CN205935718U - Hoist device of embedded integral side fascia - Google Patents

Hoist device of embedded integral side fascia Download PDF

Info

Publication number
CN205935718U
CN205935718U CN201620909343.4U CN201620909343U CN205935718U CN 205935718 U CN205935718 U CN 205935718U CN 201620909343 U CN201620909343 U CN 201620909343U CN 205935718 U CN205935718 U CN 205935718U
Authority
CN
China
Prior art keywords
wall
steel column
integrated outer
hoist
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620909343.4U
Other languages
Chinese (zh)
Inventor
王彦超
景亭
周耀彬
陈杭滨
徐永斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Timoshenko architectural design firm Limited
Original Assignee
Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd filed Critical Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd
Priority to CN201620909343.4U priority Critical patent/CN205935718U/en
Application granted granted Critical
Publication of CN205935718U publication Critical patent/CN205935718U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a hoist device of embedded integral side fascia. Fixed surface has the link under the girder steel lower flange, and the steel column lateral wall is equipped with the steel column connection board, and embedded integral side fascia top face is provided with the couple of being connected with the link cooperation, and the both sides face is provided with the wall connection plate who is connected with the cooperation of steel column connection board, embedded integral side fascia is adorned beam column frame construction through hoist and mount framves and is makeed the couple hang on the link and make steel column connection board and wall connection plate fixed connection, and the hoist and mount frame is including hoist and mount rest base seat, vertical support, fixture, hoist and mount counter weight and hoist cable, after hoist and mount target in place, loosen fixture, embedded integral outer wall heels, is provided with the annular ring on the couple inserted frame girder steel on the outer wall, loosens the hoist cable, and wall body both sides connecting piece is fixed with the connecting piece butt joint on the steel column. The utility model discloses pluck the problem of colluding the difficulty in the time of effectively solving the installation of embedded integral side fascia, but the wide application is in the construction of the embedded integral side fascia of industrialization assembly type structure.

Description

A kind of hanging apparatus of embedded integrated outer wall plate
Technical field
The utility model is related to a kind of wallboard and installs equipment, especially relates to a kind of lifting dress of embedded integrated outer wall plate Put, can be widely applied in the installation of embedded integrated outer wall plate.
Background technology
In traditional architecture industry, the energy consumption that dispersion, low-level, the inefficient handicraft mode of production are brought is big, artificial consuming The problems such as many, environmental pollution, is increasingly severe, by the manufacture of modernization, transport, install and scientific management big industrial life Product mode, to replace the mode of production of traditional architecture, is the main method of the building industrialization that country proposes, its outstanding feature It is architectural design standard, component and fitting production and construction, mechanization of building operation and organization and administration are scientific.
In the evolution of industrialized building, by colleges and universities, scientific research institutions, enterprise unremitting research and development, multiple different Assembled architecture progresses into construction market, including precast concrete building (PC), steel house, container-type building etc., Main performance is component and the assembling of component and fitting.Wherein, integrated outer wall plate is a very important component.
Integrated outer wall plate, in each component and fitting of factory process, is assembled into a component, this portion in factory or at the scene ground Product are elongated be a post away from interior overall exterior wall, comprise the window opening on exterior wall, then integral hoisting.
Due to being embedded into formula integrated outer wall plate, top is connected with the beam bottom of a upper floor more, bottom and floor coagulation Tulou plate connects, and side is embedded in the post of both sides.The lifting of integrated outer wall plate, adopts tower crane or truck crane, hoist cable hangs over more The top of wallboard, is lifted into when needing hole to be mounted, how in place and pluck suspension hook become can smooth construction key, There is presently no good solution.
Utility model content
In order to solve the installation question of embedded integrated outer wall plate, for meeting industrialized building construction requirement, this practicality is new Type proposes a kind of hanging apparatus of embedded integrated outer wall plate, can smoothly embedded integrated outer wall plate be installed, Meet the installation requirements of assembled architecture.The utility model can meet the loading in construction hoisting for the embedded integrated outer wall plate, Be accurately positioned and install, simple structure, power transmission clearly, convenient and quick construction.
The technical solution adopted in the utility model is:
The utility model include mast-up, link, steel column connecting plate and embedded integrated outer wall plate setting hook and Wall connecting plate, girder steel lower flange lower surface is fixed with link, and steel column side wall is provided with steel column connecting plate, embedded integrated outer wall plate Top end face is provided with the hook being connected with link, and two sides are provided with the wall connecting being connected with steel column connecting plate Plate;Embedded integrated outer wall plate is attached to Beam-post Frame Structure by mast-up and so that hook is suspended on link and makes steel column Connecting plate is fixedly connected with wall connecting plate.
Described mast-up includes mast-up base, vertical supports, fixture, lifting counterweight and hoist cable, mast-up base water Placing flat, mast-up base is fixedly arranged in the middle of vertical supports, and vertical supports upper end connects hoist cable, vertical supports wherein side upper Side wall is hinged with fixture, and fixture is rotatable, and the mast-up base of vertical supports opposite side side is equipped with lifting counterweight.
Mast-up base is in horizontal positioned, vertical supports be in vertical place, the lower end of vertical supports and mast-up base Middle part connects, and vertical supports top is hoist cable, constitutes basic power transmission frame system.Embedded integrated outer wall plate and lifting are joined It is placed on mast-up base, positioned at mast-up vertical supports both sides, both conduct oneself with dignity holding balance so that hanging device and embedded again Integrated outer wall plate can vertically lift by crane and not tilt.
Fixture clasps downwards embedded integrated outer wall plate so that wallboard is firmly solid during construction hoisting in lifting Fixed, not sliding does not misplace.Side fascia inside top is provided with hook, Side fascia is firmly hung on the link of steel beam bottom, The inner side of Side fascia two side is provided with wall connecting plate, and is arranged on the steel column connecting plate docking of steel column both sides and connects, and is used for Being accurately positioned and installing of Side fascia.
Described embedded integrated outer wall plate offers window opening.
Described steel column connecting plate and wall connecting plate are bolted to connection.
The utility model has the characteristics that following and beneficial effect:
(1) Side fascia and lifting counterweight dead-weight balanced so that hanging device does not tilt, be capable of exterior wall The vertical lifting of plate.
(2) Side fascia is hung on the link of beam bottom it is achieved that being accurately positioned and fast installing of Side fascia.
Brief description
Fig. 1 is embedded into the positive elevational schematic view of girder steel and steel column hole before integrated outer wall plate is installed.
Fig. 2 is embedded into the axonometric drawing of integrated outer wall plate.
Fig. 3 is embedded into positive elevational schematic view inside integrated outer wall plate.
Fig. 4 is embedded into the girder steel before integrated outer wall plate is installed and steel column hole side elevation schematic diagram.
Fig. 5 be embedded into integrated outer wall plate be placed on mast-up start lift by crane side elevation schematic diagram.
Fig. 6 is to unclamp fixture, embedded integrated outer wall plate sideways, and the hook preparation of embedding integrated outer wall plate top is linked into Side elevation schematic diagram during the link of steel beam bottom.
Fig. 7 is embedded into integrated outer wall plate top-hung hook and enters steel beam bottom link, and the side elevation after wallboard is in place is illustrated Figure.
Fig. 8 is embedded into the positive elevational schematic view in inner side of integrated outer wall plate installation.
In figure:1st, steel column, 2, concrete floor, 3, girder steel, 4, embedded integral wall, 5, fixture, 6, mast-up base, 7th, vertical supports, 8, hoist cable, 9, lifting counterweight, 10, hook, 11, link, 12, steel column connecting plate, 13, wall connecting plate, 41, Window in embedded integral wall.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
As shown in figure 1, the utility model hanging apparatus are on the Beam-post Frame Structure that inclusion girder steel 3 and steel column 1 surround Embedded integrated outer wall plate 4 in Beam-post Frame Structure is installed, embedded integrated outer wall plate 4 offers window opening.As Fig. 2 With shown in Fig. 3, hanging apparatus of the present utility model are included outside mast-up, link 11, steel column connecting plate 12 and embedded monoblock type The hook of wallboard 4 setting and wall connecting plate 13, as shown in figure 4, girder steel 3 lower flange lower surface is fixed with link 11, steel column 1 side Wall is provided with steel column connecting plate 12, and embedded integrated outer wall plate 4 top end face is provided with the hook 11 being connected with link 11, both sides Face is provided with the wall connecting plate 13 being connected with steel column connecting plate 12;Embedded integrated outer wall plate 4 is attached to by mast-up Beam-post Frame Structure simultaneously makes hook 11 be suspended on link 11 and make steel column connecting plate 12 and wall connecting plate 13 fixing even Connect.
As shown in figure 5, mast-up includes mast-up base 6, vertical supports 7, fixture 5, lifting counterweight 9 and hoist cable 8, lifting Frame base 6 horizontal positioned, mast-up base 6 is fixedly arranged in the middle of vertical supports 7, in the middle part of vertical supports 7 lower end and mast-up base 6 Connect, vertical supports 7 upper end connects hoist cable 8, the upper end side wall of vertical supports 7 wherein side is hinged with fixture 5, and fixture 5 can turn Dynamic, the mast-up base 6 of vertical supports 7 opposite side side is equipped with lifting counterweight 9.
It is of the present utility model that to be embodied as installation process as follows:
1) embedded integrated outer wall plate 4 is placed on mast-up base 6 and is equipped with the opposite side of lifting counterweight 9, embeds overall Formula Side fascia 4 is blocked by fixture 5 makes it vertically be fixed on mast-up base 6, and being lifted up vertical supports 7 by hoist cable 8 will Embedded integrated outer wall plate 4 lifts, as shown in Figure 5;
2), when embedded integrated outer wall plate 4 is lifted near the frame that Beam-post Frame Structure need to be installed, unclamping fixture 5 will embed Integrated outer wall plate 4 is rolled to girder steel 3 with bottom for the point of rotation, as shown in Figure 6 so that embedding integrated outer wall plate 4 upper end Hook 10 hangs in the link 11 of girder steel bottom;
3) remove mast-up, embedded integrated outer wall plate 4 embeds the inframe that Beam-post Frame Structure need to be installed, as shown in fig. 7, Finally with bolt, the steel column connecting plate 12 on steel column 1 is fixedly connected with the wall connecting plate 13 on embedded integrated outer wall plate 4, Complete the lifting of embedded integrated outer wall plate 4, ultimately form structure as shown in Figure 8.
Content described in this specification embodiment is only enumerating of the way of realization to the utility model design, this practicality New protection domain is not construed as being only limitted to the concrete form that embodiment is stated, protection domain of the present utility model And in those skilled in the art according to the utility model design it is conceivable that equivalent technologies mean.

