JP3230104B2 - Tower crane - Google Patents

Tower crane

Info

Publication number
JP3230104B2
JP3230104B2 JP21882692A JP21882692A JP3230104B2 JP 3230104 B2 JP3230104 B2 JP 3230104B2 JP 21882692 A JP21882692 A JP 21882692A JP 21882692 A JP21882692 A JP 21882692A JP 3230104 B2 JP3230104 B2 JP 3230104B2
Authority
JP
Japan
Prior art keywords
mast
tower crane
lifting device
lower frame
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21882692A
Other languages
Japanese (ja)
Other versions
JPH0648683A (en
Inventor
幹夫 明城
登 榎並
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP21882692A priority Critical patent/JP3230104B2/en
Publication of JPH0648683A publication Critical patent/JPH0648683A/en
Application granted granted Critical
Publication of JP3230104B2 publication Critical patent/JP3230104B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、使用後にはマストを建
築物の柱として利用する昇降装置を備えたタワークレー
ンに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower crane provided with a lifting device that uses a mast as a pillar of a building after use.

【0002】[0002]

【従来の技術】高層ビルの建設に用いられるタワークレ
ーンは、使用後にそのマストを建築物の柱として利用さ
れる。ところで、このタワークレーンには、昇降用の昇
降装置が装備されている。従来のタワークレーンは、マ
ストに鋼管を用い、この鋼管に高さ方向に等間隔をおい
て昇降装置のロックピンの挿入孔を開設してある。一
方、昇降装置は、前記鋼管に丁度外装する枠体で構成す
る上下二つのフレームを有し、それらのフレーム間をク
ライミングジャッキで連結して伸縮自在に構成されてい
る。また、上下のフレームには、鋼管の挿入孔に嵌合さ
せるため、突出及び収納可能に構成したロックピンが設
置されている。そして、昇降装置を昇降移動させる場合
は、クライミングジャッキの伸縮を繰り返し行うと同時
に、上下フレームのロックピンを鋼管の挿入孔に代わる
代わる挿入して、昇降装置の重量をロックピンを介して
鋼管に預けながら、尺取り虫状に昇降移動させる。
2. Description of the Related Art A tower crane used in the construction of a high-rise building uses its mast as a pillar of a building after use. By the way, this tower crane is equipped with a lifting device for lifting. In a conventional tower crane, a steel pipe is used as a mast, and an insertion hole for a lock pin of an elevating device is opened in the steel pipe at equal intervals in the height direction. On the other hand, the elevating device has two frames, upper and lower, each of which is composed of a frame body just covered with the steel pipe, and these frames are connected to each other with a climbing jack so as to be extendable and contractible. Further, the upper and lower frames are provided with lock pins configured to be protruded and housed so as to fit into the insertion holes of the steel pipe. When the lifting device is moved up and down, the rocking pin of the upper and lower frames is inserted in place of the steel tube insertion hole at the same time as the climbing jack is repeatedly extended and retracted, and the weight of the lifting device is inserted into the steel pipe through the lock pin. While leaving, move up and down like a scale insect.

【0003】[0003]

【発明が解決しようとする問題点】前記した従来のタワ
ークレーンにあっては、次のような問題点がある。 <イ> 昇降装置が昇降移動する鋼管には、ロックピン
の挿入孔が必要であり、鋼管を建築物の柱をして使用す
る場合その挿入孔を閉塞しなければならなく作業工程が
煩雑であった。 <ロ> 鋼管の外周面に突出物があると昇降装置の昇降
移動が行えないので、柱に必要な梁仕口を予め鋼管に取
り付けておくことができない。したがって、現場におい
て立設した鋼管に直接梁仕口又は梁を溶接しなければな
ず、作業効率が低下する原因となっていた。
The above-mentioned conventional tower crane has the following problems. <B> The steel pipe on which the elevating device moves up and down needs an insertion hole for the lock pin. When the steel pipe is used as a pillar of a building, the insertion hole must be closed and the work process is complicated. there were. <B> If there is a protrusion on the outer peripheral surface of the steel pipe, the elevating device cannot be moved up and down, so that the beam connection required for the column cannot be attached to the steel pipe in advance. Therefore, the beam connection or the beam must be directly welded to the steel pipe erected on the site, which causes a reduction in work efficiency.

【0004】[0004]

【本発明の目的】本発明は以上の問題を解決するために
成されたもので、その目的とするところは、ロックピン
挿入孔が不要であり、予め梁仕口を突設したマストに沿
って昇降装置を昇降移動でき、建築物の梁の架設作業を
効率良くかつ経済的に行えるタワークレーンを提供する
ことにある。
SUMMARY OF THE INVENTION The object of the present invention is to solve the above-mentioned problems. The purpose of the present invention is to eliminate the need for a lock pin insertion hole, and to provide a structure along a mast having a beam connection. It is an object of the present invention to provide a tower crane that can move a lifting device up and down by moving the building beam efficiently and economically.

【0005】[0005]

【問題点を解決するための手段】すなわち本発明は、マ
ストを建築物の柱として利用するタワークレーンにおい
て、マストの高さ方向に間隔をおいて建築物の梁仕口を
張り出させ、上部フレームと下部フレームの間をジャッ
キで連結した伸縮自在の昇降装置を、前記梁仕口に上部
フレーム及び下部フレームを掛止させて、マストに沿っ
て尺取り虫状に昇降させる様に構成した、タワークレー
ンである。
[Means for solving the problems] That is, the present invention relates to a tower crane that uses a mast as a pillar of a building. A tower crane comprising a telescopic elevating device in which a frame and a lower frame are connected by a jack, wherein the upper frame and the lower frame are hung on the beam connection to move up and down like a scale along the mast. It is.

【0006】[0006]

【実施例】以下図面を参照しながら本発明の一実施例に
ついて説明する。図1に示す様に、タワークレーン1
は、高さ方向に等間隔で梁仕口22を突設したマスト2
と、マスト2に沿って昇降移動する昇降装置3と、昇降
装置3上方に設置するブーム4及び操作室5とにより構
成される。以下各部について詳述する。 <イ>マストの構成(図2、図4、図5) マスト2は、図2に示す様に、断面を矩形とした鋼管か
らなる柱体21と、柱体21表面に高さ方向に等間隔で
突設した梁仕口22とにより形成される。本実施例は、
梁仕口22を柱体21の四つの面に四方向へ張り出させ
た場合ある。この様に構成したマスト2は、使用後に建
築物の柱として使用すると共に、後述する昇降装置3の
移動経路として使用される。梁仕口22は、マスト2、
2間へ水平方向に架設する建築物の梁24の接合部とし
て付設される部位であるとともに、昇降装置3の移動時
には掛止部材として利用でき、例えばH鋼等で構成され
る。また、図4及び図5に示す様に、梁仕口22上にV
字状の溝を有する受台25を設置しても良い。
An embodiment of the present invention will be described below with reference to the drawings. As shown in FIG. 1, the tower crane 1
Is a mast 2 having projecting beam connections 22 at equal intervals in the height direction.
And an elevating device 3 that moves up and down along the mast 2, and a boom 4 and an operation room 5 installed above the elevating device 3. Hereinafter, each part will be described in detail. <A> Configuration of Mast (FIGS. 2, 4 and 5) As shown in FIG. 2, the mast 2 is composed of a column 21 made of a steel pipe having a rectangular cross section, and a column 21 in the height direction. It is formed by beam connections 22 projecting at intervals. In this embodiment,
In some cases, the beam connections 22 are projected in four directions on the four surfaces of the column 21. The mast 2 thus configured is used as a pillar of a building after use, and is also used as a moving path of a lifting device 3 described later. Beam connection 22, mast 2,
It is a portion attached as a joint of a beam 24 of a building that is erected horizontally between the two, and can be used as a hanging member when the elevating device 3 is moved, and is made of, for example, H steel. Also, as shown in FIGS. 4 and 5, the V
A pedestal 25 having a U-shaped groove may be provided.

【0007】<ロ>昇降装置(図1、図3) 昇降装置3は、図3に示す様に、上部フレーム31及び
下部フレーム32と、クライミングジャッキ33と、ロ
ックピン34と、ガイドローラ35とにより構成され
る。上部フレーム31及び下部フレーム32は、枠体か
らなり、マスト2を貫通させて外装される。すなわち、
梁仕口22の外周面に位置し、梁仕口22と接触しない
寸法で形成される。上部フレーム31及び下部フレーム
32は、角部にはガイドローラ35を載置し、内部には
ロックピン34を設けている。ガイドローラ35は、車
輪は中央に溝を設けたものである。このガイドローラ3
5は、マスト2の柱体21の角部と合致して、昇降装置
3とマスト2と間隔を一定に保ち、昇降装置3の水平方
向への回転を防止する部位である。ロックピン34は、
上部フレーム31及び下部フレーム32の内部に突設さ
れ、その基部に内装されるジャッキにより水平方向に突
出及び収納自在に作動する様に構成されている。クライ
ミングジャッキ33は、上部フレーム31及び下部フレ
ーム32間を伸縮可能に連結するジャッキである。この
クライミングジャッキ33は、少なくとも収縮時にはマ
スト2の梁仕口22、22一区間分の長さとなり、伸長
時には梁仕口22、22二区間分の長さとなる様に、そ
の伸縮により上部フレーム31及び下部フレーム32間
の距離を調整することができる。尚、図1の様に、上部
フレーム31及び下部フレーム32の周囲部分に足場3
6を設けても良い。
<B> Elevating Device (FIGS. 1 and 3) As shown in FIG. 3, the elevating device 3 includes an upper frame 31, a lower frame 32, a climbing jack 33, a lock pin 34, and a guide roller 35. It consists of. The upper frame 31 and the lower frame 32 are formed of a frame, and are exteriorly provided with the mast 2 penetrating therethrough. That is,
It is located on the outer peripheral surface of the beam port 22 and is formed so as not to contact the beam port 22. The upper frame 31 and the lower frame 32 each have a guide roller 35 mounted on a corner thereof and a lock pin 34 provided therein. The guide roller 35 has a wheel provided with a groove in the center. This guide roller 3
Numeral 5 is a portion that matches the corner of the column 21 of the mast 2 and keeps the distance between the lifting device 3 and the mast 2 constant and prevents the rotation of the lifting device 3 in the horizontal direction. The lock pin 34
Projections are provided inside the upper frame 31 and the lower frame 32, and the jacks are provided at the bases of the upper frame 31 and the lower frame 32 so as to project horizontally and to be freely stored. The climbing jack 33 is a jack that connects the upper frame 31 and the lower frame 32 to be able to expand and contract. The upper frame 31 is expanded and contracted so that the climbing jack 33 has at least the length of one section of the beam connection 22 and 22 of the mast 2 at the time of contraction and the length of two sections of the beam connection 22 and 22 at the time of extension. And the distance between the lower frame 32 and the lower frame 32 can be adjusted. As shown in FIG. 1, a scaffold 3 is provided around the upper frame 31 and the lower frame 32.
6 may be provided.

【0008】<ハ>ブーム及び操作室(図1) ブーム4は、梁24等の建築部材を吊り上げ及び運搬を
行う装置であり、公知のもので採用できる。操作室5
は、昇降装置3やブーム4を作動を制御するものであ
る。ブーム4及び操作室5は、昇降装置3の上部フレー
ム31上に載置され、昇降装置3とともに昇降移動す
る。
<C> Boom and Operation Room (FIG. 1) The boom 4 is a device for lifting and transporting building members such as the beam 24, and can be used as a known device. Operation room 5
Controls the operation of the lifting device 3 and the boom 4. The boom 4 and the operation room 5 are mounted on the upper frame 31 of the lifting device 3 and move up and down together with the lifting device 3.

【0009】[0009]

【作用】次にタワークレーン1の操作方法について説明
する。 <イ>マストの立設(図1、図6) 図1の様に、昇降装置3のクライミングジャッキ3を収
縮させ、上部フレーム31及び下部フレーム32のロッ
クピン34を突出させて、昇降装置3をマスト2の梁仕
口22の受台25上に掛止させる。そして、図6の様
に、クレーン4で昇降装置3が掛止しているマスト2の
上方の延長部分に別途マスト2を吊り上げて連結する。
Next, an operation method of the tower crane 1 will be described. <A> Mast Standing (FIGS. 1 and 6) As shown in FIG. 1, the climbing jack 3 of the elevating device 3 is contracted, and the lock pins 34 of the upper frame 31 and the lower frame 32 are protruded. Is hooked on the receiving table 25 of the beam connection 22 of the mast 2. Then, as shown in FIG. 6, the mast 2 is separately lifted and connected to the extension above the mast 2 on which the lifting device 3 is hung by the crane 4.

【0010】<ロ>昇降装置の移動(図6、図7) 図6において、上部フレーム31のロックピン34を収
納する。そして、クライミングジャッキ33を伸長させ
て上部フレーム31、ブーム4及び操作室5を上方に移
動させる。上部フレーム31のロックピン34が、上段
の梁仕口22の上部に来るようにクライミングジャッキ
33の伸長を調整する。次に、上部フレーム31のロッ
クピン34を突出して梁仕口22の受台25上に掛止さ
せる。そして、下部フレーム32のロックピン34を収
納してクライミングジャッキ33を収縮させ、下部フレ
ーム32を上昇させる。下部フレーム32を一つ上の梁
仕口22まで上昇したらロックピン34を突出させて、
その梁仕口22の受台25上に掛止させ、昇降装置3の
移動を完了する。 この様に、マスト2の立設と昇降装
置3の移動を繰り返して、建築物を構築していく。
<B> Movement of the lifting device (FIGS. 6 and 7) In FIG. 6, the lock pin 34 of the upper frame 31 is stored. Then, the climbing jack 33 is extended to move the upper frame 31, the boom 4, and the operation room 5 upward. The extension of the climbing jack 33 is adjusted so that the lock pin 34 of the upper frame 31 is located above the upper beam connection 22. Next, the lock pin 34 of the upper frame 31 is protruded to be hooked on the pedestal 25 of the beam connection 22. Then, the lock pin 34 of the lower frame 32 is stored, the climbing jack 33 is contracted, and the lower frame 32 is raised. When the lower frame 32 is raised to the upper beam connection 22, the lock pin 34 is protruded,
The beam connection 22 is hung on the receiving table 25, and the movement of the lifting device 3 is completed. In this way, the building is constructed by repeating the standing of the mast 2 and the movement of the lifting device 3.

【0011】[0011]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。 <イ> 昇降装置の昇降移動を、マストに突設した梁仕
口に掛止させて行うので、従来の様にマストにロックピ
ンの挿入孔を開設する必要がなく、その挿入孔の閉塞作
業も不要である。 <ロ> マストに予め梁仕口を取付けておけるので、従
来のように現場において立設したマストに梁仕口を溶接
する手間が省け、建築物の梁の架設作業を非常に効率良
く行うことができる。
As described above, the present invention has the following effects. <B> Since the lifting device is moved up and down by hanging the beam connection projecting from the mast, there is no need to open a lock pin insertion hole in the mast as in the conventional case. Is also unnecessary. <B> Since the beam connection can be attached to the mast in advance, the work of welding the beam connection to the mast erected on site as in the past can be omitted, and the work of erection of the building beam can be performed very efficiently. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 タワークレーンの説明図FIG. 1 is an explanatory view of a tower crane.

【図2】 マストの斜視図FIG. 2 is a perspective view of a mast.

【図3】 昇降装置斜視図FIG. 3 is a perspective view of a lifting device.

【図4】 昇降装置及びマストの断面図FIG. 4 is a sectional view of a lifting device and a mast.

【図5】 昇降装置及びマストの側面図FIG. 5 is a side view of a lifting device and a mast.

【図6】 タワークレーン移動の説明図FIG. 6 is an explanatory view of moving a tower crane.

【図7】 タワークレーン移動の説明図FIG. 7 is an explanatory view of moving a tower crane.

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 23/32 Continuation of the front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 23/32

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 マストを建築物の柱として利用するタワ
ークレーンにおいて、 マストの高さ方向に間隔をおい
て建築物の梁仕口を張り出させ、上部フレームと下部フ
レームの間をジャッキで連結した伸縮自在の昇降装置
を、 前記梁仕口に上部フレーム及び下部フレームを掛止させ
て、 マストに沿って尺取り虫状に昇降させる様に構成した、 タワークレーン。
1. A tower crane using a mast as a pillar of a building, wherein a beam connection of the building is extended at intervals in a height direction of the mast, and the upper frame and the lower frame are connected by a jack. A tower crane, wherein the telescopic elevating device is configured so that an upper frame and a lower frame are hung on the beam connection to move up and down like a scale along a mast.
JP21882692A 1992-07-27 1992-07-27 Tower crane Expired - Lifetime JP3230104B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21882692A JP3230104B2 (en) 1992-07-27 1992-07-27 Tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21882692A JP3230104B2 (en) 1992-07-27 1992-07-27 Tower crane

Publications (2)

Publication Number Publication Date
JPH0648683A JPH0648683A (en) 1994-02-22
JP3230104B2 true JP3230104B2 (en) 2001-11-19

Family

ID=16725956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21882692A Expired - Lifetime JP3230104B2 (en) 1992-07-27 1992-07-27 Tower crane

Country Status (1)

Country Link
JP (1) JP3230104B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007137537A (en) * 2005-11-15 2007-06-07 Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd Locking mechanism in heavy article conveying device
JP5599056B2 (en) * 2010-09-28 2014-10-01 株式会社コシハラ Climbing method and climbing equipment
CN103407902B (en) * 2013-08-28 2015-04-15 哈尔滨工业大学 Arm-folding type tower crane jacking device and method for increasing height of tower crane
CN103863955B (en) * 2014-03-12 2015-12-09 中联重科股份有限公司 A kind of from introduction system and have this tower machine from introduction system
KR102207793B1 (en) * 2019-04-04 2021-01-26 한국전력공사 Moving type crane and assembling method thereof

Also Published As

Publication number Publication date
JPH0648683A (en) 1994-02-22

Similar Documents

Publication Publication Date Title
US4134237A (en) Modular section mast
JP3230104B2 (en) Tower crane
JP3504369B2 (en) Tower crane
AU649856B2 (en) Cantilever scaffold device
JP2780571B2 (en) Reinforcing cage construction equipment
JPH01226687A (en) Elevator scaffolding device
JPH0791904B2 (en) Push-up device
JPH092780A (en) Jib-type traveling crane provided with jack up device
JPH0544384Y2 (en)
JP3027925B2 (en) Temporary frame equipment for construction
JP3263504B2 (en) Construction method of tower structure
JP3070438B2 (en) Temporary frame equipment for construction
JPH0718701Y2 (en) Jib restraint system for steel tower construction cranes
JP3532161B2 (en) Tower construction machine and tower construction method
JP2871468B2 (en) How to build a building
JP2872886B2 (en) Construction lift equipment
JP3128178B2 (en) How to build a tent frame
JP3027924B2 (en) Temporary frame equipment for construction
JP3243539B2 (en) Equipment for setting up piles
EP0049234B1 (en) A device for the transport of material up and down along a guide
JP3179814B2 (en) Column and beam construction method and apparatus
JPH11117523A (en) Lifting work platform for elevator parking and method using the same
US2288167A (en) Movable scaffold
JPH051548Y2 (en)
JPH0262306A (en) Climbing construction method of tower crane

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090914

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100914

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110914

Year of fee payment: 10

EXPY Cancellation because of completion of term