CN207228591U CN201721029260.7U CN201721029260U CN207228591U CN 207228591 U CN207228591 U CN 207228591U CN 201721029260 U CN201721029260 U CN 201721029260U CN 207228591 U CN207228591 U CN 207228591U
Authority
CN
China
Prior art keywords
bar
architectural engineering
scaffold
column
balance weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721029260.7U
Other languages
Chinese (zh)
Inventor
姜浩
苗丹青
张秀强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongwei Construction Refco Group Ltd
Original Assignee
Zhongwei Construction Refco Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongwei Construction Refco Group Ltd filed Critical Zhongwei Construction Refco Group Ltd
Priority to CN201721029260.7U priority Critical patent/CN207228591U/en
Application granted granted Critical
Publication of CN207228591U publication Critical patent/CN207228591U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of architectural engineering scaffold, including balance weight, column is installed above the balance weight, scaffold support rod is installed above the column, platform bar is installed on the inside of the scaffold support rod, and the upper end of platform bar is provided with anti-skid chequer, ladder supports bar is installed on the left of described bar, connector is installed above the scaffold support rod, carrying board is installed on the left of the connector, pulley is installed below the carrying board, the lower left of the rope roller is provided with suspension hook, servomotor is installed on the right side of the rope roller, it is provided with below the carrying board and determines strut, it is described to determine cross bar is installed below strut.The convenient installation of the utility model and dismounting, work progress is convenient, and improves construction efficiency, while has saved labour.Whole scaffold device is all more stable firm, its use is got off safer.

Description

A kind of architectural engineering scaffold
Technical field
Technical field of buildings is the utility model is related to, is specifically a kind of architectural engineering scaffold.
Background technology
Scaffold is to ensure workbench that each work progress is smoothed out and sets up.Position by setting up is divided into outer Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided into by structural form vertical Rod-type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, choose formula scaffold, climb formula foot hand Frame.Since the nineties, some domestic enterprise's Importing Foreign Advanced Technologies, develop various new scaffold, such as bolt-type foot hand Frame, CRAB modules scaffold, disc type scaffold, square tower type scaffold, and various types of climbing frames.It is domestic to 2013 Professional over one hundred family of scaffold manufacturing enterprise, mainly on Wuxi, Guangzhou, Qingdao and other places.Technologically speaking, China's scaffold enterprise Possesses the ability for processing various new type scaffolds.But domestic market is not formed also, construction enterprises are to Novel pin hand The understanding of frame is also insufficient.As China largely modernizes the appearance of heavy construction system, current scaffold does not adapt to build The needs of construction development are built, such as:Dismounting inconvenience, cost is excessive, is difficult to repeatedly use after building, and stability is not strong etc., Devoting Major Efforts To Developing and popularization and application new type scaffold are the task of top priority at present, we provide a kind of architectural engineering scaffold for this.
Utility model content
The purpose of this utility model is to provide a kind of architectural engineering scaffold, to solve dismounting of the prior art not Just, the problems such as cost is excessive, is difficult to repeatedly use after building, and stability is not strong.
To achieve the above object, the utility model provides following technical solution:A kind of architectural engineering scaffold, including it is flat Weigh block, and column is provided with above the balance weight, and the balance weight is internally provided with bolt, the outside installation of the column There is foot support, and the bottom of foot support is provided with castor, and scaffold support rod, the scaffold are provided with above the column Platform bar is installed, and the upper end of platform bar is provided with anti-skid chequer, and ladder supports are provided with the left of described bar on the inside of supporting rod Bar, be provided with connector above the scaffold support rod, and connector is internally provided with threaded hole, the connector Left side is provided with carrying board, pulley is provided with below the carrying board, and the lower right of pulley is provided with rope roller, and rope The outside setting of roller is fluted, and the lower left of the rope roller is provided with suspension hook, and servo electricity is provided with the right side of the rope roller Machine, is provided with below the carrying board and determines strut, the carrying board is connected with determining strut by board mount, described to determine strut Lower section is provided with cross bar.
Preferably, the bolt is provided with four, and the lower section of balance weight is extended to above balance weight.
Preferably, the foot support is provided with four, and positioned at four orientation of column.
Preferably, the column foot support is connected through a screw thread.
Preferably, the ladder supports bar is connected with platform bar by drive screw.
Preferably, described bar is provided with two pairs, and symmetrical positioned at pulley.
Preferably, the connector is connected with scaffold support rod by internal thread.
Preferably, the rope roller is connected with suspension hook by rope.
Compared with prior art, the beneficial effects of the utility model are:The utility model is in design using threaded connection Mode, facilitates the installation and dismounting of the scaffold, while the scaffold is provided with platform bar, can facilitate work people by platform bar Member reaches on carrying board, is provided a convenient for work progress, and this kind of architectural engineering is provided with servomotor with scaffold and hangs Hook etc., can convey materials and parts and construction material source by settings such as servomotor and suspension hooks, improves construction efficiency, at the same time Labour is saved.And this kind of architectural engineering scaffold can make ground phase between mounting bracket by balance weight when mounted Mutually balance, so that whole scaffold device is all more stable firm, makes its use get off safer, has stronger practicality Property.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the structure left view of the utility model.
Fig. 3 is the structure diagram of the utility model pulley.
Fig. 4 is the top view of the utility model connector.
In figure:1- foot supports, 2- balance weights, 3- bolts, 4- castors, 5- columns, 6- platforms bar, 7- anti-skid chequers, 8- ladder branch Strut, 9- scaffold support rods, 10- connectors, 11- carrying boards, 12- servomotors, 13- ropes roller, 14- pulleys, 15- are hung Hook, 16- board mounts, 17- determine strut, 18- cross bars, 19- grooves, 20- threaded holes.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~4, in the utility model embodiment, a kind of architectural engineering scaffold, including balance weight 2, balance Block 2 can ensure that ground is opposed flattened, and stable and firm effect, the top peace of balance weight 2 can be played for whole scaffold Equipped with column 5, column 5 is used as main bracing frame, supports the effect of whole frame, and balance weight 2 is internally provided with bolt 3, The outside of column 5 is provided with foot support 1, and the bottom of foot support 1 is provided with castor 4, and castor 4 is convenient to carry out short distance shifting to it It is dynamic, avoid dismantling, the top of column 5 is provided with scaffold support rod 9, and the inner side of scaffold support rod 9 is provided with platform bar 6, platform Bar 6 is used to climb, and the upper end of platform bar 6 is provided with anti-skid chequer 7, and the increase friction of anti-skid chequer 7, avoids skidding, the left side peace of platform bar 6 Equipped with ladder supports bar 8, the top of scaffold support rod 9 is provided with connector 10, and connector 10 is internally provided with screw thread Hole 20, the left side of connector 10 are provided with carrying board 11, and carrying board 11 is constructed for staff above, carrying board 11 Lower section pulley 14 is installed, and the lower right of pulley 14 is provided with rope roller 13, and the outside of rope roller 13 set it is fluted 19, the lower left of rope roller 13 is provided with suspension hook 15, and the right side of rope roller 13 is provided with servomotor 12, the lower section of carrying board 11 It is provided with and determines strut 17, carrying board 11 is connected with determining strut 17 by board mount 16, and the lower section for determining strut 17 is provided with cross bar 18. Bolt 3 is provided with four, and the lower section of balance weight 2 is extended to from the top of balance weight 2.Foot support 1 is provided with four, and is located at Four orientation of column 5.5 foot support 1 of column is connected through a screw thread.Ladder supports bar 8 is connected with platform bar 6 by drive screw.Platform Bar 6 is provided with two pairs, and symmetrical positioned at pulley 14.Connector 10 is connected with scaffold support rod 9 by internal thread.
Rope roller 13 is connected with suspension hook 15 by rope.
The operation principle of the utility model is:Balance weight 2 is fixed on concrete by the equipment when in use, by bolt 3 On boundary layer, make its foundation firm stable, while column 5 is built on balance weight 2, column 5 is that scaffold lower end consolidates support Device, can carry upper end formation frame, while scaffold support rod 9 is built in 5 upper end of column, and lead between scaffold support rod 9 Cross connector 10 to be attached, the height of scaffold can be adjusted, built according to Specific construction situation, in scaffold Carrying board 11 is provided between supporting rod 9,11 personnel easy to use construct in upper end by carrying board, and can pass through platform bar 6 climb arrival carrying board 11, make its upper and lower process convenient.It can pass through dismounting when needing and carrying out short-distance movement to the scaffold Balance weight 2 and bolt 3, while promote castor 4 to be moved.When carrying out conveying materials and parts or workpiece by 12 band of servomotor Running rope rope roller 13 rotates, so that materials and parts are transported under the traction of suspension hook 15 on carrying board 11.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The scope of type is indicated by the appended claims rather than the foregoing description, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (8)

1. a kind of architectural engineering scaffold, including balance weight (2), it is characterised in that:It is provided with above the balance weight (2) Column (5), the balance weight (2) are internally provided with bolt (3), foot support (1) are provided with the outside of the column (5), and The bottom of foot support (1) is provided with castor (4), and scaffold support rod (9), the foot hand are provided with above the column (5) Platform bar (6) is installed, and the upper end of platform bar (6) is provided with anti-skid chequer (7), a left side for described bar (6) on the inside of frame supporting rod (9) Side is provided with ladder supports bar (8), and connector (10), and connector (10) are provided with above the scaffold support rod (9) Be internally provided with threaded hole (20), carrying board (11) is installed on the left of the connector (10), the carrying board (11) Lower section is provided with pulley (14), and the lower right of pulley (14) is provided with rope roller (13), and the outside of rope roller (13) is set Fluted (19), the lower left of the rope roller (13) are provided with suspension hook (15), are provided with and watch on the right side of the rope roller (13) Motor (12) is taken, is provided with below the carrying board (11) and determines strut (17), the carrying board (11) is logical with determining strut (17) Board mount (16) connection is crossed, it is described to determine cross bar (18) is installed below strut (17).
A kind of 2. architectural engineering scaffold according to claim 1, it is characterised in that:The bolt (3) is provided with four It is a, and extend to above balance weight (2) lower section of balance weight (2).
A kind of 3. architectural engineering scaffold according to claim 1, it is characterised in that:The foot support (1) is provided with Four, and positioned at four orientation of column (5).
A kind of 4. architectural engineering scaffold according to claim 1, it is characterised in that:Column (5) foot support (1) It is connected through a screw thread.
A kind of 5. architectural engineering scaffold according to claim 1, it is characterised in that:The ladder supports bar (8) with Platform bar (6) is connected by drive screw.
A kind of 6. architectural engineering scaffold according to claim 1, it is characterised in that:Described bar (6) is provided with two It is right and symmetrical positioned at pulley (14).
A kind of 7. architectural engineering scaffold according to claim 1, it is characterised in that:The connector (10) and foot hand Frame supporting rod (9) is connected by internal thread.
A kind of 8. architectural engineering scaffold according to claim 1, it is characterised in that:The rope roller (13) and suspension hook (15) connected by rope.
CN201721029260.7U 2017-08-17 2017-08-17 A kind of architectural engineering scaffold Expired - Fee Related CN207228591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721029260.7U CN207228591U (en) 2017-08-17 2017-08-17 A kind of architectural engineering scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721029260.7U CN207228591U (en) 2017-08-17 2017-08-17 A kind of architectural engineering scaffold

Publications (1)

Publication Number Publication Date
CN207228591U true CN207228591U (en) 2018-04-13

Family

ID=61858103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721029260.7U Expired - Fee Related CN207228591U (en) 2017-08-17 2017-08-17 A kind of architectural engineering scaffold

Country Status (1)

Country Link
CN (1) CN207228591U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979108A (en) * 2018-07-17 2018-12-11 无锡华美钼业有限公司 Operate convenient and fast scaffold
CN112459442A (en) * 2020-11-13 2021-03-09 五冶集团上海有限公司 Scaffold auxiliary moving device and mounting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979108A (en) * 2018-07-17 2018-12-11 无锡华美钼业有限公司 Operate convenient and fast scaffold
CN112459442A (en) * 2020-11-13 2021-03-09 五冶集团上海有限公司 Scaffold auxiliary moving device and mounting method thereof

Similar Documents

Publication Publication Date Title
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN201826516U (en) Novel attached lifting scaffold
CN207228591U (en) A kind of architectural engineering scaffold
CN110950228B (en) Prefabricated staircase hoist
CN207332288U (en) Rod-pulling type hanging basket suspension device on roof frame girder
CN104420640A (en) Heterosexual chimney construction platform
CN211548713U (en) A suspension type scaffold frame for square chimney
CN105152052B (en) Glass curtain wall component installing method
CN108316630B (en) High-altitude hanging scaffold
CN207919351U (en) Hanging basket
CN204238537U (en) A kind of elevated hoistway operation platform
CN207959931U (en) A kind of construction hydraulic climbing scaffold
CN207646996U (en) A kind of square set
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN209601999U (en) A kind of packaged type power-assisted pipeline boom hoisting
CN205242982U (en) Platform is used in construction of building outer wall
CN207330121U (en) A kind of crane hook device for building
CN206466912U (en) A kind of three-dimensional module hanging apparatus
CN205933036U (en) Pipe truss installation is with high altitude parts overhead hoist
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN208023931U (en) A kind of split blade type hoisting scaffold
CN203889962U (en) Standard counterweight device of self-climbing tower crane
CN212562404U (en) Overhanging scaffold
CN108240100A (en) A kind of annexable legerity type scaffold of working at height for building
CN211548842U (en) Material hoisting device for urban construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20180817

CF01 Termination of patent right due to non-payment of annual fee