Claims (4)

1. a kind of hanging apparatus of embedded integrated outer wall plate it is characterised in that:Connect including mast-up, link (11), steel column Hook and wall connecting plate (13) that plate (12) and embedded integrated outer wall plate (4) are arranged, girder steel (3) lower flange lower surface is solid Surely have link (11), steel column (1) side wall is provided with steel column connecting plate (12), embedded integrated outer wall plate (4) top end face be provided with The hook (11) that link (11) is connected, two sides are provided with the wall connecting plate being connected with steel column connecting plate (12) (13);Embedded integrated outer wall plate (4) is attached to Beam-post Frame Structure by mast-up and so that hook (11) is suspended to link (11) Go up and steel column connecting plate (12) is fixedly connected with wall connecting plate (13).
2. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described lifting Frame includes mast-up base (6), vertical supports (7), fixture (5), lifting counterweight (9) and hoist cable (8), mast-up base (6) water Placing flat, mast-up base (6) is fixedly arranged in the middle of vertical supports (7), and vertical supports (7) upper end connects hoist cable (8), vertical supports (7) the upper end side wall of wherein side is hinged with fixture (5), and fixture (5) is rotatable, the lifting of vertical supports (7) opposite side side Lifting counterweight (9) is equipped with frame base (6).
3. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described is embedded Integrated outer wall plate (4) offers window opening.
4. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described steel column Connecting plate (12) and wall connecting plate (13) are bolted to connection.
CN201620909343.4U 2016-08-19 2016-08-19 Hoist device of embedded integral side fascia Withdrawn - After Issue CN205935718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620909343.4U CN205935718U (en) 2016-08-19 2016-08-19 Hoist device of embedded integral side fascia

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620909343.4U CN205935718U (en) 2016-08-19 2016-08-19 Hoist device of embedded integral side fascia

Publications (1)

Publication Number Publication Date
CN205935718U true CN205935718U (en) 2017-02-08

Family

ID=57948364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620909343.4U Withdrawn - After Issue CN205935718U (en) 2016-08-19 2016-08-19 Hoist device of embedded integral side fascia

Country Status (1)

Country Link
CN (1) CN205935718U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121259A (en) * 2016-08-19 2016-11-16 杭州铁木辛柯钢结构设计有限公司 The hanging apparatus of embedded integrated outer wall plate and hanging method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121259A (en) * 2016-08-19 2016-11-16 杭州铁木辛柯钢结构设计有限公司 The hanging apparatus of embedded integrated outer wall plate and hanging method thereof

Similar Documents

Publication Publication Date Title
CN207608238U (en) A kind of boom hoisting of building panel
CN106121259B (en) The hanging apparatus and its hanging method of embedded integrated outer wall plate
CN205935718U (en) Hoist device of embedded integral side fascia
CN210316214U (en) Assembled steel construction building dysmorphism post
CN210460016U (en) Integrated form single power lift material platform
CN215755944U (en) Automatic centering lifting appliance capable of penetrating through center hole of equipment
CN205367457U (en) Cast member installs special hoist
CN210032102U (en) Support for mounting external hanging piece of building
CN210658449U (en) Remove aluminum alloy template structure
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN204357138U (en) Simple steel structure lifting upending frame
CN209618648U (en) A kind of lifting lift hanger
CN203878957U (en) Protective screen module unit
CN202657829U (en) Hoisting in place device for fixing branch hinge of arc gate
CN213112186U (en) Hoisting device for assembled component
CN215592325U (en) Lifting appliance for prefabricating inspection well
CN215402564U (en) Gallows structure for engineering construction
CN211667294U (en) Horseshoe-shaped pipeline supporting piece
CN206569900U (en) Assembling type steel structure builds mainboard mast-up and Lift-on/Lift-off System
CN210457366U (en) High-rise ALC wallboard corollary equipment
CN218893357U (en) Gypsum mould hoist
CN220201149U (en) Prefabricated section of jurisdiction hoisting structure
CN211146927U (en) Heat collecting plate mounting bracket for heat collecting plate solar water heater
CN112282649B (en) Device and method for simultaneously setting multiple drilling casings
CN212609163U (en) Lifting device for mounting electromechanical engineering pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 317 room 22, building 2, Huafeng Road, Xiacheng District, Hangzhou, Zhejiang, 310022

Patentee after: Hangzhou Timoshenko architectural design firm Limited

Address before: 317 room 22, building 2, Huafeng Road, Xiacheng District, Hangzhou, Zhejiang, 310022

Patentee before: Hangzhou hophornbeam Xin Ke structural steel design Co., Ltd

CP01 Change in the name or title of a patent holder
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180501

AV01 Patent right actively abandoned