JP3021199B2 - Construction method of chimney inner cylinder and pull jack up device for the construction - Google Patents

Construction method of chimney inner cylinder and pull jack up device for the construction

Info

Publication number
JP3021199B2
JP3021199B2 JP4218636A JP21863692A JP3021199B2 JP 3021199 B2 JP3021199 B2 JP 3021199B2 JP 4218636 A JP4218636 A JP 4218636A JP 21863692 A JP21863692 A JP 21863692A JP 3021199 B2 JP3021199 B2 JP 3021199B2
Authority
JP
Japan
Prior art keywords
inner cylinder
cylinder
jack
cylinders
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4218636A
Other languages
Japanese (ja)
Other versions
JPH0642225A (en
Inventor
浩 近藤
昌史 福本
克之 平尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP4218636A priority Critical patent/JP3021199B2/en
Publication of JPH0642225A publication Critical patent/JPH0642225A/en
Application granted granted Critical
Publication of JP3021199B2 publication Critical patent/JP3021199B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は煙突内筒の築造方法及
びその築造用プルジャッキアップ装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a chimney inner tube and a pull-up device for the construction.

【0002】[0002]

【従来の技術】例えば、鉄塔支持型煙突等においては、
地上又は支持鉄塔の下部に筒身ジャッキアップ装置を設
置し、筒身をジャッキアップして、この下側に別の筒身
を順次継足し、このジャッキアップされる筒身の頂部に
取付けたポストクレーンで、他の筒身や上記支持鉄塔を
上積み建造する並行架設方法が知られている。また、こ
の種築造用のジャッキアップ装置としては、図4側面
図に示すように、外筒の固定梁01上に設けたジャッキ
02に係合し縦送りされる長いステップロッド03の下
端に可動梁04が支持されて昇降するものがある。ここ
で、ジャッキ02はステップロッド03が挿通された固
定梁01上の固定クランプ05と、固定梁01上に台0
6を介して取付けられたセンターホールジャッキ07に
より昇降するクランプ08等で構成され、同一構造の複
数のジャッキ02及びステップロッド03で、リング状
の可動梁04が支持されるとともに、昇降される。さら
に、図5の側面図に示すように、互いに対向する側壁0
9,09上に定ピッチの複数のピン孔010が穿設され
た支柱011に係合するクライミングジャッキ012上
に可動梁013を支持し昇降するものもある。ここで、
ジャッキ012は昇降シリンダー014の上下にピン
シリンダー箱015,016がそれぞれ設けられ、
下のピンシリンダー箱015,016のピンが交互に支
柱011のピン孔010に結合するとともに、昇降シリ
ンダー014が伸縮することにより、可動梁013の昇
降が行われる。
2. Description of the Related Art For example, in a tower supported chimney,
Install a cylinder jack-up device on the ground or at the bottom of the supporting tower, jack up the cylinder, add another cylinder to the lower side in order, and attach a post attached to the top of the cylinder to be jacked up 2. Description of the Related Art A parallel erection method is known in which a crane is used to build another tubular body or the above-mentioned supporting steel tower on top of one another. As shown in the side view of FIG. 4, a jack-up device for this kind of construction is provided at the lower end of a long step rod 03 vertically engaged with a jack 02 provided on a fixed beam 01 of an outer cylinder. There is one that moves up and down while the movable beam 04 is supported. Here, the jack 02 has a fixed clamp 05 on the fixed beam 01 through which the step rod 03 is inserted, and a platform 0 on the fixed beam 01.
A ring-shaped movable beam 04 is supported by a plurality of jacks 02 and step rods 03 having the same structure, which are lifted and lowered by a center hole jack 07 attached via a center hole jack 07. Furthermore, as shown in the side view of FIG. 5, the side walls facing each other 0
In some cases, a movable beam 013 is supported on a climbing jack 012 that engages with a column 011 having a plurality of pin holes 010 having a constant pitch formed on the top and bottom of the movable beam 013. here,
Jack 012, with a pin cylinder box 015,016 and below the elevator cylinder 014 are provided respectively to pins cylinder boxes 015,016 of the upper <br/> under binds to the pin hole 010 of the post 011 alternately As the lifting cylinder 014 expands and contracts, the movable beam 013 is raised and lowered.

【0003】しかしながら、これらの手段では、それぞ
れ下記のような欠点がある。 (1)並行架設方法では、外筒が鉄筋コンクリート、内
筒が鋼製でそれぞれ構成される煙突の場合には、外筒の
築造と内筒の押上げ建造とを一緒に並行させることが難
しく、一般に鉄筋コンクリートの外筒を先に築造した
、その内部に鋼製の内筒や、エレベーターシャフト等
の築造を行っている。そして、この形式の煙突では、複
数の内筒を外筒内に築造する際、外筒が邪魔になって各
内筒のクレーン又は巻上装置による吊上げ上積み築造が
難しい。また、外筒の内底部に複数のジャッキアップ装
置を配置すると、内筒ブロックの搬入路がとれなくなる
ので、1組のジャッキアップ装置で内筒1筒ずつ順に築
造しなければならなくなり、工期が長くなる等の問題が
ある。
However, these means have the following disadvantages. (1) In the parallel erection method, if the outer cylinder is a chimney made of reinforced concrete and the inner cylinder is made of steel, it is difficult to make the construction of the outer cylinder and the push-up construction of the inner cylinder parallel at the same time. Generally, the outer cylinder of reinforced concrete was built first
Later , steel inner cylinders and elevator shafts were built inside. In this type of chimney, when a plurality of inner cylinders are built in the outer cylinder, the outer cylinders hinder the lifting and stacking of each inner cylinder by a crane or a hoisting device. In addition, if a plurality of jack-up devices are arranged at the inner bottom of the outer cylinder, the loading path of the inner cylinder block cannot be taken, so that one set of jack-up devices must be used to build the inner cylinder one cylinder at a time. There is a problem such as lengthening.

【0004】(2)図4に示すジャッキアップ装置で
は、固定梁01上のジャッキ02で可動梁04を上昇さ
せるとき、剛性の多数のステップロッド03が一緒に一
斉に外筒内を上昇するので、ステップロッド03の上昇
の際に占める空間が大きく、他の作業への影響が多くな
り、したがって、可動梁04は昇降距離を大きくするこ
とが難しい。 (3)図5に示すジャッキアップ装置では、筒身のまわ
りに配置する支柱011の据付けに広い面積が取られ、
外筒の内部に複数の筒身のためのジャッキを設置するこ
とが難しく、また、支柱011の高さ、言い換えれば可
動梁013の昇降高さもあまり大きくできない問題があ
る。
(2) In the jack-up device shown in FIG. 4, when the movable beam 04 is raised by the jack 02 on the fixed beam 01, a large number of rigid step rods 03 rise together in the outer cylinder. Since the space occupied by the step rod 03 when ascending is large, the influence on other operations is increased. Therefore, it is difficult for the movable beam 04 to increase the elevating distance. (3) In the jack-up device shown in FIG. 5, a large area is required for installation of the column 011 disposed around the cylindrical body.
It is difficult to install jacks for a plurality of cylinders inside the outer cylinder, and there is a problem that the height of the support 011, in other words, the height of the movable beam 013 cannot be increased very much.

【0005】[0005]

【発明が解決しようとする課題】本発明は、このような
事情に鑑みて提案されたもので、あらかじめ構成された
鉄筋コンクリート製の外筒の内側に複数の鋼材製の内筒
が立設される煙突において、内筒が同各内筒ごとに個別
に並行して行われる作業により立設されるようにし、上
記各内筒の築造工程を簡易化することができるように
し、外筒の内側で複数の各内筒の並行築造が可能で、し
たがって各内筒の築造工期が短縮でき、経済性に優れた
煙突内筒の築造方法を提供しようとするものである。ま
た、あらかじめ構成された鉄筋コンクリート製の外筒の
内側に複数の鋼材製の内筒が立設される煙突において、
内筒が同各内筒ごとに個別に並行して行われる作業によ
り立設されるようにし、上記各内筒の築造工程を簡易化
することができるようにし、外筒の内側で複数の各内筒
の並行築造が可能で、したがって各内筒の築造工期が短
縮でき、経済性に優れた各内筒の築造工程が簡易化で
き、かつ外筒の内側で複数の上記各内筒の並行築造が可
能な、したがって上記内筒の築造工期が短縮でき、経済
性に優れた煙突内筒の築造用プルジャッキアップ装置を
提供しようとするものである。
SUMMARY OF THE INVENTION The present invention has been proposed in view of such circumstances, and a plurality of steel inner cylinders are erected inside a pre-configured reinforced concrete outer cylinder. In the chimney, the inner cylinder is individual for each inner cylinder
To be erected by work performed in parallel with
In order to simplify the construction process of each inner cylinder
It is possible to build multiple inner cylinders in parallel inside the outer cylinder.
Therefore, the construction period of each inner cylinder can be shortened, and it is economical
It is intended to provide a method of building a chimney inner cylinder. Ma
Of pre-configured reinforced concrete outer cylinder
In a chimney in which a plurality of steel inner cylinders are erected inside,
The inner cylinders are operated separately and in parallel for each inner cylinder.
The inner cylinder is made upright to simplify the process of building each inner cylinder.
So that you can have multiple inner cylinders inside the outer cylinder
Parallel construction, and the construction period for each inner cylinder is short.
The construction process for each inner cylinder, which is economical and
And multiple inner cylinders can be built in parallel inside the outer cylinder.
Efficient, thus shortening the construction period of the inner cylinder, and economical
It is an object of the present invention to provide a pull-jack-up device for building a chimney inner cylinder having excellent performance .

【0006】[0006]

【課題を解決するための手段】そのために、請求項1の
発明の煙突内筒の築造方法は、あらかじめ構成された鉄
筋コンクリート製の外筒の内側に複数の鋼材製の内筒を
立設するための煙突内筒の築造方法であって、上記外筒
の上部に上記各内筒をそれぞれ貫通させることができる
開口が開けられた内筒吊支え用支持梁を設け、同内筒吊
支え用支持梁の上記開口を貫通した場合の上記各内筒の
外周面に沿うようにして同内筒吊支え用支持梁上に上記
各内筒ごとにそれぞれ複数のワイヤクランプジャッキを
配設し、同各ワイヤクランプジャッキをそれぞれ貫通し
て垂れ下がる複数の吊ワイヤの下端に、上記各ワイヤク
ランプジャッキに対応する上記各内筒の外周部に着脱可
能に係合する吊ビームを支持させ、地上で組立てた内筒
単位長さブロックを起立姿勢で各内筒建付位置へそれぞ
れ移動し、上記複数の各内筒ごとに互いに並行して行わ
れる個別の作業により、上記各ワイヤクランプジャッキ
にワイヤ昇降作動を行わせつつ、上記吊ビーム及び上記
吊ワイヤを介して上記各ワイヤクランプジャッキにより
吊り下げられた内筒部分の下側に、上記各内筒建付位置
へ移動した上記各内筒単位長さブロックを順次接合する
ことにより、複数の上記各内筒を上記外筒の内側に立設
することを特徴とする。
For this purpose, a method for constructing a chimney inner cylinder according to the first aspect of the present invention is a method for constructing a chimney inner cylinder which comprises a pre-configured iron.
Multiple steel inner cylinders inside the reinforced concrete outer cylinder
A method of constructing a chimney inner cylinder for standing, comprising:
Each of the above inner cylinders can penetrate the upper part of
An inner cylinder suspension support beam with an opening is provided.
Of each of the above-mentioned inner cylinders when penetrating the above-mentioned opening of the support beam for support
Place the above on the supporting beam for supporting the inner cylinder along the outer peripheral surface.
Multiple wire clamp jacks for each inner cylinder
Arrange and penetrate each wire clamp jack
At the lower end of a plurality of hanging wires,
Detachable on the outer periphery of each of the above inner cylinders corresponding to lamp jacks
An inner cylinder assembled on the ground to support a hanging beam
Move the unit length block to each inner cylinder mounting position in the standing posture.
Are performed in parallel with each other for each of the above plurality of inner cylinders.
Individual work, the above wire clamp jack
The lifting beam and the lifting beam
Each of the above wire clamp jacks via the hanging wire
At the lower side of the suspended inner cylinder part, each of the above mentioned inner cylinder mounting positions
The above-mentioned inner cylinder unit length blocks moved to are sequentially joined
This allows the plurality of inner cylinders to stand inside the outer cylinder.
It is characterized by doing.

【0007】また、請求項2の発明の煙突内筒の築造用
プルジャッキアップ装置は、あらかじめ構成された鉄筋
コンクリート製の外筒の内側に複数の鋼材製の内筒を立
設するための煙突内筒の築造用プルジャッキアップ装置
であって、上記外筒の上部に付設され同外筒の内側に互
いに並行して行われる作業により個別に立設される複数
の上記各内筒がそれぞれ貫通することのできる開口が開
けられた内筒吊支え用支持梁と、上記各内筒が上記内筒
吊支え用支持梁の上記開口を貫通した場合の上記各内筒
の外周面に沿うようにして上記内筒吊支え用支持梁上に
上記複数の各内筒ごとに配設された複数のワイヤクラン
プジャッキと、同各ワイヤクランプジャッキをそれぞれ
貫通して垂れ下がる各吊ワイヤの各下端にそれぞれ支持
され対応する上記各内筒の外周部に着脱可能に係合する
吊ビームと、上記内筒吊支え用支持梁上の上記各ワイヤ
クランプジャッキにより上記吊ワイヤ及び上記吊ビーム
を介して吊り下げられた各内筒部分の下側に内筒単位長
さブロックを起立姿勢で移動する内筒単位長さブロック
移動手段とを備え、上記ワイヤクランプジャッキが、上
記複数の各内筒ごとに互いに並行して行われる個別の作
業により上記吊ワイヤ及び上記吊ビームを介して吊り下
げられた上記各内筒部分の下側に上記内筒単位長さブロ
ックを順次接合することができるようにして上記内筒吊
支え用支持梁上に上記各内筒ごとに配設されていること
を特徴とする
[0007] The construction of the chimney inner cylinder according to the second aspect of the present invention .
The pull-up device uses pre-configured rebar
Multiple steel inner cylinders are set up inside a concrete outer cylinder.
Construction pull jack-up device chimney inner tube to set
Which is attached to the upper part of the outer cylinder and is
Several that are individually erected by work performed in parallel
The opening through which each of the above inner cylinders can
The support beam for the hanging support of the inner cylinder,
Each of the above inner cylinders when penetrating the above opening of the support beam for suspension support
On the inner cylinder suspension support beam along the outer peripheral surface of
A plurality of wire clamps arranged for each of the plurality of inner cylinders
Pujack and each wire clamp jack
Supports each lower end of each hanging wire that penetrates and hangs down
And detachably engages with the outer peripheral portion of the corresponding inner cylinder.
Suspension beam and each of the wires on the inner cylinder suspension support beam
The above hanging wire and the above hanging beam by the clamp jack
The inner cylinder unit length is below the inner cylinder part suspended through
Inner cylinder unit length block that moves the block in a standing posture
Moving means, wherein the wire clamp jack is
Individual works performed in parallel with each other for each of a plurality of inner cylinders
Hanging through the hanging wire and the hanging beam
The inner cylinder unit length blow is located below the
So that the inner cylinder can be joined sequentially.
Arranged for each of the above inner cylinders on the support beam for support
It is characterized by .

【0008】[0008]

【作用】このような構成によれば、下記の作用が行われ
る。請求項1の発明の煙突内筒の築造方法によれば、
らかじめ構成された鉄筋コンクリート製の外筒の内側に
複数の鋼材製の内筒を立設するための煙突内筒の築造方
法であって、上記外筒の上部に上記各内筒をそれぞれ貫
通させることができる開口が開けられた内筒吊支え用支
持梁を設け、同内筒吊支え用支持梁の上記開口を貫通し
た場合の上記各内筒の外周面に沿うようにして同内筒吊
支え用支持梁上に上記各内筒ごとにそれぞれ複数のワイ
ヤクランプジャッキを配設し、同各ワイヤクランプジャ
ッキをそれぞれ貫通して垂れ下がる複数の吊ワイヤの下
端に、上記各ワイヤクランプジャッキに対応する上記各
内筒の外周部に着脱可能に係合 する吊ビームを支持さ
せ、地上で組立てた内筒単位長さブロックを起立姿勢で
各内筒建付位置へそれぞれ移動し、上記複数の各内筒ご
とに互いに並行して行われる個別の作業により、上記各
ワイヤクランプジャッキにワイヤ昇降作動を行わせつ
つ、上記吊ビーム及び上記吊ワイヤを介して上記各ワイ
ヤクランプジャッキにより吊り下げられた内筒部分の下
側に、上記各内筒建付位置へ移動した上記各内筒単位長
さブロックを順次接合することにより、複数の上記各内
筒を上記外筒の内側に立設するようにされるので、高層
煙突の高さの高い内筒築造に際して、地上から頂部付
近まで吊上げ手段の内筒筒身への付け替え作業を1回だ
けの最小限に減少でき、吊ビームの下降操作量を大
減ずることが可能となる。また、ワイヤクランプジャッ
キ等の吊上げ手段が外筒の上部側に位置し、地上での内
筒ブロック搬入の支障とならず、外筒内で複数の内筒
を並行して築造することが可能となる。請求項2の発明
の煙突内筒の築造用プルジャッキアップ装置によれば、
あらかじめ構成された鉄筋コンクリート製の外筒の内側
に複数の鋼材製の内筒を立設するための煙突内筒の築造
用プルジャッキアップ装置であって、上記外筒の上部に
付設され同外筒の内側に互いに並行して行われる作業に
より個別に立設される複数の上記各内筒がそれぞれ貫通
することのできる開口が開けられた内筒吊支え用支持梁
と、上記各内筒が上記内筒吊支え用支持梁の上記開口を
貫通した場合の上記各内筒の外周面に沿うようにして上
記内筒吊支え用支持梁上に上記複数の各内筒ごとに配設
された複数のワイヤクランプジャッキと、同各ワイヤク
ランプジャッキをそれぞれ貫通して垂れ下がる各吊ワイ
ヤの各下端にそれぞれ支持され対応する上記各内筒の外
周部に着脱可能に係合する吊ビームと、上記内筒吊支え
用支持梁上の上記各ワイヤクランプジャッキにより上記
吊ワイヤ及び上記吊ビームを介して吊り下げられた各内
筒部分の下側に内筒単位長さブロックを起立姿勢で移動
する内筒単位長さブロック移動手段とを備え、上記ワイ
ヤクランプジャッキが、上記複数の各内筒ごとに互いに
並行して行われる個別の作業により上記吊ワイヤ及び上
記吊ビームを介して吊り下げられた上記各内筒部分の下
側に上記内筒単位長さブロックを順次接合することがで
きるようにして上記内筒吊支え用支持梁上に上記各内筒
ごとに配設されているので、各筒身部からの装置の最大
張出量はそれぞれリング梁の分だけで済み、これに接続
した吊ワイヤの他端はガイドリール等による案内で外筒
の内壁に近い位置を昇降し、筒身ごとの装置が占める範
囲が著しく減少し、相互干渉なしに各筒身ごとに装置を
取付け、並行状態に筒身築造ができるようになる。ま
た、吊ワイヤの作動範囲が支持梁から下方だけになり、
かつ支持梁直下までの大きいジャッキアップストローク
が他の作業へ影響を及ぼすことなしに確保でき、リング
梁の下部への付け替え回数が減少し筒身築造工程が容易
となる。
According to such a configuration, the following operation is performed. According to construction method of the chimney inner tube of the invention of claim 1, Oh
Inside the pre-configured reinforced concrete outer cylinder
How to build a chimney inner cylinder for erecting multiple steel inner cylinders
Method, wherein each of the inner cylinders passes through the upper part of the outer cylinder.
An inner cylinder suspension support with an opening through which it can be passed
A support beam is provided and penetrates through the opening of the support beam for supporting the inner cylinder.
The inner cylinders along the outer peripheral surface of
A plurality of wires are provided on the support beam for each of the above inner cylinders.
A jack clamp jack is provided, and each wire clamp jack is
Under several hanging wires, each penetrating through the jack
At the end, each of the above wire clamp jacks
A suspension beam that detachably engages with the outer periphery of the inner cylinder is supported.
And hold the inner cylinder unit length block assembled on the ground in an upright posture.
Move to each inner cylinder mounting position, and
Each work performed in parallel with each other
Make the wire clamp jack perform the wire elevating operation
Each of the wires through the hanging beam and the hanging wire.
Under the inner cylinder suspended by the jack jack
The inner cylinder unit length moved to the inner cylinder mounting position on the side
By joining the blocks sequentially,
Since the cylinder is set up inside the outer cylinder, the work of changing the lifting means to the inner cylinder body of the lifting means from the ground to near the top is required only once when constructing the high cylinder of the high-rise chimney. of can be reduced to a minimum, it is possible to reduce the lowering operation amount of suspended beam to a large width. In addition, lifting means such as wire clamp jacks are located on the upper side of the outer cylinder, so that it does not hinder the loading of the inner cylinder block on the ground, and multiple inner cylinders can be built in parallel within the outer cylinder Becomes The invention of claim 2
According to the pull-up device for construction of the chimney inner cylinder of
Inside the pre-configured reinforced concrete outer cylinder
Construction of a chimney inner cylinder for erecting multiple steel inner cylinders
Pull-up device for the upper part of the outer cylinder
For work that is attached and performed inside the outer cylinder in parallel with each other
Each of the above multiple inner cylinders that are erected individually penetrates
Support beam for inner cylinder suspension support with an openable opening
And each of the inner cylinders defines the opening of the support beam for supporting the inner cylinder.
When passing through the inner cylinder,
Arranged for each of the above multiple inner cylinders on the support beam for supporting the inner cylinder
And multiple wire clamp jacks
Each hanging wire that penetrates the lamp jack and hangs down
Outside of each of the inner cylinders supported and
A suspension beam detachably engaged with the peripheral portion, and the inner cylinder suspension support
Above each wire clamp jack on the support beam
Each part suspended through the suspension wire and the suspension beam
Move the inner cylinder unit length block in the upright position below the cylinder
Inner cylinder unit length block moving means,
The jack jacks are connected to each other
Due to the individual work performed in parallel,
Under each of the above inner cylinders suspended through the suspension beam
The inner cylinder unit length block can be sequentially joined to the side.
So that each of the inner cylinders
Because it is arranged in each, the maximum Zhang volume of the apparatus from the tubular body portion need only minute ring beams respectively, the hanging wires connected thereto and the other end of the outer cylinder in guidance by guide reels and the like and lowering the position close to the inner wall, apparatus for each cylinder body range is significantly reduced occupying, attaching the device for each cylinder body without mutual interference, so that it is cylindrical body constructed on concurrent states. Also, the working range of the suspension wire is only below the support beam,
In addition, a large jack-up stroke just below the support beam can be secured without affecting other work, and the number of times of replacement to the lower part of the ring beam is reduced, making the cylinder body building process easy
Doo ing.

【0009】[0009]

【実施例】本発明の一実施例を図面について説明する
と、まず図1(A)側面図及び(B)平面図におい
て、1は先に建造された鉄筋コンクリート製等の外筒
で、内筒支持用の構造体に対応する。2,3はそれぞれ
外筒1内に立設されたエレベーター用内筒、複数の煙路
用内筒、4,5はそれぞれ外筒1の上部に上下2段に設
けられ、複数の内筒挿通用開口6が切り明けられた内筒
吊支え用支持梁である。7は支持梁5を挿通する内筒
2,3の外周に接近してそれぞれ配置された複数のワイ
ヤクランプジャッキ、8はそれぞれ各ワイヤクランプジ
ャッキ7に係合して、一端が内筒2,3の円周近くに垂
れ下がり、他端が支持梁4上の複数のガイドリール9に
掛け回された、外筒1の壁面沿いに錘10が懸吊され
吊ワイヤ、11は複数の吊ワイヤ8の一端に周辺部が
繋ぎ止め支持されるとともに、リング状に組立てられた
筒身吊支え用の吊ビームである。12は支持梁4上に配
置したワイヤクランプジャッキ7用のポンプユニットを
含む制御盤、13は地上の外筒1の内外にわたり布設さ
れたレール14上に載置され内筒単位長さブロック2b
を横送り移動する台車である。ワイヤクランプジャッキ
7〜吊ビーム11は、築造される内筒2,3のそれぞれ
に並行に設けられるか、あるいは並行に架設する2〜
3本の内筒に対称に設けられる。14bは内筒2,3
の位置の基礎GL上に設けられた筒身仮受台である。な
お、同図(A)ではかり易くするため、中央のエレベ
ーター用内筒2にだけワイヤクランプジャッキ7等を配
置した場合を示し、また、同図(B)では内筒2,3の
2つにそれぞれ6組、12組のワイヤクランプジャッキ
7が配置された場合を示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to the drawings. First , in the side view of FIG. 1 (A) and the plan view of FIG. 1 (B) , reference numeral 1 denotes an outer cylinder made of reinforced concrete, etc. It corresponds to the structure for supporting the cylinder. Reference numerals 2 and 3 denote an elevator inner cylinder and a plurality of flue inner cylinders, respectively, standing inside the outer cylinder 1. This is a support beam for the inner cylinder suspension support in which the passage opening 6 is cut. Reference numeral 7 denotes a plurality of wire clamp jacks arranged close to the outer circumferences of the inner cylinders 2 and 3 through which the support beams 5 are inserted, and 8 engages with the respective wire clamp jacks 7 and has one end connected to the inner cylinders 2 and 3. sag near the circumference, after which the other end is wound around a plurality of guide reels 9 on the supporting beam 4, Tsuwa weight 10 along the wall surface of the outer cylinder 1 is suspended ear, 11 a plurality of suspended A suspending beam for suspending a cylindrical body, the peripheral portion of which is anchored and supported at one end of the wire 8 and assembled in a ring shape. Reference numeral 12 denotes a control panel including a pump unit for the wire clamp jack 7 disposed on the support beam 4, and reference numeral 13 denotes an inner cylinder unit length block 2b which is mounted on a rail 14 laid inside and outside the outer cylinder 1 on the ground.
Is a trolley that moves sideways. Wire clamp jack 7 slung beam 11 is either provided in parallel to each of the inner cylinder 2 to be construction, or concurrently in erection 2
Three inner cylinder of the provided symmetrically. 14b is the inner cylinder 2, 3
Is a tubular body temporary receiving stand provided on the base GL at the position of. In order to easily borrowed in FIG (A) minute, shows a case where only arranged wire clamping jack 7 or the like to the central elevator inner cylinder 2, also FIG. (B) of the inner cylinder 2 in the 2 In each case, six sets and twelve sets of wire clamp jacks 7 are shown.

【0010】次に、図2(A)側面図はワイヤクラン
プジャッキ7の1組の系列を示し、ワイヤクランプジャ
ッキ7は支持梁5上に固定した2段一体のラムチェア2
0と、このラムチェア20上に固定され上下に伸縮する
センターホールジャッキ21と、このセンターホールジ
ャッキ21の中心線に合わせ下から順に支持梁5上に固
着されたストッパークランプ22、ラムチェア20の中
段に固着された下部クランプ23及びセンターホールジ
ャッキ21の伸縮ロッド端に固着された上部クランプ2
4からなる。また、吊ビーム11は内筒2又は3と間隔
13aを保持してリング状に組立てられたビーム本体1
4aと、このビーム本体14aの上をリング中心方向へ
図示省略のシリンダー等の駆動で往復摺動するように円
周方向へ間隔をおいて設けられた複数の円筒支持部材1
5とからなり、これらの間隔部でビーム本体14aをワ
イヤクランプジャッキ7に係合した吊ワイヤ8の下端に
吊り支え、内筒頂部ブロック2a外面に設けたリング
状補強材16下面に支持部材15を摺動係合させるこ
とにより内筒2又は3の荷重を支える。
Next, a side view of FIG. 2 (A) shows a series of wire clamp jacks 7, and the wire clamp jack 7 is a two-stage ram chair 2 fixed on a support beam 5.
0, and the center hole jack 21 which expands and contracts up and down is fixed on the Ramuchea 20, this center hole di
Stopper clamp 22 from the bottom aligned with the center line secured on the support beam 5 in the order of Yakki 21, the lower is fixed to the middle Ramuchea 20 clamp 23 and a center hole upper clamp 2 is fixed to the telescopic rod end of the jack 21
Consists of four. The suspension beam 11 is spaced from the inner cylinder 2 or 3
Beam body 1 assembled into a ring while holding 13a
4a and a plurality of cylindrical support members 1 provided at intervals in the circumferential direction so as to reciprocate on the beam body 14a toward the center of the ring by driving a cylinder or the like (not shown).
Consist 5 which, supporting the beam body 14a on the lower surface of the wire clamp support hanging on the lower end of the hanging wires 8 engaged with the jack 7, a ring-shaped reinforcing member 16 provided on the outer surface of the inner cylinder top block 2a in these intervals portion The load of the inner cylinder 2 or 3 is supported by slidingly engaging the member 15.

【0011】さらに、ストッパークランプ22、下部ク
ランプ23、上部クランプ24は、それぞれ図2(B)
部分拡大縦断面図で示すように、受座25a、シリン
ダー部25b及びカバー部25cからなるハウジング2
5と、シリンダー部25b内に軸方向へ油圧駆動される
円錐内壁面を持つピストンロッド26と、上記円錐内壁
面にり係合するテーパー部で内部を挿通する吊ワイヤ
8に圧着する複数のワイヤ溝付きクランプ片27からな
り、受座25aの下部フランジ部で支持梁5上その他に
取付けられる。
Further, the stopper clamp 22, the lower clamp 23 and the upper clamp 24 are each shown in FIG.
As shown in a partially enlarged longitudinal sectional view of FIG. 2, a housing 2 including a receiving seat 25a, a cylinder portion 25b, and a cover portion 25c.
5, a piston rod 26 having a conical inner wall which is hydraulically driven in the axial direction in the cylinder portion 25b, a plurality of crimping the hanging wires 8 inserted through the inside tapered portion for sliding Rigakarigo into the tapered inner wall surface It consists of a clamp piece 27 with a wire groove, and is mounted on the support beam 5 and the like at the lower flange of the seat 25a.

【0012】ここで、ワイヤクランプジャッキ7による
ワイヤ8の上昇送りは、センターホールジャッキ21が
縮んだ状態で上部クランプ24が締付けられ、下部クラ
ンプ23が開放され、センターホールジャッキ21が伸
び駆動して停止し、これにより吊ワイヤ8がジャッキ2
1の1ストローク分上昇する。続いて、下部クランプ2
3が締付けられ、センターホールジャッキ21の内圧を
徐々に除去し、下部クランプ23、上部クランプ24間
のワイヤ張力が減少され、反力が下部クランプ23に移
され、それから上部クランプ24が開放されセンターホ
ールジャッキ21のストロークが収縮される。再び、上
部クランプ24が締付けられ、下部クランプ23が開放
され、センターホールジャッキ21のストローク伸張が
繰返され、吊ワイヤ8が上昇する。このとき、ストッパ
ークランプ22は開放され、下部クランプ23、上部ク
ランプ24それぞれの油圧力の低下や、誤動作により、
吊ワイヤ8にすべりが生じたとき、自動的に吊ワイヤ8
がクランプされる。なお、ワイヤクランプジャッキ7に
よるワイヤ8の下降送りは逆操作により行われる。
Here, when the wire 8 is moved upward by the wire clamp jack 7, the upper clamp 24 is tightened while the center hole jack 21 is contracted, the lower clamp 23 is opened, and the center hole jack 21 is extended and driven. To stop, so that the suspension wire 8 is connected to the jack 2
It rises by one stroke of one. Then, lower clamp 2
3, the internal pressure of the center hole jack 21 is gradually removed, the wire tension between the lower clamp 23 and the upper clamp 24 is reduced, the reaction force is transferred to the lower clamp 23, and the upper clamp 24 is opened and the center is released. The stroke of the hole jack 21 is contracted. Again, the upper clamp 24 is tightened, the lower clamp 23 is opened, the stroke extension of the center hole jack 21 is repeated, and the hanging wire 8 rises. At this time, the stopper clamp 22 is opened, and the lower clamp 23 and the upper clamp 24 each have a reduced hydraulic pressure or malfunction due to malfunction.
When the suspension wire 8 slips, the suspension wire 8 is automatically
Is clamped. Note that the downward movement of the wire 8 by the wire clamp jack 7 is performed by a reverse operation.

【0013】このような装置において、図3(1)〜
(8)縦断面図により本発明の架設方法を説明する。
なお、同図では内筒2を内筒3と同じ高さまでせり上げ
築造するものとして示す。最初に、同図(1)におい
て、外筒1の地上開口部1aを経てあらかじめ地上で組
立ての済んだ内筒頂部ブロック2aを台車13で内筒
建付位置へ送り込み、吊ビーム11をワイヤクラン
プジャッキ7の降下運転で下降させ、内筒頂部ブロック
2aの下端近く位置に図2(A)で示す状態にリング
状補強材16と結合させる。続いて、吊ビーム11をワ
イヤクランプジャッキ7の吊ワイヤ8の上昇運転で下部
の内筒単位長さブロック2bより若干高い高さに上昇さ
せ、台車13で下部内筒ブロック2bを建付位置へ送り
込み、吊ビーム11を若干下降させて内筒頂部ブロック
2aと内筒単位長さブロック2bを位置合わせして
合し、再び同様のサイクルを繰返すと同図(2)の状態
になる。同様の作業サイクルの繰返しで、ワイヤクラン
プジャッキ7により支える内筒長さすなわち高さは同
図(3)及び(4)に示すように次第に高くなり、この
とき、吊ビーム11は内筒頂部ブロック2aに結合した
まま、下位へ結合部を付け替える必要なしに内筒2のせ
り上げ、下継ぎが繰返され、この吊ビーム11の下部へ
の付け替えがなくなることにより、作業時間の著しい短
縮が可能になる。また、このとき台車13の走路を、使
用する装置が遮蔽しないので、台車13の走路に沿う他
の前後の内筒3の建付けを上記内筒2の工程に合わせて
並行して進められるようになる。
In such an apparatus, FIG.
The erection method of the present invention will be described with reference to the vertical sectional view of (8).
In this figure, the inner cylinder 2 is shown as being built up to the same height as the inner cylinder 3. First, in FIG. 1A, the inner cylinder top block 2a that has been assembled on the ground in advance via the ground opening 1a of the outer cylinder 1 is sent to the mounting position of the inner cylinder 2 by the bogie 13, and the suspension beam 11 Is lowered by the lowering operation of the wire clamp jack 7, and is coupled to the ring-shaped reinforcing member 16 at a position near the lower end of the inner cylinder top block 2a in the state shown in FIG. Subsequently, the suspension beam 11 is raised to a height slightly higher than the lower inner cylinder unit length block 2b by the lifting operation of the suspension wire 8 of the wire clamp jack 7, and the bogie 13 moves the lower inner cylinder block 2b to the mounting position. infeed, slung beam 11 contact <br/> combined by aligning the inner cylinder top part block 2a and the inner cylinder unit length block 2b by slightly lowered, when the same cycle is repeated again drawing (2) State. By repeating the same work cycle, the length, that is, the height of the inner cylinder supported by the wire clamp jack 7 gradually increases as shown in FIGS. 3 (3) and (4), and at this time, the suspension beam 11 is moved to the top of the inner cylinder. remains bound to the block 2a, the inner cylinder 2 without the need replace the coupling portion to the lower elevation, lower joint is returned Repetitive, by replacement is eliminated to lower the slung beam 11, a significant shortening of work time Will be possible. Also, at this time, since the device to be used does not block the running path of the bogie 13, the other front and rear inner cylinders 3 along the running path of the bogie 13 can be built in parallel with the process of the inner cylinder 2. become.

【0014】そして、同図(5)に示すように、内筒頂
部ブロック2aが支持梁5に接近したとき、吊支えた内
筒2の重量を一旦基礎GL上に預け、吊ビーム11を内
筒頂部ブロック2aから開放し、例えば2ブロック下位
の内筒ブロックに吊ビーム11の付け替えを行う。こ
の付け替えを行う下位ブロックには、内筒頂部ブロック
2aと同じ外面位置にあらかじめリング状補強材16を
取付け、また吊ビーム11の付け替え時には、内筒2
上部を適当な高さで複数の方向へワイヤで支えるなどの
手段により作業を安全に行うことが可能である。上記
付け替えの済んだ同図(6)の状態から、同図(3)、
(4)と同様にワイヤクランプジャッキ7による内筒2
のせり上げ下位の内筒単位長さブロック2bの継足
を複数回繰返すと、同図(7)のように、支持梁
5,4の開口6を挿通して所定高さの内筒接続が完了
し、内筒2全長を吊上げ、台車13を後退させた
、内筒2を降下し、基礎GL上に据付け、同図(8)
のように築造が完了する。
Then, as shown in FIG. 5 (5), when the inner cylinder top block 2a approaches the support beam 5, the weight of the suspended inner cylinder 2 is once deposited on the foundation GL, and the suspended beam 11 is moved inside. was released from the cylinder top section block 2a, for example, the inner cylinder block 2 blocks lower, performing relocation hanging beam 11. A ring-shaped reinforcing member 16 is attached in advance to the lower block to be replaced at the same outer surface position as the inner cylinder top block 2a. When replacing the suspension beam 11, the upper part of the inner cylinder 2 is set to an appropriate height. by such means as underpin in in wires in a plurality of directions, it is possible to safely perform the work. From the state of FIG. 6 (6) after the replacement, FIG.
Inner cylinder 2 with wire clamp jack 7 as in (4)
The elevated, the build-up of the lower inner cylinder unit length block 2b, when a repeated multiple times, as shown in FIG. 7, the inner cylinder of inserting the opening 6 of the support beams 5,4 predetermined height connect is complete, the entire length of the inner cylinder 2 lifting and retracting the carriage 13
Later , the inner cylinder 2 is lowered and installed on the base GL, and FIG.
Construction is completed as shown.

【0015】1(B)に示すように、築造する複数の
内筒2,3に対しては、例えば矢印14cの方向の台車
の搬入ラインで内筒単位長さブロック2bを搬入して
左右の内筒3を並行状態でそれぞれ同一型式の装置を用
いて立設した後に、次いで矢印14d方向の搬入ライ
ンで内筒単位長さブロック2bを搬入して前後の内
筒3、央部の内筒2を状態に立設することができ
る。また、上述した築造方法及び築造用プルジャッキア
ップ装置に使用する内筒吊支え用の支持梁の構成、ワイ
ヤクランプジャッキ、吊ビーム等の構成は、本実施例に
限定されることなく、適宜の構成に変更して実施し得る
ものである。
[0015] As shown in FIG. 1 (B), for multiple inner cylinder 2, 3 construction, for example, the direction of carriage of the arrow 14 c
And carrying the inner cylinder unit length block 2b in the transportable inlet line,
After the left and right inner cylinders 3 are erected using the same type of device in a parallel state , the inner cylinder unit length block 2b is then loaded in the loading line in the direction of arrow 14d , and the front and rear inner cylinders 3, the inner cylinder 2 of the central part can be erected on a flat line state. In addition, the configuration of the support beam for supporting the inner cylinder, the wire clamp jack, the configuration of the suspension beam, and the like used in the above-described construction method and the construction pull jack-up device are not limited to the present embodiment, and may be appropriately changed. The present invention can be implemented by changing the configuration.

【0016】このような実施例によれば、下記効果が奏
せられる。 (1)本実施例の煙突内筒の築造方法によると、あらか
じめ構成された鉄筋コンクリート製の外筒の内側に複数
の鋼材製の内筒を立設するための煙突内筒の築造方法で
あって、上記外筒の上部に上記各内筒をそれぞれ貫通さ
せることができる開口が開けられた内筒吊支え用支持梁
を設け、同内筒吊支え用支持梁の上記開口を貫通した場
合の上記各内筒の外周面に沿うようにして同内筒吊支え
用支持梁上に上記各内筒ごとにそれぞれ複数のワイヤク
ランプジャッキを配設し、同各ワイヤクランプジャッキ
をそれぞれ貫通して垂れ下がる複数の吊ワイヤの下端
に、上記各ワイヤクランプジャッキに対応する上記各内
筒の外周部に着脱可能に係合する吊ビームを支持させ、
地上で組立てた内筒単位長さブロックを起立姿勢で各内
筒建付位置へそれぞれ移動し、上記複数の各内筒ごとに
互いに並行して行われる個別の作業により、上記各ワイ
ヤクランプジャッキにワイヤ昇降作動を行わせつつ、上
記吊ビーム及び上記吊ワイヤを介して上記各ワイヤクラ
ンプジャッキにより吊り下げられた内筒部分の下側に、
上記各内筒建付位置へ移動した上記各内筒単位長さブロ
ックを順次接合することにより、複数の上記各内筒が上
記外筒の内側に立設されるので、高層煙突の高さの高い
内筒築造に際して、地上から頂部付近まで吊上げ手段
の内筒筒身への付け替え作業を1回だけの最小限に減少
でき、吊ビームの下降操作量を大に減ることが可能
となり、したがって内筒築造の工程が短縮し、経済性が
向上する。また、ワイヤクランプジャッキ等の吊上げ手
段が外筒の上部側に位置し、地上での内筒ブロック
入の支障とならず、外筒内で複数の内筒を並行して築造
することが可能となり、したがって内筒築造の工期が短
縮し、経済性が向上する。
[0016] According to such a real施例, the following effects are obtained if. (1) According to the construction method of the chimney inner tube of the present embodiment, whether rough
Inside the reinforced concrete outer cylinder
The construction method of the chimney inner cylinder for erecting the steel inner cylinder of
And each of the inner cylinders penetrates the upper part of the outer cylinder.
Support beam for an inner cylinder suspension support with an opening that can be extended
Is provided through the opening of the support beam for supporting the inner cylinder.
The inner cylinder hanging support along the outer peripheral surface of each of the above inner cylinders
For each of the above-mentioned inner cylinders,
A lamp jack is installed, and each wire clamp jack
The lower ends of a plurality of hanging wires penetrating through each
The above each corresponding to the above wire clamp jack
The suspension beam that detachably engages with the outer periphery of the cylinder is supported,
Hold the inner cylinder unit length block assembled on the ground in each
Move to each cylinder mounting position, and for each of the above multiple inner cylinders
Each work performed in parallel with each other
Make the jack jack lift the wire up and down.
Each of the wire claws through the suspension beam and the suspension wire.
Below the inner cylinder part suspended by the pump jack,
Each inner cylinder unit length blow moved to the above inner cylinder mounting position
By sequentially joining the locks, multiple inner cylinders
Standing inside the outer cylinder, the work of replacing the lifting means with the inner cylinder body from the ground to the top is reduced to only one time when building the high cylinder of the high-rise chimney. can, hanging the lowering operation amount of the beams enables reduced Ji Rukoto the large width, thus shortening the process of the inner cylinder construction is economical is improved. Furthermore, lifting means such as a wire clamp jack located on the upper side of the outer tube, not hinder the transportable <br/> entrance of the inner cylinder blocks on the ground, in parallel a plurality of the inner cylinder within the outer cylinder It is possible to build the inner cylinder, so that the construction period of the inner cylinder is shortened, and the economy is improved.

【0017】(2)本実施例の煙突内筒の築造用プルジ
ャッキアップ装置によると、あらかじめ構成された鉄筋
コンクリート製の外筒の内側に複数の鋼材製の内筒を立
設するための煙突内筒の築造用プルジャッキアップ装置
であって、上記外筒の上部に付設され同外筒の内側に互
いに並行して行われる作業により個別に立設される複数
の上記各内筒がそれぞれ貫通することのできる開口が開
けられた内筒吊支え用支持梁と、上記各内筒が上記内筒
吊支え用支持梁の上記開口を貫通した場合の上記各内筒
の外周面に沿うようにして上記内筒吊支え用支持梁上に
上記複数の各内筒 ごとに配設された複数のワイヤクラン
プジャッキと、同各ワイヤクランプジャッキをそれぞれ
貫通して垂れ下がる各吊ワイヤの各下端にそれぞれ支持
され対応する上記各内筒の外周部に着脱可能に係合する
吊ビームと、上記内筒吊支え用支持梁上の上記各ワイヤ
クランプジャッキにより上記吊ワイヤ及び上記吊ビーム
を介して吊り下げられた各内筒部分の下側に内筒単位長
さブロックを起立姿勢で移動する内筒単位長さブロック
移動手段とを備え、上記ワイヤクランプジャッキが、上
記複数の各内筒ごとに互いに並行して行われる個別の作
業により上記吊ワイヤ及び上記吊ビームを介して吊り下
げられた上記各内筒部分の下側に上記内筒単位長さブロ
ックを順次接合することができるようにして上記内筒吊
支え用支持梁上に上記各内筒ごとに配設されている
で、各筒身部からの装置の最大張出量はそれぞれ吊ビ
ームのリング梁の分だけで済み、このリング梁に接続し
た吊ワイヤの他端はガイドリール等による案内で外筒の
内壁に近い位置を昇降し、筒身ごとの装置が占める範囲
が著しく減少し、相互干渉なしに各筒身ごとに装置を取
付け、並行状態に筒身築造ができるようになり、した
がって内筒築造工期が短縮し、経済性が向上する。
また、吊ワイヤの作動範囲が支持梁から下方だけにな
り、かつ支持梁直下までの大きいジャッキアップスト
ロークが他の作業へ影響を及ぼすことなしに確保でき、
リング梁の下部への付け替え回数が減少し、筒身築造
工程が容易となり、したがって内筒の築造の工期が短
縮し、経済性が向上する。
(2) According to the pull-up device for building a chimney inner cylinder according to the present embodiment, a reinforcing steel bar configured in advance is used.
Multiple steel inner cylinders are set up inside a concrete outer cylinder.
Construction pull jack-up device chimney inner tube to set
Which is attached to the upper part of the outer cylinder and is
Several that are individually erected by work performed in parallel
The opening through which each of the above inner cylinders can
The support beam for the hanging support of the inner cylinder,
Each of the above inner cylinders when penetrating the above opening of the support beam for suspension support
On the inner cylinder suspension support beam along the outer peripheral surface of
A plurality of wire clamps arranged for each of the plurality of inner cylinders
Pujack and each wire clamp jack
Supports each lower end of each hanging wire that penetrates and hangs down
And detachably engages with the outer peripheral portion of the corresponding inner cylinder.
Suspension beam and each of the wires on the inner cylinder suspension support beam
The above hanging wire and the above hanging beam by the clamp jack
The inner cylinder unit length is below the inner cylinder part suspended through
Inner cylinder unit length block that moves the block in a standing posture
Moving means, wherein the wire clamp jack is
Individual works performed in parallel with each other for each of a plurality of inner cylinders
Hanging through the hanging wire and the hanging beam
The inner cylinder unit length blow is located below the
So that the inner cylinder can be joined sequentially.
Since each of the inner cylinders is provided on the support beam for supporting, the maximum amount of protrusion of the device from each cylinder body is determined by the length of the suspension pipe.
Requires only minute ring beams over arm, the other end of the hanging is connected to the ring beam of this wire is lifting a position close to the inner wall of the outer cylinder in guidance by guide reels and the like, the range occupied by the device for each cylinder body significantly reduced and the mounting device for each cylinder body without mutual interference, will be able to construction of the cylindrical body in parallel state, thus shortening the construction period of the construction of the inner cylinder, economic efficiency is improved.
Further, hanging operating range of the wire is only downward from the supporting beam, and a large jack-up stroke to just below the support beam can be ensured without affecting the other tasks,
It reduces the number of times replacement to the bottom of the ring beams, construction of the cylindrical body
, The construction period of the inner cylinder is shortened, and the economy is improved.

【0018】[0018]

【発明の効果】要するに、請求項1の発明の煙突内筒の
築造方法によれば、あらかじめ構成された鉄筋コンクリ
ート製の外筒の内側に複数の鋼材製の内筒を立設するた
めの煙突内筒の築造方法であって、上記外筒の上部に上
記各内筒をそれぞれ貫通させることができる開口が開け
られた内筒吊支え用支持梁を設け、同内筒吊支え用支持
梁の上記開口を貫通した場合の上記各内筒の外周面に沿
うようにして同内筒吊支え用支持梁上に上記各内筒ごと
にそれぞれ複数のワイヤクランプジャッキを配設し、同
各ワイヤクランプジャッキをそれぞれ貫通して垂れ下が
る複数の吊ワイヤの下端に、上記各ワイヤクランプジャ
ッキに対応する上記各内筒の外周部に着脱 可能に係合す
る吊ビームを支持させ、地上で組立てた内筒単位長さブ
ロックを起立姿勢で各内筒建付位置へそれぞれ移動し、
上記複数の各内筒ごとに互いに並行して行われる個別の
作業により、上記各ワイヤクランプジャッキにワイヤ昇
降作動を行わせつつ、上記吊ビーム及び上記吊ワイヤを
介して上記各ワイヤクランプジャッキにより吊り下げら
れた内筒部分の下側に、上記各内筒建付位置へ移動した
上記各内筒単位長さブロックを順次接合するようにして
上記複数の各内筒を上記外筒の内側に立設するようにし
たことによりあらかじめ構成された鉄筋コンクリート
製の外筒の内側に複数の鋼材製の内筒を立設するための
煙突内筒の築造方法において、高層煙突の高さの高い内
筒の築造に際して、地上から頂部付近まで吊上げ手段の
内筒筒身への付け替え作業を1回だけの最小限に減少さ
せることが可能となり、また吊ビームの下降操作量を大
幅に減少させることが可能となり、外筒の上部に設ける
内筒吊支え用支持梁上に各ワイヤクランプジャッキを配
設するので地上での各内筒単位長さブロックの搬入の支
障とならず、外筒の内側で複数の各内筒ごとに互いに並
行して行われる個別の作業により複数の内筒の並行築造
が可能となり、全体として内筒の築造工程が簡易で簡素
となり、したがって上記内筒の築造工期が短縮でき、経
済性に優れた煙突内筒の築造方法を得ることができ、産
業上極めて有益な煙突内筒の築造方法を提供することが
できる。
In short, the chimney inner cylinder according to the first aspect of the present invention
According to the construction method , pre-configured reinforced concrete
A plurality of steel inner cylinders are erected inside a metal outer cylinder.
The method of constructing the chimney inner cylinder for
Opening that allows each inner cylinder to penetrate
Provided a support beam for the inner cylinder suspension support.
Along the outer peripheral surface of each of the inner cylinders when penetrating the opening of the beam
In the same manner as above for each of the inner cylinders
Are provided with multiple wire clamp jacks, respectively.
Penetration through each wire clamp jack
At the lower end of a plurality of suspension wires,
Removably engages with the outer periphery of each of the inner cylinders corresponding to the
To support the hanging beam, and unit length block of the inner cylinder assembled on the ground.
Move the lock to each inner cylinder mounting position in the standing position,
Each of the above plurality of inner cylinders
Work raises the wire to each of the above wire clamp jacks.
While performing the lowering operation, the hanging beam and the hanging wire are
Suspended by the above wire clamp jacks
To the above-mentioned inner cylinder mounting position below the inner cylinder part
The inner cylinder unit length blocks should be joined sequentially
The plurality of inner cylinders are erected inside the outer cylinder.
By the, preconfigured Concrete
For erecting multiple steel inner cylinders inside the outer cylinder
In the construction method of the chimney inner cylinder, the high-rise chimney
When constructing the cylinder, use lifting means from the ground to near the top.
Replacement work on the inner cylinder is reduced to a minimum of one time.
And the lifting operation amount of the suspension beam can be increased.
It can be reduced to the width and it is provided at the top of the outer cylinder
Place each wire clamp jack on the support beam for the inner cylinder suspension support.
To support the loading of each inner cylinder unit length block on the ground.
Do not interfere with each other.
Parallel construction of multiple inner cylinders by individual work performed
And the whole process of building the inner cylinder is simple and simple
Therefore, the construction period of the inner cylinder can be shortened,
The construction method of the chimney inner cylinder with excellent
It is necessary to provide a method for constructing a chimney inner cylinder that is extremely useful in the industry.
it can.

【0019】また、請求項2の発明の煙突内筒の築造用
プルジャッキアップ装置によれば、あらかじめ構成され
た鉄筋コンクリート製の外筒の内側に複数の鋼材製の内
筒を立設するための煙突内筒の築造用プルジャッキアッ
プ装置であって、上記外筒の上部に付設され同外筒の内
側に互いに並行して行われる作業により個別に立設され
る複数の上記各内筒がそれぞれ貫通することのできる開
口が開けられた内筒吊支え用支持梁と、上記各内筒が上
記内筒吊支え用支持梁の上記開口を貫通した場合の上記
各内筒の外周面に沿うようにして上記内筒吊支え用支持
梁上に上記複数の各内筒ごとに配設された複数のワイヤ
クランプジャッキと、同各ワイヤクランプジャッキをそ
れぞれ貫通して垂れ下がる各吊ワイヤの各下端にそれぞ
れ支持され対応する上記各内筒の外周部に着脱可能に係
合する吊ビームと、上記内筒吊支え用支持梁上の上記各
ワイヤクランプジャッキにより上記吊ワイヤ及び上記吊
ームを介して吊り下げられた各内筒部分の下側に内筒
単位長さブロックを起立姿勢で移動する内筒単位長さブ
ロック移動手段とを備え、上記ワイヤクランプジャッキ
が、上記複数の各内筒ごとに互いに並行して行われる個
別の作業により上記吊ワイヤ及び上記吊ビームを介して
吊り下げられた上記各内筒部分の下側に上記内筒単位長
さブロックを順次接合することができるようにして上記
内筒吊支え用支持梁上に上記各内筒ごとに配設されてい
ることにより、あらかじめ構成された鉄筋コンクリート
製の外筒の内側に複数の鋼材製の内筒を立設することが
でき、高層煙突の高さの高い内筒の築造に際して内筒部
分を地上から頂部付近まで吊上げる過程における吊ビー
ムの内筒筒身への付け替え作業を例えば1回だけの最小
限に減少させることが可能となって吊ビームの下部への
付け替え回数を減少させることができて吊ビームの下降
操作量を大幅に減少させることが可能となり、各ワイヤ
クランプジャッキが外筒の上部に設けられた内筒吊支え
用支持梁上に配設されているため吊ワイヤの作動範囲が
内筒吊支え用支持梁から下方だけになり、かつ内筒吊支
え用支持梁直下までのジャッキアップストロークが大き
くともジャッキアップ作業を他の作業へ影響を及ぼすこ
となしに行うことができ、しかも各内筒の筒身部からの
装置の最大張出量はそれぞれ吊ビームの分だけで済み、
これに接続した吊ワイヤの他端が外筒の上部に付設され
た内筒吊支え用支持梁上に各内筒ごとに配設されたワイ
ヤクランプジャッキにより支持されるため、各内筒の筒
身ごとの装置が占める空間の範囲が著しく減少し、相互
干渉なしに各内筒の筒身ごとに吊ビームを取付けること
ができて、地上での各内筒単位長さブロックの搬入の支
障とならず、外筒の内側で複数の各内筒ごとに互いに並
行して行われる個別の作業により複数の内筒の並行築造
が可能となり、全体として内筒の築造工程が簡易で簡素
となり、したがって上記内筒の築造工期が短縮でき、経
済性に優れた煙突内筒の築造用プルジャッキアップ装置
を得ることができ、産業上極めて有益な煙突内筒の築造
用プルジャッキアップ装置を提供することができる。
Further, for construction of the chimney inner cylinder according to the second aspect of the present invention .
According to pull the jack-up device is preconfigured
Inside of a reinforced concrete outer cylinder
Pull jack for construction of chimney inner cylinder for erecting the cylinder
A lock device attached to an upper portion of the outer cylinder,
Side-by-side work done in parallel with each other
Opening that each of the inner cylinders can penetrate.
The support tube for the hanging support of the inner cylinder with the opening
The above when the above-mentioned opening of the support beam for supporting the inner cylinder is penetrated
Support for hanging the inner cylinder along the outer peripheral surface of each inner cylinder
A plurality of wires arranged on the beam for each of the plurality of inner cylinders
Connect the clamp jack and each wire clamp jack
At each lower end of each hanging wire that penetrates and hangs down
And is detachably attached to the outer peripheral portion of each of the above inner cylinders.
The hanging beam to be combined and each of the above
The above-mentioned hanging wire and the above-mentioned hanging
The inner cylinder under each inner cylinder portion hanging over the bi chromatography beam
Inner cylinder unit length block that moves unit length block in standing posture
The wire clamp jack, comprising: a lock moving means.
Are performed in parallel with each other for each of the plurality of inner cylinders.
By another work through the hanging wire and the hanging beam
The inner cylinder unit length is below the suspended inner cylinder part.
The blocks can be joined sequentially so that
Each of the above-mentioned inner cylinders is provided on a support beam for supporting the inner cylinder.
By pre-configured reinforced concrete
Multiple steel inner cylinders can be erected inside the outer cylinder made of steel.
When building an inner cylinder with a high-rise chimney,
In the process of lifting the minute from the ground to near the top
For example, the work of changing the
To the lower part of the suspension beam.
The number of replacements can be reduced and the hanging beam can be lowered
The amount of operation can be greatly reduced, and each wire
Inner cylinder suspension support with clamp jack provided on top of outer cylinder
The working range of the suspension wire is
The lower part of the inner cylinder suspension support
Large jack-up stroke to just below the support beam
At least the jack-up operation may affect other operations.
Can be carried out without using
The maximum overhang of the device only needs to be the suspension beam,
The other end of the hanging wire connected to this is attached to the upper part of the outer cylinder.
The wires provided for each inner cylinder on the support beam
Each inner cylinder is supported by a jack jack.
The range of space occupied by personal devices has been significantly reduced,
Attach a hanging beam to each inner cylinder without interference
To support the loading of each inner cylinder unit length block on the ground.
Do not interfere with each other.
Parallel construction of multiple inner cylinders by individual work performed
And the whole process of building the inner cylinder is simple and simple
Therefore, the construction period of the inner cylinder can be shortened,
Pull-up device for building a chimney inner cylinder with excellent cost efficiency
Construction of a chimney inner cylinder that is extremely useful in industry
A pull jack-up device can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示し、同図(A)、(B)
はそれぞれ側面図、平面図である。
FIG. 1 shows one embodiment of the present invention, and FIGS.
Is a side view and a plan view, respectively.

【図2】図1のワイヤクランプジャッキ7を示し、同図
(A)、(B)はそれぞれ側面図、クランプ22〜24
の部分拡大縦断面図である。
FIGS. 2A and 2B show the wire clamp jack 7 of FIG. 1, and FIGS.
3 is a partially enlarged longitudinal sectional view of FIG.

【図3】同図(1)〜(8)はそれぞれ図1の内筒2の
築造方法を経時的に説明する縦断面図である。
3 (1) to 3 (8) are longitudinal sectional views for explaining a method of building the inner cylinder 2 of FIG. 1 with time.

【図4】従来のステップロッド式内筒築造用ジャッキア
ップ装置を示す側面図である。
FIG. 4 is a side view showing a conventional step rod type inner cylinder construction jack-up device.

【図5】従来の穿設支柱式内筒築造用ジャッキアップ装
置を示す側面図である。
FIG. 5 is a side view showing a conventional jack-up device for constructing a perforated support type inner cylinder.

【符号の説明】[Explanation of symbols]

1 外筒 1a 地上開口部 2 内筒 2a 内筒頂部ブロック 2b 内筒単位長さブロック 3 内筒 4 支持梁 5 支持梁 6 内筒挿通用開口 7 ワイヤクランプジャッキ 8 吊ワイヤ 9 ガイドリール 10 錘 11 吊ビーム 12 制御盤 13 台車 13a 間隔 14 レール 14a ビーム本体 14b 筒身仮受台 15 支持部材 16 リング状補強材 20 ラムチェア 21 センターホールジャッキ 22 ストッパークランプ 23 下部クランプ 24 上部クランプ 25 ハウジング 25a 受座 25b シリンダー部 25c カバー部 26 ピストンロッド 27 クランプ片 Reference Signs List 1 outer cylinder 1a ground opening 2 inner cylinder 2a inner cylinder top block 2b inner cylinder unit length block 3 inner cylinder 4 support beam 5 support beam 6 inner cylinder insertion opening 7 wire clamp jack 8 hanging wire 9 guide reel 10 weight 11 Suspended beam 12 Control panel 13 Dolly 13a Spacing 14 Rail 14a Beam body 14b Temporary support for tubular body 15 Supporting member 16 Ring-shaped reinforcing material 20 Ram chair 21 Center hole jack 22 Stopper clamp 23 Lower clamp 24 Upper clamp 25 Housing 25a Receiving seat 25b Cylinder Part 25c cover part 26 piston rod 27 clamp piece

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭63−103173(JP,A) 特開 昭62−260974(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04H 12/28 E04G 21/14 - 21/16 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-63-103173 (JP, A) JP-A-62-260974 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E04H 12/28 E04G 21/14-21/16

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 あらかじめ構成された鉄筋コンクリート
製の外筒の内側に複数の鋼材製の内筒を立設するための
煙突内筒の築造方法であって、上記外筒の上部に上記各
内筒をそれぞれ貫通させることができる開口が開けられ
た内筒吊支え用支持梁を設け、同内筒吊支え用支持梁の
上記開口を貫通した場合の上記各内筒の外周面に沿うよ
うにして同内筒吊支え用支持梁上に上記各内筒ごとにそ
れぞれ複数のワイヤクランプジャッキを配設し、同各ワ
イヤクランプジャッキをそれぞれ貫通して垂れ下がる複
数の吊ワイヤの下端に、上記各ワイヤクランプジャッキ
に対応する上記各内筒の外周部に着脱可能に係合する吊
ビームを支持させ、地上で組立てた内筒単位長さブロッ
クを起立姿勢で各内筒建付位置へそれぞれ移動し、上記
複数の各内筒ごとに互いに並行して行われる個別の作業
により、上記各ワイヤクランプジャッキにワイヤ昇降作
動を行わせつつ、上記吊ビーム及び上記吊ワイヤを介し
て上記各ワイヤクランプジャッキにより吊り下げられた
内筒部分の下側に、上記各内筒建付位置へ移動した上記
各内筒単位長さブロックを順次接合することにより、複
数の上記各内筒を上記外筒の内側に立設することを特徴
とする、煙突内筒の築造方法。
1. Reinforced concrete pre-configured
For erecting multiple steel inner cylinders inside the outer cylinder
A method for constructing a chimney inner cylinder, wherein each of the above
The opening that can penetrate the inner cylinder is opened.
A support beam for supporting the inner cylinder is provided.
Along the outer peripheral surface of each inner cylinder when penetrating the opening
In this way, each of the above inner cylinders is
Arrange a plurality of wire clamp jacks, and
Multiple hangs penetrating each ear jack
At the lower end of a number of hanging wires, each of the above wire clamp jacks
Hanging to detachably engage with the outer peripheral portion of each of the inner cylinders corresponding to
The beam is supported, and the inner cylinder unit length block
Move to the inner cylinder mounting position with the
Separate work performed in parallel for each of several inner cylinders
With each of the above wire clamp jacks,
While moving, through the hanging beam and the hanging wire.
Suspended by the above wire clamp jacks
Below the inner cylinder part, the above-mentioned
By sequentially joining the inner cylinder unit length blocks,
Characterized in that the number of each inner cylinder is erected inside the outer cylinder.
The construction method of the chimney inner cylinder.
【請求項2】 あらかじめ構成された鉄筋コンクリート
製の外筒の内側に複数の鋼材製の内筒を立設するための
煙突内筒の築造用プルジャッキアップ装置であって、上
記外筒の上部に付設され同外筒の内側に互いに並行して
行われる作業により個別に立設される複数の上記各内筒
がそれぞれ貫通することのできる開口が開けられた内筒
吊支え用支持梁と、上記各内筒が上記内筒吊支え用支持
梁の上記開口を貫通した場合の上記各内筒の外周面に沿
うようにして上記内筒吊支え用支持梁上に上記複数の各
内筒ごとに配設された複数のワイヤクランプジャッキ
と、同各ワイヤクランプジャッキをそれぞれ貫通して垂
れ下がる各吊ワイヤの各下端にそれぞれ支持され対応す
る上記各内筒の外周部に着脱可能に係合する吊ビーム
と、上記内筒吊支え用支持梁上の上記各ワイヤクランプ
ジャッキによ り上記吊ワイヤ及び上記吊ビームを介して
吊り下げられた各内筒部分の下側に内筒単位長さブロッ
クを起立姿勢で移動する内筒単位長さブロック移動手段
とを備え、上記ワイヤクランプジャッキが、上記複数の
各内筒ごとに互いに並行して行われる個別の作業により
上記吊ワイヤ及び上記吊ビームを介して吊り下げられた
上記各内筒部分の下側に上記内筒単位長さブロックを順
次接合することができるようにして上記内筒吊支え用支
持梁上に上記各内筒ごとに配設されていることを特徴と
する、煙突内筒の築造用プルジャッキアップ装置。
2. Reinforced concrete pre-configured
A pull-up device for building a chimney inner cylinder for erecting a plurality of steel inner cylinders inside an outer cylinder made of steel.
It is attached to the upper part of the outer cylinder and is parallel to each other inside the outer cylinder.
A plurality of the above inner cylinders that are individually erected by the work to be performed
With an opening through which each can penetrate
The support beam for the suspension support and each of the inner cylinders is the support for the inner cylinder suspension support.
Along the outer peripheral surface of each of the inner cylinders when penetrating the opening of the beam
So that each of the plurality of
Multiple wire clamp jacks arranged for each inner cylinder
Through each wire clamp jack
Supported at the lower end of each hanging wire
Suspension beam detachably engaged with the outer peripheral portion of each of the inner cylinders
And each of the wire clamps on the support beam for supporting the inner cylinder
Through the Ri by the jack hanging wires and the slung beam
The inner cylinder unit length block is located below each suspended inner cylinder.
Inner cylinder unit length block moving means that moves the tool in a standing posture
And the wire clamp jack comprises a plurality of the wire clamp jacks.
By individual work performed in parallel for each inner cylinder
Suspended via the suspension wire and the suspension beam
Order the inner cylinder unit length block below each inner cylinder part.
Next, the inner cylinder suspension support
It is characterized by being arranged for each of the above inner cylinders on the beam
Pull-up device for building chimney inner cylinder.
JP4218636A 1992-07-24 1992-07-24 Construction method of chimney inner cylinder and pull jack up device for the construction Expired - Fee Related JP3021199B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4218636A JP3021199B2 (en) 1992-07-24 1992-07-24 Construction method of chimney inner cylinder and pull jack up device for the construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4218636A JP3021199B2 (en) 1992-07-24 1992-07-24 Construction method of chimney inner cylinder and pull jack up device for the construction

Publications (2)

Publication Number Publication Date
JPH0642225A JPH0642225A (en) 1994-02-15
JP3021199B2 true JP3021199B2 (en) 2000-03-15

Family

ID=16723057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4218636A Expired - Fee Related JP3021199B2 (en) 1992-07-24 1992-07-24 Construction method of chimney inner cylinder and pull jack up device for the construction

Country Status (1)

Country Link
JP (1) JP3021199B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535937A (en) * 2012-01-09 2012-07-04 苏州云白环境设备制造有限公司 Integral suspension type chimney

Also Published As

Publication number Publication date
JPH0642225A (en) 1994-02-15

Similar Documents

Publication Publication Date Title
JP4377506B2 (en) Bridge erection device and bridge erection method
JP2009073599A (en) Supporting structure of tower crane and climbing method
US6430892B1 (en) Apparatus and method for building a domed structure
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPH08311818A (en) Climbing type lift-up construction method of building and device thereof
JP2980020B2 (en) Push-up type self-climbing device for tower structures
JP3379014B2 (en) Push-up method and its device
JPH10140872A (en) Roof constructing method for tower structure
JP2003120037A (en) Construction lifting system for multistoried building
CN110914188B (en) Crane, method for assembling crane and method for disassembling crane
JPH062434A (en) Method of building steel structure roof
JPH06101348A (en) Method for constructing tower
JP3179814B2 (en) Column and beam construction method and apparatus
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JP3263504B2 (en) Construction method of tower structure
JPH09177070A (en) Method and device for placing of steel bar cage for deep foundation
JPH0782799A (en) Method and apparatus for erecting towerlike structure
JPH059981A (en) Construction of building
JP2704446B2 (en) Lift-up method using temporary columns
JP2872886B2 (en) Construction lift equipment
JPH05263531A (en) Automatic construction method and lifting-up device of structure
JP2750472B2 (en) Building construction method and device
JPH1037527A (en) Method for constructing inner and outer cylinder of chimney simultaneously
JP2687000B2 (en) Jib crane assembly equipment
JP2796448B2 (en) Building construction method and building construction equipment used for the construction method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19991208

LAPS Cancellation because of no payment of annual fees