CN206530037U - A kind of elevating platform assembly for Construction of Silo - Google Patents
A kind of elevating platform assembly for Construction of Silo Download PDFInfo
- Publication number
- CN206530037U CN206530037U CN201720210184.3U CN201720210184U CN206530037U CN 206530037 U CN206530037 U CN 206530037U CN 201720210184 U CN201720210184 U CN 201720210184U CN 206530037 U CN206530037 U CN 206530037U
- Authority
- CN
- China
- Prior art keywords
- platform
- truss
- platform truss
- lifting
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 230000003028 elevating effect Effects 0.000 title abstract 2
- 230000007246 mechanism Effects 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 238000000034 method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 210000005069 ears Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及升降平台设计制造领域,特别是涉及一种竖井施工的升降平台装置。The utility model relates to the field of design and manufacture of lifting platforms, in particular to a lifting platform device for shaft construction.
背景技术Background technique
现有技术中,竖井施工中一般会采用搭设建筑脚手架来进行施工,这种施工方法工程量大,施工中要大量投入脚手架和扣件等材料,投入的费用相当大;而且这种方法转换工作面速度换面,施工效率低。为解决这种问题,技术人员开始用悬挂平台来替代脚手架,但该方法经常因为固定问题而发生晃动或倾翻,存在很大危险性,因此升降平台的设计的合理和稳定性是决定施工能否按期完成和人员安全施工重要环节。In the prior art, building scaffolding is generally used in shaft construction. This construction method has a large amount of engineering, and a large amount of materials such as scaffolding and fasteners must be invested in the construction, and the cost of investment is quite large; and this method converts work The speed of the surface is changed, and the construction efficiency is low. In order to solve this problem, technicians began to replace the scaffolding with a suspended platform, but this method often shakes or overturns due to fixing problems, which is very dangerous. Therefore, the rationality and stability of the design of the lifting platform is the key to determining the construction performance. Whether it is completed on schedule and is an important part of personnel safety construction.
发明内容Contents of the invention
本实用新型所要解决的技术问题是提供一种用于竖井施工的升降平台装置,加工制作简单,可以保证整个平台的稳定性。The technical problem to be solved by the utility model is to provide a lifting platform device for shaft construction, which is easy to manufacture and can ensure the stability of the entire platform.
为解决上述技术问题,本实用新型所采用的技术方案是:包括平台桁架和安装在平台桁架周围的围栏以及安装在平台桁架上面的面板,平台桁架周围安装有多个导向滑轮和顶撑机构,所述平台桁架对称安装多个工作吊耳,所述工作吊耳可以与竖井中的预埋件连接,所述平台桁架对称安装多个提升吊耳。In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: including the platform truss, the fence installed around the platform truss and the panel installed on the platform truss, and a plurality of guide pulleys and supporting mechanisms are installed around the platform truss, The platform truss is symmetrically equipped with a plurality of working lifting lugs, and the working lifting lugs can be connected with the embedded parts in the shaft, and the platform truss is symmetrically equipped with a plurality of lifting lifting lugs.
优选的方案中,所述平台桁架由双槽型钢呈井字形拼接而成。In a preferred solution, the platform truss is spliced by double-channel steel in a well shape.
优选的方案中,所述顶撑机构沿平台中心辐射线方向安装,所述顶撑机构包括顶撑底座、螺杆、螺母和支架,所述支架固定在平台桁架上,所述顶撑底座通过顶撑套与螺杆的一端连接,螺杆通过螺母连接在支架上。In a preferred solution, the supporting mechanism is installed along the radial direction of the center of the platform, the supporting mechanism includes a supporting base, a screw, a nut and a bracket, the bracket is fixed on the platform truss, and the supporting base is passed through the The support sleeve is connected to one end of the screw rod, and the screw rod is connected to the bracket through a nut.
优选的方案中,所述导向滑轮沿平台中心辐射线方向焊接,滑轮的滑动方向延竖井方向。In a preferred solution, the guide pulley is welded along the radial direction of the center of the platform, and the sliding direction of the pulley extends along the direction of the shaft.
优选的方案中,所述平台桁架设有电梯开口。In a preferred solution, the platform truss is provided with an elevator opening.
本实用新型提供的一种用于竖井施工的升降平台装置,通过采用以上结构,能够保证升降平台在施工的过程中保持稳定,相比以往的框架结构,重量更轻,加工制作简单。The utility model provides a lifting platform device for shaft construction. By adopting the above structure, the lifting platform can be kept stable during the construction process. Compared with the previous frame structure, the lifting platform is lighter in weight and easy to manufacture.
附图说明Description of drawings
下面结合附图和实施例对本实用新型作进一步说明:Below in conjunction with accompanying drawing and embodiment the utility model is further described:
图1为本实用新型的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the utility model.
图2为本实用新型的顶撑机构示意图。Fig. 2 is a schematic diagram of the supporting mechanism of the utility model.
图3为本实用新型的工作状态示意图。Fig. 3 is a schematic diagram of the working state of the utility model.
图中:,平台桁架1,围栏2,面板3,导向滑轮4,顶撑机构5,工作吊耳11,提升吊耳12,电梯开口13,顶撑底座51,顶撑套52,螺杆53,螺母54,支架55。In the figure: platform truss 1, fence 2, panel 3, guide pulley 4, jacking mechanism 5, working lug 11, hoisting lug 12, elevator opening 13, jacking base 51, jacking sleeve 52, screw rod 53, Nut 54, bracket 55.
具体实施方式detailed description
如图1~2中,一种用于竖井施工的升降平台装置,包括平台桁架1和安装在平台桁架1周围的围栏2以及安装在平台桁架1上面的面板3,平台桁架1周围安装有多个导向滑轮4和顶撑机构5,平台桁架1对称安装多个工作吊耳11,工作吊耳11可以与竖井中的预埋件连接,平台桁架1对称安装多个提升吊耳12,提升吊耳12用于升降平台的移动。围栏2根据平台桁架1的边界由圆形钢管焊接而成,实现保护施工人员的作用。As shown in Figures 1 to 2, a lifting platform device for shaft construction includes a platform truss 1, a fence 2 installed around the platform truss 1 and a panel 3 installed on the platform truss 1, and multiple A guide pulley 4 and a top support mechanism 5, the platform truss 1 is symmetrically installed with multiple working lugs 11, the working lugs 11 can be connected with the embedded parts in the shaft, the platform truss 1 is symmetrically installed with multiple lifting lugs 12, the lifting lugs Ears 12 are used for the movement of the lifting platform. The fence 2 is welded by circular steel pipes according to the boundary of the platform truss 1 to protect construction personnel.
优选的方案中,平台桁架1由双槽型钢呈井字形拼接而成,双槽钢用螺栓螺母连接。还可以在双槽钢井字形结构上焊接槽钢,来实现结构强度的加固。该结构与框架结构相比更加轻盈,加工制作简单,而且可以保证平台的稳定性,极大地节约了型材。In a preferred solution, the platform truss 1 is spliced by double-channel steel in a well shape, and the double-channel steel is connected by bolts and nuts. Channel steel can also be welded on the double-channel steel well-shaped structure to achieve structural reinforcement. Compared with the frame structure, the structure is lighter, the processing is simple, and the stability of the platform can be guaranteed, which greatly saves the profile.
工作吊耳11总共有8个,其中6个对称分布在平台桁架外围,2个对称安装在双槽钢的腹板。提升吊耳12总共有4个,对称安装在双槽钢的连接空隙处。对应的,面板3上设有与工作吊耳11和提升吊耳12对应的吊耳孔洞。There are 8 working lugs 11 in total, 6 of which are symmetrically distributed on the periphery of the platform truss, and 2 are symmetrically installed on the web of the double channel steel. There are 4 lifting lugs 12 in total, which are symmetrically installed in the connecting gap of the double channel steel. Correspondingly, the panel 3 is provided with holes corresponding to the working lugs 11 and lifting lugs 12 .
优选的方案如图2中,顶撑机构5沿平台中心辐射线方向安装,所述顶撑机构5包括顶撑底座51、顶撑套52、螺杆53、螺母54和支架55,所述支架55固定在平台桁架1上,顶撑底座51通过顶撑套52与螺杆53的一端连接,螺杆53通过螺母54连接在支架55上。松开螺母54后,可以调整螺杆53伸出的距离,使顶撑底座51与竖井壁接触。The preferred solution is as shown in Fig. 2, the supporting mechanism 5 is installed along the radial direction of the center of the platform, and the supporting mechanism 5 includes a supporting base 51, a supporting sleeve 52, a screw rod 53, a nut 54 and a bracket 55, and the bracket 55 Fixed on the platform truss 1 , the supporting base 51 is connected to one end of a screw rod 53 through a supporting sleeve 52 , and the screw rod 53 is connected to a bracket 55 through a nut 54 . After the nut 54 is loosened, the distance that the screw rod 53 protrudes can be adjusted so that the supporting base 51 is in contact with the shaft wall.
导向滑轮4沿平台中心辐射线方向焊接,导向滑轮4的滑动方向延竖井方向,导向滑轮4的数量选择为8个。The guide pulley 4 is welded along the radial direction of the platform center, the sliding direction of the guide pulley 4 extends along the shaft direction, and the number of the guide pulley 4 is selected as 8.
优选的方案中,所述平台桁架1设有电梯开口13,可以方便上下物料和施工人员的运输。In a preferred solution, the platform truss 1 is provided with an elevator opening 13, which can facilitate the transportation of materials and construction personnel.
利用该平台装置,具体的实施过程如下:起吊机用钢索连接4个提升吊耳12,将用于竖井施工的升降平台装置下放,当装置发生左右晃动时,周围的导向滑轮4就可以使升降平台不与竖井洞壁发生剐蹭,使平台能够顺利的实现上下运动;当该装置到达需要施工的位置时,调节钢索使平台与水平面平行,调动平台周围的顶撑机构5的螺杆53使顶撑底座51与竖井洞壁接触,如图3中的工作工况所示,同时为增加平台的稳定性,将工作吊耳11与竖井壁的预埋件通过绳索连接;施工人员开始在平台上面施工。Using this platform device, the specific implementation process is as follows: the hoist connects four hoisting lugs 12 with steel cables, and lowers the lifting platform device for shaft construction. When the device shakes left and right, the surrounding guide pulleys 4 can be used The lifting platform does not rub against the shaft wall, so that the platform can move up and down smoothly; when the device reaches the position where construction is required, adjust the steel cable to make the platform parallel to the horizontal plane, and adjust the screw rod 53 of the supporting mechanism 5 around the platform to make the platform parallel to the horizontal plane. The supporting base 51 is in contact with the shaft wall, as shown in the working condition in Fig. 3. At the same time, in order to increase the stability of the platform, the working lug 11 is connected with the embedded parts of the shaft wall through ropes; above construction.
上述的实施例仅为本实用新型的优选技术方案,而不应视为对于本实用新型的限制,本实用新型的保护范围应以权利要求记载的技术方案,包括权利要求记载的技术方案中技术特征的等同替换方案为保护范围。即在此范围内的等同替换改进,也在本实用新型的保护范围之内。Above-mentioned embodiment is only the preferred technical scheme of the present utility model, and should not be considered as the restriction to the present utility model, and the protection scope of the present utility model should be the technical solution described in the claims, including the technology in the technical solution described in the claims. An equivalent alternative to the feature is the scope of protection. That is, equivalent replacement and improvement within this scope are also within the protection scope of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720210184.3U CN206530037U (en) | 2017-03-06 | 2017-03-06 | A kind of elevating platform assembly for Construction of Silo |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720210184.3U CN206530037U (en) | 2017-03-06 | 2017-03-06 | A kind of elevating platform assembly for Construction of Silo |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206530037U true CN206530037U (en) | 2017-09-29 |
Family
ID=59915173
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720210184.3U Expired - Fee Related CN206530037U (en) | 2017-03-06 | 2017-03-06 | A kind of elevating platform assembly for Construction of Silo |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206530037U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109941873A (en) * | 2019-02-25 | 2019-06-28 | 中国葛洲坝集团第一工程有限公司 | A kind of hoistable platform and construction method for vertical shaft penstock installation exercise |
-
2017
- 2017-03-06 CN CN201720210184.3U patent/CN206530037U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109941873A (en) * | 2019-02-25 | 2019-06-28 | 中国葛洲坝集团第一工程有限公司 | A kind of hoistable platform and construction method for vertical shaft penstock installation exercise |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109399432B (en) | A kind of hoistway job platform that climbs certainly | |
| CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
| CN205476563U (en) | Elevartor shaft design operation platform | |
| CN205653092U (en) | Tower crane of band plate material bracket | |
| CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
| CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
| CN112900825A (en) | Well is from climbing operation platform | |
| CN102556890B (en) | Self-lifting mounting platform for steel head material hoister and mounting method for mounting platform | |
| CN204474271U (en) | A kind of high wind resistance nacelle device | |
| CN202379620U (en) | Lifting and operating platform comprehensive equipment | |
| CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
| CN203820331U (en) | Material hoist with built-in steel wire rope | |
| CN218375115U (en) | Detachable tower crane aerial walkway | |
| CN206530037U (en) | A kind of elevating platform assembly for Construction of Silo | |
| CN204938806U (en) | Preventing lifting hook from falling device | |
| CN105776092A (en) | Stretching type basket device and construction method thereof | |
| CN205328478U (en) | Heavy balanced tower crane | |
| CN204508532U (en) | Oil storage cave depot To Construction of Silo bont | |
| CN102009930A (en) | Installation rack for height operation platform elevator | |
| CN202729645U (en) | Tower crane with elevator | |
| CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
| CN213505587U (en) | Fixing mechanism for T-beam hoisting | |
| CN209291757U (en) | Lifting device for well-tac-toe conveying materials | |
| CN210561720U (en) | Pier stud maintenance repair operation platform | |
| CN209799334U (en) | Lifting scaffold hanging device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170929 Termination date: 20180306 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |