CN207919351U - Hanging basket - Google Patents
Hanging basket Download PDFInfo
- Publication number
- CN207919351U CN207919351U CN201820298092.XU CN201820298092U CN207919351U CN 207919351 U CN207919351 U CN 207919351U CN 201820298092 U CN201820298092 U CN 201820298092U CN 207919351 U CN207919351 U CN 207919351U
- Authority
- CN
- China
- Prior art keywords
- counterweight platform
- transverse strut
- hanging basket
- counterweight
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of Hanging Basket, belong to the constructing devices such as bridge mounted lamp, including basket body, it further include counterweight platform, the basket body back fixation has connecting upright pole, the counterweight platform back fixation has counterweight platform upright bar, the connecting upright pole to be connect respectively with transverse strut with the counterweight platform upright bar;The connecting upright pole, transverse strut and/or counterweight platform upright bar are equipped with slider roller at railing, and the counterweight platform lower part is equipped with idler wheel.The Hanging Basket movement of the utility model flexibly, fast, can greatly save the time.
Description
Technical field
The utility model is related to a kind of Hanging Basket, more particularly to a kind of Hanging Basket of the installation on the outside of bridge.
Background technology
A kind of Hanging Basket hung on bridge railings of the installations generally use such as lamps and lanterns on the outside of all kinds of bridges, Hanging Basket is for construction
Personnel, which stand, to construct.Hanging Basket in the prior art is directly hung on bridge railings, has been constructed when needing to construct another place at one, has been needed
Construction personnel, which lifts Hanging Basket to another place to hang over, enters back into construction on bridge railings, need waste many in this Hanging Basket moving process
Time, use are very inconvenient.
Invention content
The technical problem to be solved by the utility model is to provide a kind of Hanging Baskets that is flexible, quick, can greatly saving the time.
To achieve the above object, the utility model provides the following technical solutions:
The utility model provides a kind of Hanging Basket, including basket body, further includes counterweight platform, the basket body back fixation has connection
Upright bar, the counterweight platform back fixation have a counterweight platform upright bar, the connecting upright pole and the counterweight platform upright bar respectively with
Transverse strut connects;The connecting upright pole, transverse strut and/or counterweight platform upright bar are equipped with sliding rolling at railing
Wheel, the counterweight platform lower part is equipped with idler wheel.
Preferably, the transverse strut is each one upper and lower, is connect respectively with connecting upright pole and counterweight platform upright bar, under
There is transverse strut support under the transverse strut in face, in following transverse strut, transverse strut support and match galassing
Platform upright bar is separately installed with slider roller at railing.
Preferably, between the connecting upright pole and transverse strut, between the counterweight platform upright bar and transverse strut
It is fixed with diagonal brace, brace is fixed between the counterweight platform and counterweight platform upright bar.
Preferably, the basket body, counterweight platform, connecting upright pole, counterweight platform upright bar, transverse strut, diagonal brace and oblique pull
Bar is made of galvanizing shaped steel.
Preferably, the connecting upright pole is two, and transverse weld has more square steel between two connecting upright poles.
Compared with prior art, the utility model has the beneficial effects that:
1, Hanging Basket shape is succinct, simple in structure, and rod piece stress is apparent, calculates, checking computations simple and convenient.
2, Hanging Basket from heavy and light, convenient disassembly, work surface is wider.
3, Hanging Basket, which is walked, uses counterweight, and there are four idler wheels as traveling wheel under counterweight platform on the inside of bridge.It is mobile flexibly,
Fast, counterweight platform and Hanging Basket move together on the inside of bridge, the time that a whole set of Hanging Basket is once walked in bridge floor 2 ~ 4 hours it
Between, it is greatly saved the time.
4, Hanging Basket material therefor is common common proximate matter, and processing is simple, and the rigidity of Hanging Basket is big, and deformation is small, is conducive to
The safety and construction monitoring of construction.
Description of the drawings
Fig. 1 is the utility model Hanging Basket use state cut-away view.
Fig. 2 is the schematic diagram of the utility model Hanging Basket basket body part.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment
The utility model Hanging Basket is made of four basket body 1, overhead support, counterweight platform, running gear parts.Basket body 1 by
Heat crosses zinc-type steel and is welded, and the basket body length is 1.2m, width 0.8m, is highly 1m, and bridge railings 12 is located at when use
Outside.Basket body back is welded with two connecting upright poles 2 being made of galvanizing square steel side by side that is, close to the one side of bridge, two
2 spacing 500mm of connecting upright pole, 6 30 × 30 × 2.5 square steel 3 of transverse weld, do cat ladder use therebetween.Counterweight platform 4 is located at bridge railing
On the inside of bar 12, clump weight 13 is placed in counterweight platform 4, is used as the balance construction weight of external basket body 1.Counterweight platform 4 with 40 ×
40 × 4 galvanizing angle steel weld, and lower part is installed four rolling 5 and used as mobile, and the four rolling 5 forms running gear.Match
4 back side of galassing platform is welded with counterweight platform upright bar 6 on one side close to bridge railings 12,4 both sides of counterweight platform are with respectively with one
40 × 40 × 4 galvanizing angle steel do brace 7, are fixed by bolts in counterweight platform upright bar 6.Connecting upright pole 2 and counterweight platform
Upright bar 6 connect 8 with transverse strut respectively.The connecting upright pole 2, transverse strut 8 and/or counterweight platform upright bar 4 are close to bridge
Slider roller 9 is installed, fixed Hanging Basket prolongs railing movement at railing 12.In the present embodiment, the transverse strut 8 is upper and lower each
It one, is connect respectively with two connecting upright poles 2 and counterweight platform upright bar 6, following transverse strut has transverse strut 8 times
Support 10 is pacified in following transverse strut 8, transverse strut support 10 and counterweight platform upright bar 6 at railing 12 respectively
Equipped with slider roller 9.The connecting upright pole 2, counterweight platform upright bar 6, transverse strut 8 and slider roller 9 form overhead support,
Basket body 1 is connect by overhead support with counterweight platform 4 and is hung on bridge railings 12.The connecting upright pole 2 and transverse strut 10
Between, diagonal brace 11 is welded between the counterweight platform upright bar 6 and transverse strut 10, the diagonal brace 11 is by 40 × 40 × 4 warm
Zinc-coated angle steel is constituted.
The utility model Hanging Basket, which is walked, uses counterweight, and there are four idler wheels as traveling wheel under counterweight platform on the inside of bridge.
It is mobile flexibly, it is quick, counterweight platform and Hanging Basket move together on the inside of bridge, and the time that a whole set of Hanging Basket is once walked in bridge floor is 2 ~ 4
Between a hour, it is greatly saved the time.
Claims (5)
1. a kind of Hanging Basket, including basket body, it is characterised in that:Further include counterweight platform, the basket body back fixation has connecting upright pole,
The counterweight platform back fixation has a counterweight platform upright bar, the connecting upright pole and the counterweight platform upright bar respectively with it is lateral
Binder connects;The connecting upright pole, transverse strut and/or counterweight platform upright bar are equipped with slider roller at railing, institute
It states counterweight platform lower part and idler wheel is installed.
2. Hanging Basket as described in claim 1, it is characterised in that:Upper and lower each one of the transverse strut is stood with connect respectively
Bar is connected with counterweight platform upright bar, under transverse strut below have transverse strut support, following transverse strut,
Transverse strut supports and counterweight platform upright bar is separately installed with slider roller at railing.
3. Hanging Basket as claimed in claim 2, it is characterised in that:Between the connecting upright pole and transverse strut, the counterweight
It is fixed with diagonal brace between platform upright bar and transverse strut, oblique pull is fixed between the counterweight platform and counterweight platform upright bar
Bar.
4. Hanging Basket as claimed in claim 3, it is characterised in that:The basket body, counterweight platform, connecting upright pole, counterweight platform are vertical
Bar, transverse strut, diagonal brace and brace are made of galvanizing shaped steel.
5. Hanging Basket as claimed in claim 3, it is characterised in that:The connecting upright pole is two, horizontal between two connecting upright poles
To being welded with more square steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820298092.XU CN207919351U (en) | 2018-03-02 | 2018-03-02 | Hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820298092.XU CN207919351U (en) | 2018-03-02 | 2018-03-02 | Hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207919351U true CN207919351U (en) | 2018-09-28 |
Family
ID=63602016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820298092.XU Active CN207919351U (en) | 2018-03-02 | 2018-03-02 | Hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207919351U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512517A (en) * | 2019-08-23 | 2019-11-29 | 邹旭君 | A kind of bridge construction platform |
CN113718646A (en) * | 2021-10-13 | 2021-11-30 | 中建八局第二建设有限公司 | Municipal administration overhead is with hanging basket device |
-
2018
- 2018-03-02 CN CN201820298092.XU patent/CN207919351U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512517A (en) * | 2019-08-23 | 2019-11-29 | 邹旭君 | A kind of bridge construction platform |
CN110512517B (en) * | 2019-08-23 | 2021-03-30 | 邹旭君 | Bridge engineering construction platform |
CN113718646A (en) * | 2021-10-13 | 2021-11-30 | 中建八局第二建设有限公司 | Municipal administration overhead is with hanging basket device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090968B (en) | Lifting method of integrated attached lifting scaffold | |
CN100590277C (en) | High-altitude bridge type cantilever scaffold | |
CN207919351U (en) | Hanging basket | |
CN105780646B (en) | A kind of bridge maintenance equipment of automatically walk | |
CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
CN202969267U (en) | Hoisting device of overhead work equipment for bridge overhauling | |
CN203255914U (en) | Unit-typed curtain wall lifting device | |
CN205934718U (en) | Travelling cradle device is used in bridge construction | |
CN102587643A (en) | Large-tonnage long-stroke cylinder jacking formwork | |
CN105152052B (en) | Glass curtain wall component installing method | |
CN205397785U (en) | Construction elevator attaches wall interval superelevation subassembly | |
CN207228591U (en) | A kind of architectural engineering scaffold | |
CN209320760U (en) | A kind of track contact net upkeep operation platform | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN211691525U (en) | Construction device for overhanging type inclined curtain wall | |
CN205693609U (en) | Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed | |
CN213417598U (en) | Basket is hung with portable to bridge construction | |
CN104818859B (en) | The installation method of orbit traffic overhead station operation platform | |
CN210737374U (en) | Bridge deck concrete pavement construction platform | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN210194435U (en) | Movable trolley for transverse prestress construction of continuous beam | |
CN103015314A (en) | Bridge maintenance overhead working equipment lifting device | |
CN218911149U (en) | Mobile hanging basket for repairing outer side of bridge guardrail | |
CN212200061U (en) | Special-shaped bridge inspection platform | |
CN205855847U (en) | A kind of telescopic arm bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Double road 610207 Sichuan province Chengdu Shuangliu Southwest Airport Economic Development Zone No. 580 three Patentee after: Huati Zhicheng system integration Co., Ltd Address before: Double road 610207 Sichuan province Chengdu Shuangliu Southwest Airport Economic Development Zone No. 580 three Patentee before: CHENGDU HUATI LIGHT FIXTURE MANUFACTURE AND INSTALLATION ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |