CN101949207A - Method for constructing subsided rest room - Google Patents
Method for constructing subsided rest room Download PDFInfo
- Publication number
- CN101949207A CN101949207A CN 201010278227 CN201010278227A CN101949207A CN 101949207 A CN101949207 A CN 101949207A CN 201010278227 CN201010278227 CN 201010278227 CN 201010278227 A CN201010278227 A CN 201010278227A CN 101949207 A CN101949207 A CN 101949207A
- Authority
- CN
- China
- Prior art keywords
- washroom
- job practices
- sunk type
- rest room
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Curing Cements, Concrete, And Artificial Stone (AREA)
Abstract
A method for constructing a subsided rest room comprises the following steps of: flatting the structural layer of the rest room with cement plaster, slopping the position of a water discharging tube, waterproofing, making a waterproof layer, paving a layer of cement plaster on the waterproof layer as a protection layer, paving porous clay bricks on the upper side of the protection layer and paving a concrete cushion. The technical scheme of the invention has good waterproof effect, high cost performance, capability of ensuring the construction quality of the rest room without increasing cost.
Description
Technical field
The invention belongs to building worker's method of a kind of worker China Democratic National Construction Association, especially belong to a kind of job practices of washroom.
Background technology
The washroom is that the upper and lower waterpipe of floor is concentrated the water room that passes through, and collects multiple working procedures such as waterproof, civil engineering, pipeline crossed construction repeatedly in the work progress again.Existence is arranged not in strict accordance with operational procedure in work progress, improper organization's construction sequence, operation interacts up and down, will inevitably cause mass defect, causes the washroom seepage.
Traditional sinking washroom flooring way is after finishing waterproof on the deck, fills with light fillers such as slag cements again.But according to engineering practice, in the maintenance of washroom seepage, a large amount of water of often having found loose light filler inner accumulated, because of flowing nowhere, so that the slightest waterproof defective all can cause seepage.
Summary of the invention
The job practices that the purpose of this invention is to provide a kind of sunk type washroom is used for overcoming conventional construction method and causes leakage problems easily.
In order to achieve the above object by the following technical solutions: the job practices of a kind of sunk type washroom may further comprise the steps:
A. on the washroom deck, use cement mortar screeding, look for the slope to the soil stack place then;
B. carry out waterproofing work then, do waterproofing course;
C. on waterproofing course, repave one deck cement mortar as topping;
D. on topping, spread the adobe brick, spread concrete cushion then.
Among the step a, cement in the described cement mortar: mortar is 1: 2; Looking for the gradient on slope is 2%.
Among the step b, described waterproofing layer thickness is 300mm.
Among the step c, cement in the described cement mortar: mortar is 1: 2.5.
In the steps d, the concrete mats layer thickness is 100mm.
Adopt the job practices of sunk type of the present invention washroom, improve filling out slag or haydite and light block pendulum block, contrast from technology, economic two angles and conventional method, drawn the conclusion that the technical solution of the present invention waterproof effect is good, cost performance is higher, thereby guaranteed the washroom workmanship, do not increased cost again.
The specific embodiment
The job practices of a kind of sunk type washroom may further comprise the steps:
A. use cement on the washroom deck: mortar is 1: 2 a cement mortar screeding, looks for the slope to the soil stack place then, and the gradient is 2%;
B. carry out waterproofing work then, do the thick waterproofing course of 300mm;
C. repave one deck cement on waterproofing course: mortar is that 1: 2.5 cement mortar is as topping;
D. on topping, spread the adobe brick, spread the thick concrete cushion of 100mm then.
Claims (5)
1. the job practices of a sunk type washroom is characterized in that may further comprise the steps:
A. on the washroom deck, use cement mortar screeding, look for the slope to the soil stack place then;
B. carry out waterproofing work then, do waterproofing course;
C. on waterproofing course, repave one deck cement mortar as topping;
D. on topping, spread the adobe brick, spread concrete cushion then.
2. the job practices of sunk type according to claim 1 washroom is characterized in that: among the step a, cement in the described cement mortar: mortar is 1: 2; Looking for the gradient on slope is 2%.
3. the job practices of sunk type according to claim 1 washroom is characterized in that: among the step b, described waterproofing layer thickness is 300mm.
4. the job practices of sunk type according to claim 1 washroom is characterized in that: among the step c, cement in the described cement mortar: mortar is 1: 2.5.
5. the job practices of sunk type according to claim 1 washroom is characterized in that: in the steps d, the concrete mats layer thickness is 100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010278227 CN101949207A (en) | 2010-09-10 | 2010-09-10 | Method for constructing subsided rest room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010278227 CN101949207A (en) | 2010-09-10 | 2010-09-10 | Method for constructing subsided rest room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101949207A true CN101949207A (en) | 2011-01-19 |
Family
ID=43452822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010278227 Pending CN101949207A (en) | 2010-09-10 | 2010-09-10 | Method for constructing subsided rest room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101949207A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103031887A (en) * | 2013-01-09 | 2013-04-10 | 东莞市彩丽建筑维护技术有限公司 | Construction method and water guide system of house bathroom water guide system |
CN103046763A (en) * | 2011-10-14 | 2013-04-17 | 中国二十冶集团有限公司 | Dust-proof water-proof leveling course construction method in reconstruction of old buildings |
CN103485509A (en) * | 2013-10-10 | 2014-01-01 | 北京首钢建设集团有限公司 | Waterproof structure manufacturing method of caisson-type toilet |
CN103821205A (en) * | 2014-02-28 | 2014-05-28 | 叶树生 | Bathroom secondary draining construction method |
CN107451357A (en) * | 2017-07-28 | 2017-12-08 | 成都智建新业建筑设计咨询有限公司 | A kind of balcony construction method of ground based on BIM |
CN109083288A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of interior thin type waterproof protective layer and construction technology |
CN109083287A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of toilet waterproofing structure and construction method |
CN109083286A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of building waterproof layer |
CN109537743A (en) * | 2018-11-23 | 2019-03-29 | 圣都家居装饰有限公司 | A kind of toilet floor heating leakage preventing construction technique |
CN114941394A (en) * | 2022-06-30 | 2022-08-26 | 苏州阳地钢装配式建筑技术有限公司 | Backfill construction process for assembled public washroom |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101054818A (en) * | 2007-04-04 | 2007-10-17 | 周安 | Novel water-seeping material for toilet floor and the technical scheme |
CN101392596A (en) * | 2008-10-23 | 2009-03-25 | 江苏兴厦建筑安装有限公司 | Sinking toilet construction method |
JP2009235889A (en) * | 2008-03-05 | 2009-10-15 | Ube Ind Ltd | Method of constructing waterproof floor structure |
CN201486104U (en) * | 2009-07-16 | 2010-05-26 | 深圳市名雕装饰股份有限公司 | Sedimentation tank structure of sink-type bathroom |
-
2010
- 2010-09-10 CN CN 201010278227 patent/CN101949207A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101054818A (en) * | 2007-04-04 | 2007-10-17 | 周安 | Novel water-seeping material for toilet floor and the technical scheme |
JP2009235889A (en) * | 2008-03-05 | 2009-10-15 | Ube Ind Ltd | Method of constructing waterproof floor structure |
CN101392596A (en) * | 2008-10-23 | 2009-03-25 | 江苏兴厦建筑安装有限公司 | Sinking toilet construction method |
CN201486104U (en) * | 2009-07-16 | 2010-05-26 | 深圳市名雕装饰股份有限公司 | Sedimentation tank structure of sink-type bathroom |
Non-Patent Citations (1)
Title |
---|
《山西建筑》 20091231 钟尉等 架空式下沉卫生间楼地面做法 第128页左栏第15行至右栏倒数第4行;图1-2 1-5 第35卷, 第36期 2 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046763B (en) * | 2011-10-14 | 2015-09-02 | 中国二十冶集团有限公司 | Dustproof and waterproof construction of leveling blanket method in old building remodeling |
CN103046763A (en) * | 2011-10-14 | 2013-04-17 | 中国二十冶集团有限公司 | Dust-proof water-proof leveling course construction method in reconstruction of old buildings |
CN103031887A (en) * | 2013-01-09 | 2013-04-10 | 东莞市彩丽建筑维护技术有限公司 | Construction method and water guide system of house bathroom water guide system |
CN103031887B (en) * | 2013-01-09 | 2014-09-03 | 东莞市彩丽建筑维护技术有限公司 | Construction method and water guide system of house bathroom water guide system |
CN103485509A (en) * | 2013-10-10 | 2014-01-01 | 北京首钢建设集团有限公司 | Waterproof structure manufacturing method of caisson-type toilet |
CN103821205B (en) * | 2014-02-28 | 2015-12-09 | 叶树生 | A kind of washroom secondary drainage construction method |
CN103821205A (en) * | 2014-02-28 | 2014-05-28 | 叶树生 | Bathroom secondary draining construction method |
CN107451357A (en) * | 2017-07-28 | 2017-12-08 | 成都智建新业建筑设计咨询有限公司 | A kind of balcony construction method of ground based on BIM |
CN109083288A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of interior thin type waterproof protective layer and construction technology |
CN109083287A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of toilet waterproofing structure and construction method |
CN109083286A (en) * | 2018-07-26 | 2018-12-25 | 中船第九设计研究院工程有限公司 | A kind of building waterproof layer |
CN109537743A (en) * | 2018-11-23 | 2019-03-29 | 圣都家居装饰有限公司 | A kind of toilet floor heating leakage preventing construction technique |
CN114941394A (en) * | 2022-06-30 | 2022-08-26 | 苏州阳地钢装配式建筑技术有限公司 | Backfill construction process for assembled public washroom |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101949207A (en) | Method for constructing subsided rest room | |
WO2014139252A1 (en) | Method for constructing large raft foundation in high-temperature environment | |
CN102720217A (en) | Basement watertightness structure and construction method thereof | |
CN104234430A (en) | Construction method for forming concrete terraces at one step | |
CN203977636U (en) | A kind of lightgage steel joist noise barrier | |
CN103242009B (en) | A kind of abutment infiltration material non-fine concrete block and manufacture craft thereof | |
CN103821263A (en) | Precast assembly self-heat preservation concrete shear wall system and construction method thereof | |
CN204001278U (en) | A kind of prefabricated assembled self-insulating concrete shear wall system | |
CN103833289A (en) | Quick-setting anti-crack polymeric mortar | |
CN102758486B (en) | Anti-seepage method for building engineering | |
CN202689240U (en) | Stone wall body | |
CN205063052U (en) | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN207919605U (en) | A kind of sliding and shock isolation device of high ductility Combined concrete masonry structure | |
CN207685984U (en) | A kind of overlength underground garage external wall structure | |
CN102535847B (en) | Method for constructing gypsum self-insulation outer wall block masonry | |
CN102535493B (en) | Method for constructing inverted type foundation beam | |
CN110670638A (en) | Seamless construction method for expansion reinforcing belt of prefabricated house basement structure | |
CN202730972U (en) | Waterproof node of wall body of bathroom | |
CN209585309U (en) | Subsided rest room waterproof construction | |
JP2013002165A (en) | Construction method for concrete dam | |
CN112302045A (en) | Construction method of foundation beam side vertical face waterproof structure | |
CN107473656A (en) | A kind of foaming concrete lightweight material and the traditional rowlock wall body construction method of filling | |
CN103526890A (en) | Silica nanometer insulation quilt roof insulation structure and construction technology of silica nanometer insulation quilt roof insulation structure | |
CN107542211A (en) | A kind of cast-in-place light wallboard and superstructure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110119 |