CN207878931U - A kind of outer wall opening fill assembly - Google Patents
A kind of outer wall opening fill assembly Download PDFInfo
- Publication number
- CN207878931U CN207878931U CN201721171553.9U CN201721171553U CN207878931U CN 207878931 U CN207878931 U CN 207878931U CN 201721171553 U CN201721171553 U CN 201721171553U CN 207878931 U CN207878931 U CN 207878931U
- Authority
- CN
- China
- Prior art keywords
- wall
- vertical plate
- hole
- reinforcing bar
- concrete slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Curing Cements, Concrete, And Artificial Stone (AREA)
Abstract
The utility model is related to a kind of outer wall opening fill assemblies, including are set to the hole closing device of wall outer side, the preset reinforcing bar for being fixed in reserved opening and being vertically arranged and are set on the inside of wall and removably pour device;The hole closing device includes and the matched concrete slab in the hole of the wall outer side and fixed steel bars;Described fixed steel bars one end is fixedly connected with the hole closing device, and the other end is fixedly connected with the preset reinforcing bar;The device that pours includes the vertical plate for being fixed on wall on the downside of hole, and there are gaps to form cement feed inlet with hole upper end for the vertical plate upper end;The vertical plate medial surface of the vertical plate is concordant with the wall medial surface of the wall.
Description
Technical field
The utility model is related to a kind of outer wall opening fill assemblies, belong to the technical field of construction.
Background technology
With the development of urbanization, the construction of the commercial house is getting faster, and people also step up the quality requirements of house.
Currently, in the whole country, residence outer wall is larger using the proportion of builder's jack accounted for.Exterior wall wall-connecting piece, I-steel hole to be provided
Mouth deals with the infiltration of generation improperly, and the problem of more always long-standing problem construction enterprises is taken when dismounting outrigger, has become
For the common fault of most projects now.Although mending-leakage can be filled a vacancy in construction in later period to meet quality requirement, cost is increased,
It fails to meet the time limit of a project.
Traditional exterior wall wall-connecting piece, the processing of builder's jack I-steel hole, basic working procedure are:I-steel is pulled out(Or wall-connecting piece faces
Shi Gaiwei)→ I-steel(Or wall-connecting piece)Hole formwork → pour and smash → form removal → plastering → decoration of exterior wall, one so simple
Technological process gets off but at least to need 3 day time, and hole is suitable for reading and contact surface goes out easily to form construction joint, causes to seep water.For section
It about tears open the frame time, reduces hole and seep water probability, therefore the novel construction method of company's design studies.
Utility model content
In order to solve the above problem present in the prior art, the utility model provides one kind and exempts to tear precast concrete open
Plate, the concrete prefabricated board is simple in structure, easy to use, greatly saves the construction time and has saved construction cost.
The technical solution of the utility model is as follows:
A kind of outer wall opening fill assembly, including be set to the hole closing device of wall outer side, be fixed on reserved opening
Preset reinforcing bar that is interior and being vertically arranged removably pours device with wall inside is set to;The hole closing device include with
The matched concrete slab in hole and fixed steel bars of the wall outer side;Described fixed steel bars one end is fixedly connected with the hole
Closing device, the other end are fixedly connected with the preset reinforcing bar;The device that pours includes being fixed on erecting for hole downside wall
Straight panel, there are gaps to form cement feed inlet with hole upper end for the vertical plate upper end;The vertical plate medial surface of the vertical plate
It is concordant with the wall medial surface of the wall.
Further, the device that pours further includes being fixedly connected with the vertical plate upper end and to far from the wall
The inclined hang plate in side.
Further, the concrete slab is to pour prismoid made of inner skeleton, the terrace with edge by pea gravel concreten
Body is 3 centimetres high, and side and the bottom surface angle of the prismoid are 45 degree;The reinforcing bar that inner skeleton is staggered by more forms.
Further, the fixed steel bars weld together with inner skeleton, and with concrete slab medial surface at 45 degree
Angle.
Further, concrete slab insertion external wall plastering layer and concordant with the external wall plastering layer.
Further, it is equipped with layer of glass fiber net on the concrete slab and the lateral surface of external wall plastering layer contact.
Further, the preset steel-bar arrangement is in the reserved opening away from wall medial surface 5-7cm.
The utility model has the advantages that:
1, the hole closing device of the outer wall opening fill assembly of the utility model is to exempt from dismantling device, accelerates tearing open for scaffold
Except the time, reduce labour, saved the time, saves construction cost.
2, the outer wall opening fill assembly of the utility model can pouring the feed inlet more and smash 5 centimeters, ensure concrete density,
Therefore the whole anti-permeability performance of concrete is more preferable.
3, the outer wall opening fill assembly construction of the utility model is protected from weather influences substantially, undesirable in weather,
The time of saving is 2 days or more, the builder's jack of high-storey is removed, duration benefit is extremely considerable.
4, the outer wall opening fill assembly of the utility model reduces situ wet operation, has saved water, the resources such as forest, protection
Environment.
Description of the drawings
Fig. 1 is a kind of outer wall opening fill assembly overall structure diagram in the utility model;
Fig. 2 is a kind of concrete slab schematic diagram of outer wall opening fill assembly of the utility model.
Reference numeral is expressed as in figure:
1, hole closing device;11, concrete slab;12, fixed steel bars;13, inner skeleton;2, preset reinforcing bar;3, it pours
Device;31, vertical plate;311, vertical plate medial surface;32, hang plate;41, external wall plastering layer;42, glass fiber net;5, wall;51、
Wall medial surface;6, cement feed inlet.
Specific implementation mode
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2, a kind of outer wall opening fill assembly, including be set to the outside of wall 5 hole closing device 1,
It is fixed on the preset reinforcing bar 2 in reserved opening and being vertically arranged and is set to 5 inside of wall and removably pour device 3;It is described
Hole closing device 1 includes the matched concrete slab 11 in hole and fixed steel bars 12 with 5 outside of the wall;The fixation
12 one end of reinforcing bar is fixedly connected with the hole closing device 1, and the other end is fixedly connected with the preset reinforcing bar 2;It is described to pour dress
It includes the vertical plate 31 for being fixed on wall 5 on the downside of hole to set 3, and there are gaps to form water with hole upper end for 31 upper end of the vertical plate
Mud feed inlet 6;The vertical plate medial surface 311 of the vertical plate 31 is concordant with the wall medial surface 51 of the wall 5.
Further, the device 3 that pours further includes being fixedly connected with 31 upper end of the vertical plate and to far from the wall
Inclined hang plate 32 on the inside of body 5.
Further, the concrete slab 11 is to pour prismoid made of inner skeleton 13 by pea gravel concreten, described
Prismoid is 3 centimetres high, and side and the bottom surface angle of the prismoid are 45 degree;The reinforcing bar that inner skeleton 13 is staggered by more
Composition.
Further, the fixed steel bars 12 weld together with inner skeleton 13, and with 11 medial surface of concrete slab at
45 degree of angle.
Further, the concrete slab 11 is embedded in external wall plastering layer 41 and concordant with the external wall plastering layer 41.
Further, layer of glass fiber net is equipped on the lateral surface that the concrete slab 11 and external wall plastering layer 41 contact
42。
Further, in the reserved opening that it is 5-7cm away from wall medial surface 51 that the preset reinforcing bar 2, which is set to,.
The operation principle of the utility model:
First outer wall opening is closed with concrete slab 11 when a kind of outer wall opening fill assembly use, then passes through fixed steel bars
12 and half be placed in the preset reinforcing bar 2 of wall 5 and weld together concrete slab 11 is fixed up;Vertical plate 31 is fixed on again
The downside of wall 5 make vertical plate 31 and upside wall 5 there are about 5 centimetres at a distance from, then hang plate 32 is tilted with vertical plate and is connected,
A cement feed inlet 6 is formed with wall 5, cement is facilitated to pour into hole;Concrete slab 11 is embedded in external wall plastering layer 41, and water is used in combination
Mud fill concrete plate 11 forms it into a plane with 41 gap of external wall plastering layer, and is laid with glass fiber net 42;Glass fiber net is laid with
External wall construction can be carried out by finishing;Wherein concrete slab 11 does not have to remove.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every
Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in
Other related technical areas are equally included in the patent within the scope of the utility model.
Claims (5)
1. a kind of outer wall opening fill assembly, it is characterised in that:Including be set to hole closing device (1) on the outside of wall (5),
It is fixed on the preset reinforcing bar (2) in reserved opening and being vertically arranged and is set to wall (5) inside and removably pour device
(3);The hole closing device (1) includes and the matched concrete slab in hole (11) on the outside of the wall (5) and fixed
Reinforcing bar (12);Described fixed steel bars (12) one end is fixedly connected with the hole closing device (1), the other end and the preset reinforcing bar
(2) it is fixedly connected;The device (3) that pours includes the vertical plate (31) for being fixed on wall (5) on the downside of hole, the vertical plate
(31) there are gaps to form cement feed inlet (6) with hole upper end for upper end;The vertical plate medial surface (311) of the vertical plate (31)
It is concordant with wall medial surface (51) of the wall (5);The embedded external wall plastering layer (41) of the concrete slab (11) and with it is described
External wall plastering layer (41) is concordant;The concrete slab (11) is to pour terrace with edge made of inner skeleton (13) by pea gravel concreten
Body, the prismoid is 3 centimetres high, and side and the bottom surface angle of the prismoid are 45 degree;Inner skeleton (13) is interlocked by more
The reinforcing bar of setting forms.
2. a kind of outer wall opening fill assembly as described in claim 1, it is characterised in that:The device (3) that pours further includes
It is fixedly connected with the vertical plate (31) upper end and to far from inclined hang plate (32) on the inside of the wall (5).
3. a kind of outer wall opening fill assembly as claimed in claim 2, it is characterised in that:The fixed steel bars (12) and inside
Skeleton (13) welds together, and with concrete slab (11) medial surface at 45 degree of angle.
4. a kind of outer wall opening fill assembly as claimed in claim 3, it is characterised in that:The concrete slab (11) and exterior wall
It is equipped with layer of glass fiber net (42) on the lateral surface of coat of plaster (41) contact.
5. a kind of outer wall opening fill assembly as claimed in claim 4, it is characterised in that:The preset reinforcing bar (2) is set to
In reserved opening away from wall medial surface (51) 5-7cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721171553.9U CN207878931U (en) | 2017-09-13 | 2017-09-13 | A kind of outer wall opening fill assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721171553.9U CN207878931U (en) | 2017-09-13 | 2017-09-13 | A kind of outer wall opening fill assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207878931U true CN207878931U (en) | 2018-09-18 |
Family
ID=63500182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721171553.9U Active CN207878931U (en) | 2017-09-13 | 2017-09-13 | A kind of outer wall opening fill assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207878931U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252759A (en) * | 2020-09-22 | 2021-01-22 | 广东龙越建筑工程有限公司 | Wall opening plugging assembly and plugging method |
-
2017
- 2017-09-13 CN CN201721171553.9U patent/CN207878931U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252759A (en) * | 2020-09-22 | 2021-01-22 | 广东龙越建筑工程有限公司 | Wall opening plugging assembly and plugging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120870B (en) | The advanced enclosed construction of poured band of outer wall of basement and construction method | |
CN208167956U (en) | A kind of basement inwall using reverse construction | |
CN209723052U (en) | The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure | |
CN201738479U (en) | Roof expansion joint integrated cover plate waterproof structure | |
CN104947719A (en) | Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof | |
CN108166771A (en) | Steel reinforced concrete pool structural reform makes construction method | |
CN108019054A (en) | A kind of wall hole to be provided antiseep plugging device | |
CN107630565A (en) | The method and its equipment of a kind of outer wall opening of closing | |
CN104358275B (en) | Darker elevator shaft or collecting well construction method | |
CN110409244A (en) | A kind of prefabricated road deck of composite bearing and prefabricated pavement construction method | |
CN109113068A (en) | A kind of inverse construction joint structure for building construction of deep basal pit | |
CN206233560U (en) | Wall formwork erecting structure | |
CN207878931U (en) | A kind of outer wall opening fill assembly | |
CN109488037A (en) | A kind of environmental protection construction method that private residence is quickly rebuild | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN205954707U (en) | Leading enclosed construction in basement outer wall post -cast strip | |
CN104594654A (en) | Building reinforcement reconstruction scheme generation method | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN209620278U (en) | Concrete anti-bank template structure with can have enough to meet need reinforcing bar inside lining | |
CN103410172A (en) | Construction method for post pouring belt plugging of underground structural roof plate | |
CN217001019U (en) | Integrated device for grouting and reinforcing concrete slab and reinforced and formed floor slab | |
CN206319404U (en) | A kind of building precast exterior sheathing | |
CN102758486A (en) | Anti-seepage method for building engineering | |
CN105019656B (en) | Construction method for floor system concrete post-cast strip suspended formwork | |
CN211774798U (en) | Wall body corner constructional column exempts from formwork structure |