CN107447948A - A kind of construction technology of subsided rest room - Google Patents
A kind of construction technology of subsided rest room Download PDFInfo
- Publication number
- CN107447948A CN107447948A CN201710731414.5A CN201710731414A CN107447948A CN 107447948 A CN107447948 A CN 107447948A CN 201710731414 A CN201710731414 A CN 201710731414A CN 107447948 A CN107447948 A CN 107447948A
- Authority
- CN
- China
- Prior art keywords
- layer
- waterproof
- cement
- coating
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02177—Floor elements for use at a specific location
- E04F15/02188—Floor elements for use at a specific location for use in wet rooms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/181—Insulating layers integrally formed with the flooring or the flooring elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/182—Underlayers coated with adhesive or mortar to receive the flooring
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of construction technology of subsided rest room, comprise the following steps:S1, hidden floor drain is installed in lower deep gouge, in sinking groove bottom cement mortar screeding, then looks for domatic into the levelling face of waterproof mortar to secretly leak;S2, in the levelling face of waterproof mortar, upper and lower deep gouge side wall coating water-repellent paint forms the first waterproof coating;S3, lay one layer of cement brick formation block assembly at equal intervals on the first waterproof coating;S4, cement plate is laid on tile floor cage, cement plate and tile floor cage are connected by cement mortar;S5, cement plate fine-stone concrete it is cast-in-place formed the first microlith concrete layer;S6, marble bonding agent formation adhesive layer is coated with the first microlith concrete layer, then wet-laying marble slab forms surface layer on adhesive layer, and surface layer upper surface and ground are generally aligned in the same plane.Remaining in the water on surface layer can flow on the first waterproof coating, be flowed downwardly into leading for the levelling face of waterproof mortar in hidden floor drain, the water in the lower deep gouge of discharge in time, reduce the probability of the surface layer accumulation of salt in the surface soil.
Description
Technical field
The present invention relates to interior architecture, and in particular to a kind of construction technology of subsided rest room.
Background technology
In the presence of many capillaries being invisible to the naked eye inside lithotome, capillary has a very strong siphonage, therefore day
Right stone material impermeabilisation ability is poor, and water can pass to other one side by the capillary in stone material by immersion face, and by another side
Volatilize away on surface.The material such as many alkali soluble in water, salt just supports with water through capillary channel so in binding material
Up to another surface, these materials just rest on stone surface after moisture evaporation, form the accumulation of salt in the surface soil.
And the ground long period of soaking in toilet easily forms the accumulation of salt in the surface soil of stone material in water.The stone material accumulation of salt in the surface soil is that wet combining stone material is normal
A kind of lesion form seen, often show as stone surface and uniformly or non-uniformly white crystals particle, stone surface gloss occur
Dimness etc., influences appearance.Laying stone material can be caused to be uneven simultaneously, stress is deteriorated, so as to cause stone material rupture etc. existing
As.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the invention to provide a kind of construction work of subsided rest room
Skill, reduce the probability that surface layer produces the accumulation of salt in the surface soil.
To achieve the above object, the invention provides following technical scheme:
A kind of construction technology of subsided rest room, comprises the following steps:
S1, accomodation ground are that sunk type forms lower deep gouge, and table floor drain, table floor drain upper end and ground are provided with ground positioned at same
One plane;Hidden floor drain is installed in lower deep gouge, in sinking groove bottom cement mortar screeding, then looks for domatic to secretly leak
Into the levelling face of waterproof mortar;
S2, in the levelling face of waterproof mortar, upper and lower deep gouge side wall coating water-repellent paint forms the first waterproof coating, and the first waterproof applies
Layer upper surface and hidden floor drain upper surface are generally aligned in the same plane;
S3, lay one layer of cement brick formation block assembly at equal intervals on the first waterproof coating, block assembly is vertically interlocked
If laying dried layer forms tile floor cage, it is connected between each cement brick by cement mortar;
S4, cement plate is laid on tile floor cage, cement plate and tile floor cage are connected by cement mortar;
S5, cement plate fine-stone concrete it is cast-in-place formed the first microlith concrete layer;
S6, marble bonding agent formation adhesive layer is coated with the first microlith concrete layer, then the wet-laying marble slab on adhesive layer
Surface layer is formed, surface layer upper surface and ground are generally aligned in the same plane.
By using above-mentioned technical proposal, the water on surface layer first passes through table floor drain and drains part.The water remained on surface layer
First microlith concrete layer, cement plate can be passed through successively by the gap of surface layer, then saved in tile floor cage.Raised on tile floor cage
Water can flow on the first waterproof coating, flowed downwardly into leading for the levelling face of waterproof mortar in hidden floor drain, so in time discharge under
Moisture in deep gouge.Reducing surface layer and ducking in drink for a long time causes the probability of its accumulation of salt in the surface soil.
It is used as backfill thing by the way that tile floor cage, cement plate, the first microlith concrete layer are combined, relatively conventional haydite returns
Fill out, tile floor cage can store up more moisture, reduce the ponding above surface layer, and then reduce the probability of the surface layer stone material accumulation of salt in the surface soil.
The combination of tile floor cage, cement plate, the first microlith concrete layer has preferable structural strength simultaneously, makes the face of the toilet
Layer can bear bigger pressure.First waterproof coating can prevent water inflow surface from causing water to leak into next floor, improve down
The comfortable for living of one floor.
The further setting of the present invention is:Between step S2 and S3, one layer of cement is first coated with the first waterproof coating
Mortar forms waterproof mortar protective layer, and waterproof mortar protective layer is parallel to the levelling face of waterproof mortar, waterproof mortar protective layer upper end
Face and hidden floor drain upper surface are generally aligned in the same plane, and tile floor cage is layed on waterproof mortar protective layer.
By using above-mentioned technical proposal, prevent worker from trampling the first waterproof coating back and forth when other processes are done,
The first waterproof coating is caused to produce Durchgangshohle by excessive friction, it is ensured that the water proofing property of the first waterproof coating.
The further setting of the present invention is:In step S5, netted means for supporting reinforcement steel bar is first laid, then pours again and smashes microlith
Concrete, form the first microlith concrete layer.
By using above-mentioned technical proposal, means for supporting reinforcement steel bar plays the role of a bracing reinforcement to the first microlith concrete layer, carries
Its high structural strength, so that the surface layer of the toilet can bear bigger pressure.
The further setting of the present invention is:Between step S5 and S6, first ground heating heat insulation is set on the first microlith concrete layer upper berth
Plate, then the cloth floor heating pipe on heat supply insulation board, finally forms the second microlith concrete layer, bonding on floor heating pipe with fine-stone concrete is cast-in-place
Layer is coated in the second microlith concrete layer.
By using above-mentioned technical proposal, temperature when floor heating pipe can improve winter in room, residence comfort is improved.Simultaneously
Floor heating, which condenses steam, can flow directly into tile floor cage, be not required to by surface layer, reduce the time that surface layer ducks in drink, so as to reduce
The probability of the surface layer accumulation of salt in the surface soil.
The further setting of the present invention is:The first microlith concrete layer is poured to smash by C20 fine-stone concrete to be formed, and described second is thin
Stone concrete layer is poured to smash and formed by C30 fine-stone concrete.
By using above-mentioned technical proposal, make the first microlith concrete layer and the second microlith concrete layer that there is enough compression strength,
To ensure that surface layer can be stably mounted in the second microlith concrete layer.Reduce the possibility of surface layer collapse and crack.
The further setting of the present invention is:Before step S1, cement slurry is first coated with the metope of toilet, is formed
First waterproof cement pulp layer;Again cement is coated with the sinking groove sidewall that sinking groove bottom is connected close to metope one end and with the end
Mud, forms the second waterproof cement pulp layer, and the first waterproof cement pulp layer is connected with the second waterproof cement pulp layer;Then it is anti-first
Brushing cement mortar in water cement pulp layer, form rendering layer.
By using above-mentioned technical proposal, penetrated into so as to reduce water from metope subsequently into ground, or penetrated into from ground
Metope causes the probability that the phenomenon of seepage occurs.Toilet is set integrally to be respectively provided with preferable leakproof.
The further setting of the present invention is:The first waterproof cement pulp layer and the first waterproof cement pulp layer corner are both needed to
Do R angles.
By using above-mentioned technical proposal, the first waterproof cement pulp layer and the first waterproof cement pulp layer are reduced around the corner
There is gap, cause water to leak into the possibility of ground and metope.
The further setting of the present invention is:Before rendering layer is coated with, first waterproof is coated with the first waterproof cement pulp layer
Coating forms the second waterproof coating, and the second waterproof coating and the first waterproof coating are connected, and rendering layer is coated with the second waterproof coating again
On.
By using above-mentioned technical proposal,
The further setting of the present invention is:Water-repellent paint is coated on rendering layer, forms the 3rd waterproof coating.
By using above-mentioned technical proposal, penetrated into so as to reduce water from metope subsequently into ground, cause water leakage of floor
Phenomenon occur.Toilet is set integrally to be respectively provided with preferable leakproof.
The further setting of the present invention is:First waterproof coating, the second waterproof coating and the 3rd waterproof coating by
Water-repellent paint is coated with twice and formed.
By using above-mentioned technical proposal, it is ensured that the first waterproof coating, the second waterproof coating and the 3rd waterproof coating
Water proofing property, reduce the possibility of seepage.
The present invention has advantages below:
1st, there is preferable crushing resistance and structural strength, toilet surface layer is born bigger pressure;
2nd, there is preferable water storage and drainage, reduce panel and steep the probability for causing its accumulation of salt in the surface soil in water for a long time.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment.
Reference:1st, ground;2nd, metope;3rd, table floor drain;4th, lower deep gouge;5th, hidden floor drain;6th, the second waterproof cement pulp layer;
7th, the levelling face of waterproof mortar;8th, the first waterproof coating;9th, waterproof mortar protective layer;10th, tile floor cage;11st, cement plate;12nd, reinforcing bar
Support frame;13rd, the first microlith concrete layer;14th, heat supply insulation board;15th, floor heating pipe;16th, the second microlith concrete layer;17th, adhesive layer;18、
Surface layer;19th, cement brick;20th, block assembly;21st, the first waterproof cement pulp layer;22nd, the second waterproof coating;23rd, rendering layer;24th,
Three waterproof coatings.
Embodiment
The present invention will be further described referring to the drawings.
Embodiment one:
As shown in figure 1, a kind of subsided rest room, including ground 1 and metope 2.Table floor drain 3 is provided with ground 1, on table floor drain 3
End face and ground 1 are generally aligned in the same plane.Ground 1 is set in depression forms lower deep gouge 4.Hidden floor drain 5, hidden floor drain 5 are provided with ground 1
In lower deep gouge 4.
As shown in figure 1, the lower bottom surface of deep gouge 4 is sequentially provided with the second waterproof cement pulp layer 6, the levelling face of waterproof mortar from bottom to up
7th, the first waterproof coating 8, waterproof mortar protective layer 9, tile floor cage 10, cement plate 11, means for supporting reinforcement steel bar 12, the first microlith concrete layer
13rd, heat supply insulation board 14, the microlith concrete layer 16 of floor heating pipe 15 and second, adhesive layer 17 and surface layer 18.The upper surface of surface layer 18 and ground 1
It is generally aligned in the same plane.
It is connected as shown in figure 1, the second waterproof cement pulp layer 6 is coated on the lower bottom surface of deep gouge 4 close to the one end of metope 2 and with the end
The side wall of lower deep gouge 4 on, by anti-cement mortar coating form.The levelling face 7 of waterproof mortar is inclined to set towards hidden floor drain 5, sees it
The moisture of top is imported in hidden floor drain 5, reduces the probability of the accumulation of salt in the surface soil of surface layer 18.It is all that first waterproof coating 8 is covered in lower deep gouge 4
Madial wall and ground 1, prevent the water of top from leaking into ground 1, cause the seepage on ground 1.The upper surface of waterproof mortar protective layer 9 and
The upper surface of hidden floor drain 5 is generally aligned in the same plane.
As shown in figure 1, tile floor cage 10 includes some cement bricks 19, cement brick 19 sets form brick in the horizontal direction at equal intervals
Unit 20, block assembly 20 are vertically provided with several, and adjacent two block assemblies 20 are in be staggered.Make tile floor cage 10 can
Part water is stored, and water can be oriented to the first waterproof coating 8 simultaneously, it is discharged into hidden floor drain 5, reduces surface layer 18 and steep always in water
In and the probability of the accumulation of salt in the surface soil.
As shown in figure 1, means for supporting reinforcement steel bar 12 is layed on cement plate 11 in netted, the first microlith concrete layer 13 is by the thin of C20
Stone concrete is poured to smash and formed in means for supporting reinforcement steel bar 12.Means for supporting reinforcement steel bar 12 strengthen the first microlith concrete layer 13 structural strength and structure it is steady
It is qualitative.Second microlith concrete layer 16 is poured to smash by C30 fine-stone concrete to be formed.
As shown in figure 1, the first waterproof cement pulp layer 21, the second waterproof coating 22, powder are sequentially provided with outwardly from interior on metope 2
The waterproof coating 24 of brush layer 23 and the 3rd, the second waterproof coating 22 are connected with the first waterproof coating 8.The He of first waterproof cement pulp layer 21
Second waterproof cement pulp layer 6 is connected.
The drainage principle of the toilet is as follows:
The water of the upper part of surface layer 18 is drained by table floor drain 3, and the water remained on surface layer 18 flows down to tile floor cage 10 and carried out
Store up.Condensate is also flowed in tile floor cage 10 caused by floor heating pipe 15.Water in tile floor cage 10 is along waterproof mortar protective layer 9
Hidden floor drain 5 is flowed to, completes draining.So as to reduce the time that surface layer 18 ducks in drink, it is reduced due to steeping for a long time in water
In and the probability of the accumulation of salt in the surface soil.
Embodiment two:
Embodiment two is the construction method of embodiment one, is comprised the following steps:
1st, accomodation ground 1 is that sunk type forms lower deep gouge 4, and table floor drain 3, the upper end of table floor drain 3 and ground 1 are provided with ground 1
It is generally aligned in the same plane;Hidden floor drain 5 is installed in lower deep gouge 4;
2nd, cement slurry is coated with the metope 2 of toilet, forms the first waterproof cement pulp layer 21;Leaned on again in the lower bottom surface of deep gouge 4
It is coated with cement slurry on nearly one end of metope 2 and the side wall of lower deep gouge 4 being connected with the end, the second waterproof cement pulp layer 6 of formation, first
Waterproof cement pulp layer 21 is connected with the second waterproof cement pulp layer 6;
3rd, R angles are done in the first waterproof cement pulp layer 21 and the corner of the second waterproof cement pulp layer 6;
4th, in the lower bottom surface cement mortar screeding of deep gouge 4, then to looking for domatic into the levelling face 7 of waterproof mortar at hidden floor drain 5;
5th, in the levelling face 7 of waterproof mortar, the upper and lower side wall of deep gouge 4 is coated with twice of water-repellent paint and forms the first waterproof coating 8;
6th, twice of water-repellent paint is coated with the first waterproof cement pulp layer 21 and forms the second waterproof coating 22, the second waterproof coating 22
It is connected with the first waterproof coating 8;
7th, the brushing cement mortar in the first waterproof cement pulp layer 21, rendering layer 23 is formed;
8th, twice of water-repellent paint is coated on rendering layer 23, forms the 3rd waterproof coating 24;
9th, one layer of waterproof cement mortar is coated with the first waterproof coating 8 and forms waterproof mortar protective layer 9, waterproof mortar protective layer
9 parallel to the levelling face 7 of waterproof mortar;
10th, lay one layer of cement brick 19 at equal intervals on the first waterproof coating 8 and form block assembly 20, by block assembly 20 along vertical side
If forming tile floor cage 10 to staggeredly laying dried layer, it is connected between each cement brick 19 by cement mortar;
11st, cement plate 11 is laid on tile floor cage 10, cement plate 11 and tile floor cage 10 are connected by cement mortar;
12nd, netted means for supporting reinforcement steel bar 12 is laid on cement plate 11, then with C20 fine-stone concrete the first fine-stone concrete of cast-in-place formation
Layer 13;
13rd, heat supply insulation board 14 is laid in the first microlith concrete layer 13, then the cloth floor heating pipe 15 on heat supply insulation board 14, finally
With C30 fine-stone concrete the second microlith concrete layer 16 of cast-in-place formation on floor heating pipe 15;
14th, marble bonding agent is coated with the second microlith concrete layer 16 and forms adhesive layer 17;
15th, it is made up in the upper berth overlay coating 18 of adhesive layer 17, surface layer 18 of marble, the upper surface of surface layer 18 and ground 1 are positioned at same
Plane.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art
Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of construction technology of subsided rest room, it is characterized in that, comprise the following steps:
S1, accomodation ground(1)Lower deep gouge is formed for sunk type(4), ground(1)Table floor drain is inside installed(3), table floor drain(3)
Upper end and ground(1)It is generally aligned in the same plane;By hidden floor drain(5)It is installed on lower deep gouge(4)It is interior, in lower deep gouge(4)Bottom surface cement
Mortar levelling, then to hidden floor drain(5)Domatic is looked for into the levelling face of waterproof mortar by place(7);
S2, in the levelling face of waterproof mortar(7)Upper and lower deep gouge(4)Side wall coating water-repellent paint forms the first waterproof coating(8), the
One waterproof coating(8)Upper surface and hidden floor drain(5)Upper surface is generally aligned in the same plane;
S3, in the first waterproof coating(8)On lay one layer of cement brick at equal intervals(19)Form block assembly(20), by block assembly(20)
Vertically staggeredly if laying dried layer forms tile floor cage(10), each cement brick(19)Between be connected by cement mortar;
S4, in tile floor cage(10)Upper laying cement plate(11), cement plate(11)With tile floor cage(10)It is connected by cement mortar;
S5, in cement plate(11)The first microlith concrete layer is formed with fine-stone concrete is cast-in-place(13);
S6, in the first microlith concrete layer(13)Upper coating marble bonding agent forms adhesive layer(17), then in adhesive layer(17)On
Wet-laying marble slab forms surface layer(18), surface layer(18)Upper surface and ground(1)It is generally aligned in the same plane.
2. a kind of construction technology of subsided rest room according to claim 1, it is characterized in that:Step S2 and S3 it
Between, first in the first waterproof coating(8)Upper one layer of cement mortar of coating forms waterproof mortar protective layer(9), waterproof mortar protective layer
(9)Parallel to the levelling face of waterproof mortar(7), waterproof mortar protective layer(9)Upper surface and hidden floor drain(5)Upper surface is positioned at same flat
Face, tile floor cage(10)It is layed in waterproof mortar protective layer(9)On.
3. a kind of construction technology of subsided rest room according to claim 2, it is characterized in that:In step S5, first lay
Netted means for supporting reinforcement steel bar(12), then pour again and smash fine-stone concrete, form the first microlith concrete layer(13).
4. a kind of construction technology of subsided rest room according to claim 3, it is characterized in that:Step S5 and S6 it
Between, first in the first microlith concrete layer(13)Upper laying heat supply insulation board(14), then in heat supply insulation board(14)Upper cloth floor heating pipe
(15), finally in floor heating pipe(15)It is upper to form the second microlith concrete layer with fine-stone concrete is cast-in-place(16), adhesive layer(17)It is coated on second
Microlith concrete layer(16)On.
5. a kind of construction technology of subsided rest room according to claim 4, it is characterized in that:The first microlith concrete layer
(13)Pour to smash by C20 fine-stone concrete and form, the second microlith concrete layer(16)Pour to smash by C30 fine-stone concrete and form.
6. a kind of construction technology of subsided rest room according to claim 5, it is characterized in that:Before step S1, first
Metope in toilet(2)Upper coating cement slurry, form the first waterproof cement pulp layer(21);Again in lower deep gouge(4)Bottom surface is leaned on
Nearly metope(2)One end and the lower deep gouge being connected with the end(4)Cement slurry is coated with side wall, forms the second waterproof cement pulp layer
(6), the first waterproof cement pulp layer(21)With the second waterproof cement pulp layer(6)It is connected;Then in the first waterproof cement pulp layer(21)
Upper brushing cement mortar, form rendering layer(23).
7. a kind of construction technology of subsided rest room according to claim 6, it is characterized in that:First waterproof cement
Pulp layer(21)With the second waterproof cement pulp layer(6)Corner is both needed to do R angles.
8. a kind of construction technology of subsided rest room according to claim 7, it is characterized in that:In coating rendering layer(23)
Before, first in the first waterproof cement pulp layer(21)Upper coating water-repellent paint forms the second waterproof coating(22), the second waterproof coating
(22)With the first waterproof coating(8)It is connected, rendering layer(23)It is coated with the second waterproof coating again(22)On.
9. a kind of construction technology of subsided rest room according to claim 8, it is characterized in that:In rendering layer(23)On again
Water-repellent paint is coated with, forms the 3rd waterproof coating(24).
10. a kind of construction technology of subsided rest room according to claim 9, it is characterized in that:First waterproof applies
Layer(8), the second waterproof coating(22)With the 3rd waterproof coating(24)It is coated with twice and forms by water-repellent paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710731414.5A CN107447948A (en) | 2017-08-23 | 2017-08-23 | A kind of construction technology of subsided rest room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710731414.5A CN107447948A (en) | 2017-08-23 | 2017-08-23 | A kind of construction technology of subsided rest room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107447948A true CN107447948A (en) | 2017-12-08 |
Family
ID=60493845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710731414.5A Pending CN107447948A (en) | 2017-08-23 | 2017-08-23 | A kind of construction technology of subsided rest room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107447948A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108193856A (en) * | 2018-01-05 | 2018-06-22 | 浙江蓝城联合装饰工程有限公司 | A kind of construction technology of subsided rest room |
CN108643320A (en) * | 2018-05-17 | 2018-10-12 | 圣都家居装饰有限公司 | A kind of sinking toilet construction method |
CN109537743A (en) * | 2018-11-23 | 2019-03-29 | 圣都家居装饰有限公司 | A kind of toilet floor heating leakage preventing construction technique |
CN109930780A (en) * | 2019-03-19 | 2019-06-25 | 浙江君豪建筑装饰设计工程有限公司 | A kind of construction technology of subsided rest room |
CN111424797A (en) * | 2020-05-09 | 2020-07-17 | 海天建设集团有限公司 | Secondary floor drain connecting structure of sinking type toilet and construction process of secondary floor drain connecting structure |
CN112359988A (en) * | 2020-12-18 | 2021-02-12 | 重庆渝高科技产业(集团)股份有限公司 | Construction method of stone whiskering diversion structure |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
CN114232936A (en) * | 2022-01-11 | 2022-03-25 | 华诚建设集团股份有限公司 | Construction method of waterproof decorative structure of toilet |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0642148A (en) * | 1992-07-24 | 1994-02-15 | Ohbayashi Corp | Anti-corrosive sheet floor surface constructing method and precast board for it |
JPH0649971A (en) * | 1992-07-31 | 1994-02-22 | Ohbayashi Corp | Noncorrosion method of concrete floor surface and wall surface and precast plate with anchor used therefor |
CN202745335U (en) * | 2012-08-21 | 2013-02-20 | 东莞市亚欧装饰设计工程有限公司 | Sunken type toilet water-resistant deodorization settling basin structure |
CN103290910A (en) * | 2013-06-19 | 2013-09-11 | 中建四局第一建筑工程有限公司 | Anti-seepage method and structure of drainage of same floor |
CN204001601U (en) * | 2014-05-26 | 2014-12-10 | 深圳市洪涛装饰股份有限公司 | Between a kind of antiseep is bathed and is defended |
CN104818835A (en) * | 2015-05-18 | 2015-08-05 | 青岛建安建设集团有限公司 | Toilet threshold stone waterproof structure and construction method |
CN105442814A (en) * | 2015-11-19 | 2016-03-30 | 浙江桐砚建筑规划设计有限公司 | Construction method for bathroom ground structure |
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
-
2017
- 2017-08-23 CN CN201710731414.5A patent/CN107447948A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0642148A (en) * | 1992-07-24 | 1994-02-15 | Ohbayashi Corp | Anti-corrosive sheet floor surface constructing method and precast board for it |
JPH0649971A (en) * | 1992-07-31 | 1994-02-22 | Ohbayashi Corp | Noncorrosion method of concrete floor surface and wall surface and precast plate with anchor used therefor |
CN202745335U (en) * | 2012-08-21 | 2013-02-20 | 东莞市亚欧装饰设计工程有限公司 | Sunken type toilet water-resistant deodorization settling basin structure |
CN103290910A (en) * | 2013-06-19 | 2013-09-11 | 中建四局第一建筑工程有限公司 | Anti-seepage method and structure of drainage of same floor |
CN204001601U (en) * | 2014-05-26 | 2014-12-10 | 深圳市洪涛装饰股份有限公司 | Between a kind of antiseep is bathed and is defended |
CN104818835A (en) * | 2015-05-18 | 2015-08-05 | 青岛建安建设集团有限公司 | Toilet threshold stone waterproof structure and construction method |
CN105442814A (en) * | 2015-11-19 | 2016-03-30 | 浙江桐砚建筑规划设计有限公司 | Construction method for bathroom ground structure |
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108193856A (en) * | 2018-01-05 | 2018-06-22 | 浙江蓝城联合装饰工程有限公司 | A kind of construction technology of subsided rest room |
CN108643320A (en) * | 2018-05-17 | 2018-10-12 | 圣都家居装饰有限公司 | A kind of sinking toilet construction method |
CN109537743A (en) * | 2018-11-23 | 2019-03-29 | 圣都家居装饰有限公司 | A kind of toilet floor heating leakage preventing construction technique |
CN109930780A (en) * | 2019-03-19 | 2019-06-25 | 浙江君豪建筑装饰设计工程有限公司 | A kind of construction technology of subsided rest room |
CN112746678A (en) * | 2019-10-31 | 2021-05-04 | 江西伦比新材料科技有限公司 | Kitchen and bathroom waterproof system and construction process thereof |
CN111424797A (en) * | 2020-05-09 | 2020-07-17 | 海天建设集团有限公司 | Secondary floor drain connecting structure of sinking type toilet and construction process of secondary floor drain connecting structure |
CN112359988A (en) * | 2020-12-18 | 2021-02-12 | 重庆渝高科技产业(集团)股份有限公司 | Construction method of stone whiskering diversion structure |
CN114232936A (en) * | 2022-01-11 | 2022-03-25 | 华诚建设集团股份有限公司 | Construction method of waterproof decorative structure of toilet |
CN114232936B (en) * | 2022-01-11 | 2023-08-15 | 华诚建设集团股份有限公司 | Construction method of waterproof decorative structure of toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107447948A (en) | A kind of construction technology of subsided rest room | |
CN107190844B (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN104358341B (en) | Building brickwork and masonry construction method of building brickwork | |
CN110878700A (en) | Tunnel waterproof structure and construction method thereof | |
CN104806017A (en) | Construction method of assembly type reinforced concrete waterproof roof | |
CN111877596B (en) | Miscellaneous-masonry antique wall structure and construction method thereof | |
CN103255845A (en) | Coated rock wool board heat-preservation system for building curtain walls | |
CN103266676B (en) | Preparation method of film-coated rock wool board heat insulation system for building curtain wall | |
CN207829371U (en) | Whole paving marble floor structure on a kind of raised flooring | |
CN109797875A (en) | A kind of low energy consumption energy saving building system | |
CN113404170A (en) | Waterproof structure at joint of prefabricated outer wall and cast-in-place floor slab and construction method thereof | |
CN206220272U (en) | Ground hot water lays heating toilet doorway sealing damp proof insulation construction | |
CN209585309U (en) | Subsided rest room waterproof construction | |
CN102758486B (en) | Anti-seepage method for building engineering | |
CN207672761U (en) | A kind of water proof structure of floor and steel plate wall intersection | |
CN207144394U (en) | A kind of subsided rest room | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN107989287A (en) | Inverted roof light and shade drainage system construction method | |
CN209025235U (en) | Garage Dampproof water-drainage structure | |
CN210658785U (en) | Embedded light wallboard steel construction building structure | |
DE202006014105U1 (en) | Thermally insulated ground plate for building has a layer of foam glass between the plate and a geothermal membrane | |
CN210105071U (en) | Curtain wall veneer external wall insulation system | |
CN209082689U (en) | A kind of waterproof construction between kitchen lavatory at pipe root | |
CN106480979A (en) | A kind of active antiseepage basement shear wall and its construction technology | |
CN208251335U (en) | A kind of external wall water-proofing anticracking insulation construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |
|
RJ01 | Rejection of invention patent application after publication |