JP3070438B2 - Temporary frame equipment for construction - Google Patents

Temporary frame equipment for construction

Info

Publication number
JP3070438B2
JP3070438B2 JP7116125A JP11612595A JP3070438B2 JP 3070438 B2 JP3070438 B2 JP 3070438B2 JP 7116125 A JP7116125 A JP 7116125A JP 11612595 A JP11612595 A JP 11612595A JP 3070438 B2 JP3070438 B2 JP 3070438B2
Authority
JP
Japan
Prior art keywords
frame
temporary
construction
building
roof frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7116125A
Other languages
Japanese (ja)
Other versions
JPH08312144A (en
Inventor
達也 脇坂
則之 古屋
康平 栗田
裕明 池田
利光 坂井
英雄 小野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP7116125A priority Critical patent/JP3070438B2/en
Priority to US08/765,967 priority patent/US5881504A/en
Priority to PCT/JP1995/002761 priority patent/WO1996036780A1/en
Priority to EP95942313A priority patent/EP0771916A4/en
Publication of JPH08312144A publication Critical patent/JPH08312144A/en
Application granted granted Critical
Publication of JP3070438B2 publication Critical patent/JP3070438B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、全天候型の建設用仮
設架構装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an all-weather construction temporary frame apparatus.

【0002】[0002]

【従来の技術】RC構造の高層ビルの建設用仮設足場と
して、全天候型の仮設架構が提案されている。この仮設
架構は、構築予定建物の形状に合わせてその周囲に立設
された複数本の仮設支柱と、各仮設支柱間の上部に支持
された屋根架構からなり、屋根架構の下面に天井クレー
ンを配置し、エレベータ等により揚重された資材を天井
クレーンを通じて各部に搬送し組立を行う。施工現場の
上面全体は屋根架構で覆われるので天候とは無関係に作
業できる。
2. Description of the Related Art An all-weather temporary frame has been proposed as a temporary scaffold for the construction of an RC structure high-rise building. This temporary frame is composed of a plurality of temporary columns erected around the building to be constructed according to the shape of the building to be constructed, and a roof frame supported above the temporary columns, and an overhead crane is mounted on the lower surface of the roof frame. The materials placed and lifted by elevators etc. are transported to each part through overhead cranes and assembled. The entire upper surface of the construction site is covered with a roof frame, so work can be performed regardless of the weather.

【0003】このため、仮設架構は施工階の直上に常時
配置されるべく施工の進捗度合いに応じて順次上昇させ
ることが必要であり、従来では例えば特開平4−221
172号公報に示すように、地上部において仮設支柱
(仮設櫓)の周囲に配置した揚重手段により仮設支柱を
持ち上げ、下部に新たな支柱材を継ぎ足す手法が提案さ
れている。
For this reason, the temporary frame needs to be sequentially raised according to the degree of progress of the construction so that it is always placed immediately above the construction floor.
As disclosed in Japanese Patent Publication No. 172, a method has been proposed in which a temporary support is lifted by a lifting means arranged around a temporary support (temporary tower) on the ground portion, and a new support material is added to a lower portion.

【0004】また、これの他に例えば特開平5−598
17号公報に示すように、仮設支柱を伸縮自在な複数の
テレスコピック状のロングポストにより構成しこのロン
グポストの上部に作業ステーションを配置し、ロングポ
ストを順次繰り出すことによって作業ステーションを上
昇させる手法も提案されている。
[0004] In addition to this, for example, Japanese Patent Laid-Open No. 5-598
As disclosed in Japanese Patent Publication No. 17-175, there is also a method in which a temporary support column is constituted by a plurality of telescopic long posts that can be extended and retracted, and a work station is arranged above the long post, and the work station is raised by sequentially feeding out the long posts. Proposed.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、前者の
発明は、仮設架構を上昇させる毎に継ぎ足す仮設支柱材
の重量が増加し、揚重手段の負荷が順次増加するため
に、最終重量を設定した駆動力を予め設定しておく必要
がある。
However, in the former invention, the final weight is set because the weight of the temporary column material to be added increases each time the temporary frame is raised, and the load on the lifting means increases sequentially. It is necessary to set the obtained driving force in advance.

【0006】一方、後者の発明は、揚重し始めから全荷
重が加わるためやはり相当な駆動力が必要であり、順次
ロングポストを繰り出す毎に繰出し長さが収容されてい
る長さより大きくなるため、継ぎ部分での支持モーメン
トが不安定になる。
On the other hand, in the latter invention, since a full load is applied from the beginning of lifting, a considerable driving force is also required. Each time the long post is sequentially extended, the extended length becomes longer than the accommodated length. The support moment at the joint becomes unstable.

【0007】また、いずれの発明にあっても、仮設支柱
自体が移動するのでこれの支持を建設中の建物から取る
ことはできず、高層階になるほど個々の仮設支柱の自立
が不安定となる。自立不安定の解消のためには、各仮設
支柱間に補強材としてブレースを掛け渡せば良いが、ブ
レースの掛け渡し作業が面倒であるばかりか、荷重が増
加し、揚重のためにさらに大きな動力を必要とするた
め、特に超高層ビルなどの階数の多い建物建設用の仮設
架構として不適当であった。
Further, in any of the inventions, since the temporary supporting column itself moves, it cannot be supported from the building under construction, and the higher the floor is, the more unstable the individual temporary supporting column becomes. . In order to eliminate the instability of the independence, braces may be laid as reinforcements between the temporary columns, but it is not only troublesome to bridge the brace, but also increases the load and increases the load due to lifting. Since it requires power, it is not suitable as a temporary frame especially for building a multi-story building such as a skyscraper.

【0008】この発明は、既存の装置を有効活用するこ
とができながら、屋根架構の上昇のための駆動力を小さ
く、かつ常時一定とすることができ、仮設支柱の支持を
建物から取ることができ、屋根架構の上昇時における撓
みを抑制し、最上部の仮設支柱の継足し作業を建設作業
に競合することなく行うことを目的とする。
According to the present invention, while the existing apparatus can be effectively used, the driving force for raising the roof frame can be made small and constant at all times, and the temporary support can be supported from the building. It is an object of the present invention to suppress bending of a roof frame when it is raised, and to perform a work of extending a top temporary support column without competing with a construction work.

【0009】[0009]

【課題を解決するための手段】この発明は、建物の建設
予定位置に近接してまたは該予定位置内に立設され、か
つ建設高さの増加に応じて順次上方に継ぎ足される1な
いし複数の仮設支柱と、該仮設支柱の周囲に上下のガイ
ドローラを介して昇降可能にガイドされた上部フレーム
および下部フレームを備えるとともに、該上下フレーム
間に昇降用のジャッキを配置したクライミング機構と、
前記下部フレームの下部に前記仮設支柱を貫通した状態
吊下状態に支持され、前記建物の上面全体を水平に覆
う屋根架構と、該屋根架構の下面側に固定されガイドロ
ーラが配置されて前記仮設支柱に昇降可能にガイドされ
る支持フレームとを備えたことを特徴とする(請求項
1)。
SUMMARY OF THE INVENTION The present invention provides one or a plurality of erections which are erected close to or within a planned construction site of a building and which are successively added upward as the construction height increases. A temporary support, and an upper frame guided around the temporary support via upper and lower guide rollers so as to be able to move up and down.
And provided with a lower frame, the upper and lower frames
And climbing mechanism of arranging the jack for lifting in between,
A state in which the temporary support pillar has penetrated below the lower frame.
A roof frame that is supported in a suspended state and horizontally covers the entire upper surface of the building ; and a guide frame fixed to the lower surface side of the roof frame.
Is arranged and guided by the temporary support so as to be able to move up and down.
Characterized in that a that the support frame (claim 1).

【0010】また、前記屋根架構の下面に資材搬送用の
天井クレーンを配置するとともに、上面に資材揚重用の
クレーン装置を配置することが望ましく(請求項2)、
前記仮設支柱はタワークレーンのマストを採用すること
が望ましく(請求項3)、前記仮設支柱は水平控えを介
して建物側に支持されることが望ましい(請求項4)。
In addition, it is desirable that an overhead crane for transporting materials is disposed on the lower surface of the roof frame, and a crane device for lifting materials is disposed on the upper surface.
It is preferable that the mast of the tower crane is adopted as the temporary support (claim 3), and the temporary support is preferably supported on the building side via a horizontal stay (claim 4).

【0011】[0011]

【作用】請求項1の構成により、屋根架構の組立を、地
上に近接或いは接した状態で仮設支柱の基礎の直上で行
うことができる。仮設支柱は順次上方に継ぎ足すので既
設の仮設支柱はその状態のまま固定される。上昇作業時
にクライミング機構は屋根架構のみの重量を支えた状態
で上昇する。
According to the structure of the first aspect, the assembly of the roof frame can be performed immediately above the foundation of the temporary support column while being close to or in contact with the ground. Since the temporary columns are sequentially added upward, the existing temporary columns are fixed in that state. During the climbing operation, the climbing mechanism rises while supporting the weight of only the roof frame.

【0012】請求項2の構成とすることで、建設作業に
おける資材の搬入および据付作業を天井クレーンで行
い、上面のクレーンは専ら仮設支柱を揚重し順次上方に
継ぎ足す作業を行う。また、建設終了後は屋根架構の解
体に使用できる。
According to the construction of the second aspect, the loading and loading of the materials in the construction work is performed by the overhead crane, and the crane on the upper surface exclusively lifts the temporary columns and sequentially adds the temporary columns upward. After the construction is completed, it can be used to dismantle the roof frame.

【0013】請求項3の構成とすることで、クライミン
グ機構をタワークレーン用クライミング機構を適用でき
る。
According to the third aspect of the present invention, the climbing mechanism for a tower crane can be applied.

【0014】請求項4の構成とすることで、仮設支柱間
を繋ぐブレースを減少したり不要とできる。
According to the structure of the fourth aspect, the number of braces connecting the temporary columns can be reduced or made unnecessary.

【0015】[0015]

【実施例】図1,2において、仮設架構装置は、建設予
定の建物1の外側に配置され、地上部に配置された基礎
2a上に立設された4本(図においては2本のみ示され
ている)のマスト2と、各マスト2に昇降可能に取付け
たクライミング機構3と、各クライミング機構3下部に
四隅を吊下状態に支持され、建物1の上面全体を水平に
覆う屋根架構4と、屋根架構4の下面に配置された複数
の天井クレーン5と、屋根架構4の上面中央に移動可能
に配置したジブクレーン6とを備えている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIGS. 1 and 2, four temporary frame devices are arranged outside a building 1 to be constructed and are erected on a foundation 2a arranged on the ground (only two are shown in the figures). Mast 2), a climbing mechanism 3 attached to each mast 2 so as to be able to move up and down, and a roof frame 4 that is supported at four corners under each climbing mechanism 3 so as to horizontally cover the entire upper surface of the building 1. And a plurality of overhead cranes 5 arranged on the lower surface of the roof frame 4 and a jib crane 6 movably arranged at the center of the upper surface of the roof frame 4.

【0016】屋根架構4の組立、およびジブクレーン6
の据付にあたっては図1に示すように、マスト2の基礎
2aの直上で行えるため、地上からの作業高さが低く、
作業能率、安全性が高いものとなる。そしてクライミン
グ機構3を四隅上部に組付けた後これを駆動して上昇さ
せた後、天井クレーン5,ホイスト7等を組付ければ、
組立を完了し、その後は屋根架構4を上昇させつつ、建
物1の建設を行うことができる。
Assembly of roof frame 4 and jib crane 6
As shown in FIG. 1, since the work can be performed immediately above the foundation 2 a of the mast 2, the work height from the ground is low,
Work efficiency and safety will be high. Then, after assembling the climbing mechanism 3 at the upper four corners, driving the ascending mechanism 3 and ascending it, assembling the overhead cranes 5, the hoists 7, etc.,
After the assembly is completed, the building 1 can be constructed while the roof frame 4 is raised.

【0017】建設の進捗に応じて建物1の一側面には図
2に示すように貨物リフト8が配置され、このリフト8
を通じて揚重されたプレキャスト部材などの資材は天井
クレーン5を走行するホイスト7に受け渡され、建物1
の各部に供給される。
According to the progress of the construction, a cargo lift 8 is arranged on one side of the building 1 as shown in FIG.
Materials such as precast members lifted through the building are transferred to a hoist 7 traveling on an overhead crane 5 and
Is supplied to each part.

【0018】前記マスト2およびクライミング機構3
は、タワークレーンに用いる機構を適用したものであ
り、マスト2はトラス組柱状体の他に円筒形柱状体を選
択でき、図2に示すように、ある程度まで高さが高くな
ると、建物1側に一端固定された水平控え9に支持され
て自立安定性を保ちつつ、施工階の上昇に応じてジブク
レーン6で揚重されたマスト材2bを上方に継ぎ足すこ
とで順次高さを増すことができる。
The mast 2 and the climbing mechanism 3
Applies a mechanism used for a tower crane, and a mast 2 can select a cylindrical columnar body in addition to a trussed columnar body, and as shown in FIG. The height of the mast material 2b lifted by the jib crane 6 in accordance with the rise of the construction floor is sequentially increased while maintaining the independence stability while being supported by the horizontal stay 9 fixed to one end. it can.

【0019】クライミング機構3は、マスト2の外周に
挿通されたスリーブ3aと、スリーブ3aの下部に一体
化された上部フレーム3bと、上部フレーム3bの下部
側に配置された下部フレーム3cと、上下フレーム3
b,3c間を連結した複数の昇降用油圧ジャッキ3dと
を備え、下部フレーム3bの下面にマスト2を貫通した
状態で屋根架構4を吊下状態に支持している。また屋根
架構4の下面側においてマスト2の外周には支持フレー
ム3eが固定されている。
The climbing mechanism 3 includes a sleeve 3a inserted around the outer periphery of the mast 2, an upper frame 3b integrated below the sleeve 3a, a lower frame 3c disposed below the upper frame 3b, Frame 3
A plurality of lifting hydraulic jacks 3d are connected to each other between b and 3c, and the roof frame 4 is supported in a suspended state with the mast 2 penetrating the lower surface of the lower frame 3b. A support frame 3e is fixed to the outer periphery of the mast 2 on the lower surface side of the roof frame 4.

【0020】各フレーム3b,3c,3eの内側には図
3(a)〜(c)に断面して示すように前記マスト2の
外側部に接して転動する複数のガイドローラ10が配置
され、各フレーム3b〜3cを昇降可能にガイドする。
Inside each of the frames 3b, 3c, 3e, there are arranged a plurality of guide rollers 10 which roll in contact with the outer part of the mast 2 as shown in cross section in FIGS. 3 (a) to 3 (c). , And guides the frames 3b to 3c to be able to move up and down.

【0021】また上部フレーム3bと下部フレーム3c
には同図(a),(b)に示すようにそれぞれ鉛直荷
支持用の一対のピン11がマスト2に抜き差し可能に挿
通され、クライミング機構3をマスト2の周囲に支持固
定している。
The upper frame 3b and the lower frame 3c
FIG (a), a pair of pins 11 for each vertical load heavy <br/> support as shown in (b) are inserted and removed capable inserted in the mast 2, the supporting climbing mechanism 3 around the mast 2 It is fixed.

【0022】以上の構成において、クライミング機構3
の停止状態では油圧ジャッキ3dは縮小し、各ピン11
によりマスト2の所定高さ位置に支持されている。
In the above configuration, the climbing mechanism 3
In the stopped state, the hydraulic jack 3d contracts and each pin 11
At a predetermined height of the mast 2.

【0023】上昇させるには、上部フレーム3bのピン
11を抜き、油圧ジャッキ3dを伸長させることによ
り、上部フレーム3bから上の部分はジャッキストロー
ク分だけ上昇する。
To lift the upper frame 3b, the pin 11 of the upper frame 3b is pulled out and the hydraulic jack 3d is extended, so that the portion above the upper frame 3b is raised by the jack stroke.

【0024】次いで上部フレーム3bにピン11を挿通
してマスト2に鉛直支持させた後、下部フレーム3cの
ピン12を抜き、油圧ジャッキ3dを縮小させれば、下
部フレーム3cも追随して上昇し、屋根架構4を引き上
げる。この後ピン11を挿通して下部フレーム3cをマ
スト2に鉛直支持させれば、上昇作業を完了する。
Next, the pin 11 is inserted into the upper frame 3b and vertically supported on the mast 2, and then the pin 12 of the lower frame 3c is pulled out and the hydraulic jack 3d is reduced, so that the lower frame 3c also rises. , Raise the roof frame 4. Thereafter, if the lower frame 3c is vertically supported on the mast 2 by inserting the pin 11, the lifting operation is completed.

【0025】以上のクライミング機構3を用いて屋根架
構4を上昇させるには、建設作業の中断の後、4つのク
ライミング機構3を同時に上昇動作させる。
In order to raise the roof frame 4 using the climbing mechanism 3, the four climbing mechanisms 3 are simultaneously moved upward after the construction work is interrupted.

【0026】このとき各部の上昇速度の過小により屋根
架構4に撓もうとする力が発生するが、下部フレーム3
cと支持フレーム3eのガイドローラ10がその傾き方
向に対して互いに逆方向の反力ローラとして作用するた
め、屋根架構4の撓みを抑制することができる。このよ
うに、屋根架構4が撓もうとする力は天井クレーン5が
資材を移送する際にも発生するが、ガイドローラ10が
反力ローラとして作用することにより屋根架構4の撓み
を抑制することができる。
At this time, a force that causes the roof frame 4 to bend is generated due to an excessively low rising speed of each part.
Since the guide roller 10c and the guide roller 10 of the support frame 3e act as reaction force rollers in directions opposite to each other with respect to the inclination direction, the bending of the roof frame 4 can be suppressed. As described above, the force that the roof frame 4 tends to bend also occurs when the overhead crane 5 transfers materials, but the guide roller 10 acts as a reaction force roller to suppress the deflection of the roof frame 4. Can be.

【0027】上昇停止後、下部フレーム3cにピン11
を差し込み、荷重をマスト2に預けることにより屋根架
構4の四隅はマスト2の高さで位置決めされ、水平に支
持される。この後建設作業を再開できる。
After the ascent is stopped, the pins 11 are attached to the lower frame 3c.
The four corners of the roof frame 4 are positioned at the height of the mast 2 and supported horizontally by inserting the load into the mast 2. After this, construction work can be resumed.

【0028】建物1の建設完了後はジブクレーン6によ
り天井クレーン5および屋根架構4を順次解体した後ジ
ブクレーン6自体も解体し、建物1に干渉しない状態と
した後、図示しない補助クレーン等によりマスト2を上
方から順に撤去しつつ前記とは逆の手順でクライミング
機構3を下降することで、仮設架構装置を撤去できる。
After the construction of the building 1 is completed, the overhead crane 5 and the roof frame 4 are sequentially dismantled by the jib crane 6, and then the jib crane 6 itself is dismantled so as not to interfere with the building 1. The temporary frame device can be removed by descending the climbing mechanism 3 in the reverse procedure to the above while sequentially removing from the top.

【0029】なお、以上の実施例では建物1が矩形状断
面であるため、マスト2を建物1の外側4箇所に配置し
た場合を説明したが、建物断面積に応じて1〜3本のみ
配置し、その上部を屋根架構で覆っても良いし、断面積
が大きい場合にはさらに多数設けても良いことは勿論で
ある。
In the above embodiment, since the building 1 has a rectangular cross section, the case where the masts 2 are arranged at four places outside the building 1 has been described. However, only one to three masts are arranged according to the cross sectional area of the building. Then, the upper part may be covered with a roof frame or, if the cross-sectional area is large, more may be provided.

【0030】[0030]

【発明の効果】この発明の建設用仮設架構装置は次の利
点がある。
The construction temporary frame apparatus of the present invention has the following advantages.

【0031】(1)仮設支柱を順次上方に継ぎ足すた
め、既設の仮設支柱はその状態のまま固定されるので、
仮設支柱の支持を建物側に取ることができる。
(1) Since the temporary columns are sequentially added upward, the existing temporary columns are fixed as they are.
Temporary columns can be supported on the building side.

【0032】(2)上昇作業時にクライミング機構は屋
根架構のみの重量を支えた状態で上昇させるため、仮設
架構の上昇のための駆動動力を小さく、かつ常時一定と
することができる。
(2) Since the climbing mechanism raises the roof frame while supporting only the weight of the roof frame during the lifting operation, the driving power for raising the temporary frame can be kept small and constant.

【0033】(3)屋根架構の組立を地上に近接或いは
接した状態で行うことができ、組立作業性が良く、高い
精度の架構が得られるとともに、組立時における屋根架
構の地上高さを低くすることができるので作業を安全に
行うことができる。
(3) The assembling of the roof frame can be performed close to or in contact with the ground, the assembling workability is good, a frame with high accuracy can be obtained, and the height of the roof frame at the time of assembly is reduced. Work can be performed safely.

【0034】(4)請求項2の構成とすることで、建設
に必要な資材の搬入、据付は天井クレーンで行い、上面
のクレーンは専ら仮設支柱を揚重し順次上方に継ぎ足す
作業を行うため、仮設支柱の増設作業と建物の建設作業
との競合がない。また、建設終了後は上面のクレーンは
屋根架構の解体に使用できる。
(4) With the construction of claim 2, the materials necessary for the construction are carried in and installed by an overhead crane, and the crane on the upper surface exclusively lifts the temporary columns and sequentially adds them upward. Therefore, there is no conflict between the work for adding temporary columns and the work for building. After the construction is completed, the crane on the top can be used to dismantle the roof frame.

【0035】(5)請求項3の構成とすることで、クラ
イミング機構をタワークレーン用クライミング機構を適
用でき、既存の装置を有効活用できる。
(5) By adopting the configuration of claim 3, a climbing mechanism for a tower crane can be applied to the climbing mechanism, and existing equipment can be effectively used.

【0036】(6)請求項4の構成とすることで、仮設
支柱は水平控えにより自立安定性を確保でき、仮設支柱
間を連結するブレースを減少したり、不要とできるの
で、重量低減効果がある。
(6) By adopting the constitution of claim 4, the temporary support can secure the self-standing stability by horizontal holding, and the brace connecting the temporary support can be reduced or unnecessary, so that the weight reduction effect is obtained. is there.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明による仮設架構装置の初期組立状態の
側面図である。
FIG. 1 is a side view of a temporary frame device according to the present invention in an initial assembled state.

【図2】同装置を用いた建設中の側面図である。FIG. 2 is a side view during construction using the same device.

【図3】(a)は図1のA−A線断面図である。(b)
は同B−B線断面図である。(c)は同C−C線断面図
である。
FIG. 3A is a sectional view taken along line AA of FIG. (B)
FIG. 3 is a sectional view taken along line BB of FIG. (C) is a sectional view taken along the line CC.

【符号の説明】 1 建物 2 マスト(仮設支柱) 3 クライミング機構 3b,3c フレーム 3d 昇降用油圧ジャッキ 4 屋根架構 5 天井クレーン 6 ジブクレーン 10 ガイドローラ 11 鉛直荷重支持ピン[Description of Signs] 1 Building 2 Mast (temporary support) 3 Climbing mechanism 3b, 3c Frame 3d Hydraulic jack for lifting 4 Roof frame 5 Overhead crane 6 Jib crane 10 Guide roller 11 Vertical load support pin

───────────────────────────────────────────────────── フロントページの続き (72)発明者 池田 裕明 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (72)発明者 坂井 利光 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (72)発明者 小野 英雄 埼玉県川越市南台1−10−4 株式会社 大林組 東京機械工場内 (56)参考文献 特開 平5−239927(JP,A) 特開 平6−212801(JP,A) 特開 平5−71166(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 - 21/16 E04G 21/28 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroaki Ikeda 2-3-3 Kandajicho, Chiyoda-ku, Tokyo Obayashi Gumi Tokyo Head Office (72) Inventor Toshimitsu Sakai 2-3-3 Kandajicho, Chiyoda-ku, Tokyo Stock (72) Inventor Hideo Ono 1-10-4 Minamidai, Kawagoe-shi, Saitama Prefecture Obayashi Corporation Tokyo Machinery Plant (56) References JP-A-5-239927 (JP, A) JP-A-6- 212801 (JP, A) JP-A-5-71166 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 21/14-21/16 E04G 21/28

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建物の建設予定位置に近接してまたは該
予定位置内に立設され、かつ建設高さの増加に応じて順
次上方に継ぎ足される1ないし複数の仮設支柱と、 該仮設支柱の周囲に上下のガイドローラを介して昇降可
能にガイドされた上部フレームおよび下部フレームを備
えるとともに、該上下フレーム間に昇降用のジャッキを
配置したクライミング機構と、前記下部フレーム の下部に前記仮設支柱を貫通した状態
吊下状態に支持され、前記建物の上面全体を水平に覆
う屋根架構と、該屋根架構の下面側に固定されガイドロ
ーラが配置されて前記仮設支柱に昇降可能にガイドされ
る支持フレームとを備えたことを特徴とする建設用仮設
架構装置。
1. One or a plurality of temporary struts which are erected near or within a planned construction position of a building, and which are successively extended upward in accordance with an increase in the construction height; An upper frame and a lower frame are provided around the periphery of the upper and lower guide rollers.
State with obtaining, passing through the climbing mechanism is arranged jack for lifting between the upper and lower frames, the temporary supports the lower portion of the lower frame
A roof frame that is supported in a suspended state and horizontally covers the entire upper surface of the building ; and a guide frame fixed to the lower surface side of the roof frame.
Is arranged and guided by the temporary support so as to be able to move up and down.
And a supporting frame for construction.
【請求項2】 前記屋根架構の下面に資材搬送用の天井
クレーン配置するとともに、上面に資材揚重用のクレ
ーンを配置したことを特徴とする請求項1記載の建設用
仮説架構装置。
2. The hypothetical frame system for construction according to claim 1, wherein an overhead crane for transporting materials is disposed on a lower surface of the roof frame, and a crane for lifting materials is disposed on an upper surface of the roof frame.
【請求項3】 前記仮設支柱はタワークレーンのマスト
であることを特徴とする請求項1または2記載の建設用
仮設架構装置。
3. The temporary frame device for construction according to claim 1, wherein the temporary column is a mast of a tower crane.
【請求項4】 前記仮設支柱は水平控えを介して建物側
に支持されることを特徴とする請求項1ないし3記載の
建設用仮設架構装置。
4. The temporary frame device for construction according to claim 1, wherein the temporary column is supported on a building side via a horizontal stay.
JP7116125A 1995-05-15 1995-05-15 Temporary frame equipment for construction Expired - Lifetime JP3070438B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP7116125A JP3070438B2 (en) 1995-05-15 1995-05-15 Temporary frame equipment for construction
US08/765,967 US5881504A (en) 1995-05-15 1995-12-28 Temporary frame system for construction
PCT/JP1995/002761 WO1996036780A1 (en) 1995-05-15 1995-12-28 Temporary frame structure for construction of building
EP95942313A EP0771916A4 (en) 1995-05-15 1995-12-28 Temporary frame structure for construction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7116125A JP3070438B2 (en) 1995-05-15 1995-05-15 Temporary frame equipment for construction

Publications (2)

Publication Number Publication Date
JPH08312144A JPH08312144A (en) 1996-11-26
JP3070438B2 true JP3070438B2 (en) 2000-07-31

Family

ID=14679330

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7116125A Expired - Lifetime JP3070438B2 (en) 1995-05-15 1995-05-15 Temporary frame equipment for construction

Country Status (1)

Country Link
JP (1) JP3070438B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101838958B1 (en) * 2016-04-06 2018-03-15 베렉스주식회사 Digital Step Attenuator with glitch-safe circuit

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7051642B2 (en) * 2018-08-28 2022-04-11 株式会社タカミヤ Mobile lift scaffolding

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101838958B1 (en) * 2016-04-06 2018-03-15 베렉스주식회사 Digital Step Attenuator with glitch-safe circuit

Also Published As

Publication number Publication date
JPH08312144A (en) 1996-11-26

Similar Documents

Publication Publication Date Title
JP3202055B2 (en) Assembled scaffold movable within the elevator shaft for mounting shaft equipment
WO1996036780A1 (en) Temporary frame structure for construction of building
GB1589693A (en) Climbing device for a climbing crane
JP3070438B2 (en) Temporary frame equipment for construction
JP2980020B2 (en) Push-up type self-climbing device for tower structures
JP3027925B2 (en) Temporary frame equipment for construction
JP3027924B2 (en) Temporary frame equipment for construction
JP3822084B2 (en) Construction lifting system for high-rise buildings
JPH09137506A (en) Construction method of building
JPH08312149A (en) Temporary frame device for construction
JP3532161B2 (en) Tower construction machine and tower construction method
JP2872886B2 (en) Construction lift equipment
JP3179814B2 (en) Column and beam construction method and apparatus
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JPH0648683A (en) Tower crane
JP2704446B2 (en) Lift-up method using temporary columns
JPH0745778B2 (en) Lifting method and device for lotus stand
JP2871468B2 (en) How to build a building
JP2796448B2 (en) Building construction method and building construction equipment used for the construction method
JP2776128B2 (en) Lifting device for building frame
JP3200792B2 (en) Outer sheath
JP3239154B2 (en) Lift-up device for all-weather temporary roof
JP2778842B2 (en) Building construction method
JPH0978843A (en) Assembling method of all-weather type temporary roof
JPH0262306A (en) Climbing construction method of tower crane