CN207276111U - Large space light cellular partition board mast-up - Google Patents
Large space light cellular partition board mast-up Download PDFInfo
- Publication number
- CN207276111U CN207276111U CN201721270767.1U CN201721270767U CN207276111U CN 207276111 U CN207276111 U CN 207276111U CN 201721270767 U CN201721270767 U CN 201721270767U CN 207276111 U CN207276111 U CN 207276111U
- Authority
- CN
- China
- Prior art keywords
- cross bar
- mast
- frame body
- steel wire
- gate frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of large space light cellular partition board mast-up of the utility model, including:Gate frame body, the gate frame body include two upright bars and the first cross bar at the top of the upright bar;At least two diagonal braces, the first end of the diagonal brace connect the gate frame body, and the second end of the diagonal brace is supported in ground;Second cross bar, is connected between two diagonal brace;Electric hoist, arranged on second cross bar;Fixed pulley, arranged on first cross bar;Steel wire rope, is arranged in the fixed pulley, and the first end of the steel wire rope connects the electric hoist, and the second end of the steel wire rope connects a suspension hook.Pass through the mast-up of the utility model, partition plate to be lifted is connected using suspension hook, restart electric block and slowly lift light cellular partition board to close to after 90 degree, artificial station touches plate top on crosshead, the same human assistance in lower end, light cellular partition board is accurately moved to designated position, suspension hook is taken down into the preliminary installation of completion afterwards.
Description
Technical field
The utility model is related to the realm of building construction, be specially it is a kind of be used for the higher-height lightweight of construction site every
The instrument of wallboard installation.
Background technology
In recent years, corresponding policy and specification on developing assembled architecture etc. has been issued with the Central Committee of the Communist Party of China, State Council,
Assembled architecture construction technology becomes the fashion trend of building trade in the future.And light cellular partition board is as a kind of novel energy-conserving walling
The advantages that material, it has environmental protection, fire prevention, moistureproof and waterproof, heat-insulation and heat-preservation, and quick construction is simple, and lightweight is economic, can effectively be reduced
Environmental pollution, is conducive to scientific management and civilized construction, Accelerating The Construction speed, improves the quality, performance and quality of engineering, realize
Social resources saving, the characteristics of meeting fabricated construction technology low-carbon, save material, is energy saving, environmentally protective.And most public buildings,
Since clear height is higher, and weight is larger.So the installation for being manually difficult to complete light cellular partition board is, it is necessary to the backman being easily installed
Tool.
Utility model content
In order to overcome it is above-mentioned in the prior art the shortcomings that, a purpose of the utility model is to provide a kind of novel hanging
Instrument, portable construction are easy to operate.
To achieve the above objectives, a kind of large space light cellular partition board mast-up of the utility model, including:Door type frame
Body, the gate frame body include two upright bars and the first cross bar at the top of the upright bar;At least two diagonal braces, the diagonal brace
First end connects the gate frame body, and the second end of the diagonal brace is supported in ground;Second cross bar, be connected to two diagonal brace it
Between;Electric hoist, arranged on second cross bar;Fixed pulley, arranged on first cross bar;Steel wire rope, is arranged in the fixed pulley, institute
The first end for stating steel wire rope connects the electric hoist, and the second end of the steel wire rope connects a suspension hook.
By the mast-up of the utility model, partition plate to be lifted is connected using suspension hook, restarts electric block and delays
Slow lifting light cellular partition board is to close to after 90 degree, and artificial station touches plate top on crosshead, and the same human assistance in lower end, makes light
Matter partition plate is accurately moved to designated position, and suspension hook is taken down the preliminary installation of completion afterwards.
Further improvement of the utility model is, it is oblique that reinforcement is provided between the upright bar of the door type frame and the first cross bar
Bar.
Further improvement of the utility model is that the bottom interval of the upright bar offers height adjusting holes, described to hang
The height regulating rod for further including and being useful for plugging the bottom into the upright bar is shelved, the height is coordinated on the height regulating rod
Adjustment hole offers through hole.
Brief description of the drawings
Fig. 1 is the side portion structure schematic diagram of the utility model mast-up;
Fig. 2 is the positive structure schematic of the utility model mast-up;
Fig. 3 is the structure diagram for the height regulating rod for coordinating the utility model mast-up to use.
Embodiment
In order to be more clearly understood that the technology contents of the utility model, described in detail especially exemplified by following embodiments.
Refer to shown in Fig. 1~2, it is main in the mast-up for being used to lift large space light cellular partition board of the utility model
It is made of a gate frame body 10 with diagonal brace 20, wherein:
The gate frame body 10 includes two upright bars 11 and the first cross bar 12 arranged on the top of upright bar 11, the bottom of upright bar 11
Ground is supported in when portion is with using;The quantity at least two of diagonal brace 20, is symmetrically disposed on the both sides of gate frame body, its first end
It is connected on the first cross bar 12 of gate frame body, its second end is supported in ground.One second cross bar is equipped between two diagonal braces 20
21, electric hoist 30 is fixed with the second cross bar 21, and the entirety that two diagonal braces 20 can also be further enhanced by the second cross bar 21 connects
Connect intensity.
Further, a fixed pulley 13 is set on the first cross bar 12, and a steel wire rope 14 is arranged in the fixed pulley 13, steel wire
One end of rope 14 is connected with a suspension hook 15, the other end connection electric hoist 30 of steel wire rope 14.
As the preferred embodiment of the utility model, it is provided between 11 and first cross bar 12 of upright bar of the door type frame
Bracing diagonal 16, bracing piece 22 is connected between the gate frame body 10 and the diagonal brace 20, for further strengthening door type frame
The integral strength of body 10.
As the preferred embodiment of the utility model, coordinate shown in Fig. 3, the bottom interval of the upright bar 11 offers height
Adjustment hole 111, the mast-up further include the height regulating rod 17 for being useful for plugging the bottom into the upright bar 11, the height
The height adjusting holes are coordinated to offer through hole 171 on adjusting rod 17.
Using the utility model mast-up when, the light partition wall that lifts will be needed to be transported to by means of transport first and treated
Hoisting Position, then catches on the lifting point on light partition wall using the suspension hook 15 on mast-up, starts electric hoist 30 and is slowly lifted
Light partition wall is to close to 90 degree of positions, and then by manually touching light partition wall top by mast-up, lower end is same manually auxiliary
Help, light cellular partition board is accurately moved to designated position, suspension hook is taken down into the preliminary installation of completion afterwards.Frame body height can be according to existing
Height regulating rod 14, when needing to adjust height, is inserted into the bottom of upright bar 11, coordinates through hole 171 by field actual conditions customization
The height adjusting holes 111 of proper height position are directed at, then wear through hole 171 using latch realizes admittedly in height adjusting holes 111
It is fixed.
It can be seen from the above that the purpose of this utility model is achieved completely and effectively.The function of the utility model and
Structural principle is shown and is illustrated in embodiment, and under without departing substantially from the principle, embodiment can make any modification.Institute
With the utility model includes all variant embodiments based on claim spirit and right.
Claims (4)
- A kind of 1. large space light cellular partition board mast-up, it is characterised in that including:Gate frame body, the gate frame body include two upright bars and the first cross bar at the top of the upright bar;At least two diagonal braces, the first end of the diagonal brace connect the gate frame body, and the second end of the diagonal brace is supported in ground;Second cross bar, is connected between two diagonal brace;Electric hoist, arranged on second cross bar;Fixed pulley, arranged on first cross bar;Steel wire rope, is arranged in the fixed pulley, and the first end of the steel wire rope connects the electric hoist, and the second of the steel wire rope One suspension hook of end connection.
- 2. mast-up as claimed in claim 1, it is characterised in that:It is provided between the upright bar of the door type frame and the first cross bar Bracing diagonal.
- 3. mast-up as claimed in claim 1, it is characterised in that:The bottom interval of the upright bar offers height adjusting holes, The mast-up further includes the height regulating rod for being useful for plugging the bottom into the upright bar, and institute is coordinated on the height regulating rod State height adjusting holes and offer through hole.
- 4. mast-up as claimed in claim 1, it is characterised in that:Reinforcement is connected between the gate frame body and the diagonal brace Bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721270767.1U CN207276111U (en) | 2017-09-29 | 2017-09-29 | Large space light cellular partition board mast-up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721270767.1U CN207276111U (en) | 2017-09-29 | 2017-09-29 | Large space light cellular partition board mast-up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207276111U true CN207276111U (en) | 2018-04-27 |
Family
ID=61988443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721270767.1U Expired - Fee Related CN207276111U (en) | 2017-09-29 | 2017-09-29 | Large space light cellular partition board mast-up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207276111U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098453A (en) * | 2018-08-28 | 2018-12-28 | 中国化学工程第十四建设有限公司 | Steel-structure factory building battenboard wall face construction technique |
CN109853971A (en) * | 2019-04-01 | 2019-06-07 | 中国二十二冶集团有限公司 | Light partition wall board mounting assembly and its application method |
CN114753651A (en) * | 2022-04-01 | 2022-07-15 | 中建三局集团有限公司 | Simple large-size partition plate vertical plate machine |
CN115977402A (en) * | 2022-12-09 | 2023-04-18 | 中国十七冶集团有限公司 | Light partition board installation device and construction method |
-
2017
- 2017-09-29 CN CN201721270767.1U patent/CN207276111U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098453A (en) * | 2018-08-28 | 2018-12-28 | 中国化学工程第十四建设有限公司 | Steel-structure factory building battenboard wall face construction technique |
CN109098453B (en) * | 2018-08-28 | 2021-01-26 | 中国化学工程第十四建设有限公司 | Outer wall surface installation and construction process of sandwich board of steel structure factory building |
CN109853971A (en) * | 2019-04-01 | 2019-06-07 | 中国二十二冶集团有限公司 | Light partition wall board mounting assembly and its application method |
CN114753651A (en) * | 2022-04-01 | 2022-07-15 | 中建三局集团有限公司 | Simple large-size partition plate vertical plate machine |
CN115977402A (en) * | 2022-12-09 | 2023-04-18 | 中国十七冶集团有限公司 | Light partition board installation device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207276111U (en) | Large space light cellular partition board mast-up | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN103556648B (en) | Removable assembled steel case single footing | |
CN108004931B (en) | Using the method for mixing drag-line construction steel reinforced concrete combination beam | |
CN205634687U (en) | Both arms building frock crane | |
CN206607724U (en) | A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure | |
CN206267443U (en) | A kind of prefabrication and assembly construction concrete structure stair | |
CN210396071U (en) | Intelligent all-steel attached lifting scaffold | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN206607709U (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN204357138U (en) | Simple steel structure lifting upending frame | |
CN113802840A (en) | Method for quickly disassembling and assembling shear wall template | |
CN219217261U (en) | Special scissors formula diagonal sling of prefabricated component | |
CN207191677U (en) | A kind of hollow partition board conveying arrangement | |
CN205397928U (en) | Building frock crane | |
CN207092411U (en) | High-strength light biomass fiber precast stair | |
CN205777552U (en) | A kind of new concrete material distributing machine | |
CN212926977U (en) | Can have enough to meet need formula high-rise fire control gallery inner courtyard operation platform | |
CN218117146U (en) | Assembled building outer wall protection frame | |
CN108589995B (en) | Prefabricated exterior cladding panel construction method without external frame | |
CN203939249U (en) | Wallboard hanger structure | |
CN108328491A (en) | A kind of Mobile hoisting equipment of Super High Core Walls Structure | |
CN210370035U (en) | Box-type house meeting static placement and dynamic lifting, loading and transporting | |
CN216512511U (en) | Energy-conserving efficient roofing hoisting equipment | |
CN203006731U (en) | Hoisting device for tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180427 |