数管材の押し上げを容易に実現
させることが可能である。
In the vertical pipe construction method according to the first and second aspects, when the pipe is pushed up in a vertical state, as described in the third aspect, a guide rail having at least the length of the pushed up length is previously erected, At least the lower end of the pipe is supported on a mount that can be raised along the guide rail, and the pipe is pushed up by raising the mount, so that the pipe can be easily and smoothly pushed up vertically. . Therefore, even when a plurality of pipes are pushed up at the same time, it is possible to easily push up the plurality of pipes by setting the plurality of pipes on the mount and raising the mount.

【0009】管材の少なくとも下端部をこの架台に支持
させる場合、例えば当該管材の下端部を受容するソケッ
トなどの受容部を架台に設ければ、当該支持を容易に実
現することができる。従って、複数の管材を同時に押し
上げる場合も、このような受容部を複数設けておけばよ
い。
In the case where at least the lower end of the tube is supported by the mount, the support can be easily realized by providing a mount such as a socket for receiving the lower end of the tube in the mount. Therefore, even when a plurality of pipe members are pushed up at the same time, a plurality of such receiving portions may be provided.

【0010】第2の目的を達成するため、請求項4によ
れば、外周に突部を有し、建物に竪配管される管材を垂
直状態でこの建物側に仮固定するための装置であって、
水平状態から上方にのみ回動自在である複数の係止体が
前記建物側の適宜の部材に取り付けられ、これら各係止
体には各々切欠部が形成され、これら各係止体が水平状
態にあるときには、前記各切欠部の集合によって前記管
材の本体部分のみが通過自在な開口部が形成されるよう
に、各係止体の取り付け位置や切欠部の形状を構成した
ことを特徴とする、竪管施工用の仮固定装置が提供され
る。
According to a fourth aspect of the present invention, there is provided an apparatus having a projection on an outer periphery for temporarily fixing a pipe vertically piped to a building to the building in a vertical state. hand,
A plurality of locking members that are rotatable only upward from the horizontal state are attached to appropriate members on the building side, and each of the locking members is formed with a notch, and each of the locking members is in a horizontal state. In the configuration, the mounting position of each locking body and the shape of the notch portion are configured such that the opening of the main body of the pipe material can only pass through the collection of the notch portions. A temporary fixing device for vertical pipe construction is provided.

【0011】この竪管施工用の仮固定装置を用いれば、
下方から開口部を目標として管材を上昇させていき、こ
の開口部内を管材の頂部が通過するようにさらに上昇さ
せていくと、この開口部は管材の本体のみ通過する形状
であるから、管材外周の突部に開口部周縁が係止され、
管材の上昇に伴って係止体は上方に回動する。そしてな
おも管材を上昇させると、開口部周縁の係止が解除さ
れ、係止体は自重によって再び水平状態に復帰する。こ
の時点で管材を下降させていくと、今度は管材外周の突
部が開口部周縁に係止される。係止体は上方にのみ回動
自在であるから、この時点で管材の支持を解除しても、
管材は仮固定装置に吊下された状態となり、いわば仮固
定される。従って、請求項1、2の竪管の施工方法を実
施する際に、この請求項3の仮固定装置を用いれば、管
材の押し上げ、下降動作だけで自動的に仮固定がさなれ
る。なおそのように管材はいわば吊下された状態である
から、管材の上昇動作は自在である。
If this temporary fixing device for vertical pipe construction is used,
The tube is raised from below with the target of the opening, and further raised so that the top of the tube passes through the opening, and since the opening is shaped to pass only the main body of the tube, the outer periphery of the tube is The periphery of the opening is locked to the protrusion of
The locking body rotates upward with the rise of the tube material. Then, when the pipe is further raised, the locking of the periphery of the opening is released, and the locking body returns to the horizontal state again by its own weight. When the tube is lowered at this point, the projection on the outer periphery of the tube is locked to the periphery of the opening. Since the locking body can rotate only upward, even if the support of the tube material is released at this point,
The tube material is suspended from the temporary fixing device, so that it is temporarily fixed. Therefore, when the method for constructing a vertical pipe according to the first or second aspect is used, if the temporary fixing device according to the third aspect is used, the temporary fixing is automatically performed only by pushing up and down the pipe material. In addition, since the pipe material is in a hung state as it is, the raising operation of the pipe material is free.

【0012】第3の目的を達成するため、請求項5によ
れば、管材を垂直状態で上昇させて建物に竪配管を施工
する際に用いる治具であって、前記建物側に固定される
本体と、この本体に取り付けられて前記管材を挟んで対
向する少なくとも一対のローラ部材とを備えてなること
を特徴とする、竪管施工用配管折れ防止治具が提供され
る。
According to a fifth aspect of the present invention, there is provided a jig for vertically mounting a vertical pipe on a building and fixing the pipe to the building, the jig being fixed to the building. A pipe breaking prevention jig for vertical pipe construction is provided, comprising: a main body; and at least a pair of roller members attached to the main body and facing each other with the pipe material interposed therebetween.

【0013】従ってこの竪管施工用配管折れ防止治具を
管材の上昇経路に配置することにより、上昇する管材は
ローラ部材によってガイドされると共に、左右の動きが
規制されるので、配管が曲がったり折れたりすることを
防止できる。
Therefore, by disposing the pipe breaking preventing jig for vertical pipe construction on the rising path of the pipe, the rising pipe is guided by the roller member and the right and left movement is regulated, so that the pipe may be bent. Breaking can be prevented.

【0014】[0014]

【発明の実施の形態】以下、図面に基づいて本発明の実
施の形態を説明する。図1は本実施形態にかかる竪管の
施工方法の準備段階を示しており、まず竪配管を実施す
る建物の1階の床面1から2階の階床部2、3階の階床
部3に渡って押し上げ装置10を設置する。この押し上
げ装置10は、1階の床面1から2階の階床部2にかけ
て垂直に立設させた2本の対向するガイドレール11、
12と、これらガイドレール11、12間に装着され、
これらガイドレール11、12に沿って上下に摺動自在
な架台13とを有している。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a preparation stage of a vertical pipe construction method according to this embodiment. First, a first floor to a second floor, a second floor, and a third floor of a building in which vertical piping is to be performed. The lifting device 10 is installed over 3. The push-up device 10 includes two opposing guide rails 11 vertically erected from the floor 1 on the first floor to the floor 2 on the second floor.
12 and is mounted between these guide rails 11 and 12,
A gantry 13 slidable up and down along the guide rails 11 and 12 is provided.

【0015】3階の階床部3には、押し上げ装置10の
上部支持台14が設置される。この上部支持台14は、
2本の鋼材、例えばH鋼材を所定の間隔をあけて平行に
配した構成を採っている。そしてこの上部支持台14の
両端近傍には、外周にネジを切った2本のネジ棒15、
15が螺貫しており、これら各ネジ棒15、15の下端
部には、接続ピン16、16を介してネジ棒接続治具1
7、17の上端部が接続されている。このネジ棒接続治
具17、17は、2階の階床部2に形成された適宜のス
リーブ(図示せず)を遊貫している。さらに各ネジ棒接
続治具17、17の下端部には、接続ピン18、18を
介して外周にネジを切った2本のネジ棒19、19の上
端部が取り付けられ、これらネジ棒19、19の下端部
は、各々前記架台13の両端部近傍を貫通している。
An upper support 14 of the lifting device 10 is installed on the floor 3 of the third floor. This upper support 14 is
It employs a configuration in which two steel materials, for example, H steel materials are arranged in parallel at predetermined intervals. In the vicinity of both ends of the upper support base 14, two screw rods 15 each having an outer periphery threaded,
The screw rod connection jig 1 is connected to the lower end of each of the screw rods 15 via connection pins 16.
The upper ends of 7 and 17 are connected. The threaded rod connecting jigs 17 and 17 pass through appropriate sleeves (not shown) formed on the floor 2 on the second floor. Further, to the lower ends of the screw rod connecting jigs 17, 17, the upper ends of two screw rods 19, 19 threaded to the outer periphery via connection pins 18, 18 are attached. The lower ends of 19 penetrate the vicinity of both ends of the gantry 13, respectively.

【0016】上部支持台14の上面には、ネジ棒15、
15側をウォームホイルとして、ウォームギヤ機構を構
成するウォームギヤ装置21、21が取り付けられてお
り、さらに各ウォームギヤ装置21はモータ22によっ
て駆動されるようになっている。従って、モータ22を
作動させると、各ウォームギヤ装置21によってネジ棒
15、15は上昇又は下降する。従って、それに伴って
ネジ棒接続治具17、17及びネジ棒19、19も上下
動する。
On the upper surface of the upper support 14, a screw rod 15,
Worm wheels 21 and 21 constituting a worm gear mechanism are attached to the worm wheel on the 15 side, and each worm gear device 21 is driven by a motor 22. Therefore, when the motor 22 is operated, the screw rods 15, 15 are raised or lowered by the respective worm gear devices 21. Accordingly, the screw rod connecting jigs 17, 17 and the screw rods 19, 19 also move up and down accordingly.

【0017】架台13の下面には、ネジ棒19、19側
をウォームホイルとして、ウォームギヤ機構を構成する
ウォームギヤ装置23、23が取り付けられており、さ
らに各ウォームギヤ装置23はモータ24によって駆動
されるようになっている。従って、モータ24を作動さ
せると、ウォームギヤ装置23、23の働きにより、ガ
イドレール11、12に対して摺動自在な架台13は、
このネジ棒19、19に対して上昇又は下降する。
On the lower surface of the gantry 13, worm gear devices 23, 23 constituting a worm gear mechanism are attached, with the screw rods 19, 19 side being worm wheels, and each worm gear device 23 is driven by a motor 24. It has become. Accordingly, when the motor 24 is operated, the gantry 13 slidable with respect to the guide rails 11 and 12 by the action of the worm gear devices 23 and 23
It rises or falls with respect to this screw rod 19,19.

【0018】2階の階床部2には、図2、図3に示した
ような配管折れ防止治具31が2カ所に設けられてい
る。この配管折れ防止治具31は、例えばアングル材な
どによって構成された一対の本体32、33と、この本
体32、33間に渡されて固定されるシャフト34の外
周に回転自在に装着されたローラ部材35によって構成
されている。本実施形態にかかる配管折れ防止治具31
においては、本体32、33の対向側面32a、33a
に、適当間隔で複数の取り付け孔32b、33bを対向
位置に夫々形成し、これら取り付け孔32b、33bの
うちの任意の取り付け孔に、シャフト34をダブルナッ
ト等の固定手段36で固定してある。図示の配管折れ防
止治具31においては、4本のシャフト34を取り付け
て4つのローラ部材35を備えている。
The jigs 31 for preventing pipe breakage as shown in FIGS. 2 and 3 are provided at two places on the floor 2 of the second floor. The pipe break prevention jig 31 includes a pair of main bodies 32 and 33 made of, for example, an angle material, and a roller rotatably mounted on an outer circumference of a shaft 34 fixed between the main bodies 32 and 33. It is constituted by a member 35. Piping break prevention jig 31 according to the present embodiment
, The opposing side surfaces 32a, 33a of the main bodies 32, 33
A plurality of mounting holes 32b and 33b are formed at opposing positions at appropriate intervals, and a shaft 34 is fixed to an arbitrary one of the mounting holes 32b and 33b by fixing means 36 such as a double nut. . The illustrated jig 31 for preventing pipe breakage has four roller members 35 to which four shafts 34 are attached.

【0019】これらローラ部材35の設置間隔は、図3
に示したように、竪配管を構成する管材Pを挟んで、2
つのローラ部材35が所定の距離(例えば後述のつば部
pfの径よりも長い距離)を隔てて対向するように設定
される。この場合、シャフト34の取り付け孔32b、
33bは任意に選択でき、しかもシャフト34自体の長
さを適宜選択することにより、管径が異なった各種の管
材に対処することができる。
The installation interval of these roller members 35 is as shown in FIG.
As shown in FIG.
The two roller members 35 are set to face each other at a predetermined distance (for example, a distance longer than the diameter of a flange portion pf described later). In this case, the mounting hole 32b of the shaft 34,
33b can be arbitrarily selected, and by appropriately selecting the length of the shaft 34 itself, it is possible to cope with various pipe materials having different pipe diameters.

【0020】後述のように本実施形態にかかる竪管の施
工方法では、4本の管材を平行に同時に施工するので、
前記配管折れ防止治具31は、各管材が配管される階床
のスリーブに適合するように、2階の階床部2には2つ
設置固定されている。なお前記配管折れ防止治具31は
かかる構造に限らず、長尺の本体を用いることにより、
より多数のローラ部材35を装着したり、あるいは短尺
の本体を用いてより少数のローラ部材35を装着できる
構成としてもよい。前者によれば1つの治具で例えば4
本の同時施工に対処することができ、後者によれば、同
時に施工する管材の径が各々大きく異なっている場合
に、個々に設置することで対処できるメリットがある。
As will be described later, in the method for constructing a vertical pipe according to the present embodiment, four pipes are simultaneously constructed in parallel.
Two jigs 31 for preventing pipe breakage are installed and fixed to the floor part 2 on the second floor so as to fit the sleeves of the floor on which each pipe material is piped. The pipe breaking prevention jig 31 is not limited to such a structure, and by using a long body,
A configuration may be adopted in which a greater number of roller members 35 can be mounted, or a smaller number of roller members 35 can be mounted using a short main body. According to the former, one jig requires, for example, 4
It is possible to cope with the simultaneous construction of books, and according to the latter, there is an advantage that if the diameters of the pipes to be constructed at the same time differ greatly, it can be dealt with by installing them individually.

【0021】前出上部支持台14には、図4に示した仮
固定装置41が4カ所に設けられている。この仮固定装
置41は、上部支持台14を構成している2本の鋼材1
4a、14bに跨って回動自在に取り付けられた2つの
係止体42、43によって構成されている。これら係止
体42、43は左右対称形状をなし、各々内側が突き合
わさるように対向して配置され、各外側辺42a、43
aの両端近傍と鋼材14a、14bとの間に、蝶番等の
回動部材44を取り付けて、水平状態から上方にのみ回
動自在となるように構成されている。仮固定装置41の
材質としては、板厚20mmの鋼板を例示することができ
る。
The temporary support device 41 shown in FIG. 4 is provided at four places on the upper support 14. The temporary fixing device 41 includes two steel materials 1 forming the upper support base 14.
It is constituted by two locking members 42 and 43 which are rotatably mounted over 4a and 14b. The locking members 42 and 43 have a symmetrical shape and are arranged to face each other such that the insides thereof abut each other.
A rotatable member 44 such as a hinge is attached between the vicinity of both ends of a and the steel materials 14a and 14b, so that the rotatable member 44 is rotatable only upward from a horizontal state. As a material of the temporary fixing device 41, a steel plate having a thickness of 20 mm can be exemplified.

【0022】また係止体42、43の突き合わせ側内側
辺には半円形の切欠部42b、43bが形成されてい
る。そして図4に示したように、係止体42、43が水
平状態で各内側辺が突き合わさっている状態では、これ
ら2つの切欠部42b、43bによって、円形の開口部
Hが形成される。この開口部Hの内径は、管材Pの外径
よりも僅かに大きい程度に設定され、つば部pfの外径
よりも小さくなるように設定されている。
Further, semicircular notches 42b and 43b are formed on the inner sides of the engagement members 42 and 43 on the butting side. Then, as shown in FIG. 4, in a state where the locking members 42 and 43 are in a horizontal state and their inner sides abut each other, a circular opening H is formed by these two notches 42 b and 43 b. The inner diameter of the opening H is set to be slightly larger than the outer diameter of the pipe material P, and is set to be smaller than the outer diameter of the collar pf.

【0023】一方前出架台13には、管材Pの下端部を
受容するソケット形状の受容部13aが、架台13の上
面に固着された支持柱13bの上部に、複数(本実施形
態においては4つ)設けられている。以上のようにして
押し上げ装置10、配管折れ防止治具31、仮固定装置
41が設定されると準備が完了する。次に施工手順につ
いて説明する。
On the other hand, a socket-shaped receiving portion 13a for receiving the lower end portion of the tube material P is provided on the front mounting base 13 on a support column 13b fixed to the upper surface of the mounting base 13 in a plurality (4 in this embodiment). One) is provided. Preparation is completed when the push-up device 10, the pipe break prevention jig 31, and the temporary fixing device 41 are set as described above. Next, the construction procedure will be described.

【0024】本実施形態にかかる竪管の施工方法におい
ては、図5に示したように、管材Pの上端部近傍の外周
に、本発明でいう突部を構成するつば部pfを例えば溶
接等によって固着した管材Pを用いている。もちろん突
部の形状はこのようなつば部pfに限らず、外周に突出
する形態のものであればよい。つば部pfとしては、公
知の接続ソケットで兼用することができる。
In the method for constructing a vertical pipe according to the present embodiment, as shown in FIG. 5, a flange pf constituting the projection according to the present invention is attached to the outer periphery near the upper end of the pipe material P by welding or the like. Is used. Of course, the shape of the protrusion is not limited to such a flange portion pf, but may be any shape as long as it protrudes to the outer periphery. A well-known connection socket can also be used as the collar pf.

【0025】そして最上部に配管される管材P1を、適
宜の吊り込み部材で吊り込んで、図6に示したように、
その下端部を架台13の受容部13a内に挿入して、セ
ットする。このとき管材P1の上部は、配管折れ防止治
具31の対向する一対のローラ部材35、35間に挿通
させる。
Then, the pipe material P1 to be piped at the uppermost portion is hung by an appropriate hanging member, and as shown in FIG.
The lower end is inserted into the receiving portion 13a of the gantry 13 and set. At this time, the upper part of the pipe material P1 is inserted between a pair of roller members 35, 35 of the pipe break prevention jig 31 facing each other.

【0026】次に上部支持台14側のモータ22、及び
架台13側のモータ24を作動させる。モータ22が作
動すると、ネジ棒15自体が上昇し、それに伴ってネジ
棒接続治具17、17が上昇する。一方モータ24の作
動により架台13がガイドレール11、12に沿って上
昇する。従って、架台13は、ネジ棒19自体の上昇
と、このネジ棒19に沿っての上昇とによって上昇し、
それによって架台13の受容部13aにセットされてい
る4本の管材P1が、図7に示したように、上方に押し
上げられる。
Next, the motor 22 on the upper support 14 and the motor 24 on the gantry 13 are operated. When the motor 22 operates, the screw rod 15 itself rises, and the screw rod connection jigs 17 rise accordingly. On the other hand, the gantry 13 moves up along the guide rails 11 and 12 by the operation of the motor 24. Therefore, the gantry 13 rises by the rise of the screw rod 19 itself and the rise along the screw rod 19,
Thereby, the four pipe members P1 set in the receiving portion 13a of the gantry 13 are pushed upward as shown in FIG.

【0027】図8に示したように、管材P1が上方に押
し上げられていくと、管材P1が3階の階床部3のスリ
ーブ3aの上部に設けられている仮固定装置41の開口
部Hに接近し、なおもそのまま管材P1を上方に押し上
げると、当該開口部Hは管材P1の本体のみを通過させ
る形状であるから、やがて管材P1のつば部pfが開口
部Hの周縁部、即ち各係止体42、43の切欠部42
b、43bに引っかかり、管材P1の押し上げにより、
図9に示したように、各係止体42、43は開いて持ち
上げられる。
As shown in FIG. 8, when the pipe material P1 is pushed upward, the pipe material P1 is opened on the opening H of the temporary fixing device 41 provided above the sleeve 3a of the third floor 3 of the third floor. When the pipe material P1 is pushed upward as it is, the opening H has a shape that allows only the main body of the pipe material P1 to pass therethrough. Notch 42 of locking body 42, 43
b, 43b, and by pushing up the pipe material P1,
As shown in FIG. 9, each locking body 42, 43 is opened and lifted.

【0028】なおもそのまま押し上げると、各係止体4
2、43の切欠部42b、43bに対する管材P1のつ
ば部pfの前記引っかかりは解除され、図10に示した
ように、各係止体42、43は、自重によって下方に回
動して水平状態になる。ここで管材P1の押し上げを停
止し、今度はモータ22、24を逆回転させて架台13
を下降させて管材P1を徐々に降下させると、図11に
示したように、管材P1のつば部pfが開口部Hの周縁
部、即ち各係止体42、43の切欠部42b、43bに
係止され、管材P1は仮固定装置41に吊下された状
態、即ち仮固定状態となる。
Still further, when pushed up as it is, each locking body 4
The engagement of the flange portion pf of the pipe material P1 with the notch portions 42b, 43b of the pipes 2, 43 is released, and as shown in FIG. become. At this point, the lifting of the pipe material P1 is stopped, and the motors 22 and 24 are rotated in reverse, and
Is lowered to gradually lower the pipe material P1, and as shown in FIG. 11, the flange portion pf of the pipe material P1 is inserted into the peripheral portion of the opening H, that is, the notch portions 42b, 43b of the locking members 42, 43. The tube material P1 is locked and suspended in the temporary fixing device 41, that is, in a temporarily fixed state.

【0029】架台13はそのまま下降させ、図12に示
したように、再び管材のセット位置で停止させる。次に
図13に示したように、前記管材P1の下端に接続され
る管材P2を、架台13の受容部13aにセットする。
次いで再びモータ22、24を上昇側に作動させて、図
14に示したように、管材P2を押し上げる。
The gantry 13 is lowered as it is, and is stopped again at the pipe material setting position as shown in FIG. Next, as shown in FIG. 13, a tube P2 connected to the lower end of the tube P1 is set in the receiving portion 13a of the gantry 13.
Next, the motors 22 and 24 are operated again to the upside, and the pipe material P2 is pushed up as shown in FIG.

【0030】そして管材P1の下端部に管材P2の上端部
が接触した時点で、モータ22、24を停止させて架台
13を静止させて状態で、各管材P1の下端部と各管材
P2の上端部とを、溶接等によって接続固定する。接続
固定作業が完了すると、再びモータ22、24を作動さ
せて架台13を上昇させ、各管材P1、P2ごと押し上げ
る。
When the lower end of the tube P1 comes into contact with the upper end of the tube P2, the motors 22, 24 are stopped and the pedestal 13 is stopped, and the lower end of each tube P1 and the upper end of each tube P2 are stopped. The part is connected and fixed by welding or the like. When the connection and fixing work is completed, the motors 22 and 24 are operated again to raise the gantry 13 and push up the pipes P1 and P2 together.

【0031】管材P2を押し上げていくと、今度はこの
管材P2のつば部pfが上部支持台14の仮固定装置4
1の係止体42、43を押し上げ、なおもそのまま管材
P2を押し上げていくと、管材P1の場合と同様に、係止
体42、43は自重によって水平状態に復帰する。この
時点でモータ22、24を逆回転させて架台13を下降
させていくと、管材P2は図15に示したように、上部
支持台14の仮固定装置に仮固定される。同図中、4は
4階の階床部を示している。そして図16に示したよう
に、再び管材のセット位置まで架台13を下降させて停
止させる。後は同様な手順で順次、次の管材を架台13
の受容部13aにセットし、再び同様な作業手順で当該
次の管材を押し上げていけばよい。
When the pipe P2 is pushed up, the flange pf of the pipe P2 is temporarily fixed to the temporary fixing device 4 of the upper support base 14.
When the first locking members 42 and 43 are pushed up and the pipe material P2 is still pushed up as it is, the locking members 42 and 43 return to the horizontal state by their own weight, as in the case of the pipe material P1. At this point, when the pedestal 13 is lowered by rotating the motors 22 and 24 in the reverse direction, the pipe material P2 is temporarily fixed to the temporary fixing device of the upper support 14 as shown in FIG. In the figure, reference numeral 4 denotes a floor portion of the fourth floor. Then, as shown in FIG. 16, the gantry 13 is lowered again to the set position of the tube material and stopped. Then, in the same procedure, the next tube is sequentially attached to the gantry 13.
Is set in the receiving portion 13a, and the next tube is pushed up again in the same operation procedure.

【0032】以上の作業手順でもわかるように、本実施
形態にかかる竪管の施工方法によれば、まずタワークレ
ーンを使用しないので、独自に工事を進めることがで
き、これまで面倒であったタワークレーンの使用につい
ての他の工事方との調整が不要である。従って、設計段
階の早期に工事日程を決定する必要はなく、事後の修正
にも応ずることができる。またその分、タワークレーン
を使用する他の工事方の工事期間も短縮できる。
As can be seen from the above work procedure, according to the vertical pipe construction method according to the present embodiment, since the tower crane is not used first, the construction can be carried out independently, and the tower which has been troublesome until now can be obtained. Coordination with other construction methods for the use of cranes is not required. Therefore, it is not necessary to determine a construction schedule early in the design stage, and it is possible to respond to a subsequent correction. In addition, the construction period of other construction methods using the tower crane can be shortened accordingly.

【0033】しかも下方からの押し上げによって上側の
管材の下端部と下側の管材の上端部との接続を行うの
で、芯合わせが容易であり、接続固定作業が従来より簡
易、迅速に行え、しかも精度よく行える。本実施形態に
おいては、特に架台13の受容部13aに管材Pの下端
部を挿入し、この架台13によって管材Pを押し上げる
ようにしているから、安定した押し上げ作業が行える。
しかも架台13の両端部は、ガイドレール11、12に
沿って摺動自在であるから、さらに安定した押し上げ作
業を可能にしている。
Further, since the connection between the lower end of the upper tube and the upper end of the lower tube is made by pushing up from below, the alignment is easy, and the connection and fixing work can be performed more simply and quickly than before. Can be performed with high accuracy. In the present embodiment, particularly, the lower end of the pipe P is inserted into the receiving portion 13a of the pedestal 13, and the pedestal 13 pushes up the pipe P, so that a stable lifting operation can be performed.
In addition, since both ends of the gantry 13 are slidable along the guide rails 11 and 12, a more stable lifting operation is possible.

【0034】使用した管材P自体も、外周部につば部p
fを設けるだけの加工で済むから、従来の竪管ユニット
よりも加工が簡単であり、コストも低廉に抑えることが
できる。なおこのつば部pfに代えて、適宜外周に突部
を構成する形状を選択してもよい。
The used pipe material P itself also has a collar portion p on the outer peripheral portion.
Since only the processing of providing f is required, the processing is simpler than the conventional vertical tube unit, and the cost can be reduced. Note that, instead of the flange portion pf, a shape forming a protrusion on the outer periphery may be appropriately selected.

【0035】さらに本実施形態にかかる竪管の施工方法
においては、配管折れ防止治具31を用いているから、
押し上げられる管材Pが中で曲がったり、倒れたり折れ
たりすることはない。この配管折れ防止治具31は全て
の階床部に設置してもよく、適宜必要に応じて設置して
もよい。また階床部の下面や階床部と階床部との間の空
間に設置するようにしてもよい。
Further, in the method for constructing a vertical pipe according to the present embodiment, since the pipe break prevention jig 31 is used,
The pushed-up pipe material P does not bend, fall or break inside. The jig 31 for preventing pipe breakage may be installed on all floors, or may be installed as needed. Further, it may be installed on the lower surface of the floor or in the space between the floors.

【0036】押し上げた管材の仮固定についても、本実
施形態にかかる竪管の施工方法では、図4に示した仮固
定装置41を用いているから、管材Pを一旦余分に押し
上げ、その後そのまま架台13を下降させるだけで、管
材Pを所定の位置に自動的に仮固定させることができ、
特別な仮固定作業や専用の人員も不要である。
Regarding the temporary fixing of the pushed-up pipe material, since the method of constructing a vertical pipe according to the present embodiment uses the temporary fixing device 41 shown in FIG. 13, the pipe material P can be automatically temporarily fixed at a predetermined position by simply lowering the pipe 13.
There is no need for special temporary fixing work or dedicated personnel.

【0037】[0037]

【発明の効果】請求項1、2及び3の竪管の施工方法に
よれば、管相互の接続作業が従来よりも容易である。し
かもタワークレーンを用いる必要はないので、独自に工
事を進めることができ、設計段階の早期に工事日程を決
定する必要はない。管材もプレハブ化によるユニット構
成とする必要はないので、製造が容易でコストも低廉で
ある。特に請求項3の場合には、管材を容易にかつ円滑
に垂直に押し上げることが可能であり、また複数の管材
を同時に押し上げることも容易である。
According to the method for constructing a vertical pipe according to the first, second and third aspects, the connecting operation between pipes is easier than before. Moreover, since there is no need to use a tower crane, the construction can be carried out independently, and there is no need to determine the construction schedule early in the design stage. Since the tube does not need to be made into a unit structure by prefabrication, it is easy to manufacture and the cost is low. In particular, in the case of claim 3, it is possible to easily and smoothly push up the pipe vertically, and it is also easy to push up a plurality of pipes simultaneously.

【0038】請求項4の竪管施工用の仮固定装置を用い
れば、管材の上昇、下降動作だけで自動的に管材を仮固
定することができる。従って請求項1、2の竪管の施工
方法を容易かつ好適に実施することが可能である。
By using the temporary fixing device for vertical pipe construction according to the fourth aspect, the pipe material can be automatically temporarily fixed only by raising and lowering the pipe material. Therefore, the method for constructing a vertical pipe according to claims 1 and 2 can be easily and suitably implemented.

【0039】請求項5の竪管施工用配管折れ防止治具を
用いれば、管材を垂直状態で上昇、下降させる場合、当
該管材が長尺に渡っても、途中で曲がったり折れたりす
ることを防止できる。従って、請求項1、2の竪管の施
工方法を好適に実施することができる。
According to the vertical pipe construction jig for preventing vertical pipe construction according to claim 5, when the pipe material is raised and lowered in a vertical state, even if the pipe material is long, it can be bent or broken on the way. Can be prevented. Therefore, the method for constructing a vertical pipe according to claims 1 and 2 can be suitably implemented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態にかかる竪管の施工方法に
おいて、管材を架台にセットする前の状態を示す説明図
である。
FIG. 1 is an explanatory view showing a state before a pipe material is set on a gantry in a method for constructing a vertical pipe according to an embodiment of the present invention.

【図2】本発明の実施の形態にかかる竪管の施工方法に
用いた配管折れ防止治具の斜視図である。
FIG. 2 is a perspective view of a pipe breaking preventing jig used in the vertical pipe construction method according to the embodiment of the present invention.

【図3】図2の配管折れ防止治具の平面図である。FIG. 3 is a plan view of the jig for preventing a pipe from being broken in FIG. 2;

【図4】本発明の実施の形態にかかる竪管の施工方法に
用いた仮固定装置の斜視図である。
FIG. 4 is a perspective view of a temporary fixing device used in the vertical pipe construction method according to the embodiment of the present invention.

【図5】本発明の実施の形態にかかる竪管の施工方法に
用いた管材の上部の正面図である。
FIG. 5 is a front view of an upper part of a pipe used in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図6】本発明の実施の形態にかかる竪管の施工方法に
おいて、管材を架台にセットした状態を示す説明図であ
る。
FIG. 6 is an explanatory diagram showing a state in which a pipe is set on a gantry in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図7】本発明の実施の形態にかかる竪管の施工方法に
おいて、管材を仮固定位置まで押し上げた状態を示す説
明図である。
FIG. 7 is an explanatory view showing a state in which the pipe is pushed up to a temporarily fixed position in the method for constructing a vertical pipe according to the embodiment of the present invention.

【図8】本発明の実施の形態にかかる竪管の施工方法に
おいて、管材が仮固定装置に接近した状態を示す説明図
である。
FIG. 8 is an explanatory view showing a state in which the pipe material has approached the temporary fixing device in the vertical pipe construction method according to the embodiment of the present invention.

【図9】本発明の実施の形態にかかる竪管の施工方法に
おいて、管材のつば部が仮固定装置の係止体を持ち上げ
た状態を示す説明図である。
FIG. 9 is an explanatory view showing a state in which the collar of the pipe material lifts the locking body of the temporary fixing device in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図10】本発明の実施の形態にかかる竪管の施工方法
において、仮固定装置の係止体が水平状態に復帰した状
態を示す説明図である。
FIG. 10 is an explanatory view showing a state in which the locking body of the temporary fixing device has returned to the horizontal state in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図11】本発明の実施の形態にかかる竪管の施工方法
において、管材が仮固定装置に仮固定された状態を示す
説明図である。
FIG. 11 is an explanatory view showing a state in which the pipe is temporarily fixed to the temporary fixing device in the method for constructing a vertical pipe according to the embodiment of the present invention.

【図12】本発明の実施の形態にかかる竪管の施工方法
において、最上部に配管される管材を仮固定した後、架
台を次の管材のセット位置まで下降させた状態を示す説
明図である。
FIG. 12 is an explanatory view showing a state in which, after temporarily fixing a pipe material to be piped on the uppermost portion, the gantry is lowered to a set position of the next pipe material in the method for constructing a vertical pipe according to the embodiment of the present invention; is there.

【図13】本発明の実施の形態にかかる竪管の施工方法
において、最上部の次に配管される管材を架台にセット
した状態を示す説明図である。
FIG. 13 is an explanatory view showing a state in which a pipe material to be piped next to the uppermost part is set on a gantry in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図14】本発明の実施の形態にかかる竪管の施工方法
において、最上部の次に配管される管材を所定の接続位
置まで押し上げた状態を示す説明図である。
FIG. 14 is an explanatory diagram showing a state in which a pipe material to be piped next to the uppermost part is pushed up to a predetermined connection position in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図15】本発明の実施の形態にかかる竪管の施工方法
において、最上部の次に配管される管材を仮固定位置ま
で押し上げた状態を示す説明図である。
FIG. 15 is an explanatory diagram showing a state in which a pipe material to be piped next to the uppermost part is pushed up to a temporarily fixed position in the method of constructing a vertical pipe according to the embodiment of the present invention.

【図16】本発明の実施の形態にかかる竪管の施工方法
において、最上部の次に配管される管材を仮固定した
後、架台を次の管材のセット位置まで下降させた状態を
示す説明図である。
FIG. 16 is a view showing a state in which, after temporarily fixing a pipe to be piped next to the uppermost part, the gantry is lowered to a set position of the next pipe in the method for constructing a vertical pipe according to the embodiment of the present invention; FIG.

【符号の説明】[Explanation of symbols]

1 1階の床面 2 2階の階床部 3 3階の階床部 10 押し上げ装置 11、12 ガイドレール 13 架台 13a 受容部 14 上部支持台 15、19 ネジ棒 21、23 ウォーム装置 22、24 モータ 31 配管折れ防止治具 32、33 本体 35 ローラ部材 41 仮固定装置 42、43 係止体 42b、43b 切欠部 H 開口部 P、P1、P2 管材 pf つば部 DESCRIPTION OF SYMBOLS 1 Floor of 1st floor 2 Floor of 2nd floor 3 Floor of 3rd floor 10 Push-up device 11, 12 Guide rail 13 Stand 13a Receiving part 14 Upper support 15, 19 Screw rod 21, 23 Worm device 22, 24 Motor 31 Pipe break prevention jig 32, 33 Main body 35 Roller member 41 Temporary fixing device 42, 43 Locking body 42b, 43b Notch H Opening P, P1, P2 Pipe pf Collar

───────────────────────────────────────────────────── フロントページの続き (72)発明者 泉 康博 東京都多摩市永山5−21−27−2 (72)発明者 松井 昭三 東京都中央区銀座八丁目21番1号 株式会 社竹中工務店東京本店内 (72)発明者 松本 勲 東京都中央区銀座八丁目21番1号 株式会 社竹中工務店東京本店内 (72)発明者 鬼頭 良太 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 (72)発明者 西村 光久 東京都新宿区原町3丁目61番地 西村工業 株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Yasuhiro Izumi 5-21-27-2 Nagayama, Tama-shi, Tokyo (72) Inventor Shozo Matsui 8-21-1, Ginza, Chuo-ku, Tokyo Takenaka Corporation Inside the Tokyo Head Office (72) Inventor Isao Matsumoto 8-21-1, Ginza, Chuo-ku, Tokyo Inside the Tokyo Head Office Takenaka Corporation (72) Inventor Ryota Kito 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo (72) Inventor Mitsuhisa Nishimura 3-61 Haramachi, Shinjuku-ku, Tokyo Nishimura Industry Co., Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 建物に竪配管を施工するにあたり、前記
竪配管を構成するための管材のうち上側に位置する管材
を垂直状態で所定の仮固定箇所で建物側に仮固定し、次
いで下側に位置する管材を垂直状態で押し上げて上側の
管材の下部と下側の管材の上部とを接続固定し、その後
前記仮固定を解除すると共に、下側の管材を前記所定の
仮固定箇所での仮固定に必要な位置まで押し上げること
を特徴とする、竪管の施工方法。
1. When constructing a vertical pipe in a building, of the pipes constituting the vertical pipe, a pipe located on an upper side is temporarily fixed to a building side at a predetermined temporary fixing point in a vertical state, and then a lower side is formed. The pipe located in the vertical direction is pushed up in a vertical state to connect and fix the lower part of the upper pipe and the upper part of the lower pipe, and then release the temporary fixing, and lower the pipe at the predetermined temporary fixing place. A vertical pipe construction method characterized by pushing up to the position required for temporary fixing.
【請求項2】 建物に竪配管を施工するにあたり、前記
竪配管を構成するための管材のうち、まず最上部に配管
される管材を垂直にした状態で所定の仮固定箇所での仮
固定に必要な位置まで押し上げ、次いで当該管材を前記
所定の仮固定箇所で建物側に仮固定し、その後当該管材
の下に配管される他の管材を垂直にした状態で押し上げ
て、先の管材の下部と前記他の管材の上部とを接続固定
し、その後前記仮固定を解除すると共に、前記他の管材
を前記所定の仮固定箇所での仮固定に必要な位置まで押
し上げることを特徴とする、竪管の施工方法。
2. When vertical pipes are constructed in a building, of the pipes constituting the vertical pipes, first, the pipes to be piped at the uppermost part are vertically fixed at a predetermined temporary fixing point. Push up to the required position, and then temporarily fix the tubing to the building side at the predetermined temporary fixing point, and then push up the other tubing piped under the tubing in a vertical state, and place the tubing at the bottom of the previous tubing. And the upper portion of the other tube material is connected and fixed, and then the temporary fixation is released, and the other tube material is pushed up to a position required for temporary fixation at the predetermined temporary fixation point, Pipe construction method.
【請求項3】 管材を垂直状態で押し上げるにあたり、
少なくとも当該押し上げ長の長さを有するガイドレール
を予め立設し、当該管材の少なくとも下端部をこのガイ
ドレールに沿って上昇自在な架台に支持させ、この架台
を上昇させて当該管材を押し上げることを特徴とする、
請求項1又は2に記載の竪管の施工方法。
3. When pushing up a pipe in a vertical state,
At least a guide rail having the length of the push-up length is erected in advance, and at least the lower end of the pipe is supported on a mount that can be raised along the guide rail, and the mount is raised to push up the pipe. Features,
The method for constructing a vertical pipe according to claim 1.
【請求項4】 外周に突部を有し、建物に竪配管される
管材を垂直状態でこの建物側に仮固定するための装置で
あって、水平状態から上方にのみ回動自在である複数の
係止体が前記建物側の適宜の部材に取り付けられ、これ
ら各係止体には各々切欠部が形成され、これら各係止体
が水平状態にあるときには、前記各切欠部の集合によっ
て前記管材の本体部分のみが通過自在な開口部が形成さ
れるように構成されたことを特徴とする、竪管施工用の
仮固定装置。
4. An apparatus for temporarily fixing a pipe vertically piped to a building to a side of a building in a vertical state and having a projection on an outer periphery, the apparatus being rotatable only upward from a horizontal state. Are attached to appropriate members on the building side, and each of these locking members is formed with a notch, and when each of these locking members is in a horizontal state, a set of the notches is used to collect the notches. A temporary fixing device for vertical pipe construction, wherein an opening portion through which only a main body portion of a pipe material can pass is formed.
【請求項5】 管材を垂直状態で上昇させて建物に竪配
管を施工する際に用いる治具であって、前記建物側に固
定される本体と、この本体に取り付けられて前記管材を
挟んで対向する少なくとも一対のローラ部材とを備えて
なることを特徴とする、竪管施工用配管折れ防止治具。
5. A jig used for vertically pipe-building a building by vertically raising a pipe material, comprising: a main body fixed to the building side; and a jig attached to the main body and sandwiching the pipe material. A pipe breaking prevention jig for vertical pipe construction, comprising at least a pair of opposed roller members.
JP33282296A 1996-11-27 1996-11-27 Temporary fixing device for dredging construction and construction method for dredging Expired - Fee Related JP3658118B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33282296A JP3658118B2 (en) 1996-11-27 1996-11-27 Temporary fixing device for dredging construction and construction method for dredging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33282296A JP3658118B2 (en) 1996-11-27 1996-11-27 Temporary fixing device for dredging construction and construction method for dredging

Publications (2)

Publication Number Publication Date
JPH10160040A true JPH10160040A (en) 1998-06-16
JP3658118B2 JP3658118B2 (en) 2005-06-08

Family

ID=18259196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33282296A Expired - Fee Related JP3658118B2 (en) 1996-11-27 1996-11-27 Temporary fixing device for dredging construction and construction method for dredging

Country Status (1)

Country Link
JP (1) JP3658118B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012202514A (en) * 2011-03-28 2012-10-22 Sanki Eng Co Ltd Method for reserving flexible tube or flexible wire and retaining tool used for the method
CN104806822A (en) * 2015-04-16 2015-07-29 上海市安装工程集团有限公司 Combined type stand pipe and modularized installation method thereof
KR20170000277A (en) * 2015-06-23 2017-01-02 삼성물산 주식회사 Riser pipe installation apparatus and construction method thereof
JP2017057969A (en) * 2015-09-18 2017-03-23 積水化学工業株式会社 Pipeline support structure
CN108285085A (en) * 2018-03-27 2018-07-17 中国建筑第八工程局有限公司 Pipe installing vertical-horizontal means of transport and transportation resources
CN112854666A (en) * 2021-03-19 2021-05-28 中建五局第三建设有限公司 Assembled integrated pipe well and construction method thereof
CN114607834A (en) * 2022-03-31 2022-06-10 中交水利水电建设有限公司 Pipeline vertical jacking construction method
WO2023193403A1 (en) * 2022-04-08 2023-10-12 上海市安装工程集团有限公司 Row pipe bundle hoisting tooling and construction method therefor

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101795369B1 (en) * 2015-12-02 2017-11-09 아주대학교산학협력단 piping moudle for building and construction method of piping system using the same

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012202514A (en) * 2011-03-28 2012-10-22 Sanki Eng Co Ltd Method for reserving flexible tube or flexible wire and retaining tool used for the method
CN104806822A (en) * 2015-04-16 2015-07-29 上海市安装工程集团有限公司 Combined type stand pipe and modularized installation method thereof
KR20170000277A (en) * 2015-06-23 2017-01-02 삼성물산 주식회사 Riser pipe installation apparatus and construction method thereof
JP2017057969A (en) * 2015-09-18 2017-03-23 積水化学工業株式会社 Pipeline support structure
CN108285085A (en) * 2018-03-27 2018-07-17 中国建筑第八工程局有限公司 Pipe installing vertical-horizontal means of transport and transportation resources
CN112854666A (en) * 2021-03-19 2021-05-28 中建五局第三建设有限公司 Assembled integrated pipe well and construction method thereof
CN114607834A (en) * 2022-03-31 2022-06-10 中交水利水电建设有限公司 Pipeline vertical jacking construction method
WO2023193403A1 (en) * 2022-04-08 2023-10-12 上海市安装工程集团有限公司 Row pipe bundle hoisting tooling and construction method therefor

Also Published As

Publication number Publication date
JP3658118B2 (en) 2005-06-08

Similar Documents

Publication Publication Date Title
JP4012974B2 (en) Wind turbine tower assembly apparatus and assembly method
JPH10160040A (en) Vertical piping construction, temporarily fixing device therefor, and piping bent preventing jig for vertical piping construction
KR102144434B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
JP3511239B2 (en) Steel tower intermediate raising device and steel tower intermediate raising method
KR102059627B1 (en) Mini crane for building curtain wall
JP4885259B2 (en) Precast balcony slide method and precast balcony slide rollers and rails
JP5435569B2 (en) Dismantling equipment and method for dismantling steel tower support
KR102502713B1 (en) Mold and wheel type mold facility and method for installing panels
JPH1018598A (en) House-up device
JPH10184021A (en) Pressing up device for vertical piping work
KR102116738B1 (en) scaffold system
CN220285354U (en) Backup plate device for bistable steel structure installation
JPH10184016A (en) Method of executing vertical pipe
KR20190002012A (en) loading device for steel processing structure
JPH1046822A (en) Wire tensioning device for erection method and collapse prevention method
JPH0125858B2 (en)
JPH0791904B2 (en) Push-up device
JP3055878B2 (en) Mobile scaffolding for curved roofs
JP3066218B2 (en) Rotation erection method and its rotation device
JP4368659B2 (en) Slide method for precast balcony
JPH11131811A (en) Method for constructing building
JPH0673793A (en) Multistoried building and constructing method thereof
CN113877966A (en) Installation method of large-scale perforating machine in limited space
JP2766769B2 (en) How to bring in air conditioning equipment
CN112678652A (en) Elevator and efficient construction equipment and construction method thereof

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041025

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050311

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090318

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090318

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100318

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100318

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110318

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120318

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120318

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140318

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees