CN205367457U - Cast member installs special hoist - Google Patents

Cast member installs special hoist Download PDF

Info

Publication number
CN205367457U
CN205367457U CN201620129046.8U CN201620129046U CN205367457U CN 205367457 U CN205367457 U CN 205367457U CN 201620129046 U CN201620129046 U CN 201620129046U CN 205367457 U CN205367457 U CN 205367457U
Authority
CN
China
Prior art keywords
component
hung
horizontal hanging
hoist
hanging beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620129046.8U
Other languages
Chinese (zh)
Inventor
樊裕伟
戴祝泉
张周强
樊彬彬
陈祖平
姜学鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Industry Co., Ltd.
Original Assignee
LONGXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGXIN CONSTRUCTION GROUP CO Ltd filed Critical LONGXIN CONSTRUCTION GROUP CO Ltd
Priority to CN201620129046.8U priority Critical patent/CN205367457U/en
Application granted granted Critical
Publication of CN205367457U publication Critical patent/CN205367457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a cast member installs special hoist, including long horizontal hanging beam, the member has been hung through the fixed pulley to long horizontal hanging beam one end, and the other end has hung the rectangle through the fixed pulley and has hung the frame, and the rectangle hangs and is equipped with the mass in the frame. If the component hangs the component for the post, then the hoist can design into post hoist and mount hoist structure, and long horizontal hanging beam has hung the post through the drop shot roof beam and has hung the component. If the component hangs the component for the roof beam, then the hoist can design into roof beam hoist and mount hoist structure, the horizontal hanging beam of length hung two roof beam hoisting component through vice long horizontal hanging beam, roof beam hoisting component hoists respectively at vice long horizontal hanging beam both ends. The utility model discloses it makes member focus and tower crane lifting hook not on same perpendicular line to utilize horizontal hanging beam one end to add the counter weight for the member can by the handling to install the position directly over, satisfy member hoist and mount requirement.

Description

A kind of precast concrete installs special suspender
Technical field
This utility model relates to building machinery field, and specifically a kind of precast concrete installs special suspender.
Background technology
Development recently as architectural industrialization, PC(prefabricated assembled concrete component and fitting: post, beam, plate, stair etc.), curtain wall, light partition wall, ornamental portion material, combined kitchen tool, integral bathroom, the technology such as device systems appearance, increasing engineering adopts prefabricated assembled lifting construction.The engineering of some narrow fields, component vertical lifting machinery (tower crane) is installed within main structure body so that sub-fraction is within the component of tower crane root is in tower crane minimum operational range, and lifting component can not be put in place by tower crane lifting.
Utility model content
This utility model is in order to solve problem of the prior art, it is provided that a kind of precast concrete installs special suspender so that component can be hoisted to directly over installation position, meets lifting component requirement.
This utility model includes long horizontal hanging beam, and component has been hung by fixed pulley in long horizontal hanging beam one end, and the other end has hung rectangle hanging box by fixed pulley, equipped with mass in rectangle hanging box.
If component is post hangs component, then suspender can be designed to post hoisting appliance structure, and long horizontal hanging beam has hung post by drop shot beam and hung component.
If component is beam hangs component, then suspender can be designed to beam hoisting appliance structure, and the horizontal hanging beam of described length has hung two beam lifting components by secondary long horizontal hanging beam, and beam lifting components is lifted on secondary long horizontal hanging beam two ends respectively.
Described mass is the hopper equipped with concrete pressure-testing block.
This utility model has the beneficial effects that: utilizes horizontal hanging beam one end to add counterweight and makes component gravity center and crane hook not on same vertical line so that component can be hoisted to directly over installation position, meets lifting component requirement.
Accompanying drawing explanation
Fig. 1 is post hoisting appliance structural representation.
Fig. 2 is beam hoisting appliance structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
This utility model includes the horizontal hanging beam of length of 5m length, and component has been hung by fixed pulley in long horizontal hanging beam one end, and the other end has hung 1.2m × 1.8m rectangle hanging box by the fixed pulley of rated load 5t, equipped with mass in rectangle hanging box.Each accessory connects either directly through the steel wire rope of rated load 10t.
If component is post hangs component, then suspender can be designed to post hoisting appliance structure, as it is shown in figure 1, long horizontal hanging beam has hung post by drop shot beam and hung component.
If component is beam hangs component, then suspender can be designed to beam hoisting appliance structure, as in figure 2 it is shown, the horizontal hanging beam of described length has hung two beam lifting components by secondary long horizontal hanging beam, beam lifting components is lifted on secondary long horizontal hanging beam two ends respectively.
Described mass is the 1m × 1m equipped with 50mm × 150mm × 150mm or 100mm × 100mm × 100mm concrete pressure-testing block × 1m hopper.
Utilize the complete hoisting process that this utility model carries out as follows:
Component is marched into the arena the → qualified end-dump car of reception test, stacking → floor structure unwrapping wire → PC stigma reinforcing bar, flower pond reserved steel bar Correction Die dismounting → PC post, flower reserved steel bar position, pond is checked, correction → PC post, at the bottom of Hua Chi, absolute altitude copies survey, pad is leveled up (four-point) → stockyard suspender assembling → crane hook and is first hung up horizontal hanging beam → horizontal hanging beam one end of balance and hang up component suspender (PC post drop shot beam or the horizontal hanging beam of PC beam length or flower pond, laminated floor slab steel hanging box etc.) → horizontal hanging beam the other end hangs up counterweight (place concrete block: 150 × 150 × 150mm in 1m × 1m × 1m iron charge bucket 123 pieces or 100 × 100null416 pieces of × 100mm,About 1 ton of weight) → tower crane the suspender combined is promoted to need lifting PC component above component is hung up,Hang up properly cable wind rope → tower crane low speed lifting member simultaneously,Make the liftoff 300mm of component,Observe horizontal hanging beam equilibrium condition、Lifting member again after each hanging point connection state → all go well,→ component is hoisted to tower crane root needs installation site,Adjusting component makes counterweight outside,Uniform descent is to installed surface → post、Beam sides is installed bearing diagonal rear part and is unloaded hook → member position、Perpendicularity correction → suspension column closure → sleeve is in the milk、Maintenance → column sleeve cylinder filling intensity reach 30MPa after lifting flower pond → set up form bracing frame,Regulate horizontal absolute altitude → lifting PC beam → lifting laminated floor slab → colligation beam、Slab muscle → water power preheating embedding line → post、The flower pond fixing mould of reserved steel bar is laid、Correction → post beam bearing diagonal point embedded part is pre-buried → reinforcing bar、Template、Reserved、Pre-buried concealment acceptance → concreting、Maintenance → enter next layer of lifting construction.
The plant parameter that this utility model uses is as follows:
The concrete application approach of this utility model is a lot; the above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the premise without departing from this utility model principle; can also making some improvement, these improvement also should be regarded as protection domain of the present utility model.

Claims (4)

1. a precast concrete installs special suspender, it is characterised in that: including long horizontal hanging beam, component has been hung by fixed pulley in long horizontal hanging beam one end, and the other end has hung rectangle hanging box by fixed pulley, equipped with mass in rectangle hanging box.
2. precast concrete according to claim 1 installs special suspender, it is characterised in that: the horizontal hanging beam of described length has hung post by drop shot beam and has hung component.
3. precast concrete according to claim 1 installs special suspender, it is characterised in that: the horizontal hanging beam of described length has hung two beam lifting components by secondary long horizontal hanging beam, and beam lifting components is lifted on secondary long horizontal hanging beam two ends respectively.
4. precast concrete according to claim 1 installs special suspender, it is characterised in that: described mass is the hopper equipped with concrete pressure-testing block.
CN201620129046.8U 2016-02-19 2016-02-19 Cast member installs special hoist Active CN205367457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620129046.8U CN205367457U (en) 2016-02-19 2016-02-19 Cast member installs special hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620129046.8U CN205367457U (en) 2016-02-19 2016-02-19 Cast member installs special hoist

Publications (1)

Publication Number Publication Date
CN205367457U true CN205367457U (en) 2016-07-06

Family

ID=56271824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620129046.8U Active CN205367457U (en) 2016-02-19 2016-02-19 Cast member installs special hoist

Country Status (1)

Country Link
CN (1) CN205367457U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106258555A (en) * 2016-07-28 2017-01-04 龙信建设集团有限公司 Prefabricated assembled greening flower pond construction method for hanging
CN108104260A (en) * 2017-12-29 2018-06-01 昌大建筑科技有限公司 Assembled architecture overhanging component construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106258555A (en) * 2016-07-28 2017-01-04 龙信建设集团有限公司 Prefabricated assembled greening flower pond construction method for hanging
CN108104260A (en) * 2017-12-29 2018-06-01 昌大建筑科技有限公司 Assembled architecture overhanging component construction method

Similar Documents

Publication Publication Date Title
CN207608238U (en) A kind of boom hoisting of building panel
CN106930484A (en) For the full precast stairway system and construction method of prefabricated concrete structure
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN106865414A (en) A kind of combined hanging installation method of Con casting ladle panoramic table
CN205367457U (en) Cast member installs special hoist
CN107795122A (en) Concrete stack shell constructing device and construction method
CN109019254A (en) A kind of multiscrew multi-storey building elevator
CN203173684U (en) Component for hoisting reinforcement cage
CN101845882A (en) Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials
CN107476263A (en) A kind of construction method of prestressed pier anchor cable
CN205442393U (en) Posture that falls suspension system
CN108726348B (en) Horizontal prefabrication, overturning and hoisting method for pipe gallery segments
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN205840190U (en) A kind of pin key connects the mounting structure of prefabricated bench
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN210398821U (en) Lamp mounting structure free of erecting scaffold
CN207277541U (en) Prefabricated component and cast-in-place column assembled integral concrete frame structure
CN206580444U (en) A kind of urban construction building prefabricated components hanging apparatus
CN205387439U (en) Mast hoisting accessory
CN202248861U (en) Device for substituting lifting formwork with supporting formwork in pouring of concrete floor of multi-storey building
CN205935718U (en) Hoist device of embedded integral side fascia
CN106121259B (en) The hanging apparatus and its hanging method of embedded integrated outer wall plate
CN109098395A (en) A kind of installation method of the prefabricated piping lane of assembly concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190115

Address after: 226100 Room 4, No. 88 Jinjiang Road, Binjiang Street, Haimen City, Nantong City, Jiangsu Province

Patentee after: Jiangsu Construction Industry Co., Ltd.

Address before: 226102 No. 318 Ruijiang South Road, Haimen City, Nantong City, Jiangsu Province

Patentee before: Longxin Construction Group Co., Ltd.