CN205935718U - Hoist device of embedded integral side fascia - Google Patents
Hoist device of embedded integral side fascia Download PDFInfo
- Publication number
- CN205935718U CN205935718U CN201620909343.4U CN201620909343U CN205935718U CN 205935718 U CN205935718 U CN 205935718U CN 201620909343 U CN201620909343 U CN 201620909343U CN 205935718 U CN205935718 U CN 205935718U
- Authority
- CN
- China
- Prior art keywords
- wall
- steel column
- integrated outer
- hoist
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model discloses a hoist device of embedded integral side fascia. Fixed surface has the link under the girder steel lower flange, and the steel column lateral wall is equipped with the steel column connection board, and embedded integral side fascia top face is provided with the couple of being connected with the link cooperation, and the both sides face is provided with the wall connection plate who is connected with the cooperation of steel column connection board, embedded integral side fascia is adorned beam column frame construction through hoist and mount framves and is makeed the couple hang on the link and make steel column connection board and wall connection plate fixed connection, and the hoist and mount frame is including hoist and mount rest base seat, vertical support, fixture, hoist and mount counter weight and hoist cable, after hoist and mount target in place, loosen fixture, embedded integral outer wall heels, is provided with the annular ring on the couple inserted frame girder steel on the outer wall, loosens the hoist cable, and wall body both sides connecting piece is fixed with the connecting piece butt joint on the steel column. The utility model discloses pluck the problem of colluding the difficulty in the time of effectively solving the installation of embedded integral side fascia, but the wide application is in the construction of the embedded integral side fascia of industrialization assembly type structure.
Description
Technical field
The utility model is related to a kind of wallboard and installs equipment, especially relates to a kind of lifting dress of embedded integrated outer wall plate
Put, can be widely applied in the installation of embedded integrated outer wall plate.
Background technology
In traditional architecture industry, the energy consumption that dispersion, low-level, the inefficient handicraft mode of production are brought is big, artificial consuming
The problems such as many, environmental pollution, is increasingly severe, by the manufacture of modernization, transport, install and scientific management big industrial life
Product mode, to replace the mode of production of traditional architecture, is the main method of the building industrialization that country proposes, its outstanding feature
It is architectural design standard, component and fitting production and construction, mechanization of building operation and organization and administration are scientific.
In the evolution of industrialized building, by colleges and universities, scientific research institutions, enterprise unremitting research and development, multiple different
Assembled architecture progresses into construction market, including precast concrete building (PC), steel house, container-type building etc.,
Main performance is component and the assembling of component and fitting.Wherein, integrated outer wall plate is a very important component.
Integrated outer wall plate, in each component and fitting of factory process, is assembled into a component, this portion in factory or at the scene ground
Product are elongated be a post away from interior overall exterior wall, comprise the window opening on exterior wall, then integral hoisting.
Due to being embedded into formula integrated outer wall plate, top is connected with the beam bottom of a upper floor more, bottom and floor coagulation
Tulou plate connects, and side is embedded in the post of both sides.The lifting of integrated outer wall plate, adopts tower crane or truck crane, hoist cable hangs over more
The top of wallboard, is lifted into when needing hole to be mounted, how in place and pluck suspension hook become can smooth construction key,
There is presently no good solution.
Utility model content
In order to solve the installation question of embedded integrated outer wall plate, for meeting industrialized building construction requirement, this practicality is new
Type proposes a kind of hanging apparatus of embedded integrated outer wall plate, can smoothly embedded integrated outer wall plate be installed,
Meet the installation requirements of assembled architecture.The utility model can meet the loading in construction hoisting for the embedded integrated outer wall plate,
Be accurately positioned and install, simple structure, power transmission clearly, convenient and quick construction.
The technical solution adopted in the utility model is:
The utility model include mast-up, link, steel column connecting plate and embedded integrated outer wall plate setting hook and
Wall connecting plate, girder steel lower flange lower surface is fixed with link, and steel column side wall is provided with steel column connecting plate, embedded integrated outer wall plate
Top end face is provided with the hook being connected with link, and two sides are provided with the wall connecting being connected with steel column connecting plate
Plate;Embedded integrated outer wall plate is attached to Beam-post Frame Structure by mast-up and so that hook is suspended on link and makes steel column
Connecting plate is fixedly connected with wall connecting plate.
Described mast-up includes mast-up base, vertical supports, fixture, lifting counterweight and hoist cable, mast-up base water
Placing flat, mast-up base is fixedly arranged in the middle of vertical supports, and vertical supports upper end connects hoist cable, vertical supports wherein side upper
Side wall is hinged with fixture, and fixture is rotatable, and the mast-up base of vertical supports opposite side side is equipped with lifting counterweight.
Mast-up base is in horizontal positioned, vertical supports be in vertical place, the lower end of vertical supports and mast-up base
Middle part connects, and vertical supports top is hoist cable, constitutes basic power transmission frame system.Embedded integrated outer wall plate and lifting are joined
It is placed on mast-up base, positioned at mast-up vertical supports both sides, both conduct oneself with dignity holding balance so that hanging device and embedded again
Integrated outer wall plate can vertically lift by crane and not tilt.
Fixture clasps downwards embedded integrated outer wall plate so that wallboard is firmly solid during construction hoisting in lifting
Fixed, not sliding does not misplace.Side fascia inside top is provided with hook, Side fascia is firmly hung on the link of steel beam bottom,
The inner side of Side fascia two side is provided with wall connecting plate, and is arranged on the steel column connecting plate docking of steel column both sides and connects, and is used for
Being accurately positioned and installing of Side fascia.
Described embedded integrated outer wall plate offers window opening.
Described steel column connecting plate and wall connecting plate are bolted to connection.
The utility model has the characteristics that following and beneficial effect:
(1) Side fascia and lifting counterweight dead-weight balanced so that hanging device does not tilt, be capable of exterior wall
The vertical lifting of plate.
(2) Side fascia is hung on the link of beam bottom it is achieved that being accurately positioned and fast installing of Side fascia.
Brief description
Fig. 1 is embedded into the positive elevational schematic view of girder steel and steel column hole before integrated outer wall plate is installed.
Fig. 2 is embedded into the axonometric drawing of integrated outer wall plate.
Fig. 3 is embedded into positive elevational schematic view inside integrated outer wall plate.
Fig. 4 is embedded into the girder steel before integrated outer wall plate is installed and steel column hole side elevation schematic diagram.
Fig. 5 be embedded into integrated outer wall plate be placed on mast-up start lift by crane side elevation schematic diagram.
Fig. 6 is to unclamp fixture, embedded integrated outer wall plate sideways, and the hook preparation of embedding integrated outer wall plate top is linked into
Side elevation schematic diagram during the link of steel beam bottom.
Fig. 7 is embedded into integrated outer wall plate top-hung hook and enters steel beam bottom link, and the side elevation after wallboard is in place is illustrated
Figure.
Fig. 8 is embedded into the positive elevational schematic view in inner side of integrated outer wall plate installation.
In figure:1st, steel column, 2, concrete floor, 3, girder steel, 4, embedded integral wall, 5, fixture, 6, mast-up base,
7th, vertical supports, 8, hoist cable, 9, lifting counterweight, 10, hook, 11, link, 12, steel column connecting plate, 13, wall connecting plate, 41,
Window in embedded integral wall.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
As shown in figure 1, the utility model hanging apparatus are on the Beam-post Frame Structure that inclusion girder steel 3 and steel column 1 surround
Embedded integrated outer wall plate 4 in Beam-post Frame Structure is installed, embedded integrated outer wall plate 4 offers window opening.As Fig. 2
With shown in Fig. 3, hanging apparatus of the present utility model are included outside mast-up, link 11, steel column connecting plate 12 and embedded monoblock type
The hook of wallboard 4 setting and wall connecting plate 13, as shown in figure 4, girder steel 3 lower flange lower surface is fixed with link 11, steel column 1 side
Wall is provided with steel column connecting plate 12, and embedded integrated outer wall plate 4 top end face is provided with the hook 11 being connected with link 11, both sides
Face is provided with the wall connecting plate 13 being connected with steel column connecting plate 12;Embedded integrated outer wall plate 4 is attached to by mast-up
Beam-post Frame Structure simultaneously makes hook 11 be suspended on link 11 and make steel column connecting plate 12 and wall connecting plate 13 fixing even
Connect.
As shown in figure 5, mast-up includes mast-up base 6, vertical supports 7, fixture 5, lifting counterweight 9 and hoist cable 8, lifting
Frame base 6 horizontal positioned, mast-up base 6 is fixedly arranged in the middle of vertical supports 7, in the middle part of vertical supports 7 lower end and mast-up base 6
Connect, vertical supports 7 upper end connects hoist cable 8, the upper end side wall of vertical supports 7 wherein side is hinged with fixture 5, and fixture 5 can turn
Dynamic, the mast-up base 6 of vertical supports 7 opposite side side is equipped with lifting counterweight 9.
It is of the present utility model that to be embodied as installation process as follows:
1) embedded integrated outer wall plate 4 is placed on mast-up base 6 and is equipped with the opposite side of lifting counterweight 9, embeds overall
Formula Side fascia 4 is blocked by fixture 5 makes it vertically be fixed on mast-up base 6, and being lifted up vertical supports 7 by hoist cable 8 will
Embedded integrated outer wall plate 4 lifts, as shown in Figure 5;
2), when embedded integrated outer wall plate 4 is lifted near the frame that Beam-post Frame Structure need to be installed, unclamping fixture 5 will embed
Integrated outer wall plate 4 is rolled to girder steel 3 with bottom for the point of rotation, as shown in Figure 6 so that embedding integrated outer wall plate 4 upper end
Hook 10 hangs in the link 11 of girder steel bottom;
3) remove mast-up, embedded integrated outer wall plate 4 embeds the inframe that Beam-post Frame Structure need to be installed, as shown in fig. 7,
Finally with bolt, the steel column connecting plate 12 on steel column 1 is fixedly connected with the wall connecting plate 13 on embedded integrated outer wall plate 4,
Complete the lifting of embedded integrated outer wall plate 4, ultimately form structure as shown in Figure 8.
Content described in this specification embodiment is only enumerating of the way of realization to the utility model design, this practicality
New protection domain is not construed as being only limitted to the concrete form that embodiment is stated, protection domain of the present utility model
And in those skilled in the art according to the utility model design it is conceivable that equivalent technologies mean.
Claims (4)
1. a kind of hanging apparatus of embedded integrated outer wall plate it is characterised in that:Connect including mast-up, link (11), steel column
Hook and wall connecting plate (13) that plate (12) and embedded integrated outer wall plate (4) are arranged, girder steel (3) lower flange lower surface is solid
Surely have link (11), steel column (1) side wall is provided with steel column connecting plate (12), embedded integrated outer wall plate (4) top end face be provided with
The hook (11) that link (11) is connected, two sides are provided with the wall connecting plate being connected with steel column connecting plate (12)
(13);Embedded integrated outer wall plate (4) is attached to Beam-post Frame Structure by mast-up and so that hook (11) is suspended to link (11)
Go up and steel column connecting plate (12) is fixedly connected with wall connecting plate (13).
2. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described lifting
Frame includes mast-up base (6), vertical supports (7), fixture (5), lifting counterweight (9) and hoist cable (8), mast-up base (6) water
Placing flat, mast-up base (6) is fixedly arranged in the middle of vertical supports (7), and vertical supports (7) upper end connects hoist cable (8), vertical supports
(7) the upper end side wall of wherein side is hinged with fixture (5), and fixture (5) is rotatable, the lifting of vertical supports (7) opposite side side
Lifting counterweight (9) is equipped with frame base (6).
3. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described is embedded
Integrated outer wall plate (4) offers window opening.
4. a kind of embedded integrated outer wall plate according to claim 1 hanging apparatus it is characterised in that:Described steel column
Connecting plate (12) and wall connecting plate (13) are bolted to connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620909343.4U CN205935718U (en) | 2016-08-19 | 2016-08-19 | Hoist device of embedded integral side fascia |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620909343.4U CN205935718U (en) | 2016-08-19 | 2016-08-19 | Hoist device of embedded integral side fascia |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205935718U true CN205935718U (en) | 2017-02-08 |
Family
ID=57948364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620909343.4U Withdrawn - After Issue CN205935718U (en) | 2016-08-19 | 2016-08-19 | Hoist device of embedded integral side fascia |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205935718U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121259A (en) * | 2016-08-19 | 2016-11-16 | 杭州铁木辛柯钢结构设计有限公司 | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof |
-
2016
- 2016-08-19 CN CN201620909343.4U patent/CN205935718U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121259A (en) * | 2016-08-19 | 2016-11-16 | 杭州铁木辛柯钢结构设计有限公司 | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207608238U (en) | A kind of boom hoisting of building panel | |
CN106121259B (en) | The hanging apparatus and its hanging method of embedded integrated outer wall plate | |
CN205935718U (en) | Hoist device of embedded integral side fascia | |
CN210316214U (en) | Assembled steel construction building dysmorphism post | |
CN210460016U (en) | Integrated form single power lift material platform | |
CN215755944U (en) | Automatic centering lifting appliance capable of penetrating through center hole of equipment | |
CN205367457U (en) | Cast member installs special hoist | |
CN210032102U (en) | Support for mounting external hanging piece of building | |
CN210658449U (en) | Remove aluminum alloy template structure | |
CN210457249U (en) | Electric pole holding structure with self-jacking machine body | |
CN204357138U (en) | Simple steel structure lifting upending frame | |
CN209618648U (en) | A kind of lifting lift hanger | |
CN203878957U (en) | Protective screen module unit | |
CN202657829U (en) | Hoisting in place device for fixing branch hinge of arc gate | |
CN213112186U (en) | Hoisting device for assembled component | |
CN215592325U (en) | Lifting appliance for prefabricating inspection well | |
CN215402564U (en) | Gallows structure for engineering construction | |
CN211667294U (en) | Horseshoe-shaped pipeline supporting piece | |
CN206569900U (en) | Assembling type steel structure builds mainboard mast-up and Lift-on/Lift-off System | |
CN210457366U (en) | High-rise ALC wallboard corollary equipment | |
CN218893357U (en) | Gypsum mould hoist | |
CN220201149U (en) | Prefabricated section of jurisdiction hoisting structure | |
CN211146927U (en) | Heat collecting plate mounting bracket for heat collecting plate solar water heater | |
CN112282649B (en) | Device and method for simultaneously setting multiple drilling casings | |
CN212609163U (en) | Lifting device for mounting electromechanical engineering pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 317 room 22, building 2, Huafeng Road, Xiacheng District, Hangzhou, Zhejiang, 310022 Patentee after: Hangzhou Timoshenko architectural design firm Limited Address before: 317 room 22, building 2, Huafeng Road, Xiacheng District, Hangzhou, Zhejiang, 310022 Patentee before: Hangzhou hophornbeam Xin Ke structural steel design Co., Ltd |
|
CP01 | Change in the name or title of a patent holder | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170208 Effective date of abandoning: 20180501 |
|
AV01 | Patent right actively abandoned |