CN106480979A - A kind of active antiseepage basement shear wall and its construction technology - Google Patents

A kind of active antiseepage basement shear wall and its construction technology Download PDF

Info

Publication number
CN106480979A
CN106480979A CN201611182796.2A CN201611182796A CN106480979A CN 106480979 A CN106480979 A CN 106480979A CN 201611182796 A CN201611182796 A CN 201611182796A CN 106480979 A CN106480979 A CN 106480979A
Authority
CN
China
Prior art keywords
basement
drainpipe
backfill
filter membrane
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611182796.2A
Other languages
Chinese (zh)
Other versions
CN106480979B (en
Inventor
周越
李海文
李志文
李志强
万海涛
周春明
樊雪勇
帅品峰
李珺
陈至柔
熊谟针
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Nanchang Municipal Public Works Project Management Co Ltd
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Nanchang Municipal Public Works Project Management Co Ltd
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI ZHANGYAO CONSTRUCTION Co Ltd, Nanchang Municipal Public Works Project Management Co Ltd, JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGXI ZHANGYAO CONSTRUCTION Co Ltd
Priority to CN201611182796.2A priority Critical patent/CN106480979B/en
Publication of CN106480979A publication Critical patent/CN106480979A/en
Application granted granted Critical
Publication of CN106480979B publication Critical patent/CN106480979B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • E04B1/7023Drying or keeping dry, e.g. by air vents by collecting water in basements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to the outer shear wall antiseepage drainage system of a kind of active antiseepage basement shear wall and its construction technology, particularly shear wall upstream face and its construction technology.Basement is located in foundation ditch, arranges multiple sumps in basement surrounding, and drainpipe two ends are positioned in sump, and drainpipe connects integral;The basement it include basement roof, basement shear wall, basement bottom board;Backfill and medium coarse sand is filled with foundation ditch and in the region on the outside of basement;Backfill is multilayer with the number of plies of medium coarse sand, and every layer of backfill is interlaced arrangement architecture with medium coarse sand, and drainpipe is located in medium coarse sand, and filter membrane wraps up drainpipe.The present invention is formed around drainage system in its basement shear wall, allows underground water and surface water to discharge on one's own initiative, so as to effectively guard against the impact of a large amount of underground water and surface water to basement shear wall.

Description

A kind of active antiseepage basement shear wall and its construction technology
Technical field
The present invention relates to a kind of active antiseepage basement shear wall and its construction technology, particularly shear wall upstream face is outer Shear wall antiseepage drainage system and its construction technology.
Background technology
After the completion of basement main structure construction, its surrounding is required to do water-proofing treatment by the shear wall of upstream face, finishes The protection for carrying out related waterproof layer afterwards is processed, and can carry out basement backfilling of earthwork operation after acceptance(check).This way is Normal conditions, the life-span of the use function of general waterproof roll are about 5-20 or so, and common buildings basement agent structure sets The meter life-span is about 40-70, even up to 100 years Important building basement Design of Main Structure life-span.Once waterproof layer is used Disabler, carrys out waterproof by xoncrete structure itself entirely.Stay in work progress set construction joint position, post-cast strip position and Meet cold seam position of construction set by construction requirement etc., if waterproof layer loses, and function is used, be all easily caused with upper bit Infiltration.If facing precipitate heavy rain, in the basement for losing waterproof layer protection, it is more likely that become a big pool, Caused economic loss will be difficult to estimate, or even have influence on the safety of owners and use function.At present, in underground In the waterproof layer design of room, its waterproof layer is generally twice waterproof roll, or even Important building is three to four times waterproof rolls, and this is just Substantial amounts of CO can be caused2Discharge, does not meet the strategic objective of China's energy-saving and emission-reduction.If meeting Spring In Southern plum rain season, underground The higher area of water level, still occurs localized seepage, metope and ground humidity phenomenon.
Basement shear wall antiseepage problem be can be seen that from above-mentioned present situation extremely urgent.By increasing shear wall waterproof layer Quantity not only result in environmental pollution, and it is also possible to be unsatisfactory for requiring because the life-span of waterproof layer expires.So, development A kind of both simple and economic basement shear wall water-impervious construction technology seems particularly urgent.
Content of the invention
The technical problem to be solved is the shortcoming for above-mentioned prior art, is to provide one kind so as to purpose Active antiseepage basement shear wall and its construction technology.
The present invention to achieve these goals, is adopted the following technical scheme that:
A kind of active antiseepage basement shear wall, basement are located in foundation ditch, arrange multiple sumps, draining in basement surrounding Pipe two ends are positioned in sump, and drainpipe connects integral;
The basement it include basement roof, basement shear wall, basement bottom board;
Backfill and medium coarse sand is filled with foundation ditch and in the region on the outside of basement;Backfill and the number of plies of medium coarse sand For multilayer, and every layer of backfill is interlaced arrangement architecture with medium coarse sand, and drainpipe is located in medium coarse sand, and filter membrane is wrapped up Drainpipe.
Further, hole is had on the drainpipe.
A kind of construction technology of active antiseepage basement shear wall:
(1), before basement surrounding backfilling of earthwork, first backfill first element soil and be simultaneously compacted to the position of basement foundation ditch bottom, Must in the middle of arch camber both sides have gravity flow water delivery the gradient, the gradient be not less than 0.6%, i.e., from base center along to both sides lay the gradient Not less than 0.6%;And sump is set in basement surrounding, and water pump is disposed about in sump, so as to by ponding from sump Middle extraction;
(2), fill out blotter, spread filter membrane;One layer of blotter is filled out in the element soil bottom surface finished in backfill, and compacting makes which smooth, Used as filter membrane, non-woven geotextile will disconnect laying non-woven geotextile, and leave the length of overlap joint thereon;
(3), put drainpipe on filter membrane;The drainpipe of perisporium perforate is furnished on filter membrane, and drainpipe two ends are positioned over catchments In well, drainpipe connects integral, and ensures the sealing of interface;
(4), filter membrane parcel drainpipe;Drainpipe is wrapped by the filter membrane being laid on the bottom surface of gutter from both sides;
(5), foundation ditch backfill;After drainpipe laying is finished, the less medium coarse sand of backfill clay content, substrate is backfilled to basement bottom At plate hight degree;
(6), backfill second element soil to the position in the middle of basement foundation ditch and be compacted, there is the slope of gravity flow water delivery middle arch camber both sides Degree, the gradient are not less than 0.6%, i.e., be not less than 0.6% from base center along to the both sides laying gradient;And import surrounding arrange catchment Well;
(7), fill out blotter for the second time, spread filter membrane, the same step of way(2);
(8), put drainpipe on filter membrane, the same step of way(3);
(9), filter membrane parcel drainpipe, the same step of way(4);
(10), foundation ditch backfill, the same step of way(5);
(11), the 3rd road of backfill element soil be compacted, it is necessary to there is the gradient of gravity flow water delivery middle arch camber both sides, and the gradient is not less than 0.6%, i.e., it is not less than 0.6% from base center along to the both sides laying gradient;And import surrounding setting sump;
(12), fill out blotter for the third time, spread filter membrane, the same step of way(2);
(13), put drainpipe on filter membrane, the same step of way(3);
(14), filter membrane parcel drainpipe, the same step of way(4);
(15), foundation ditch backfill, the same step of way(5).
Beneficial effects of the present invention:
The present invention is formed around drainage system in its basement shear wall, allows underground water and surface water to discharge on one's own initiative, so as to have Effect has guarded against the impact of a large amount of underground water and surface water to basement shear wall, it is ensured that basement shearing is non-leakage, and subtracts The thickness of few waterproof layer and pass, even if can also play active antiseepage in the case that waterproof layer reaches the life-span or is damaged prevent Leakage, has reached the effect of dual guarantee.
Description of the drawings
Fig. 1 is drainage system floor plan schematic diagram of the present invention.
Fig. 2 is drainage system sectional drawing schematic diagram of the present invention.
Fig. 3 is drainage system elevational schematic view of the present invention.
Specific embodiment
This technique is further illustrated with implementation below in conjunction with the accompanying drawings.
A kind of active antiseepage basement shear wall, basement 3 are located in foundation ditch 4, arrange multiple catchmenting in 3 surrounding of basement Well 1,2 two ends of drainpipe are positioned in sump 1, and drainpipe 2 connects integral;
The basement 3 it include basement roof 5, basement shear wall 6, basement bottom board 7;
Backfill 8 and medium coarse sand 10 are filled with foundation ditch 4 and in the region in 3 outside of basement;Backfill 8 and medium coarse sand 10 number of plies is multilayer, and every layer of backfill 8 is interlaced arrangement architecture with medium coarse sand 10, and drainpipe 2 is thick in being located at In sand 10, filter membrane(9)Parcel drainpipe 2.
Hole 11 is had on the drainpipe 2.
1), before basement surrounding backfilling of earthwork, first backfill first element soil and simultaneously press to the position of basement foundation ditch bottom Real, it is necessary to which that there is the gradient of gravity flow water delivery middle arch camber both sides, the gradient is not less than 0.6%, i.e., lay slope from base center along to both sides Degree is not less than 0.6%;And sump is set in basement surrounding, and water pump is disposed about in sump, so as to by ponding from catchmenting Extract out in well;
(2), fill out blotter, spread filter membrane;One layer of blotter is filled out in the element soil bottom surface finished in backfill, and compacting makes which smooth, Used as filter membrane, non-woven geotextile will disconnect laying non-woven geotextile, and leave the length of overlap joint thereon;
(3), put drainpipe on filter membrane;The drainpipe of perisporium perforate is furnished on filter membrane, and drainpipe two ends are positioned over catchments In well, drainpipe connects integral, and ensures the sealing of interface;
(4), filter membrane parcel drainpipe;Drainpipe is wrapped by the filter membrane being laid on the bottom surface of gutter from both sides;
(5), foundation ditch backfill;After drainpipe laying is finished, the less medium coarse sand of backfill clay content, substrate is backfilled to basement bottom At plate hight degree;
(6), backfill second element soil to the position in the middle of basement foundation ditch and be compacted, there is the slope of gravity flow water delivery middle arch camber both sides Degree, the gradient are not less than 0.6%, i.e., be not less than 0.6% from base center along to the both sides laying gradient;And import surrounding arrange catchment Well;
(7), fill out blotter for the second time, spread filter membrane, the same step of way(2);
(8), put drainpipe on filter membrane, the same step of way(3);
(9), filter membrane parcel drainpipe, the same step of way(4);
(10), foundation ditch backfill, the same step of way(5);
(11), the 3rd road of backfill element soil be compacted, it is necessary to there is the gradient of gravity flow water delivery middle arch camber both sides, and the gradient is not less than 0.6%, i.e., it is not less than 0.6% from base center along to the both sides laying gradient;And import surrounding setting sump;
(12), fill out blotter for the third time, spread filter membrane, the same step of way(2);
(13), put drainpipe on filter membrane, the same step of way(3);
(14), filter membrane parcel drainpipe, the same step of way(4);
(15), foundation ditch backfill, the same step of way(5).

Claims (3)

1. a kind of active antiseepage basement shear wall, it is characterised in that:Basement(3)Positioned at foundation ditch(4)In, in basement(3) Surrounding arranges multiple sumps(1), drainpipe(2)Two ends are positioned over sump(1)In, drainpipe(2)Company is integral;
The basement(3)It includes basement roof(5), basement shear wall(6), basement bottom board(7);
In foundation ditch(4)Interior and in basement(3)Backfill is filled with the region in outside(8)With medium coarse sand(10);Backfill (8)With medium coarse sand(10)The number of plies be multilayer, and every layer of backfill(8)With medium coarse sand(10)Tie for interlaced arrangement Structure, drainpipe(2)Positioned at medium coarse sand(10)In, filter membrane(9)Parcel drainpipe(2).
2. active antiseepage basement shear wall according to claim 1, it is characterised in that:The drainpipe(2)On have Hole(11).
3. the construction technology of the active antiseepage basement shear wall described in a kind of claim 1 or 2, its feature are as follows:
(1), before basement surrounding backfilling of earthwork, first backfill first element soil and be simultaneously compacted to the position of basement foundation ditch bottom, Must in the middle of arch camber both sides have gravity flow water delivery the gradient, the gradient be not less than 0.6%, i.e., from base center along to both sides lay the gradient Not less than 0.6%;And sump is set in basement surrounding, and water pump is disposed about in sump, so as to by ponding from sump Middle extraction;
(2), fill out blotter, spread filter membrane;One layer of blotter is filled out in the element soil bottom surface finished in backfill, and compacting makes which smooth, Used as filter membrane, non-woven geotextile will disconnect laying non-woven geotextile, and leave the length of overlap joint thereon;
(3), put drainpipe on filter membrane;The drainpipe of perisporium perforate is furnished on filter membrane, and drainpipe two ends are positioned over catchments In well, drainpipe connects integral, and ensures the sealing of interface;
(4), filter membrane parcel drainpipe;Drainpipe is wrapped by the filter membrane being laid on the bottom surface of gutter from both sides;
(5), foundation ditch backfill;After drainpipe laying is finished, the less medium coarse sand of backfill clay content, substrate is backfilled to basement bottom At plate hight degree;
(6), backfill second element soil to the position in the middle of basement foundation ditch and be compacted, there is the slope of gravity flow water delivery middle arch camber both sides Degree, the gradient are not less than 0.6%, i.e., be not less than 0.6% from base center along to the both sides laying gradient;And import surrounding arrange catchment Well;
(7), fill out blotter for the second time, spread filter membrane, the same step of way(2);
(8), put drainpipe on filter membrane, the same step of way(3);
(9), filter membrane parcel drainpipe, the same step of way(4);
(10), foundation ditch backfill, the same step of way(5);
(11), the 3rd road of backfill element soil be compacted, it is necessary to there is the gradient of gravity flow water delivery middle arch camber both sides, and the gradient is not less than 0.6%, i.e., it is not less than 0.6% from base center along to the both sides laying gradient;And import surrounding setting sump;
(12), fill out blotter for the third time, spread filter membrane, the same step of way(2);
(13), put drainpipe on filter membrane, the same step of way(3);
(14), filter membrane parcel drainpipe, the same step of way(4);
(15), foundation ditch backfill, the same step of way(5).
CN201611182796.2A 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall and its construction technology Active CN106480979B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611182796.2A CN106480979B (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611182796.2A CN106480979B (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall and its construction technology

Publications (2)

Publication Number Publication Date
CN106480979A true CN106480979A (en) 2017-03-08
CN106480979B CN106480979B (en) 2019-07-09

Family

ID=58284882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611182796.2A Active CN106480979B (en) 2016-12-20 2016-12-20 A kind of active antiseepage basement shear wall and its construction technology

Country Status (1)

Country Link
CN (1) CN106480979B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100206A (en) * 2017-06-22 2017-08-29 山东建筑大学 A kind of prevention and controls of basement leakage
CN108755724A (en) * 2018-06-15 2018-11-06 上海二十冶建设有限公司 The external water drainage waterproof method of pipe gallery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5852906A (en) * 1997-08-07 1998-12-29 Kuban; Eugene J. Internal-wall drain system
CN202202335U (en) * 2011-08-05 2012-04-25 昆明一建建设集团有限公司 Flow guiding and water draining structure in deep foundation pit
CN104234089A (en) * 2014-08-21 2014-12-24 中国十七冶集团有限公司 Construction method for waterproof and water-draining combination of basement
CN105569063A (en) * 2015-06-05 2016-05-11 中建四局第一建筑工程有限公司 Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure
CN206289732U (en) * 2016-12-20 2017-06-30 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5852906A (en) * 1997-08-07 1998-12-29 Kuban; Eugene J. Internal-wall drain system
CN202202335U (en) * 2011-08-05 2012-04-25 昆明一建建设集团有限公司 Flow guiding and water draining structure in deep foundation pit
CN104234089A (en) * 2014-08-21 2014-12-24 中国十七冶集团有限公司 Construction method for waterproof and water-draining combination of basement
CN105569063A (en) * 2015-06-05 2016-05-11 中建四局第一建筑工程有限公司 Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure
CN206289732U (en) * 2016-12-20 2017-06-30 江西中联建设集团有限公司 A kind of active antiseepage basement shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100206A (en) * 2017-06-22 2017-08-29 山东建筑大学 A kind of prevention and controls of basement leakage
CN108755724A (en) * 2018-06-15 2018-11-06 上海二十冶建设有限公司 The external water drainage waterproof method of pipe gallery

Also Published As

Publication number Publication date
CN106480979B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN107386326A (en) Underground pipe gallery structure and its construction method
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN102995599A (en) Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN206289732U (en) A kind of active antiseepage basement shear wall
CN107100206A (en) A kind of prevention and controls of basement leakage
CN106480979B (en) A kind of active antiseepage basement shear wall and its construction technology
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN212104515U (en) Be used for basement percolating water prevention and cure construction structures
CN107724405B (en) Dewatering of foundation construction method in a kind of underground pipe construction
CN216865222U (en) Bearing platform foundation structure
CN115012452A (en) Post-cast strip construction process and basement drainage pressure relief structure
CN105421499B (en) A kind of ground storehouse anti-floating construction method
CN214363925U (en) Cut water seepage ditch system
CN108755724A (en) The external water drainage waterproof method of pipe gallery
CN210712967U (en) Impervious anti structure that floats of basement
CN206477347U (en) The water storage structure of basement
CN107989287A (en) Inverted roof light and shade drainage system construction method
CN208965510U (en) A kind of open diversion canal antiseepage drainage system
CN210621879U (en) Steel construction vestibule drainage structures system
CN204023593U (en) Reduce the water proof drainage system of underground hydrostatic water table
CN113718808A (en) Precipitation structure for preventing underground structure from floating and construction method thereof
CN204000924U (en) Low buttress type station retaining structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 330000 D-41 Central Alliance Headquarters Building, 398 Hezhou Road, Nanchang County, Nanchang City, Jiangxi Province

Applicant after: Zhonglian Construction Group Co., Ltd.

Applicant after: Zhongyao Construction Industry Group Co., Ltd.

Applicant after: Nanchang Municipal Public Works Project Management Co., Ltd.

Address before: 330000 No. 6666 Fusheng Road, Nanchang County, Nanchang City, Jiangxi Province

Applicant before: Jiangxi Zhonglian Construction Group Co.,Ltd.

Applicant before: JIANGXI ZHANGYAO CONSTRUCTION CO., LTD.

Applicant before: Nanchang Municipal Public Works Project Management Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant