JP3179814B2 - Column and beam construction method and apparatus - Google Patents

Column and beam construction method and apparatus

Info

Publication number
JP3179814B2
JP3179814B2 JP27840891A JP27840891A JP3179814B2 JP 3179814 B2 JP3179814 B2 JP 3179814B2 JP 27840891 A JP27840891 A JP 27840891A JP 27840891 A JP27840891 A JP 27840891A JP 3179814 B2 JP3179814 B2 JP 3179814B2
Authority
JP
Japan
Prior art keywords
floor
climbing
jack
locking
climbing floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27840891A
Other languages
Japanese (ja)
Other versions
JPH0586651A (en
Inventor
勇夫 正岡
源昭 伊藤
学 仁ノ平
正男 白石
直一 秋山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP27840891A priority Critical patent/JP3179814B2/en
Publication of JPH0586651A publication Critical patent/JPH0586651A/en
Application granted granted Critical
Publication of JP3179814B2 publication Critical patent/JP3179814B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、柱及び梁の構築方法及
び装置に係り、特に屋根とシェルターにより全天候下で
の作業が可能な構築方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for constructing columns and beams, and more particularly to a method and an apparatus for constructing a roof and a shelter capable of working in all weather.

【0002】[0002]

【従来の技術】従来、建築物を構築する場合、まず土台
の形成後、鉄骨等による柱を建て、これらの柱の間を、
水平方向に梁用の鋼材を渡して固定して梁を形成してい
る。これらの作業は、大型クレーンを使用して鉄骨を吊
り上げて所定の階までこれを運搬し、所定の箇所に溶接
及びボルト止めし、全体を組み立ててゆくのが通常の方
法である。
2. Description of the Related Art Conventionally, when constructing a building, first, after forming a base, pillars made of steel frames or the like are built, and a space between these pillars is formed.
The beam is formed by passing and fixing the steel material for the beam in the horizontal direction. In these operations, it is a usual method to lift a steel frame using a large crane, transport the steel frame to a predetermined floor, weld and bolt it to a predetermined place, and assemble the whole.

【0003】この場合、下階から上階に向かって作業が
進み、1階部分の柱と梁が組み立てられたら、次に2階
部分を組み立てることにより、順次上階に向かって作業
が移行してゆく。
[0003] In this case, the work proceeds from the lower floor to the upper floor, and after the pillars and beams of the first floor are assembled, the work is sequentially shifted to the upper floor by assembling the second floor. Go on.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の方法では、いわば屋根のない場所において組
立作業が進ので、作業が天候に左右されることになる。
天候が不順であれば工期の遅れを来たし、その調整が大
変である。
However, in such a conventional method, assembling work proceeds in a place without a roof, so that the work depends on the weather.
If the weather is irregular, the construction period has been delayed and adjustments are difficult.

【0005】またクレーンを設置するための特別な設備
が必要であり、周囲にその設置空間がないときは、クレ
ーンを建物の一部に取り付けるので、その作業に多くの
手間を要していた。このような事情から、本発明者は種
々検討の結果、予め屋根を構築し、これを順次上階に向
かってマストコラムに支持しながらクライミングさせ、
同時にこれをクレーンの支持体として利用することによ
り、上記の問題を解決した。
[0005] Further, special equipment for installing the crane is required, and when there is no space for installing the crane, the crane is attached to a part of the building. Under such circumstances, as a result of various studies, the present inventor constructed a roof in advance, and climbed it while sequentially supporting it on the mast column toward the upper floor,
At the same time, the above problem was solved by using this as a support for the crane.

【0006】本発明は、クレーンの支持体としても使用
でき、屋根となるフロア下において柱及び梁の構築作業
が実施できる全天候型の柱と梁の構築方法、及び装置を
提供することを目的とする。
An object of the present invention is to provide a method and an apparatus for constructing an all-weather type column and beam capable of being used as a support for a crane and capable of performing a column and beam construction operation under a floor serving as a roof. I do.

【0007】[0007]

【課題を解決するための手段】本発明は上記の課題を解
決するために以下のような構成としている。すなわち、
本発明の柱及び梁の構築方法は、地上で建築物の屋上に
相当するクライミングフロアを組み立てる工程と、任意
の数のマストコラムで前記クライミングフロアを支持し
ながら、下階の作業が可能な空間を保持できる高さまで
前記クライミングフロアを上昇させる行程と、前記クラ
イミングフロア下の柱と梁を組み立てる工程とを含み、
これらの工程を繰り返して実施することにより、所定の
高さまで前記柱及び梁を構築する柱及び梁の構築方法に
おいて、前記クライミングフロアを上昇させる行程は、
前記マストコラムに前記建築物の上下階の間隔を等分し
た長さと同一の間隔で設けた複数の係止孔のいずれか
に、前記クライミングフロアの下側に設けたジャッキを
係止する工程と、前記ジャッキにより前記クライミング
フロアを前記係止孔の間隔分だけ押し上げる工程と、前
記クライミングフロアを前記係止孔に係止する工程と、
前記ジャッキの前記係止孔に対する係止を解除して前記
ジャッキを縮小することにより前記ジャッキを引き上げ
る工程と、を繰り返して行うことを特徴とする。
SUMMARY OF THE INVENTION The present invention has the following arrangement to solve the above-mentioned problems. That is,
Posts and method for constructing a beam of the present invention includes the steps of assembling a climbing floor corresponding to the roof of the building on the ground, while supporting the climbing floor in any number of mast column, space that can work under floor Up to a height that can hold
It includes a step of raising the climbing floor, and a step of assembling the columns and beams under the class <br/> Imingufuroa,
By repeating these steps , a predetermined
The method of constructing columns and beams to construct the columns and beams up to the height
In the process of raising the climbing floor,
Equally divide the space between the upper and lower floors of the building on the mast column
One of multiple locking holes provided at the same interval as
In addition, the jack provided under the climbing floor
Locking step and the climbing by the jack
Pushing up the floor by the distance of the locking hole;
Locking the climbing floor in the locking hole;
Release the locking of the jack to the locking hole and
Pull up the jack by shrinking the jack
And the step of repeating the steps.

【0008】またマストコラムを本設の柱として使用せ
ずに解体する場合は、下階の作業が可能な空間を確保で
きる高さまで前記クライミングフロアを上昇させた後、
前記マストコラムが立設している箇所以外に設ける前記
柱、梁を先ず組み立て、前記マストコラムを順次上方に
引き上げ、組み立てられた前記柱のみで前記クライミン
グフロアを支持し、その後、残りの前記柱部分を組み立
てる工程を経ることができる。
[0008] When dismantling without the use of mast column as a pillar of the setting, after raising the climbing floor to a height which can secure a space that can work under floor,
The <br/> pillar provided at locations other than where the mast column is erected, assembled firstly the beam, said pulling the mast column sequentially upward, only the pillars assembled supporting the Kuraimin <br/> Gufuroa and, thereafter, it may undergo a process of assembling the rest of the pillar portion.

【0009】さらに、柱と梁の組立の際、下階の外壁を
取り付けることができる。上記作業は、コンピュータ制
御により行えば正確かつ迅速な実施が可能である。また
上述した方法を実施する装置は、クライミングフロアを
支持する複数のマストコラムと、このマストコラムに取
り付けられ、前記マストコラムに沿って前記クライミン
グフロアを上昇させる上昇機構とを備え、この上昇機構
により上昇する前記クライミングフロアの最上階のフロ
アが支持され、前記クライミングフロアの下面には天井
走行クレーンを取り付けるレールを設け、前記上昇機構
は、前記クライミングフロアを押し上げるため前記クラ
イミングフロアの下側に取り付けたジャッキと、前記マ
ストコラムに前記建築物の上下階の間隔を等分した長さ
と同一の間隔で設けた複数の孔と、前記クライミングフ
ロアを前記孔に係止するためのピンと、前記ジャッキを
前記孔に係止するためのピンを備え、前記クライミング
フロアと前記ジャッキを前記マストコラムの前記係止孔
に交互に係止しながら、前記ジャッキを前記係止孔の間
隔と同一のストロークだけ伸縮させることにより、前記
クライミングフロアを上昇させることを特徴とする。
Further, when assembling the columns and beams, an outer wall on the lower floor can be attached. The above operations can be performed accurately and quickly if performed under computer control. The apparatus for performing the above-described method includes a plurality of mast columns that support the climbing floor, and a lifting mechanism attached to the mast column and configured to raise the climbing floor along the mast column. the top floor of the floor of the climbing floor rises are supported, a rail for attaching the overhead traveling crane provided on the lower surface of the climbing floor, the lifting mechanism
Is used to push up the climbing floor.
A jack attached to the underside of the
The length of the column that equally divided the space between the upper and lower floors of the building
A plurality of holes provided at the same intervals as
A pin for locking the lower to the hole and the jack
A pin for locking the hole,
Connect the floor and the jack with the locking holes of the mast column
While alternately locking the jack, place the jack between the locking holes.
By expanding and contracting by the same stroke as the distance,
It is characterized by raising the climbing floor .

【0010】[0010]

【0011】[0011]

【0012】[0012]

【作用】本発明は上述のような構成であるので、建築物
の屋上に相当するクライミングフロアがマストコラムを
上昇し、その下部において、下階の作業が可能な空間を
確保する。よってどのような天候の下においても作業が
できる。また、このマストコラムに取り付けられ、マス
トコラムに沿ってクライミングフロアを上昇させる上昇
機構により上昇するクライミングフロアの下面には天井
走行クレーンを取り付け、下部の柱及び梁の組み立て作
業を行うことができる。
According to the present invention having the above-described structure, the climbing floor corresponding to the roof of the building rises up the mast column, and a space below the floor can be secured for work on the lower floor. Therefore, work can be performed in any weather. Further, an overhead traveling crane can be attached to the lower surface of the climbing floor which is mounted on the mast column and raised by a lifting mechanism which raises the climbing floor along the mast column, so that lower pillars and beams can be assembled.

【0013】前記上昇機構は、昇降体をマストコラムに
固定した後、ジャッキを作動させてクライミングフロア
を上昇させる。次にマストコラムにクライミングフロア
を上昇した位置で固定し、ジャッキを元の位置に戻し
て、昇降体を再びマストコラムに固定する。この作業を
繰り返すことにより、マストコラムに沿ってクライミン
グフロアが、ジャッキの一ストローク分ずつ上昇してゆ
く。
[0013] After the lifting mechanism is fixed to the mast column, the lifting mechanism operates the jack to raise the climbing floor. Next, the climbing floor is fixed to the mast column at the raised position, the jack is returned to the original position, and the elevating body is fixed to the mast column again. By repeating this operation, the climbing floor rises along the mast column by one stroke of the jack.

【0014】クライミングフロアは、最上階に到達した
ら、そのまま建築物の屋上面として使用する。このよう
に屋根部分となるクライミングフロアを、ジャッキによ
り、少しずつ上昇させていくので、複雑な機構を採らず
に確実な支持が得られ、安全性も確保される。
When the climbing floor reaches the top floor, it is used as it is as the roof surface of the building. In this way, the climbing floor, which is the roof portion, is gradually raised by the jack, so that reliable support can be obtained without using a complicated mechanism, and safety is also ensured.

【0015】[0015]

【実施例】次に本発明の実施例について図面を参照して
説明する。図1は本発明に係る柱及び梁の構築装置の全
体側面図である。これは、上端と下端の双方の水平方向
に、上部梁体1aと下部梁体1bを備え、これらの間を
補強材1cにてトラス状に連結したクライミングフロア
1が設けられている。このクライミングフロア1の上面
には、建築物の屋上となり、防水加工を施したフロア3
が完成した状態で載置され、他方、側面には外壁4が、
同様に完成した状態で取り付けられている。このクライ
ミングフロア1の前記上部梁体1aと下部梁体1bに
は、複数本(図面では4本)のマストコラム2が挿通し
ている。このマストコラム2には、固定用のピンが挿通
する孔2aを、後述するジャッキ6の一ストロークと同
一の長さの距離をおいて、長手方向に連続して設けてい
る。
Next, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is an overall side view of a column and beam building apparatus according to the present invention. The climbing floor 1 is provided with an upper beam 1a and a lower beam 1b in the horizontal direction of both the upper end and the lower end, and a truss-like connection between them by a reinforcing member 1c. On the upper surface of the climbing floor 1, a roof 3 of a building, a waterproofed floor 3
Is placed in a completed state, while the outer wall 4 is on the side,
It is also installed in a completed state. A plurality of (four in the drawing) mast columns 2 are inserted through the upper beam 1a and the lower beam 1b of the climbing floor 1. The mast column 2 is provided with holes 2a through which fixing pins are inserted continuously in the longitudinal direction at a distance equal to a stroke of a jack 6 described later.

【0016】そしてクライミングフロア1はマストコラ
ム2に沿って、上下方向に移動自在となっている。他
方、マストコラム2に沿ってクライミングフロア1を上
昇させる上昇機構が、マストコラム2とクライミングフ
ロア1の間に介在し、これは、図5〜6に示すように、
油圧式のジャッキ6と、上部フレーム7、下部フレーム
8と、昇降フレーム9からなるものである。
The climbing floor 1 is vertically movable along the mast column 2. On the other hand, a lifting mechanism that raises the climbing floor 1 along the mast column 2 is interposed between the mast column 2 and the climbing floor 1, and as shown in FIGS.
It comprises a hydraulic jack 6, an upper frame 7, a lower frame 8, and a lifting frame 9.

【0017】上部フレーム7は、クライミングフロア1
の上部梁体1aに固定され、マストコラム2の上記孔2
aに対応する貫通孔7aが設けられ、下部フレーム8も
同様に、クライミングフロア1の下部梁体1bに固定さ
れ、マストコラム2の上記孔2aに対応する貫通孔7b
が設けられている。昇降フレーム9は、マストコラム2
に沿って上下動自在であり、ピン貫通孔9aに着脱自在
に貫通し、孔2aに達するピン10により、マストコラ
ム2上に固定される。
The upper frame 7 includes the climbing floor 1
Is fixed to the upper beam 1a of the mast column 2
a, and the lower frame 8 is similarly fixed to the lower beam 1b of the climbing floor 1, and the through hole 7b corresponding to the hole 2a of the mast column 2.
Is provided. The lifting frame 9 is a mast column 2
, And is fixed on the mast column 2 by a pin 10 which detachably penetrates through the pin through hole 9a and reaches the hole 2a.

【0018】また油圧式の伸縮ジャッキ6は、その上端
のピストン6aの端部を上部フレーム7に固定され、反
対側の下端のシリンダ部6bの端を昇降フレーム9に固
定されている。この上昇機構は、上部フレーム7、下部
フレーム8、または昇降フレーム9のいずれかが、ピン
10によりマストコラム2に固定されることにより、支
持され、同時にクライミングフロア1も所定位置を保持
している。この上昇機構は、それぞれのマストコラム2
について設置することが望ましいが、十分な支持力が得
られ、またクライミングフロア1の水平が維持されるな
ら、必要な箇所のみ設置してもよい。
The hydraulic telescopic jack 6 has an end of a piston 6a at an upper end thereof fixed to an upper frame 7, and an end of a cylinder portion 6b at an opposite lower end to an elevating frame 9. In this lifting mechanism, one of the upper frame 7, the lower frame 8, and the lifting frame 9 is fixed to the mast column 2 by a pin 10 to be supported, and at the same time, the climbing floor 1 also holds a predetermined position. . This lifting mechanism is provided for each mast column 2
However, if sufficient supporting force can be obtained and the level of the climbing floor 1 is maintained, only the necessary portions may be installed.

【0019】さらに、下部フレーム8の下面には、図4
に示すように、天井走行クレーン16を取り付けるレー
ル11が設けられている。また図7に示すように、この
レール11にガイドされる走行体12に設けたウインチ
13に巻回されたワイヤー14により、クレーンフック
15が支持される。このクレーン16は、下部フレーム
8が互いに交差する箇所において設けた、図示しないト
ラバーサによって、その走行方向を変換できるように設
置する。
Further, on the lower surface of the lower frame 8, FIG.
As shown in FIG. 1, a rail 11 for mounting an overhead traveling crane 16 is provided. As shown in FIG. 7, a crane hook 15 is supported by a wire 14 wound around a winch 13 provided on a traveling body 12 guided by the rail 11. The crane 16 is installed so that its traveling direction can be changed by a traverser (not shown) provided at a location where the lower frames 8 cross each other.

【0020】以下、上記の装置を使用して柱及び梁を組
み立てる方法について説明する。まず、図1のように、
地上で建築物の屋上に相当するクライミングフロア1を
組み立てる。そしてこれに挿通するマストコラム2を複
数本、立設する。図8は、本発明の方法による施工状態
を示す平面図であり、マストコラム2を、クライミング
フロア1の最外周から一段内側に位置するように、その
左右に分離して配置している。
Hereinafter, a method for assembling columns and beams using the above apparatus will be described. First, as shown in FIG.
Assemble the climbing floor 1 corresponding to the roof of a building on the ground. Then, a plurality of mast columns 2 to be inserted therethrough are erected. FIG. 8 is a plan view showing a construction state according to the method of the present invention. The mast column 2 is disposed on the left and right sides of the climbing floor 1 so as to be located one step inside from the outermost periphery.

【0021】そしてクライミングフロア1を上昇機構に
より、マストコラム2に沿って上昇させる。これは、次
のような手順で行う。最初に、昇降フレーム9のピン1
0をマストコラム2の孔2aに挿入して、昇降フレーム
9を固定する。次に、図2のように、昇降フレーム9の
油圧ジャッキ6を伸張させ、クライミングフロア1をジ
ャッキの一ストローク分、上昇させる。
Then, the climbing floor 1 is raised along the mast column 2 by the lifting mechanism. This is performed in the following procedure. First, pin 1 of lifting frame 9
0 is inserted into the hole 2a of the mast column 2, and the lifting frame 9 is fixed. Next, as shown in FIG. 2, the hydraulic jack 6 of the lifting frame 9 is extended, and the climbing floor 1 is raised by one stroke of the jack.

【0022】その後、上部フレーム1aの貫通孔7aに
ピン10を貫通させて上部フレーム1aをマストコラム
2に固定し、昇降フレーム9のピン10を外し、これを
フリーの状態にする。そして、伸張したジャッキ6を収
縮させた後、昇降フレーム9のピン10をマストコラム
2の孔2aに再び挿入して、これを固定する。
Thereafter, the pins 10 are passed through the through holes 7a of the upper frame 1a, and the upper frame 1a is fixed to the mast column 2, and the pins 10 of the elevating frame 9 are removed, and this is set in a free state. After contracting the extended jack 6, the pin 10 of the elevating frame 9 is reinserted into the hole 2a of the mast column 2 and fixed.

【0023】本実施例では、ジャッキ6の一ストローク
の伸張により、6分の1階の上昇が可能であるので、上
記の工程を6階繰り返せば、クライミングフロア1が1
フロア分上昇することになる。その後、クライミングフ
ロア1を屋根とし、上記クレーン16を利用して下階の
躯体工事を進行させる。この場合は、クライミングフロ
ア1の安定と確実な支持のために、下部フレーム1bを
ピン10により、マストコラム2に固定しておく。
In this embodiment, since the jack 6 can be moved up by one-sixth floor by one stroke extension, if the above-described process is repeated on the sixth floor, the climbing floor 1 becomes one floor.
It will rise by the floor. After that, the climbing floor 1 is used as a roof, and the cranes 16 are used to carry out the framing work on the lower floor. In this case, the lower frame 1b is fixed to the mast column 2 by pins 10 in order to stably and surely support the climbing floor 1.

【0024】またその際、図4に示すように、クライミ
ングフロア1から施工階の外周部を覆うシェルター19
を垂下させることにより、全天候下での作業がより確実
に行える。このシェルター19は、表面にテフロン等を
施した防水加工シート等を利用できる。
At this time, as shown in FIG. 4, the shelter 19 covers the climbing floor 1 from the outer periphery of the construction floor.
The work under all weather can be performed more reliably. As the shelter 19, a waterproof sheet or the like having a surface coated with Teflon or the like can be used.

【0025】下階の作業が可能な空間を確保できる高さ
までクライミングフロア1を上昇させた後は、図3のよ
うに、マストコラム2が立設している箇所以外に設ける
柱17、梁18を組み立てる。そしてそれらの柱により
クライミングフロア1が支持できるようになったら、図
4に示すように、マストコラムを順次上方に引き上げ、
組み立てられた柱17のみでクライミングフロア1を支
持して、残りの梁18部分を組み立てる。
After the climbing floor 1 has been raised to a height at which a work space on the lower floor can be secured, as shown in FIG. 3, columns 17 and beams 18 are provided at places other than the place where the mast column 2 stands. Assemble. Then, when the climbing floor 1 can be supported by the pillars, the mast column is sequentially pulled up as shown in FIG.
The climbing floor 1 is supported only by the assembled pillars 17, and the remaining beams 18 are assembled.

【0026】このような作業を繰り返して実施し、次第
に上階の施工が完成するが、最上階に達したら、上部フ
レーム1a、下部フレーム1b、補強体1cを分解撤去
し、フロア部3と外壁4のみ残し、マストコラム2も撤
去する。但し、マストコラム2は、これをそのまま本設
の柱として残すことも可能である。
By repeating these operations, the construction of the upper floor is completed gradually. When the upper floor is reached, the upper frame 1a, the lower frame 1b, and the reinforcing body 1c are disassembled and removed, and the floor 3 and the outer wall are removed. 4 and leave the mast column 2 removed. However, the mast column 2 can be left as a main pillar as it is.

【0027】[0027]

【発明の効果】本発明によれば、どのような天候の下に
おいても屋根となるクライミングフロアの下部に空間を
確保し、柱と梁の構築等の作業ができる。またクライミ
ングフロアの下面に天井走行クレーンを取り付け、下部
の作業に利用できるので、極めて効率のよい作業が可能
である。したがって高層階の建築物におては大幅な工期
の短縮、工費の節減が図れる。
According to the present invention, it is possible to secure a space below the climbing floor, which serves as a roof, and perform work such as construction of columns and beams in any weather. In addition, an overhead traveling crane is attached to the lower surface of the climbing floor and can be used for lower work, so that extremely efficient work is possible. Therefore, for high-rise buildings, it is possible to significantly shorten the construction period and reduce construction costs.

【0028】さらにクライミングフロアは、そのまま最
上階の一部として使用できるので効率的である。
Further, the climbing floor can be used as it is as a part of the top floor, so that it is efficient.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る柱及び梁の構築装置の全体側面
FIG. 1 is an overall side view of a column and beam construction apparatus according to the present invention.

【図2】 ジャッキが伸張しクライミングフロアが上昇
する状態を示す図
FIG. 2 is a view showing a state where a jack is extended and a climbing floor is raised.

【図3】 クライミングフロアの下部の柱を構築する状
態を示す図
FIG. 3 is a diagram showing a state where a lower pillar of the climbing floor is constructed.

【図4】 マストコラムを上方にスライドさせ、柱と梁
を構築する状態を示す図
FIG. 4 is a diagram showing a state in which a mast column is slid upward to construct columns and beams.

【図5】 上昇機構の正面図FIG. 5 is a front view of a lifting mechanism.

【図6】 上昇機構の側面図FIG. 6 is a side view of a lifting mechanism.

【図7】 天井走行クレーンの概略図FIG. 7 is a schematic diagram of an overhead traveling crane.

【図8】 本発明の方法による施工状態を示す平面図FIG. 8 is a plan view showing a construction state according to the method of the present invention.

【符号の説明】[Explanation of symbols]

1 クライミングフロア 2 マストコラム 6 ジャッキ 7 上部フレーム 8 下部フレーム 9 昇降フレーム 10 ピン 17 柱 18 梁 DESCRIPTION OF SYMBOLS 1 Climbing floor 2 Mast column 6 Jack 7 Upper frame 8 Lower frame 9 Elevating frame 10 Pin 17 Column 18 Beam

───────────────────────────────────────────────────── フロントページの続き (72)発明者 白石 正男 東京都千代田区富士見二丁目10番26号 前田建設工業株式会社内 (72)発明者 秋山 直一 東京都千代田区富士見二丁目10番26号 前田建設工業株式会社内 (56)参考文献 特開 昭51−21651(JP,A) 実開 平1−152990(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04B 1/35 E04G 21/16 E04G 21/28 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Masao Shiraishi 2- 10-26 Fujimi, Chiyoda-ku, Tokyo Inside Maeda Construction Industry Co., Ltd. (72) Inventor Naoichi Akiyama 2- 10-26 Fujimi 2-chome, Chiyoda-ku, Tokyo Maeda Construction Industry Co., Ltd. (56) References JP-A-51-21651 (JP, A) JP-A 1-152990 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04B 1/35 E04G 21/16 E04G 21/28

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地上で建築物の屋上に相当するクライミ
ングフロアを組み立てる工程と、任意の数のマストコラ
ムで前記クライミングフロアを支持しながら、下階の作
業が可能な空間を保持できる高さまで前記クライミング
フロアを上昇させる行程と、前記クライミングフロア下
の柱と梁を組み立てる工程とを含み、これらの工程を繰
り返して実施することにより、所定の高さまで前記柱及
び梁を構築する柱及び梁の構築方法において、 前記クライミングフロアを上昇させる行程は、前記マス
トコラムに前記建築物の上下階の間隔を等分した長さと
同一の間隔で設けた複数の係止孔のいずれかに、前記ク
ライミングフロアの下側に設けたジャッキを係止する工
程と、前記ジャッキにより前記クライミングフロアを前
記係止孔の間隔分だけ押し上げる工程と、前記クライミ
ングフロアを前記係止孔に係止する工程と、前記ジャッ
キの前記係止孔に対する係止を解除して前記ジャッキを
縮小することにより前記ジャッキを引き上げる工程と、
を繰り返して行うことを特徴とする柱及び梁の構築方
法。
And 1. A process for assembling a climbing floor corresponding to the roof of the ground in buildings, while supporting the climbing floor in any number of mast column, until said height to hold the space capable of working under floor a step of raising the climbing floor, and a step of assembling the columns and beams under the climbing floor, by performing repeat these steps, the pillar及to a predetermined height
In the method of constructing columns and beams for constructing a beam, the step of raising the climbing floor includes the step of
And the length of the upper and lower floors of the building equally divided
The lock is inserted into one of the plurality of locking holes provided at the same interval.
Work to lock the jack provided under the rimming floor
The climbing floor by the jack
Pushing up by the distance of the locking hole,
Locking the locking floor in the locking hole;
Release the lock of the key to the lock hole and remove the jack
Raising the jack by reducing it; and
Method of constructing pillars and beams characterized by repeating
Law.
【請求項2】 下階の作業が可能な空間を確保できる高
さまで前記クライミングフロアを上昇させた後、前記
ストコラムが立設している箇所以外に設ける前記柱、梁
を先ず組み立て、前記マストコラムを順次上方に引き上
げ、組み立てられた前記柱のみで前記クライミングフロ
アを支持し、その後、残りの前記梁部分を組み立てる工
程を経ることを特徴とする請求項1に記載の柱及び梁の
構築方法。
Wherein after raising the climbing floor to a height capable of ensuring the lower floor of the tasks can be space, the pillar provided in locations other than said Ma <br/> strike column is erected, the beam first assembly, the mast column sequentially pulled upward, to support the climbing floor only by the pillars assembled, then the pillars of claim 1, characterized in that through the process of assembling the rest of the beam portion And how to build beams.
【請求項3】 クライミングフロアを支持する複数のマ
ストコラムと、このマストコラムに取り付けられ、前記
マストコラムに沿って前記クライミングフロアを上昇さ
せる上昇機構とを備え、この上昇機構により上昇する
クライミングフロアの最上階のフロアが支持され、ま
た前記クライミングフロアの下面には天井走行クレーン
を取り付けるレールを設け 前記上昇機構は、前記クライミングフロアを押し上げる
ため前記クライミングフロアの下側に取り付けたジャッ
キと、前記マストコラムに前記建築物の上下階の間隔を
等分した長さと同一の間隔で設けた複数の孔と、前記ク
ライミングフロアを前記孔に係止するためのピンと、前
記ジャッキを前記孔に係止するためのピ ンを備え、 前記クライミングフロアと前記ジャッキを前記マストコ
ラムの前記係止孔に交互に係止しながら、前記ジャッキ
を前記係止孔の間隔と同一のストロークだけ伸縮させる
ことにより、前記クライミングフロアを上昇させる こと
を特徴とする柱及び梁の構築装置。
3. A plurality of mast columns supporting the climbing floor, attached to the mast column, and a lifting mechanism for raising the climbing floor along said <br/> mast column, raised by the lifting mechanism Before
Serial Climbing floor top floor of the floor is supported, also the rail for attaching the overhead traveling crane provided on the lower surface of the climbing floor, the lifting mechanism pushes up the climbing floor
For this reason, a jack attached below the climbing floor
G and the mast column to the upper and lower floors of the building
A plurality of holes provided at the same interval as the equally-divided length;
A pin for locking the rimming floor to the hole,
Serial comprises a pin for locking the jack into the hole, the said climbing floor and the jack Masutoko
While alternately locking in the locking holes of the ram, the jack
Is extended and contracted by the same stroke as the distance between the locking holes.
An apparatus for constructing columns and beams , wherein the climbing floor is raised .
JP27840891A 1991-09-30 1991-09-30 Column and beam construction method and apparatus Expired - Fee Related JP3179814B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27840891A JP3179814B2 (en) 1991-09-30 1991-09-30 Column and beam construction method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27840891A JP3179814B2 (en) 1991-09-30 1991-09-30 Column and beam construction method and apparatus

Publications (2)

Publication Number Publication Date
JPH0586651A JPH0586651A (en) 1993-04-06
JP3179814B2 true JP3179814B2 (en) 2001-06-25

Family

ID=17596933

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27840891A Expired - Fee Related JP3179814B2 (en) 1991-09-30 1991-09-30 Column and beam construction method and apparatus

Country Status (1)

Country Link
JP (1) JP3179814B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996036780A1 (en) * 1995-05-15 1996-11-21 Obayashi Corporation Temporary frame structure for construction of building
CN109399432B (en) * 2018-11-23 2019-12-03 燕山大学 A kind of hoistway job platform that climbs certainly

Also Published As

Publication number Publication date
JPH0586651A (en) 1993-04-06

Similar Documents

Publication Publication Date Title
JP3179814B2 (en) Column and beam construction method and apparatus
JP2957328B2 (en) Peripheral holding self-elevating construction method
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JP2796448B2 (en) Building construction method and building construction equipment used for the construction method
JP3532161B2 (en) Tower construction machine and tower construction method
JPH0791904B2 (en) Push-up device
JP3070438B2 (en) Temporary frame equipment for construction
JP2872886B2 (en) Construction lift equipment
JPH059981A (en) Construction of building
JP3263504B2 (en) Construction method of tower structure
JP3247954B2 (en) Structure lifting method and apparatus
JP3079329B2 (en) Push-up method with composite jack for push-pull
JP3002054U (en) Tower crane with multiple main columns as tower mast
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPH0782799A (en) Method and apparatus for erecting towerlike structure
JP3119982B2 (en) Self-elevating construction equipment
JP3185016B2 (en) How to raise and lower structures
JP3230012B2 (en) Building construction equipment
JP2612219B2 (en) Climbing device for truss structure
JP2776128B2 (en) Lifting device for building frame
JP3225455B2 (en) How to build a building
JP3069213B2 (en) Lifting device in all-weather construction method
JP3177726B2 (en) Dismantling method of temporary shed for building structures
JP2778842B2 (en) Building construction method
JP2637358B2 (en) Chimney erection method and equipment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees