CN102758486A - Anti-seepage method for building engineering - Google Patents

Anti-seepage method for building engineering Download PDF

Info

Publication number
CN102758486A
CN102758486A CN2012102402467A CN201210240246A CN102758486A CN 102758486 A CN102758486 A CN 102758486A CN 2012102402467 A CN2012102402467 A CN 2012102402467A CN 201210240246 A CN201210240246 A CN 201210240246A CN 102758486 A CN102758486 A CN 102758486A
Authority
CN
China
Prior art keywords
concrete
construction
wall
water
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102402467A
Other languages
Chinese (zh)
Other versions
CN102758486B (en
Inventor
成军
冯惠青
丁云文
张红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xinqi Cultural Tourism Co ltd
Original Assignee
ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO LTD filed Critical ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO LTD
Priority to CN201210240246.7A priority Critical patent/CN102758486B/en
Publication of CN102758486A publication Critical patent/CN102758486A/en
Application granted granted Critical
Publication of CN102758486B publication Critical patent/CN102758486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses an anti-leakage method for building engineering, which comprises the steps of roof concrete floor anti-leakage construction, parapet and roof stairwell bottom anti-leakage construction, outer wall anti-leakage construction, kitchen and toilet anti-leakage construction, basement anti-leakage construction and engineering data management. The invention has convenient construction and good effect and ensures the anti-seepage quality.

Description

The Antiseep method of construction work
Technical field
The present invention relates to a kind of Antiseep method of construction work.
Background technology
The antiseep of architectural process is an important project, and existing method ubiquity defective is difficult to ensure the quality of products or construct complicacy.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the Antiseep method of the construction work that construction quality is good.
Technical solution of the present invention is:
A kind of Antiseep method of construction work; Comprise roofing concrete floor anti-seepage construction, parapet and go out roofing staircase bottom anti-seepage construction, exterior wall anti-seepage construction, lavatory, kitchen anti-seepage construction, basement anti-seepage construction, engineering data management, it is characterized in that:
(1) roofing concrete floor anti-seepage construction
Roofing concrete intensity is not less than C30, and the expansion agent of mixing the 5-30% percentage by weight processes expansive concrete, and concrete is played from waterproof action; Use the double-layer double-direction steel mesh reinforcement, at the plate angle increase radiation anticracking reinforcing bar that is prone to produce the crack; The every in length and breadth 6m of roof drainage >=2%, leveling layer establishes the lattice seam, stitches wide 20mm;
(2) parapet and go out roofing staircase bottom anti-seepage construction
For the double-layer double-direction reinforcing bar that the cast-in-situ concrete parapet is joined φ 8150, thickness of slab>=100mm; When brick parapet or staircase body of wall, except that corner is provided with the cast-in-situ concrete constructional column, set up the cast-in-situ concrete constructional column in the body of wall middle part, spacing≤3m, the building wall mortar strength is not less than M7.5; Flashing place waterproof height is stretched over below the bearing down on one of parapet;
(3) exterior wall anti-seepage construction
Impermeable wall is mainly in the construction sectors, there are holes for a place in the block when the first water spray wetting the surrounding brick, and then with a fine stone concrete pouring dense, heavy case of loose bricks should assemble; framework fill to the top of the wall tiles left 7d? above and then masonry, masonry and down wedged tight, brick walls and the gap between the frame column filled with mortar;
During the decoration of outside wall construction, motar uses the cement mortar that is not less than 1:3, and the thickness of plastering is not less than 20mm, and the position of thickness low LCL or outstanding metope is chipping in advance; At the position that is prone to the crack, set up gauze wire cloth in the floated coat, floated coat is done waterproofing work; Adopt special pointing packing real around the window frame, encapsulation process is done at the girth seam place of aluminium alloys housing;
When outer walling uses concrete hollow block, reinforced concrete pillar is set, body of wall and concrete structure binding site are provided with the anticracking construction measure; Windowsill is provided with pea gravel concreten and bears down on one; What exterior wall had air-conditioning or other facilities is provided with support shelf and hole, avoids or reduces the user and on exterior wall, cut a hole the eye punching;
(4) lavatory, kitchen anti-seepage construction
Casting and compacting of concrete is closely knit; Lavatory, kitchen peripheral flanging concrete exceeds flooring 120mm at least, and builds simultaneously with the flooring concrete, does not take secondary to build way; Around lavatory hole, after the form removable, smear the 1:2 waterproofing mortar and do leveling layer, and plaster with levelling before to remove dust, greasy dirt and swabbing gray scale in the basic unit earlier be that the plain-water slurry of 1:2 is closely knit to guarantee to combine with basic unit; Mortar laminated compacting, surface layer is smooth, and thickness is not less than 20mm; The height of plastering is smeared to floor face around the wall of hole, and fillet is made at the negative and positive angle, and the hole wall should be accomplished simultaneously with the end, hole and not stay constuction joint; Answer the water filling maintenance after plastering construction is intact, the time is no less than 7 round the clock;
Concrete cushion after the heavy hole backfill in lavatory adopts pea gravel concreten to water puddling in fact, and thickness is not less than 40mm; Concrete cushion must not have the slit with the joint that reaches closet all around, thereby forms waterproof barrier one, prevents that effectively the water on surface from infiltrating the end, hole, requires every layer to accomplish that joint is tight when next doing leveling layer and finish coat equally, does not form the slit.So just form complete from level to level waterproof system from top to bottom;
The floor in lavatory, kitchen and flange adopt self-waterproof concrete, to reduce the formation in concrete self crack; Plaster and levelling employing waterproofing mortar; The floor in lavatory, kitchen is done 2mm thick waterproof coating layer and topping, and waterproofing course exceeds floor face 300mm at least, and kitchen surface is lower than outside ground 40mm~50mm;
(5) basement anti-seepage construction
Before the concreting, spread the thick and concrete cement mortar in proportion of 50mm~100mm earlier, striking time is 14d, to avoid structure crack or to be vibrated in advance; Basic unit's swabbing gray scale is 0.5 cement slurry, and smooth basic unit also does texturing in advance and handles, and floated coat is combined firmly with basic unit.
(6) engineering data management
Roofing is done pouring water test for the first time after finishing leveling layer, test figure should be write drainage grade, water-sprinkling time exactly; Infiltration and ponding situation at the bottom of the inspection plate, around the pipeline are done for the second time pouring water test or are done the retaining test after the heat insulation construction of roof heat insulation is intact, the retaining test should be drawn plan view, dated pipeline location and draining, water outlet direction on the figure;
The lavatory, kitchen finish plaster with leveling layer, waterproofing course after respectively do retaining test, require exhaustive test; The most shallow 25mm that is not less than of the retaining degree of depth, and be no more than the sleeve pipe height; What the pipeline plug receptacle was low will stop up, and the retaining time is not less than 24h; After surface construction is intact, also do water injection test one time, also increase has or not seeping phenomenon after indicating draining specifically;
Exterior wall is done water pouring test one time when plastering maintenance, after facing is intact, do the secondary water pouring test, and paint elevation.
Easy construction of the present invention, effective, guarantee the antiseep quality.
Below in conjunction with embodiment the present invention is described further.
The specific embodiment
A kind of Antiseep method of construction work comprises roofing concrete floor anti-seepage construction, parapet and goes out roofing staircase bottom anti-seepage construction, exterior wall anti-seepage construction, lavatory, kitchen anti-seepage construction, basement anti-seepage construction, engineering data management,
(1) roofing concrete floor anti-seepage construction
Roofing concrete intensity is not less than C30, and the expansion agent of mixing the 5-30% percentage by weight processes expansive concrete, and concrete is played from waterproof action; Use the double-layer double-direction steel mesh reinforcement, at the plate angle increase radiation anticracking reinforcing bar that is prone to produce the crack; The every in length and breadth 6m of roof drainage >=2%, leveling layer establishes the lattice seam, stitches wide 20mm;
(2) parapet and go out roofing staircase bottom anti-seepage construction
For the double-layer double-direction reinforcing bar that the cast-in-situ concrete parapet is joined φ 8150, thickness of slab>=100mm; When brick parapet or staircase body of wall, except that corner is provided with the cast-in-situ concrete constructional column, set up the cast-in-situ concrete constructional column in the body of wall middle part, spacing≤3m, the building wall mortar strength is not less than M7.5; Flashing place waterproof height is stretched over below the bearing down on one of parapet;
(3) exterior wall anti-seepage construction
Impermeable wall is mainly in the construction sectors, there are holes for a place in the block when the first water spray wetting the surrounding brick, and then with a fine stone concrete pouring dense, heavy case of loose bricks should assemble; framework Fill to the top of the wall tiles left 7d? above and then masonry, masonry and down wedged tight, brick walls and the gap between the frame column filled with mortar;
During the decoration of outside wall construction, motar uses the cement mortar that is not less than 1:3, and the thickness of plastering is not less than 20mm, and the position of thickness low LCL or outstanding metope is chipping in advance; At the position that is prone to the crack, set up gauze wire cloth in the floated coat, floated coat is done waterproofing work; Adopt special pointing packing real around the window frame, encapsulation process is done at the girth seam place of aluminium alloys housing;
When outer walling uses concrete hollow block, reinforced concrete pillar is set, body of wall and concrete structure binding site are provided with the anticracking construction measure; Windowsill is provided with pea gravel concreten and bears down on one; What exterior wall had air-conditioning or other facilities is provided with support shelf and hole, avoids or reduces the user and on exterior wall, cut a hole the eye punching;
(4) lavatory, kitchen anti-seepage construction
Casting and compacting of concrete is closely knit; Lavatory, kitchen peripheral flanging concrete exceeds flooring 120mm at least, and builds simultaneously with the flooring concrete, does not take secondary to build way; Around lavatory hole, after the form removable, smear the 1:2 waterproofing mortar and do leveling layer, and plaster with levelling before to remove dust, greasy dirt and swabbing gray scale in the basic unit earlier be that the plain-water slurry of 1:2 is closely knit to guarantee to combine with basic unit; Mortar laminated compacting, surface layer is smooth, and thickness is not less than 20mm; The height of plastering is smeared to floor face around the wall of hole, and fillet is made at the negative and positive angle, and the hole wall should be accomplished simultaneously with the end, hole and not stay constuction joint; Answer the water filling maintenance after plastering construction is intact, the time is no less than 7 round the clock;
Concrete cushion after the heavy hole backfill in lavatory adopts pea gravel concreten to water puddling in fact, and thickness is not less than 40mm; Concrete cushion must not have the slit with the joint that reaches closet all around, thereby forms waterproof barrier one, prevents that effectively the water on surface from infiltrating the end, hole, requires every layer to accomplish that joint is tight when next doing leveling layer and finish coat equally, does not form the slit.So just form complete from level to level waterproof system from top to bottom;
The floor in lavatory, kitchen and flange adopt self-waterproof concrete, to reduce the formation in concrete self crack; Plaster and levelling employing waterproofing mortar; The floor in lavatory, kitchen is done 2mm thick waterproof coating layer and topping, and waterproofing course exceeds floor face 300mm at least, and kitchen surface is lower than outside ground 40mm~50mm;
(5) basement anti-seepage construction
Before the concreting, spread the thick and concrete cement mortar in proportion of 50mm~100mm earlier, striking time is 14d, to avoid structure crack or to be vibrated in advance; Basic unit's swabbing gray scale is 0.5 cement slurry, and smooth basic unit also does texturing in advance and handles, and floated coat is combined firmly with basic unit.
(6) engineering data management
Roofing is done pouring water test for the first time after finishing leveling layer, test figure should be write drainage grade, water-sprinkling time exactly; Infiltration and ponding situation at the bottom of the inspection plate, around the pipeline are done for the second time pouring water test or are done the retaining test after the heat insulation construction of roof heat insulation is intact, the retaining test should be drawn plan view, dated pipeline location and draining, water outlet direction on the figure;
The lavatory, kitchen finish plaster with leveling layer, waterproofing course after respectively do retaining test, require exhaustive test; The most shallow 25mm that is not less than of the retaining degree of depth, and be no more than the sleeve pipe height; What the pipeline plug receptacle was low will stop up, and the retaining time is not less than 24h; After surface construction is intact, also do water injection test one time, also increase has or not seeping phenomenon after indicating draining specifically;
Exterior wall is done water pouring test one time when plastering maintenance, after facing is intact, do the secondary water pouring test, and paint elevation.

Claims (1)

1. the Antiseep method of a construction work; Comprise roofing concrete floor anti-seepage construction, parapet and go out roofing staircase bottom anti-seepage construction, exterior wall anti-seepage construction, lavatory, kitchen anti-seepage construction, basement anti-seepage construction, engineering data management, it is characterized in that:
(1) roofing concrete floor anti-seepage construction
Roofing concrete intensity is not less than C30, and the expansion agent of mixing the 5-30% percentage by weight processes expansive concrete, and concrete is played from waterproof action; Use the double-layer double-direction steel mesh reinforcement, at the plate angle increase radiation anticracking reinforcing bar that is prone to produce the crack; The every in length and breadth 6m of roof drainage >=2%, leveling layer establishes the lattice seam, stitches wide 20mm;
(2) parapet and go out roofing staircase bottom anti-seepage construction
For the double-layer double-direction reinforcing bar that the cast-in-situ concrete parapet is joined φ 8150, thickness of slab>=100mm; When brick parapet or staircase body of wall, except that corner is provided with the cast-in-situ concrete constructional column, set up the cast-in-situ concrete constructional column in the body of wall middle part, spacing≤3m, the building wall mortar strength is not less than M7.5; Flashing place waterproof height is stretched over below the bearing down on one of parapet;
(3) exterior wall anti-seepage construction
Impermeable wall is mainly in the construction sectors, there are holes for a place in the block when the first water spray wetting the surrounding brick, and then with a fine stone concrete pouring dense, heavy case of loose bricks should assemble; framework fill to the top of the wall tiles left 7d? above and then masonry, masonry and down wedged tight, brick walls and the gap between the frame column filled with mortar;
During the decoration of outside wall construction, motar uses the cement mortar that is not less than 1:3, and the thickness of plastering is not less than 20mm, and the position of thickness low LCL or outstanding metope is chipping in advance; At the position that is prone to the crack, set up gauze wire cloth in the floated coat, floated coat is done waterproofing work; Adopt special pointing packing real around the window frame, encapsulation process is done at the girth seam place of aluminium alloys housing;
When outer walling uses concrete hollow block, reinforced concrete pillar is set, body of wall and concrete structure binding site are provided with the anticracking construction measure; Windowsill is provided with pea gravel concreten and bears down on one; What exterior wall had air-conditioning or other facilities is provided with support shelf and hole, avoids or reduces the user and on exterior wall, cut a hole the eye punching;
(4) lavatory, kitchen anti-seepage construction
Casting and compacting of concrete is closely knit; Lavatory, kitchen peripheral flanging concrete exceeds flooring 120mm at least, and builds simultaneously with the flooring concrete, does not take secondary to build way; Around lavatory hole, after the form removable, smear the 1:2 waterproofing mortar and do leveling layer, and plaster with levelling before to remove dust, greasy dirt and swabbing gray scale in the basic unit earlier be that the plain-water slurry of 1:2 is closely knit to guarantee to combine with basic unit; Mortar laminated compacting, surface layer is smooth, and thickness is not less than 20mm; The height of plastering is smeared to floor face around the wall of hole, and fillet is made at the negative and positive angle, and the hole wall should be accomplished simultaneously with the end, hole and not stay constuction joint; Answer the water filling maintenance after plastering construction is intact, the time is no less than 7 round the clock;
Concrete cushion after the heavy hole backfill in lavatory adopts pea gravel concreten to water puddling in fact, and thickness is not less than 40mm; Concrete cushion must not have the slit with the joint that reaches closet all around, thereby forms waterproof barrier one, prevents that effectively the water on surface from infiltrating the end, hole, requires every layer to accomplish that joint is tight when next doing leveling layer and finish coat equally, does not form the slit.So just form complete from level to level waterproof system from top to bottom;
The floor in lavatory, kitchen and flange adopt self-waterproof concrete, to reduce the formation in concrete self crack; Plaster and levelling employing waterproofing mortar; The floor in lavatory, kitchen is done 2mm thick waterproof coating layer and topping, and waterproofing course exceeds floor face 300mm at least, and kitchen surface is lower than outside ground 40mm~50mm;
(5) basement anti-seepage construction
Before the concreting, spread the thick and concrete cement mortar in proportion of 50mm~100mm earlier, striking time is 14d, to avoid structure crack or to be vibrated in advance; Basic unit's swabbing gray scale is 0.5 cement slurry, and smooth basic unit also does texturing in advance and handles, and floated coat is combined firmly with basic unit.
(6) engineering data management
Roofing is done pouring water test for the first time after finishing leveling layer, test figure should be write drainage grade, water-sprinkling time exactly; Infiltration and ponding situation at the bottom of the inspection plate, around the pipeline are done for the second time pouring water test or are done the retaining test after the heat insulation construction of roof heat insulation is intact, the retaining test should be drawn plan view, dated pipeline location and draining, water outlet direction on the figure;
The lavatory, kitchen finish plaster with leveling layer, waterproofing course after respectively do retaining test, require exhaustive test; The most shallow 25mm that is not less than of the retaining degree of depth, and be no more than the sleeve pipe height; What the pipeline plug receptacle was low will stop up, and the retaining time is not less than 24h; After surface construction is intact, also do water injection test one time, also increase has or not seeping phenomenon after indicating draining specifically;
Exterior wall is done water pouring test one time when plastering maintenance, after facing is intact, do the secondary water pouring test, and paint elevation.
CN201210240246.7A 2012-07-12 2012-07-12 Anti-seepage method for building engineering Active CN102758486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210240246.7A CN102758486B (en) 2012-07-12 2012-07-12 Anti-seepage method for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210240246.7A CN102758486B (en) 2012-07-12 2012-07-12 Anti-seepage method for building engineering

Publications (2)

Publication Number Publication Date
CN102758486A true CN102758486A (en) 2012-10-31
CN102758486B CN102758486B (en) 2013-05-29

Family

ID=47053118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210240246.7A Active CN102758486B (en) 2012-07-12 2012-07-12 Anti-seepage method for building engineering

Country Status (1)

Country Link
CN (1) CN102758486B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102936954A (en) * 2012-11-28 2013-02-20 深圳市鹏城建筑集团有限公司 Method and structure for plugging pipeline floor hole
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method
CN106677355A (en) * 2017-02-27 2017-05-17 中国冶集团有限公司 Floor slab hole plugging device and method
CN108755983A (en) * 2018-06-01 2018-11-06 湖南吉米防水科技有限公司 A kind of waterproof technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3969861A (en) * 1974-06-17 1976-07-20 Hanlon Edward J O Leakproof roof and method of constructing same
CN87102845A (en) * 1987-04-22 1988-11-02 马铭锋 Concrete work leak-prevention treatment and repair material and technologies such as roofing
CN1109130A (en) * 1994-03-25 1995-09-27 郭玉民 Method for preventing water leakage of roof or floor
CN2876207Y (en) * 2006-03-15 2007-03-07 刘丹 Water leakage proof structure of floor surface or roof surface deformed seam
CN201474099U (en) * 2009-08-11 2010-05-19 北京城建集团有限责任公司 Three-layer waterproof structure for deformation joint
CN202124949U (en) * 2011-06-28 2012-01-25 天津天一建设集团有限公司 Equal height type waterproof expansion joint of roof parapet wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3969861A (en) * 1974-06-17 1976-07-20 Hanlon Edward J O Leakproof roof and method of constructing same
CN87102845A (en) * 1987-04-22 1988-11-02 马铭锋 Concrete work leak-prevention treatment and repair material and technologies such as roofing
CN1109130A (en) * 1994-03-25 1995-09-27 郭玉民 Method for preventing water leakage of roof or floor
CN2876207Y (en) * 2006-03-15 2007-03-07 刘丹 Water leakage proof structure of floor surface or roof surface deformed seam
CN201474099U (en) * 2009-08-11 2010-05-19 北京城建集团有限责任公司 Three-layer waterproof structure for deformation joint
CN202124949U (en) * 2011-06-28 2012-01-25 天津天一建设集团有限公司 Equal height type waterproof expansion joint of roof parapet wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102936954A (en) * 2012-11-28 2013-02-20 深圳市鹏城建筑集团有限公司 Method and structure for plugging pipeline floor hole
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method
CN106677355A (en) * 2017-02-27 2017-05-17 中国冶集团有限公司 Floor slab hole plugging device and method
CN108755983A (en) * 2018-06-01 2018-11-06 湖南吉米防水科技有限公司 A kind of waterproof technology
CN108755983B (en) * 2018-06-01 2020-09-08 湖南吉米防水科技有限公司 Waterproof process

Also Published As

Publication number Publication date
CN102758486B (en) 2013-05-29

Similar Documents

Publication Publication Date Title
CN107227813B (en) Steel structure keel masonry brick outer curtain wall system and construction method thereof
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN103104094B (en) Construction method of lattice light-gauge steel house
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN102644382B (en) Mounting technology of large-module wall
CN203625942U (en) Basement outer wall post-cast strip ahead water stopping structure
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN101949207A (en) Method for constructing subsided rest room
CN105672664A (en) Integral heat insulation wallboard building system
CN102758486B (en) Anti-seepage method for building engineering
CN208933989U (en) A kind of tower-crane foundation structure
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN103883022B (en) Construction method of building envelope inner and outer wall anti-seismic, sound insulation and anti-cracking integrated structure
CN207194239U (en) Lightgage steel joist concrete anticracking fills wall
CN108547450A (en) A kind of self-insulating brick wall construction method for exempting from formwork
CN101761287A (en) Reinforced concrete windowsill coping adverse construction method
CN102535847B (en) Method for constructing gypsum self-insulation outer wall block masonry
CN102535493B (en) Method for constructing inverted type foundation beam
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN213773865U (en) Precast concrete reversed bank
CN202990446U (en) Overhang frame structure
CN209412856U (en) A kind of assembled integral basement structure meeting stability against floating requirement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215300 No. 1158 Xiao Li Road, Kunshan, Jiangsu, Suzhou

Patentee after: Zhenhua Group (Kunshan) construction Limited by Share Ltd

Address before: 215300 No. 1158 Xiao Li Road, Kunshan, Jiangsu, Suzhou

Patentee before: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.

TR01 Transfer of patent right

Effective date of registration: 20201201

Address after: 538000 Chengxi Industrial Zone, Shangsi County, Fangchenggang City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Shangsi Hualin forest products industry Co., Ltd

Address before: 215300 No. 1158 Xiao Li Road, Kunshan, Jiangsu, Suzhou

Patentee before: Zhenhua Group (Kunshan) Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210513

Address after: 294 zhongzi street, Sishui County, Jining City, Shandong Province

Patentee after: Zhang Fei

Address before: 538000 Chengxi Industrial Zone, Shangsi County, Fangchenggang City, Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Shangsi Hualin forest products industry Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211217

Address after: 273500, 500m southwest of Liuzhuang village, Chengqian Town, Zoucheng City, Jining City, Shandong Province

Patentee after: Shandong Mencius ecological agriculture Limited by Share Ltd.

Address before: 294 zhongzi street, Sishui County, Jining City, Shandong Province

Patentee before: Zhang Fei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220506

Address after: 273500 No. 517, merchants Road, Gangshan street, Zoucheng City, Jining City, Shandong Province (North Gate of Xinqi farmers' market)

Patentee after: Shandong Xinqi Cultural Tourism Co.,Ltd.

Address before: 273500, 500m southwest of Liuzhuang village, Chengqian Town, Zoucheng City, Jining City, Shandong Province

Patentee before: Shandong Mencius ecological agriculture Limited by Share Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Anti leakage method of building engineering

Effective date of registration: 20220518

Granted publication date: 20130529

Pledgee: Zou Cheng Branch of industrial and Commercial Bank of China Ltd.

Pledgor: Shandong Xinqi Cultural Tourism Co.,Ltd.

Registration number: Y2022980005702

PE01 Entry into force of the registration of the contract for pledge of patent right