CN211548842U CN201922037561.XU CN201922037561U CN211548842U CN 211548842 U CN211548842 U CN 211548842U CN 201922037561 U CN201922037561 U CN 201922037561U CN 211548842 U CN211548842 U CN 211548842U
Authority
CN
China
Prior art keywords
rope
chassis
fixed
fixedly connected
hoisting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922037561.XU
Other languages
Chinese (zh)
Inventor
畅红斌
王建果
畅友宾
王俊卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922037561.XU priority Critical patent/CN211548842U/en
Application granted granted Critical
Publication of CN211548842U publication Critical patent/CN211548842U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The utility model discloses a material hangs and gets device for urban construction, which comprises a base frame, the last fixed surface of chassis is connected with branch, the last fixed surface of branch is connected with the pivot piece, two swing joint has the cantilever between the pivot piece, the one end fixedly connected with fixed pulley of cantilever, the surface activity of fixed pulley is connected with the rope, the surface activity of rope is connected with the movable pulley, the solid fixed ring of one end fixedly connected with of rope, gu fixed ring's fixed surface is connected with the cantilever. This material is hung and is got device for city construction drives the reel through the motor and makes the rope on the reel roll up, can hang on the material hung through the couple, can mention the material hung through the motor rotation, places the balancing weight through the counter weight pole on and can push down the device of hanging, but the weight of balancing weight will be greater than the material hung, and the cantilever arm through the rotatory setting of branch upper surface can adjust the contained angle between the two.

Description

Material hoisting device for urban construction
Technical Field
The utility model relates to a hang and get technical field, specifically be a material hangs and gets device for urban construction.
Background
The urban construction is based on planning, the urban living environment is transformed through construction engineering, various material facilities in the urban system are constructed, the urban construction content comprises the physical behaviors of the various material facilities in the urban system, the basic and staged work for creating good conditions for managing the city is achieved, and the special economic work is obvious in process and periodicity.
In the urban construction, a large amount of materials are needed, the materials are greatly lifted by a large-scale hoisting tower on a large-scale construction site, the sand cement on building floors is often inconvenient to hoist, a material hoisting device for urban construction is needed, the materials on each floor are hoisted, the length of the extending room edge cannot be adjusted by the conventional hoisting device, and the hoisting motor has low cost efficiency.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a material is hung and is got device for urban construction has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a material hangs and gets device for city construction, includes the chassis, the last fixed surface of chassis is connected with branch, the last fixed surface of branch is connected with the pivot piece, two swing joint has the cantilever between the pivot piece, the one end fixedly connected with fixed pulley of cantilever, the surperficial swing joint of fixed pulley has the rope, the surperficial swing joint of rope has the movable pulley, the solid fixed ring of the one end fixedly connected with of rope, gu fixed ring's fixed surface is connected with the cantilever, the other end fixedly connected with winding wheel of rope, one side swing joint of winding wheel has the motor.
Optionally, a through hole is formed in the other side of the bottom frame, a balance weight rod is connected to the surface of the through hole in a sliding mode, a positioning hole is formed in the upper surface of the balance weight rod, a positioner is connected to the surface of the bottom frame through threads, and the positioner is connected to the bottom frame through threads of the positioning hole.
Optionally, a through hole is formed in the other side of the bottom frame, a balance weight rod is connected to the surface of the through hole in a sliding mode, a positioning hole is formed in the upper surface of the balance weight rod, a positioner is connected to the surface of the bottom frame through threads, and the positioner is connected to the bottom frame through threads of the positioning hole.
Optionally, the upper surface of the bottom frame is fixedly connected with a reinforcing rod, the other end of the reinforcing rod is fixedly connected with a supporting rod, and the lower surface of the movable pulley is fixedly connected with a hook.
Optionally, through holes are formed in one side of the extending arm, and the number of the through holes is eight.
Optionally, one side of the rotating shaft block is connected with an extension arm through a hexagon bolt in a threaded manner.
(III) advantageous effects
The utility model provides a device is hung with material to urban construction possesses following beneficial effect:
1. this material is hung and is got device for city building construction, it makes the rope on the winding wheel roll up to drive the winding wheel through the motor, can hang on the material hung through the couple, can mention the material hung through the motor rotation, it can push down the device of hanging to place the balancing weight on the counter weight pole, but the weight of balancing weight will be greater than the material hung, the contained angle between the two can be adjusted to the cantilever arm that sets up through the rotation of branch upper surface, then the distance on the room edge is stretched out in the change, the condition of the length that current unable adjustment stretched out the room edge has been solved.
2. This material is hung and is got device for city construction can constitute a assembly pulley through movable pulley and the fixed pulley that the rope surface set up and make the motor more laborsaving. The power of the motor is increased, the supporting rod and the extending arm can be fixed through the hexagon bolts, the supporting rod can be reinforced through the reinforcing rod, and the extending length of the counterweight rod can be changed through the positioning hole and the positioner.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the section structure of the rotating shaft block of the present invention.
In the figure: 1. a chassis; 2. a strut; 3. a rotating shaft block; 4. a reach arm; 5. a fixed pulley; 6. a rope; 7. a movable pulley; 8. a fixing ring; 9. a winding wheel; 10. a motor; 11. a base; 12. a connecting rod; 13. A weight lever; 14. positioning holes; 15. a positioner; 16. a reinforcing rod; 17. hooking; 18. a hexagon bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a material hoisting device for urban construction comprises an underframe 1, a supporting rod 2 is fixedly connected to the upper surface of the underframe 1, rotating shaft blocks 3 are fixedly connected to the upper surface of the supporting rod 2, an extending arm 4 is movably connected between the two rotating shaft blocks 3, a fixed pulley 5 is fixedly connected to one end of the extending arm 4, a rope 6 is movably connected to the surface of the fixed pulley 5, a movable pulley 7 is movably connected to the surface of the rope 6, a fixed ring 8 is fixedly connected to one end of the rope 6, an extending arm 4 is fixedly connected to the surface of the fixed ring 8, a winding wheel 9 is fixedly connected to the other end of the rope 6, a motor 10 is movably connected to one side of the winding wheel 9, a through hole is formed in the other side of the underframe 1, the winding wheel 9 is driven by the motor 10 to wind up the rope 6 on the winding wheel 9, the hanging can be hung on a hoisted material through a hook 17, the hoisted material can be hoisted through, but the weight of balancing weight will be greater than the material of being hoisted, and the cantilever 4 through the rotatory setting of branch 2 upper surface can adjust the contained angle between the two, then changes the distance of stretching out the room limit, has solved the condition that current unable adjustment stretches out the length of room edge.
The surface of the through hole is connected with a balance weight rod 13 in a sliding way, the upper surface of the balance weight rod 13 is provided with a positioning hole 14, the surface of the underframe 1 is connected with a positioner 15 in a threaded way, the positioner 15 is connected with the underframe 1 in a threaded way through the positioning hole 14, the other side of the underframe 1 is provided with a through hole, the surface of the through hole is connected with the balance weight rod 13 in a sliding way, the upper surface of the balance weight rod 13 is provided with a positioning hole 14, the surface of the underframe 1 is connected with the positioner 15 in a threaded way, the positioner 15 is connected with the underframe 1 in a threaded way through the positioning hole 14, the upper surface of the underframe 1 is fixedly connected with a reinforcing rod 16, the other end of the reinforcing rod 16 is fixedly connected with a support rod 2, the lower surface, the movable pulley 7 and the fixed pulley 5 arranged on the surface of the rope 6 can form a pulley block, so that the motor 10 is more labor-saving. The power of the motor 10 is increased, the support rod 2 and the extension arm 4 can be fixed through the hexagon bolt 18, the support rod 2 can be reinforced through the reinforcing rod 16, and the extension length of the counterweight rod 13 can be changed through the positioning hole 14 and the positioner 15.
As an optimal technical solution of the utility model: the rope is a steel rope, lubricating oil is coated on the surface of the rope, and a balancing weight is placed on the upper surface of the balancing weight rod.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the material hoisting device for urban construction is used, a wrench is contacted with the hexagon bolt 18 to adjust the angle between the extending arm 4 and the support rod 2, so that the length of the extending house edge is adjusted, then the counterweight block is pressed on the counterweight rod 13, then the motor 10 drives the winding wheel 9 to enable the rope 6 to fall to the first floor, the hook 17 is used for hanging materials, then the motor 10 is driven to recover the rope 6 to hoist the materials, and the materials reach the upstairs required by the materials under manual movement.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a material hoisting device for city construction, includes chassis (1), its characterized in that: the utility model discloses a novel chassis, including chassis (1), last fixed surface is connected with branch (2), the last fixed surface of branch (2) is connected with pivot piece (3), two swing joint has cantilever (4) between pivot piece (3), the one end fixedly connected with fixed pulley (5) of cantilever (4), the surface swing joint of fixed pulley (5) has rope (6), the surface swing joint of rope (6) has movable pulley (7), the solid fixed ring of one end fixedly connected with (8) of rope (6), the surface fixed connection of solid fixed ring (8) has cantilever (4), the other end fixedly connected with winding wheel (9) of rope (6), one side swing joint of winding wheel (9) has motor (10).
2. The material hoisting device for urban construction according to claim 1, characterized in that: the lower fixed surface of motor (10) is connected with base (11), the last fixed surface of base (11) is connected with connecting rod (12), one side fixedly connected with branch (2) of base (11), opposite side fixedly connected with chassis (1) of connecting rod (12).
3. The material hoisting device for urban construction according to claim 1, characterized in that: the through-hole has been seted up to the opposite side of chassis (1), the surperficial sliding connection of through-hole has counterweight rod (13), locating hole (14) have been seted up to the upper surface of counterweight rod (13), chassis (1) surface threaded connection has locator (15), locator (15) have chassis (1) through locating hole (14) threaded connection.
4. The material hoisting device for urban construction according to claim 1, characterized in that: the upper surface of chassis (1) fixed connection has reinforcing rod (16), the other end fixed connection of reinforcing rod (16) has branch (2), the lower fixed surface of movable pulley (7) is connected with couple (17).
5. The material hoisting device for urban construction according to claim 1, characterized in that: through holes are formed in one side of each extending arm (4), and the number of the through holes is eight.
6. The material hoisting device for urban construction according to claim 1, characterized in that: one side of the rotating shaft block (3) is connected with an extending arm (4) through a hexagon bolt (18) in a threaded manner.
CN201922037561.XU 2019-11-22 2019-11-22 Material hoisting device for urban construction Expired - Fee Related CN211548842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922037561.XU CN211548842U (en) 2019-11-22 2019-11-22 Material hoisting device for urban construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922037561.XU CN211548842U (en) 2019-11-22 2019-11-22 Material hoisting device for urban construction

Publications (1)

Publication Number Publication Date
CN211548842U true CN211548842U (en) 2020-09-22

Family

ID=72501387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922037561.XU Expired - Fee Related CN211548842U (en) 2019-11-22 2019-11-22 Material hoisting device for urban construction

Country Status (1)

Country Link
CN (1) CN211548842U (en)

Similar Documents

Publication Publication Date Title
CN200940077Y (en) Miniature crane
CN201376850Y (en) Unitary curtain wall field lifting device
CN201567803U (en) Temporary support device for steel structure hoisting construction
CN216252101U (en) Auxiliary device for electric power engineering
CN205472336U (en) Loop wheel machine that construction was used
CN206427945U (en) A kind of adjustable hanging apparatus for building
CN213326235U (en) Stable and anti-shaking lifting device for building construction
CN2030991U (en) Miniature mechanical (manual) lifting device for rural building construction
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN211548842U (en) Material hoisting device for urban construction
CN211141282U (en) Steel reinforcement cage installation hoist device
CN201762035U (en) Simple crane movable arm
CN218478434U (en) Prefabricated shear wall lifting device for building convenient to dismantle installation
CN207228591U (en) A kind of architectural engineering scaffold
CN201785135U (en) Lifting bracket for installation
CN213597518U (en) Crossbeam steel construction
CN109748194A (en) A kind of hoisting equipment for building
CN111924725A (en) Building templates hoist device for house construction
CN220998917U (en) Pipeline lifting device for building construction
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN110104573A (en) A kind of lifting appliance structure that architectural engineering is strong with secured performance
CN2224832Y (en) Portable cramp hoist
CN221397013U (en) Building construction building materials handling equipment is built in room
CN214828640U (en) Hoisting accessory is used in steel construction
CN220245374U (en) Anti-drop lifting appliance of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922

Termination date: 20211122