CN109537743A - A kind of toilet floor heating leakage preventing construction technique - Google Patents

A kind of toilet floor heating leakage preventing construction technique Download PDF

Info

Publication number
CN109537743A
CN109537743A CN201811405948.XA CN201811405948A CN109537743A CN 109537743 A CN109537743 A CN 109537743A CN 201811405948 A CN201811405948 A CN 201811405948A CN 109537743 A CN109537743 A CN 109537743A
Authority
CN
China
Prior art keywords
floor heating
toilet
laid
ground
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811405948.XA
Other languages
Chinese (zh)
Inventor
颜伟阳
祝伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Holy Home Furnishing Decoration Co
Original Assignee
Holy Home Furnishing Decoration Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Holy Home Furnishing Decoration Co filed Critical Holy Home Furnishing Decoration Co
Priority to CN201811405948.XA priority Critical patent/CN109537743A/en
Publication of CN109537743A publication Critical patent/CN109537743A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of toilet floor heating leakage preventing construction techniques, it is related to floor heating technical field of construction, including construction procedure in detail below: first cleaning out accomodation ground, and accomodation ground is dried in the way of hot wind flash baking or natural air drying, then after accomodation ground is dry, brushing weber waterproofing agent row Cheng Yici waterproof layer, and accomodation ground look for using microlith mixed mud after weber waterproofing agent parches and is parallel-laid into microlith mixed mud screed-coat.The present invention below threshold stone by being arranged water expandable waterstop at floor heating pipe, it effectively eliminates to expand with heat and contract with cold and generates crack phenomenon, beneficial hydropexis is discharged in wet area, by being arranged floor heating water divider in Gan Qu, the independent auxiliary pipe in toilet, substantially increases toilet threshold stone backwater effect in this way.

Description

A kind of toilet floor heating leakage preventing construction technique
Technical field
The present invention relates to floor heating technical field of construction, in particular to a kind of toilet floor heating leakage preventing construction technique.
Background technique
With continuously improving for architecture heating system, residential project heating system is most of all to use floor heating, and floor heating is answered Certain hidden danger is brought with the waterproof construction accordingly to toilet.Generally, existing toilet floor heating waterproof construction method master If one of waterproof layer is only arranged on the concrete leveling layer on the structure basis ground of heating toilet, due to being somebody's turn to do for toilet Road waterproof layer is kept away after the completion of water test, is often occurred damaged situation in fitment process, water can be caused to leak.
Floor heating engineering is that winter in temperate is brought for client, but is difficulty of construction to decoration corporation's bring.Because of floor heating pipe Highest point can reach 70 DEG C.Cause the physical reactions of floor heating pipe and contact surface to expand with heat and contract with cold.So prevent be thoroughly outside moisture Major issue in construction.Therefore, it is necessary to solve the above problems to invent a kind of toilet floor heating leakage preventing construction technique.
Summary of the invention
The purpose of the present invention is to provide a kind of toilet floor heating leakage preventing construction techniques, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the invention provides the following technical scheme: a kind of toilet floor heating leakage preventing construction technique, packet Include construction procedure in detail below:
Step 1: ground heater laying prepares:
A: first cleaning out accomodation ground, and to defending in the way of hot wind flash baking or natural air drying Ground is dried between life;
B: after accomodation ground is dry, brushing weber waterproofing agent row Cheng Yici waterproof layer, and it is dry to weber waterproofing agent Accomodation ground look for using microlith mixed mud after thoroughly and is parallel-laid into microlith mixed mud screed-coat;
Step 2: floor heating construction:
A: being laid with one layer of polystyrene foam plate in accomodation ground first, tiles being located at the top of polystyrene foam plate Then floor heating pipe is individually laid with by one layer of aluminized mylar in toilet, before floor heating pipe laying, need in floor heating One layer of water expandable waterstop is wrapped up on pipe, and floor heating water divider is in addition placed on dry area;
B, ground look for using microlith mixed mud after the completion of toilet floor heating pipe is laid with and be parallel-laid into microlith mixed mud Then screed-coat carries out levelling ground using concrete again;
A, after levelling to ground brushing weber waterproofing agent row at secondary waterproof layer;
Step 3: threshold stone and ground tile paving:
A, it after secondary waterproof layer parches, is first laid in the position of sticker door sill stone to be needed by cement: the ratio of middle sand=1:2 A certain amount of water mixing row is configured into level-one cement sand bed, is then laid in threshold stone above;
B, after threshold stone is laid, toilet other positions cement: the proportional arrangement of middle sand=1:2.5 is a certain amount of Water row at second level cement sand bed carry out shop fixtures compacting, and height is lower than between floor tile finished surface 9mm-11mm, then uses Cement: a certain amount of water row of the proportional arrangement of middle sand=1:4 is at dry cement sand bed paving floor tile;
Step 4: quality examination:
After the completion of ground tile paving 1-2 days after dry cement sand bed and floor tile bottom solidify, hammered into shape using hollowing light Floor tile is struck, if the sound of " rub-a-dub rub-a-dub " occurs in floor tile, then illustrates this block floor tile hollowing, is then purged, and according to step Step B in three re-starts tile work.
Preferably, for the step B in step 1 when carrying out brushing a waterproof layer, waterproofing agent need to turn over brushing metope 30mm-35mm, and the step C in the step B and step 2 in step 1 is forbidden when carrying out waterproofing agent brushing in waterproofing agent In be watered.
Preferably, the step A in the step B and step 2 in step 1 is thin to polystyrene foam plate and aluminum polyester When film is laid with, forbid to be laid below threshold stone, and the water expandable waterstop of the step A package in step 2 needs to spread It is located at below threshold stone.
Preferably, the step A in step 2 needs before floor heating pipe wraps up water expandable waterstop to ground and floor heating Pipe is cleared up, and guarantees ground and floor heating pipe surface without bearing water and dirt.
Preferably, the step A in step 2, need to be mixed with model C20 immediately after water expandable waterstop is constructed Solidifying soil or the concrete progress stirred by hand are levelling, and the concrete stirred by hand is cement: middle sand according to mass fraction ratio: Rubble=1:2:4 ratio is mixed evenly.
Preferably, the step A in step 3 is when being laid with threshold stone, in the level-one cement sand bed configured also Need to add 8% 2000 waterproofing agent of Seeking Truth.
Preferably, the step B in step 3 water slope is returned when being laid with to floor tile, composed by floor tile need to be to floor drain side The gradient of Xiang Hangcheng 1%, and gap≤0.5mm between adjacent floor tile, and flatness≤3mm and straightness≤0.5mm.
In addition the present invention also provides a kind of leakage detection method, the specific detection method is as follows:
First the drainage hole in toilet is blocked tightly, then water is piled in toilet, observation 24 hours or more, is looked into downstairs It sees and entire toilet outside is checked, confirm impermeable in progress next step construction.
Technical effect and advantage of the invention:
1, the present invention is effectively eliminated and is expanded with heat and contract with cold by the way that water expandable waterstop is arranged at floor heating pipe below threshold stone Crack phenomenon is generated, beneficial hydropexis is discharged in wet area;
2, the present invention is laid with polystyrene foam plate and aluminized mylar by will forbid under threshold stone, makes screed-coat Fine-stone concrete and original ground are effectively bonded, to substantially increase fastness;
3, the present invention is by by groundIn Gan Qu, the independent auxiliary pipe in toilet substantially increases health in this way for water segregator setting Between threshold stone backwater effect.
Detailed description of the invention
Fig. 1 is toilet threshold stone position floor heating construction drawing of the present invention.
In figure: 1, a waterproof layer;2, microlith mixed mud screed-coat;3, polystyrene foam plate;4, aluminized mylar; 5, floor heating pipe;6, water expandable waterstop;7, secondary waterproof layer;8, threshold stone;9, level-one cement sand bed;10, two class g cement Screed;11, dry cement sand bed;12, floor tile.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
The present invention provides a kind of toilet floor heating leakage preventing construction techniques as shown in Figure 1, including construct in detail below Step:
Step 1: ground heater laying prepares:
A: first cleaning out accomodation ground, and to defending in the way of hot wind flash baking or natural air drying Ground is dried between life;
B: after accomodation ground is dry, brushing weber waterproofing agent row Cheng Yici waterproof layer 1, and waterproofing agent need to turn over painting Whitewash a wall face 30mm-35mm, then look for being parallel-laid into accomodation ground using microlith mixed mud after weber waterproofing agent parches Microlith mixed mud screed-coat;
Step 2: floor heating construction:
A: being laid with one layer of polystyrene foam plate 3 in accomodation ground first, is being located at 3 top horizontal of polystyrene foam plate One layer of aluminized mylar 4 is spread, is then individually laid with floor heating pipe 5 in toilet, before the laying of floor heating pipe 5, is needed One layer of water expandable waterstop 6 is wrapped up on floor heating pipe 5, and floor heating pipe 5 wraps up water expandable waterstop 6 and needs over the ground before Face and floor heating pipe 5 are cleared up, and guarantee that floor heating water divider without bearing water and dirt, is in addition placed on by ground and 5 surface of floor heating pipe Dry area;
B, ground look for using microlith mixed mud after the completion of toilet floor heating pipe 5 is laid with and be parallel-laid into microlith mixed mud Then screed-coat 2 carries out levelling ground using concrete again;
C, after levelling to ground brushing weber waterproofing agent row at secondary waterproof layer 7;
Step 3: threshold stone and ground tile paving:
A, it after secondary waterproof layer 7 parches, is first laid in the position of sticker door sill stone 8 to be needed by cement: the ratio of middle sand=1:2 Example configures a certain amount of water mixing row and also needs to add at level-one cement sand bed 9, and in the level-one cement sand bed 9 configured Threshold stone 8, is then laid in above by 2000 waterproofing agent of Seeking Truth for adding 8%;
B, after threshold stone 8 is laid, toilet other positions cement: the proportional arrangement of middle sand=1:2.5 is certain The water row of amount at second level cement sand bed 10 carry out shop fixtures compacting, and height is lower than between floor tile finished surface 9mm-11mm, Again use cement: a certain amount of water row of the proportional arrangement of middle sand=1:4 at 11 paving floor tile 12 of dry cement sand bed, and When being laid with to floor tile 12, water slope is returned composed by floor tile 12 to be conducive to mention and defend to floor drain direction row at 1% gradient Hydrophobic effect between life avoids and is laid with smooth floor tile 12 and be easy to cause phenomenon of catchmenting when in use, and adjacent floor tile 12 it Between gap≤0.5mm, and flatness≤3mm and straightness≤0.5mm, floor tile 12 can be greatly improved in this way when being laid with Aesthetics;
Step 4: quality examination:
When floor tile 12 laying after the completion of 1-2 days after dry cement sand bed 11 and 12 bottom of floor tile solidification after, utilize sky Drum hammer tapping floor tile 12 then illustrates this 12 hollowing of block floor tile, is then purged if the sound of " rub-a-dub rub-a-dub " occurs in floor tile 12, And tile work is re-started according to the step B in step 3.
Embodiment 2
Unlike the first embodiment:
Carry out it is secondary brush weber waterproofing agent row at a waterproof layer 1 and secondary waterproof layer 7 when, forbid anti-in weber The solvent with other influences weber waterproofing agent performance is watered in aqua, so that the waterproof performance of weber waterproofing agent reduces, to make It obtains toilet and there is infiltration phenomenon when in use.
When being laid with polystyrene foam plate 3 and aluminized mylar 4, forbid to be laid on 8 lower section of threshold stone, this Sample can make the microlith mixed mud screed-coat 2 of 8 bottom of threshold stone and level-one cement sand bed 9 that can reduce health after solidification Between seepage rate, and water expandable waterstop 6 need to be laid on the lower section of threshold stone 8, by the way that the setting of water expandable waterstop 6 exists 8 bottom end of threshold stone, when so that the floor heating pipe 5 being located at toilet having water leakage, water expandable waterstop 6 is connected to meeting after water It immediately expands and is split out toilet and Gan Qu, avoid seeped water and enter in dry area.
After water expandable waterstop 6 is constructed, the concrete that need to be stirred immediately with model C20 concrete or by hand Carry out it is levelling, and the concrete stirred by hand according to mass fraction ratio be cement: middle sand: rubble=1:2:4 ratio carry out It is mixed evenly, reaches the fixed effect to water expandable waterstop 6 in this way, avoid and be laid with microlith mixed mud screed-coat The shaking of floor heating pipe 5 is caused when 2, so that water expandable waterstop 6 shifts and separate 8 bottom end of threshold stone, thus greatly Reduce waterproof performance greatly.
Embodiment 3
Unlike embodiment 1 and embodiment 2:
The present invention also provides a kind of leakage detection methods, and the specific detection method is as follows:
The drainage hole in toilet is blocked tightly, then the water depth piling water in toilet, and being put first The 2cm-3cm on accomodation ground, it is very few and absorbed by concrete to avoid put water, to influence detection effect;
Then observe 24 hours or more, it is checked downstairs on the outside of entire toilet;
Illustrate that waterproof is not carried out with if there is moist phenomenon on the outside of toilet if downstairs, re-start waterproof arrangement, If then illustrating that waterproof has been carried out with non-the occurrence of wetness phenomenon on the outside of toilet downstairs, then by the process of hot-air seasoning to defending Between life ground carry out rapid draing (it is existing most of when carrying out toilet drying, be all to be dried by natural wind, in this way It causes the required time to greatly improve, and due to the influence of rainy day toilet metope is got damp again, and then influence to defend Drying effect between life) to carry out next step construction, the water leakage situation of the waterproof layer 1 done can be examined in this way It looks into, avoids finding that infiltration situation greatly improves maintenance cost after the completion of ground heater laying.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (8)

1. a kind of toilet floor heating leakage preventing construction technique, which is characterized in that including construction procedure in detail below:
Step 1: ground heater laying prepares:
A: first cleaning out accomodation ground, and to toilet in the way of hot wind flash baking or natural air drying Ground is dried;
B: after accomodation ground is dry, brushing weber waterproofing agent row Cheng Yici waterproof layer (1), and parched to weber waterproofing agent Afterwards accomodation ground look for using microlith mixed mud and is parallel-laid into microlith mixed mud screed-coat (2);
Step 2: floor heating construction:
A: being laid with one layer of polystyrene foam plate (3) in accomodation ground first, is being located at polystyrene foam plate (3) top horizontal One layer of aluminized mylar (4) is spread, is then individually laid with floor heating pipe (5) in toilet, is laid with it in floor heating pipe (5) Before, it needs to wrap up one layer of water expandable waterstop (6) on floor heating pipe (5), floor heating water divider is in addition placed on dry area;
B, ground look for using microlith mixed mud after the completion of toilet floor heating pipe (5) are laid with and be parallel-laid into microlith mixed mud and look for Leveling (2), then carries out levelling ground using concrete again;
C, after levelling to ground brushing weber waterproofing agent row at secondary waterproof layer (7);
Step 3: threshold stone and ground tile paving:
A, it after secondary waterproof layer (7) parches, is first laid in the position of sticker door sill stone (8) to be needed by cement: the ratio of middle sand=1:2 Example configures a certain amount of water mixing row at level-one cement sand bed (9), is then laid in threshold stone (8) above;
B, after threshold stone (8) is laid, toilet other positions cement: the proportional arrangement of middle sand=1:2.5 is a certain amount of Water row at second level cement sand bed (10) carry out shop fixtures compacting, and height is lower than between floor tile finished surface 9mm-11mm, Use cement again: a certain amount of water row of the proportional arrangement of middle sand=1:4 is at dry cement sand bed (11) paving floor tile (12);
Step 4: quality examination:
After the completion of floor tile (12) are laid with 1-2 days after dry cement sand bed (11) and floor tile (12) bottom solidify, utilization Hollowing hammer tapping floor tile (12) then illustrates this block floor tile (12) hollowing if the sound of " rub-a-dub rub-a-dub " occurs in floor tile (12), then into Row is removed, and re-starts tile work according to the step B in step 3.
2. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the B in step 1 For step when carrying out brushing waterproof layer (1), waterproofing agent need to turn over brushing metope 30mm-35mm, and the B step in step 1 Step C in rapid and step 2 is forbidden to be watered in waterproofing agent when carrying out waterproofing agent brushing.
3. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: B is walked in step 1 Suddenly it needs to carry out leak water detdction to it, the specific detection method is as follows at rear in waterproof layer (1) row:
First the drainage hole in toilet is blocked it is tight, then piling water in toilet, observation 24 hours or more, check downstairs and It checks, confirms impermeable in progress next step construction on the outside of entire toilet.
4. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the B in step 1 Step A in step and step 2 is forbidden to spread when being laid with polystyrene foam plate (3) and aluminized mylar (4) It is located at below threshold stone (8), and the water expandable waterstop (6) of the step A package in step 2 need to be laid on threshold stone (8) Lower section.
5. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the A in step 2 Step needs to clear up ground and floor heating pipe (5) before floor heating pipe (5) package water expandable waterstop (6), guarantees ground Face and floor heating pipe (5) surface are without bearing water and dirt.
6. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the A in step 2 Step after water expandable waterstop (6) construct, the concrete that need to be stirred immediately with model C20 concrete or by hand into Row is levelling, and the concrete stirred by hand is cement according to mass fraction ratio: middle sand: rubble=1:2:4 ratio is mixed Conjunction stirs evenly.
7. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the A in step 3 Step also needs to add 8% Seeking Truth when being laid with to threshold stone (8) in the level-one cement sand bed (9) that is configured 2000 waterproofing agents.
8. a kind of toilet floor heating leakage preventing construction technique according to claim 1, it is characterised in that: the B in step 3 Step returned when being laid with to floor tile (12), composed by floor tile (12) water slope need to floor drain direction row at 1% the gradient, and And gap≤0.5mm between adjacent floor tile (12), and flatness≤3mm and straightness≤0.5mm.
CN201811405948.XA 2018-11-23 2018-11-23 A kind of toilet floor heating leakage preventing construction technique Pending CN109537743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811405948.XA CN109537743A (en) 2018-11-23 2018-11-23 A kind of toilet floor heating leakage preventing construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811405948.XA CN109537743A (en) 2018-11-23 2018-11-23 A kind of toilet floor heating leakage preventing construction technique

Publications (1)

Publication Number Publication Date
CN109537743A true CN109537743A (en) 2019-03-29

Family

ID=65849691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811405948.XA Pending CN109537743A (en) 2018-11-23 2018-11-23 A kind of toilet floor heating leakage preventing construction technique

Country Status (1)

Country Link
CN (1) CN109537743A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177177A (en) * 2020-09-24 2021-01-05 德泰建设有限公司 Waterproof process for decoration of non-destructible toilet
CN113605635A (en) * 2021-08-16 2021-11-05 圣都家居装饰有限公司 Anti-leakage device for floor heating in toilet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949207A (en) * 2010-09-10 2011-01-19 中建七局第四建筑有限公司 Method for constructing subsided rest room
JP2017133181A (en) * 2016-01-25 2017-08-03 株式会社Lixil Floor structure of bathroom
CN107447948A (en) * 2017-08-23 2017-12-08 浙江宏恩装饰工程有限公司 A kind of construction technology of subsided rest room
CN108532951A (en) * 2018-04-20 2018-09-14 宁波大泽天成云空间设计有限公司 A kind of waterproof technology installed in floor heating shower house

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949207A (en) * 2010-09-10 2011-01-19 中建七局第四建筑有限公司 Method for constructing subsided rest room
JP2017133181A (en) * 2016-01-25 2017-08-03 株式会社Lixil Floor structure of bathroom
CN107447948A (en) * 2017-08-23 2017-12-08 浙江宏恩装饰工程有限公司 A kind of construction technology of subsided rest room
CN108532951A (en) * 2018-04-20 2018-09-14 宁波大泽天成云空间设计有限公司 A kind of waterproof technology installed in floor heating shower house

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张芳莲: "低温热水地热采暖卫生间渗漏原因及防治", 《山西建筑》 *
王永平: "精装修带地暖卫生间防水工艺探讨", 《科技创新导报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177177A (en) * 2020-09-24 2021-01-05 德泰建设有限公司 Waterproof process for decoration of non-destructible toilet
CN113605635A (en) * 2021-08-16 2021-11-05 圣都家居装饰有限公司 Anti-leakage device for floor heating in toilet

Similar Documents

Publication Publication Date Title
CN106988184B (en) porous pavement
Morel et al. Weathering and durability of earthen material and structures
CN103741715B (en) The hydrophobic construction method of a kind of basement waterproofing
CN109537743A (en) A kind of toilet floor heating leakage preventing construction technique
US6769216B2 (en) Process of waterproofing construction surface and slit of construction surface
CN106555371B (en) Garden large area pervious concrete road construction technique
CN104831820A (en) Waterproofing system of kitchen structure
CN112392157A (en) Toilet waterproof structure, construction process and protection process thereof
CN108385614A (en) A kind of concrete facing board construction method of anti-floating towing force
CN107761760A (en) Based on the technique for improving cable duct efficiency of construction
CN108677998A (en) A kind of corner type reinforced earth retaining wall structure and production method
CN108316608A (en) A kind of ground ruggedized construction and its construction method
CN204609007U (en) The waterproofing system of a kind of kitchen structure
CN208502160U (en) A kind of ground ruggedized construction
CN206655078U (en) A kind of porous pavement
CN111519865A (en) Waterproof construction method for toilet base layer
CN109930703A (en) A kind of construction technology of toilet warterproof beam
CN111058467A (en) Basement backwater surface waterproof drainage structure and construction method
CN107762097A (en) A kind of toilet caisset and construction method
TWI624578B (en) Acrylic wear-resistant waterproof layer structure and construction method
KR101032821B1 (en) The construction method for root barrier and waterproof
CN212026329U (en) Stretch over river and gush subway station roof waterproof construction and subway station
CN211499629U (en) Non-telescopic and non-cracking caisson waterproof structure
CN219862986U (en) Building basement waterproof construction
CN210315683U (en) Basement bottom plate stagnant water structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190329

WD01 Invention patent application deemed withdrawn after publication