JPH0791904B2 - Push-up device - Google Patents

Push-up device

Info

Publication number
JPH0791904B2
JPH0791904B2 JP4090115A JP9011592A JPH0791904B2 JP H0791904 B2 JPH0791904 B2 JP H0791904B2 JP 4090115 A JP4090115 A JP 4090115A JP 9011592 A JP9011592 A JP 9011592A JP H0791904 B2 JPH0791904 B2 JP H0791904B2
Authority
JP
Japan
Prior art keywords
roof
base
building
fixed
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4090115A
Other languages
Japanese (ja)
Other versions
JPH05263531A (en
Inventor
一夫 合原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP4090115A priority Critical patent/JPH0791904B2/en
Publication of JPH05263531A publication Critical patent/JPH05263531A/en
Publication of JPH0791904B2 publication Critical patent/JPH0791904B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築物の自動構築化を
達成する迫り上げ装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a push-up device for achieving automatic building construction.

【0002】[0002]

【従来の技術】従来、建築物の自動構築化方法において
は、構築する建築物の全体若しくは所定区域を覆う仮設
の屋根を設け、これをガイド支柱を構築しながら前記仮
設屋根を尺とり虫のような動作で前記ガイド支柱に沿っ
て油圧ジャッキ等で上昇させ、この仮設屋根の下に作業
空間を確保して、組立ロボット等で構築するようにして
いた。
2. Description of the Related Art Conventionally, in a method of automatically constructing a building, a temporary roof covering the entire building or a predetermined area to be constructed is provided, and while the guide strut is constructed, the temporary roof is covered with insects. In such an operation, a hydraulic jack or the like is used to move up along the guide column, a working space is secured under the temporary roof, and the robot is constructed by an assembly robot or the like.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述の
建築物の自動構築方法では、組立ロボットや搬送装置等
を仮設屋根に支持させており、建築資材を搬入したりす
る際に仮設屋根に過度な負担がかかり、仮設屋根の撓み
や重量物の組立ロボットを懸吊できないなどの問題があ
った。また、ガイド支柱を先行組立てさせて、このガイ
ド支柱により仮設屋根を尺とり虫のように上昇させるの
は手間がかかるとともに、上昇用ジャッキの盛り替えに
時間が掛かり工期が長くなると言った欠点が存在した。
However, in the above-described method for automatically constructing a building, the assembly robot, the transfer device, and the like are supported on the temporary roof, and when the building materials are carried in, the temporary roof is excessively loaded. There were problems such as the burden on the temporary roof and the inability to suspend the robot for assembling heavy objects. In addition, it takes time and effort to pre-assemble the guide columns and raise the temporary roof like a bug by using the guide columns, and it takes time to replace the lifting jacks and the construction period becomes long. Were present.

【0004】本発明は、上記の課題に鑑みてなされたも
ので、建築物の自動構築方法において、仮設屋根や組立
ロボット等を支持する支持材を迅速に上昇させることの
できる迫り上げ装置を提供することを目的とする。
The present invention has been made in view of the above problems, and provides a pushing-up device capable of quickly raising a support member for supporting a temporary roof, an assembly robot, or the like in an automatic building construction method. The purpose is to do.

【0005】[0005]

【課題を解決するための手段】本発明の上記課題を解決
し上記目的を達成するための要旨は、建築物の複数階床
に亘る高さに相当する長さの外管と、該外管の上部に水
平方向に延設して固着された仮設屋根及び搬送架台と、
同じく外管の下部に固着されるとともに建築物の梁間に
架設されかつ上下方向に昇降可能にされた屋根支柱ベー
スと、該屋根支柱ベースに固設されたジャッキ装置と、
前記外管に貫入される内管と、前記外管に貫入され該外
管の上端部から突出している内管の頭部に設けられたジ
ャッキ装置と、同じく前記外管の下端部から突出してい
る内管の下部に固設されるとともに、建築物の梁間に架
設されかつ上下方向に昇降可能にされたポストベースと
から形成したことに存する。
SUMMARY for achieving a solution to the object above object of the present invention SUMMARY OF], a plurality of building floors
The outer tube with a length corresponding to the height over the
A temporary roof and a transportation platform that are extended and fixed in the horizontal direction;
Also fixed to the lower part of the outer tube and between the beams of the building
A roof brace that is erected and can be moved up and down.
And a jack device fixed to the roof support base,
An inner pipe penetrating the outer pipe, and an outer pipe penetrating the outer pipe
A jig provided on the head of the inner pipe protruding from the upper end of the pipe.
Similarly to the jacking device, it projects from the lower end of the outer tube.
It is fixed to the lower part of the inner pipe and is installed between the beams of the building.
With a post base that is installed and can be moved up and down
It is formed from.

【0006】[0006]

【0007】[0007]

【作用】本発明の迫り上げ装置によれば、外管とこれに
貫入される内管の二重管方式により、屋根支柱ベースと
ポストベースとを介して互いに尺とり虫のようにクライ
ミングして仮設屋根や搬送架台を迫り上げることができ
ることになる。また、前記搬送架台は外管により支持さ
れるので、これに懸吊される各種組立作業用のロボット
を強固に支持できることになる。更に、前記迫り上げ装
置をクライミングさせた後は、迫り上げ装置が上昇した
あとの空間を直ちに閉鎖することができ、各階層を順次
構築を完了させていくことができる。
According to the pushing-up device of the present invention, the outer pipe and the inner pipe penetrating the outer pipe are double- piped so that they are climbed like insects through the roof support base and the post base. It will be possible to push up the temporary roof and the transportation platform. Further, since the carrier frame is supported by the outer tube, it is possible to firmly support the robots for various assembly work suspended on the carrier frame. Furthermore, after the climbing device is climbed, the space after the climbing device is raised can be immediately closed, and the construction of each layer can be completed in sequence.

【0008】[0008]

【実施例】次に、本発明について図面を参照して説明す
る。図1は、本発明に係る迫り上げ装置の正面図であ
る。図2は構築物の両端における迫り上げ装置の一端側
を示す正面図である。図において符号1は迫り上げ装
置、2は外管、3は内管、4は仮設屋根、5は屋根支柱
ベース、6はポストベース、7は搬送用架台、8はH型
鋼、9は支持台、10は天井クレーン、11はジャッキ
架台、12,13はセンターホール型油圧ジャッキ、1
4は油圧ジャッキのワイヤーを各々示している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the present invention will be described with reference to the drawings. FIG. 1 is a front view of the pushing-up device according to the present invention. FIG. 2 is a front view showing one end side of the push-up device at both ends of the construct. In the figure, reference numeral 1 is a lifting device, 2 is an outer pipe, 3 is an inner pipe, 4 is a temporary roof, 5 is a roof support base, 6 is a post base, 7 is a transportation mount, 8 is an H-shaped steel, and 9 is a support base. 10 is an overhead crane, 11 is a jack stand, 12 and 13 are center-hole type hydraulic jacks, 1
Reference numerals 4 respectively denote wires of the hydraulic jack.

【0009】前記迫り上げ装置1の構成は、建築物の3
階床から4階床に亘る高さに相当する長さの外管2と、
該外管2の上部に水平方向に延設して固着された仮設屋
根4及び搬送架台7と、同じく外管2の下部に固着され
た屋根支柱ベース5と、該屋根支柱ベース5に固設され
たジャッキ装置(13,14)と、前記外管2の約2倍
程度の長さでこの外管2に貫入される内管3と、この内
管3の頭部に設けられたジャッキ装置(11,12,1
4)と、同じく内管3の下部に固設されたポストベース
6とからなるものである。
The construction of the pushing-up device 1 is 3
An outer tube 2 having a length corresponding to the height from the floor to the fourth floor,
A temporary roof 4 and a carrier frame 7 which are horizontally extended and fixed to the upper portion of the outer tube 2, a roof support base 5 which is also fixed to the lower portion of the outer tube 2, and a roof support base 5 which is fixed to the roof support base 5. Jack device (13, 14), an inner pipe 3 penetrating the outer pipe 2 with a length about twice that of the outer pipe 2, and a jack device provided on the head of the inner pipe 3. (11, 12, 1
4) and a post base 6 fixed to the lower portion of the inner pipe 3 as well.

【0010】前記迫り上げ装置1は、図1に示すよう
に、建築物の左右方向の中央部においては、図3に示す
様な井桁状の屋根支柱ベース5の上に外管2が4本立設
され、この4本の外管2の上部に仮設屋根4が設けられ
るものである。そして、建築物の左右方向の両端部にも
図2に示すように前記迫り上げ装置1が設けられる。
As shown in FIG. 1, in the pushing-up device 1, four outer tubes 2 are erected on a roof girder-shaped roof support base 5 as shown in FIG. A temporary roof 4 is provided above the four outer tubes 2. Further, as shown in FIG. 2, the pushing-up device 1 is also provided at both ends of the building in the left-right direction.

【0011】前記仮設屋根4は図6に示すように左右方
向では建築物の全体を覆う大きさになされており、紙面
垂直方向の奥行きでは一定区画を覆うようになされた大
きさである。
As shown in FIG. 6, the temporary roof 4 is sized so as to cover the entire building in the left-right direction, and covers a certain section in the depth perpendicular to the plane of the drawing.

【0012】そして、前記仮設屋根4の下側で左右方向
に外管2の表面から台形状の支持台9が突設され、この
奥行き方向における支持台9,9間にH型鋼8が架設し
て固定されている。そして、建築物の中央部と両端部に
おける外管2のH型鋼8,8間に搬送用架台7が各々架
設されている。こうして搬送用架台7が従来のように仮
設屋根により支持されるものでなく外管2により強固に
支持されているので、各種作業ロボットを懸装させるこ
とができる。
Under the temporary roof 4, a trapezoidal support 9 is projected from the surface of the outer tube 2 in the left-right direction, and an H-shaped steel 8 is installed between the support 9 and 9 in the depth direction. It is fixed. Then, a transportation platform 7 is installed between the H-shaped steels 8 and 8 of the outer pipe 2 at the center and both ends of the building. In this way, the carrier 7 is not supported by the temporary roof as in the conventional case, but is firmly supported by the outer tube 2, so that various work robots can be suspended.

【0013】前記搬送用架台7には、例えば天井クレー
ン10,10aや、コンクリート打設ロボットや各種組
立ロボット等(図示せず)が図面左右方向に移動自在に
懸吊されるものである。
An overhead crane 10, 10a, a concrete placing robot, various assembling robots and the like (not shown) are suspended on the transfer platform 7 so as to be movable in the left and right directions in the drawing.

【0014】また、建築物の中央部や両端部における外
管2の下部に固着された前記屋根支柱ベース5は、図3
に平面図で示すように、井桁状の本体に回転アーム5a
が4本延設されており、屋根支柱ベース5が荷重を支え
るときには回転アーム5aが各々梁15上に載置され固
定される。そして、屋根支柱ベース5が上昇するときに
は、各回転アーム5aが本体方向に退避するように回転
し、上階の梁に衝突しないようになされる。
Further, the roof support base 5 fixed to the lower portion of the outer pipe 2 at the center or both ends of the building is shown in FIG.
As shown in the plan view in FIG.
Are extended, and when the roof strut base 5 bears a load, the rotary arms 5a are placed and fixed on the beams 15, respectively. Then, when the roof support base 5 rises, the rotating arms 5a rotate so as to retract toward the main body so that they do not collide with the beams on the upper floor.

【0015】更に、図1乃至図2に示すように内管3や
ポストベース6を引き上げるジャッキ装置(13,1
4)が設けられている。そしてこの屋根支柱ベース5に
おける油圧ジャッキ13もセンターホール型のジャッキ
で、そのワイヤ14の先端部がポストベース6の本体の
フック6bに繋着されている。
Further, as shown in FIGS. 1 and 2, a jack device (13, 1) for pulling up the inner tube 3 and the post base 6 is provided.
4) is provided. The hydraulic jack 13 on the roof support base 5 is also a center hole type jack, and the tip of the wire 14 is connected to the hook 6b of the main body of the post base 6.

【0016】次に、各外管2に貫入される内管3の頭部
にはジャッキ装置が設けられる。即ち、内管3の頭部間
に横架してジャッキ架台11,11aが設けられてお
り、その上に油圧ジャッキ12が所要数固設されてい
る。この各油圧ジャッキ12は、センターホール型のジ
ャッキであり、ワイヤー14が下方向に延びて、その先
端部が前記仮設屋根4のフック4aに繋着されている。
Next, a jack device is provided on the head of the inner pipe 3 which penetrates each outer pipe 2. That is, the jack mounts 11 and 11a are provided horizontally between the heads of the inner pipes 3, and the required number of hydraulic jacks 12 are fixedly mounted on the jack mounts 11 and 11a. Each of the hydraulic jacks 12 is a center hole type jack, and a wire 14 extends downward, and its tip end is connected to the hook 4 a of the temporary roof 4.

【0017】また、前記内管3の下部に固着されたポス
トベース6は、図4に平面図で示すように、各本体から
伸縮自在なベース6aが左右方向に設けられている。こ
のポストベース6は、前記仮設屋根4や外管2および屋
根支柱ベース5が上昇するときにその全体の荷重を支え
るために、各ベース6aが伸長されて梁15a上に載置
されて固定される。また、ポストベース6が上昇すると
きには、前記ベース6aを各々本体側に縮退させて上階
の梁に衝突しないようになされる。
As shown in a plan view of FIG. 4, the post base 6 fixed to the lower portion of the inner tube 3 is provided with a base 6a which is extendable from each main body in the left-right direction. The post bases 6 are fixed by being mounted on the beams 15a by extending the bases 6a so as to support the entire load of the temporary roof 4, the outer tube 2, and the roof support base 5 when they rise. It Further, when the post base 6 rises, the bases 6a are retracted toward the main body side so as not to collide with the beams on the upper floor.

【0018】従って、前記外管2と内管3には互いに相
手を上昇させる油圧ジャッキ12,13が各々設けられ
ており、一方が梁上に回転アームやベースを介して固定
されて反力をとり、他方を油圧ジャッキで上階の梁にベ
ース若しくは回転アームを介して載置できるように所定
量吊り上げるようにした二重管方式である。
Therefore, the outer pipe 2 and the inner pipe 3 are respectively provided with hydraulic jacks 12 and 13 for raising their counterparts to each other, and one of them is fixed on the beam via a rotary arm or a base to generate a reaction force. The other is a double pipe system in which a hydraulic jack is used to hang a predetermined amount so that the hydraulic jack can be placed on a beam on the upper floor via a base or a rotating arm.

【0019】上記迫り上げの様子を図5で説明すると、
図5は内管3がポストベース6を介して梁15aで支持
された状態において、内管3の頭部の油圧ジャッキ12
でワイヤ14によりフック4aを介して、仮設屋根4と
外管2と搬送用架台7及び屋根支持ベース5を一体的に
上階の梁15の位置まで上昇させたものである。
The state of the above-mentioned approach will be described with reference to FIG.
FIG. 5 shows the hydraulic jack 12 on the head of the inner pipe 3 in a state where the inner pipe 3 is supported by the beam 15 a via the post base 6.
The wire 14 is used to raise the temporary roof 4, the outer tube 2, the carrier 7 and the roof support base 5 integrally to the position of the beam 15 on the upper floor through the hook 4a.

【0020】そして、屋根支柱ベース5を梁15に固定
した後に、前記搬送用架台7に天井クレーン10,10
aや各種の組立ロボットを懸吊して、柱や梁やスラブを
構築する。所定の組立が終了したら屋根支柱ベース5の
油圧ジャッキ13でワイヤ14を巻き上げてポストベー
ス6を1階分引き上げる(図5中の破線で示す)。この
ポストベース6を引き上げるときにはベース6aを縮退
させ、上階の梁の位置に達したらベース6aを伸長させ
て当該梁にポストベース6を固定させる。
After fixing the roof support base 5 to the beam 15, the overhead cranes 10 and 10 are mounted on the carrying base 7.
A and various assembly robots are suspended to build columns, beams, and slabs. When the predetermined assembly is completed, the wire 14 is wound up by the hydraulic jack 13 of the roof post base 5 and the post base 6 is pulled up by one floor (shown by a broken line in FIG. 5). When pulling up the post base 6, the base 6a is retracted, and when the position of the upper beam is reached, the base 6a is extended to fix the post base 6 to the beam.

【0021】このように外管2と内管3とが屋根支柱ベ
ース5とポストベース6を介して、尺とり虫のようにク
ライミングしていくものである。
In this way, the outer tube 2 and the inner tube 3 are climbed like a worm on the roof pillar base 5 and the post base 6.

【0022】また、図2に示すように、建築物の左右両
端の外管2には、張出し架台16が設けられ、その先端
部から吊足場17が懸吊されている。この吊足場17で
建築資材の搬入をしたり組立をしたりするものである。
そして、この吊足場17の下にホイストクレーン18が
懸吊して設けられる。該ホイストクレーン18によりカ
ーテンウォール19等を吊り上げて外壁を構築するもの
である。
Further, as shown in FIG. 2, the outer pipes 2 at the left and right ends of the building are provided with overhanging pedestals 16, and hanging scaffolds 17 are suspended from the tip ends thereof. The suspension scaffold 17 is used to carry in and assemble building materials.
A hoist crane 18 is suspended below the suspension scaffold 17. The hoist crane 18 hoists the curtain wall 19 and the like to construct an outer wall.

【0023】次に上述のようにして形成された迫り上げ
装置1を使用して建築物を自動構築化する方法について
図6乃至図8を参照して説明する。まず図6に示すよう
に、地下躯体を構築した後に、建築物の左右方向の中央
部にポストベース6を梁に固定し内管3を立設する。
Next, a method for automatically constructing a building using the pushing-up device 1 formed as described above will be described with reference to FIGS. 6 to 8. First, as shown in FIG. 6, after constructing an underground skeleton, the post base 6 is fixed to the beam and the inner pipe 3 is erected at the center of the building in the left-right direction.

【0024】そして、外管2を前記内管3に嵌挿させ、
屋根支持ベース5を1階層の梁に架け渡して固定すると
ともに前記外管2を立設する。これを建築物の左右両端
部でも同様に行って迫り上げ装置1を形成し、搬送用架
台7を架設し、仮設屋根4を中央部と両端部の外管2に
架設する。そして内管2の頭部にジャッキ架台11を設
けて油圧ジャッキ12を設置する。
Then, the outer tube 2 is fitted into the inner tube 3,
The roof support base 5 is bridged and fixed to a beam of one layer and the outer pipe 2 is erected. This is similarly performed at the left and right ends of the building to form the approaching device 1, the transfer mount 7 is installed, and the temporary roof 4 is installed on the central part and the outer pipes 2 at both ends. Then, the jack base 11 is provided on the head of the inner pipe 2 and the hydraulic jack 12 is installed.

【0025】更に、前記搬送用架台7に組立作業用の各
種作業ロボットを移動自在に懸装し、吊足場17を装着
する。次に前記組立ロボットで2階層と3階層の床や柱
及び床等を構築する。
Further, various work robots for assembling work are movably suspended on the transportation platform 7 and a suspension scaffold 17 is attached. Next, the assembling robot constructs floors, pillars, floors, etc. of the second and third layers.

【0026】そして、3階層の組立が完了したら、図7
に示すように、2階層に屋根支柱ベース5を上昇させ
る。これには、前述したように、梁に固定された屋根支
柱ベース5の固定を解除し、内管3の頭部の油圧ジャッ
キ12で少し仮設屋根4や外管2をワイヤ14を介して
引き上げ、外管2の回転アーム5aを約90゜程度本体
側に回転させる。建築物の中央部と両端部における屋根
支柱ベース5を同時に操作するのは勿論である。
When the assembly of the three layers is completed, FIG.
As shown in, the roof support base 5 is raised to the second floor. To this end, as described above, the roof pillar base 5 fixed to the beam is released, and the temporary roof 4 and the outer pipe 2 are slightly pulled up via the wire 14 by the hydraulic jack 12 on the head of the inner pipe 3. , The rotating arm 5a of the outer tube 2 is rotated about 90 ° toward the main body. It goes without saying that the roof pillar bases 5 at the center and both ends of the building are simultaneously operated.

【0027】そして井桁状の梁の内側に前記屋根支柱ベ
ース5が上下方向に上昇するに衝突の心配がないように
収まったら、前記油圧ジャッキ12で仮設屋根4を1階
高分引き上げる。これにより外管2や搬送用架台7や吊
足場17及び屋根支柱ベース5も同時に吊上げられる
When the roof strut base 5 is set up inside the cross beam so that there is no risk of collision as it rises in the vertical direction, the temporary roof 4 is pulled up by the height of one floor by the hydraulic jack 12. As a result, the outer tube 2, the transportation platform 7, the suspension scaffold 17, and the roof support base 5 are simultaneously lifted.

【0028】次に吊上げられた屋根支柱ベース5の各々
の回転アーム5aを前述とは逆に回転させて戻し、該回
転アーム5aを2階層の梁に載置させて、2階層の梁に
屋根支柱ベース5を固定する。こうした後に前記屋根支
柱ベース5の油圧ジャッキ13で、ポストベース6のベ
ース6aを縮退させて井桁状の梁の内側にポストベース
6が収まった後に、このポストベース6を1階高分引き
上げる。
Next, each of the rotating arms 5a of the hoisted roof pillar base 5 is rotated back in the opposite manner to the above, and the rotating arms 5a are placed on the beams of the two layers, and the beams of the two layers are roofed. Fix the column base 5. After that, the base 6a of the post base 6 is retracted by the hydraulic jack 13 of the roof support base 5 and the post base 6 is set inside the cross beam, and then the post base 6 is lifted by one floor.

【0029】これにより内管3とジャッキ架台11と油
圧ジャッキ12が同時に引き上げられる。そして、1階
層の梁にポストベース6のベース6aを伸長させて載置
し、更にポストベース6を固定する。
As a result, the inner pipe 3, the jack mount 11 and the hydraulic jack 12 are simultaneously pulled up. Then, the base 6a of the post base 6 is extended and placed on the beam of one layer, and the post base 6 is further fixed.

【0030】こうして更に上階の柱や梁等を搬送用架台
7に懸装された組立ロボットを使用し組立して、屋根支
柱ベース5とポストベース6を内管3と外管2を交互に
クライミングさせて、図8に示すように建築物を構築し
て行くものである。
In this way, columns and beams on the upper floor are assembled by using the assembly robot suspended on the carrier 7, and the roof pillar base 5 and the post base 6 are alternately arranged with the inner pipe 3 and the outer pipe 2. Climbing is performed to build a building as shown in FIG.

【0031】また、所定階分組立られたら、吊足場17
のホイストクレーン18でカーテンウォール19を吊り
上げて柱や梁の金具に固着して組立て、建築物の外壁2
0を構築して行くものである。
When the predetermined floors are assembled, the suspension scaffold 17
The curtain wall 19 is lifted by the hoist crane 18 and fixed to the metal fittings of the pillar or the beam to assemble the outer wall 2 of the building.
It is to build 0.

【0032】なお、ポストベース6等がクライミングし
ていく空間部分21は、図8に示すように小型のクレー
ン22でPCスラブ23を組み立てし、各階毎に前記空
間部分21を各々閉鎖していくものである。
In the space portion 21 where the post base 6 and the like are climbed, the PC slab 23 is assembled by a small crane 22 as shown in FIG. 8, and the space portion 21 is closed for each floor. It is a thing.

【0033】[0033]

【発明の効果】以上説明したように、本発明の迫り上げ
装置は、外管とこれに貫入される内管の二重管方式によ
り、屋根支柱ベースとポストベースとを介して互いに尺
とり虫のようにクライミングして仮設屋根や搬送架台を
迫り上げる装置なので、簡易な構造の迫り上げ装置によ
り迅速に建築物を構築することができて工期の短縮を図
ることができる。そして、建築物が円形状であっても矩
形状であっても容易に対応できるものであり、自動構築
化の応用範囲が広いものである。更に、前記迫り上げ装
置をクライミングさせた後は、迫り上げ装置が上昇した
あとの空間を直ちに閉鎖することができ、各階層を順次
構築を完了させていくことができるので、作業能率の向
上となる。また、搬送架台は外管により支持されるの
で、これに懸吊される各種組立作業用のロボットが重量
物であっても強固に支持できることになり組立作業能率
が向上する。
As described above, the present invention is pushed up.
Device, the double-tube type in pipe that is penetrated and the outer tube thereto, since device Seriageru climbing to temporary roofs and conveying platform as long tori insect each other via the roof strut base and post base The building structure can be quickly constructed by using the push-up device having a simple structure, and the construction period can be shortened. The buildings are those that can respond easily be rectangular shape be circular shape, but the application range of the automatic construction of wide. Furthermore, after climbing the push-up device, the space after the push-up device has been raised can be immediately closed, and the construction of each layer can be completed in sequence, thus improving work efficiency. Become. Further, since the carrier frame is supported by the outer tube, various assembling robots suspended thereon can be firmly supported even if it is a heavy object, and the assembling work efficiency is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る迫り上げ装置の正面図である。FIG. 1 is a front view of a pushing-up device according to the present invention.

【図2】構築物の両端における迫り上げ装置の一端側を
示す正面図である。
FIG. 2 is a front view showing one end side of the push-up device at both ends of the construct.

【図3】屋根支柱ベースの平面図である。FIG. 3 is a plan view of a roof support base.

【図4】ポストベースの平面図である。FIG. 4 is a plan view of a post base.

【図5】建築物の中央部における迫り上げ装置を作動さ
せた様子を示す正面図である。
FIG. 5 is a front view showing a state where the push-up device in the central portion of the building is operated.

【図6】構築物の構築手順を示す説明図である。FIG. 6 is an explanatory diagram showing a procedure for constructing a construct.

【図7】同じく構築物の構築手順を示す説明図である。FIG. 7 is an explanatory view showing a construction procedure of the construct.

【図8】同じく構築物の構築手順を示す説明図である。FIG. 8 is an explanatory view showing a procedure for constructing the construct.

【符号の説明】[Explanation of symbols]

1 迫り上げ装置、2 外管、3 内管、4 仮設屋
根、5 屋根支柱ベース、6 ポストベース、7 搬送
用架台、8 H型鋼、9 支持台、10 天井クレー
ン、11 ジャッキ架台、12,13 油圧ジャッキ、
14 油圧ジャッキのワイヤー。
1 Lifting device, 2 Outer pipe, 3 Inner pipe, 4 Temporary roof, 5 Roof support base, 6 Post base, 7 Transfer mount, 8 H-shaped steel, 9 Support base, 10 Overhead crane, 11 Jack mount, 12,13 Hydraulic jack,
14 Hydraulic jack wire.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】建築物の複数階床に亘る高さに相当する長
さの外管と、該外管の上部に水平方向に延設して固着さ
れた仮設屋根及び搬送架台と、同じく外管の下部に固着
されるとともに建築物の梁間に架設されかつ上下方向に
昇降可能にされた屋根支柱ベースと、該屋根支柱ベース
に固設されたジャッキ装置と、前記外管に貫入される内
管と、前記外管に貫入され該外管の上端部から突出して
いる内管の頭部に設けられたジャッキ装置と、同じく前
記外管の下端部から突出している内管の下部に固設され
るとともに、建築物の梁間に架設されかつ上下方向に昇
降可能にされたポストベースとから形成したことを特徴
としてなる迫り上げ装置。
1. A length corresponding to a height over a plurality of floors of a building
And an outer tube that is horizontally extended and fixed to the upper part of the outer tube.
Fixed temporary roof and transfer stand, and similarly fixed to the lower part of the outer tube
And is installed between the beams of the building and vertically
A roof support base that can be raised and lowered, and the roof support base
Jack device fixed to the inner pipe to be inserted into the outer pipe.
A tube and a penetrating into the outer tube and protruding from the upper end of the outer tube.
The jack device provided on the head of the inner tube
It is fixed to the lower part of the inner pipe protruding from the lower end of the outer pipe.
It is installed between the beams of the building and rises in the vertical direction.
Characterized by being formed from a post base that was made descendable
It is a pushing device.
JP4090115A 1992-03-17 1992-03-17 Push-up device Expired - Fee Related JPH0791904B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4090115A JPH0791904B2 (en) 1992-03-17 1992-03-17 Push-up device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4090115A JPH0791904B2 (en) 1992-03-17 1992-03-17 Push-up device

Publications (2)

Publication Number Publication Date
JPH05263531A JPH05263531A (en) 1993-10-12
JPH0791904B2 true JPH0791904B2 (en) 1995-10-09

Family

ID=13989521

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4090115A Expired - Fee Related JPH0791904B2 (en) 1992-03-17 1992-03-17 Push-up device

Country Status (1)

Country Link
JP (1) JPH0791904B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05141336A (en) * 1991-11-22 1993-06-08 Honda Motor Co Ltd Ignition device for internal combustion engine
JPH09137506A (en) * 1995-09-11 1997-05-27 Ohbayashi Corp Construction method of building
JP2005178940A (en) * 2003-12-17 2005-07-07 Ohbayashi Corp Tower crane stand and tower crane supporting method
JP7097203B2 (en) * 2018-03-20 2022-07-07 清水建設株式会社 Climbing telpher and how to demolish a building

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0768774B2 (en) * 1989-06-14 1995-07-26 日立造船株式会社 High-rise building construction method
JP2834588B2 (en) * 1991-01-18 1998-12-09 株式会社熊谷組 Climb-up type building construction apparatus and construction method

Also Published As

Publication number Publication date
JPH05263531A (en) 1993-10-12

Similar Documents

Publication Publication Date Title
EP0487516B1 (en) Construction apparatus and construction method
JPH0791904B2 (en) Push-up device
JP3230104B2 (en) Tower crane
JPH05133016A (en) Peripheral supporting self-rising type building engineering method
JP3066460B2 (en) How to build a tower
JP3841242B2 (en) Elevator parking elevating work table and construction method using it
JP2704446B2 (en) Lift-up method using temporary columns
JP2704447B2 (en) Lift-up method using permanent columns
JP3179814B2 (en) Column and beam construction method and apparatus
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JPH10152981A (en) Vertically moving scaffold
JP3115942B2 (en) Building construction method
JP6971178B2 (en) How to replace work scaffolding
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
JP2592980B2 (en) Construction method of steel frame material for high-rise structure
JP2872886B2 (en) Construction lift equipment
JP2871468B2 (en) How to build a building
JP2881503B2 (en) Temporary strut for stroke pole
JPH0833030B2 (en) Construction method
JPH08105228A (en) Construction of building
JP2528452Y2 (en) High work equipment
JP2791749B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JPH08312144A (en) Temporary frame device for construction
JPH05330792A (en) Lift-up crane
JPH07150766A (en) Steel frame erecting method for multistory building

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees